Susitna-Watana Hydroelectric Project Document
ARLIS Uniform Cover Page
Title:
Revised study plan determination schedule
SuWa 88
Author(s) – Personal:
Jeff C. Wright
Author(s) – Corporate:
AEA-identified category, if specified:
Correspondence
AEA-identified series, if specified:
Series (ARLIS-assigned report number):
Susitna-Watana Hydroelectric Project document number 88
Existing numbers on document:
Published by:
[2013]
Date published:
January 17, 2013
Published for:
Wayne Dyok
Date or date range of report:
Volume and/or Part numbers:
Final or Draft status, as indicated:
Document type:
Letter
Pagination:
5 p.
Related work(s):
This letter is a reply to: SuWa 87.
Pages added/changed by ARLIS:
Notes:
Has attachment: Revised study plan determination schedule for December 14, 2012, revised study
plan studies 5.5, 5.6, 5.7, 6.5, 6.6, 7.5, 7.6, 8.5, 8.6, 9.5, 9.6, 9.8, and 9.9.
All reports in the Susitna-Watana Hydroelectric Project Document series include an ARLIS-
produced cover page and an ARLIS-assigned number for uniformity and citability. All reports
are posted online at http://www.arlis.org/resources/susitna-watana/
FEDERAL ENERGY REGULATORY COMMISSION
WASHINGTON, DC 20426
January 17, 2013
OFFICE OF ENERGY PROJECTS
Project No. 14241-000—Alaska
Susitna-Watana Hydroelectric Project
Alaska Energy Authority
Wayne Dyok
Susitna-Watana Project Manager
Alaska Energy Authority
813 West Northern Lights Boulevard
Anchorage, AK 99503
Reference: Revised Study Plan Determination Schedule
Dear Mr. Dyok:
On December 31, 2012, Commission staff issued a letter modifying the study plan
determination (SPD) schedule for 13 of the 58 studies proposed by the Alaska Energy
Authority (AEA) in its revised study plan for the Susitna-Watana Project No.14241. The
schedule was modified because there was insufficient detail in those 13 study plans upon
which to complete a SPD.
The December 31, 2012 letter included a schedule for AEA to file by March 15,
2013, the following additional information: (1) implementation plans for 3 of the 13
studies (studies 9.5, 9.6, and 9.8),and (2)the final list of proposed 2013 middle and
lower river focus areas described in study 8.5 that would affect the implementation of the
remaining 10 of the 13 studies (studies 5.5, 5.6, 5.7, 6.5, 6.6, 7.5, 7.6, 8.5, 8.6, and 9.9),
as well as two of the studies requiring implementation plans (studies 9.6 and 9.8).1 The
December 31, 2012 letter also required AEA to file the results of its open-water flow
routing model and initial habitat mapping conducted in 2012 by January 21, 2013,and to
hold a meeting with stakeholders to discuss the study results and draft implementation
plans by February 15, 2013. The December 31, 2012 schedule included a Commission
staff study plan determination for the 13 studies by May 14, 2013.
On January 7, 2013, AEA filed a letter requesting Commission staff withdraw the
revised schedule, and reestablish the original deadline of February 1, 2013 for completing
1 Study 9.5 does not have any components that would be implemented within
focus areas; therefore, it would not be affected by the final selection of focus areas.
2
the SPD for all 58 studies.2 AEA contends that the revised study plan contains sufficient
detail for the Commission staff to complete its SPD for all 58 studies, and the revised
schedule would cause AEA to miss the entire 2013 field season for the 13 studies.
Finally, AEA requests that, in the event that Commission staff still determines that
additional information is needed prior to completing the SPD for the 13 studies, the
Commission staff modify the schedule for the 13 studies such that the SPD would be
issued by April 1, 2013, which would allow sufficient time to complete the necessary
prerequisites to implement all of the studies in the 2013 study season.
As explained in the December 31, 2012 letter, the requested information is integral
to determining whether the studies would gather the needed information to process
AEA’s license application. Therefore, AEA’s request to withdraw the December 31,
2012,letter is denied. However, in light of AEA’s commitment to provide the results of
its 2012 open-water flow routing model and habitat mapping efforts, draft
implementation plans, and proposed focus areas for the middle and lower river by
January 31, 2012;hold meetings with stakeholders to discuss the study results,draft
implementation plans, and focus areas on February 14 and 15;and file final
implementation plans and focus areas by March 1, 2013;we are modifying the schedule
for completing the SPD on the 13 studies as proposed by AEA and set forth in
Attachment A. Subject to AEA providing the above information and holding the
meetings as proposed, the SPD is now scheduled to be issued by April 1, 2013. If AEA
is unable to meet its proposed filing schedule, the SPD schedule will be adjusted
accordingly.
By copy of this letter, interested stakeholders are notified of the modification to
the schedule for the 13 previously identified studies, as described in Attachment A, and
are reminded that comments on the 45 other study plans included in AEA’s December
14, 2012, revised study plan, are still due by January 18, 2013. The Commission staff’s
study plan determination for the remaining 45 studies is scheduled to be issued by
February 1, 2013. The initial and updated study reports for all studies are still due
February 3, 2014, and February 2, 2015, respectively.
2 On January 11, 2013, AEA filed a response to a January 2, 2013 letter from the
National Marine Fisheries Service requesting Commission staff find the revised study
plan deficient. Many of the same points raised in AEA’s January 7, 2013 letter to
Commission staff are raised in its January 11, 2013 letter.
3
If you have any questions, please contact David Turner at (202) 502-6091.
Sincerely,
Jeff C. Wright
Director
Office of Energy Projects
Enclosure:Attachment A—Revised Study Plan Determination Schedule for
December 14, 2012, revised study plan studies 5.5, 5.6, 5.7, 6.5, 6.6, 7.5,
7.6, 8.5, 8.6, 9.5, 9.6, 9.8, and 9.9.
cc:Mailing List
Public Files
4
ATTACHMENT A
REVISED STUDY PLAN DETERMINATION SCHEDULE FOR
DECEMBER 14,2012, REVISED STUDY PLAN STUDIES 5.5, 5.6, 5.7, 6.5, 6.6,
7.5, 7.6, 8.5, 8.6, 9.5, 9.6, 9.8, and 9.9.
A study plan determination will be issued for the following studies in accordance
with the schedule below: (1) Baseline Water Quality (study 5.5), (2) Water Quality
Modeling Study (study 5.6), (3) Mercury Assessment and Potential for Bioaccumulation
Study (study 5.7), (4) Geomorphology Study (study 6.5), (5) Fluvial Geomorphology
Modeling Below Watana Dam Study (study 6.6), (6) Groundwater Study (study 7.5), (7)
Ice Processes in the Susitna River Study (study 7.6), (8) Fish and Aquatics Instream Flow
Study (study 8.5), (9) Riparian Instream Flow Study (study 8.6), (10) Study of Fish
Distribution and Abundance in the Upper Susitna River (study 9.5), (11) Study of Fish
Distribution and Abundance in the Middle and Lower Susitna River (study 9.6), (12)
River Productivity Study (study 9.8), and (13) Characterization and Mapping of Aquatic
Habitats (study 9.9).
Shaded milestones are unnecessary if there are no study disputes filed by any agency with
mandatory conditioning authority. If a due date falls on a weekend or holiday, the due
date is the following business day.
Responsible
Party
Pre-Filing Milestone Date FERC
Regulation
AEA AEA files results of 2012 open-water flow
routing model and habitat mapping; draft
implementation plans for the Fish
Distribution and Abundance in the Upper
Susitna River (study 9.5), the Fish
Distribution and Abundance in the Lower
and Middle Susitna River (study 9.6), and
River Productivity (study 9.8)studies;all
proposed focus areas; and a description of
habitat units within the focus areas for all
aquatic studies to be implemented in the
middle Susitna River.3
January 31, 2013 N/A
3 The December 31, 2012 letter did not request a description of the habitat units
within the focus areas; however, AEA proposed to file this information in their January 7,
2013 filing.
5
AEA AEA holds meetings to discuss the study
results,proposed implementation plans,
and selected focus areas in the middle and
lower Susitna River.
February 14-15,
2013
N/A
AEA AEA files final implementation plans for
Fish Distribution and Abundance in the
Upper Susitna River (study 9.5), the Fish
Distribution and Abundance in the Lower
and Middle Susitna River (study 9.6), and
River Productivity (study 9.8)studies; and
final focus areas for 2013 middle and
lower river studies.
March 1, 2013 5.13(a)
All Stakeholders Revised Study Plan Comments Due for
studies 5.5, 5.6, 5.7, 6.5, 6.6, 7.5, 7.6,
8.5, 8.6, 9.5, 9.6, 9.8, and 9.9.
March 18, 2013 5.13(b) d
FERC Director’s Study Plan Determination for
studies 5.5, 5.6, 5.7, 6.5, 6.6, 7.5, 7.6,
8.5, 8.6, 9.5,9.6, 9.8, and 9.9.
April 1, 2013 5.13(c)
Mandatory
Conditioning
Agencies only
Any Study Disputes Due for studies 5.5,
5.6, 5.7, 6.5, 6.6, 7.5, 7.6, 8.5, 8.6, 9.5,
9.6, 9.8, and 9.9.
April 22, 2013 5.14(a)
Dispute Panel Third Dispute Panel Member Selected May 7, 2013 5.14(d)
Dispute Panel Dispute Resolution Panel Convenes May 13, 2013 5.14(d)(3)
AEA Applicant Comments on Study Disputes
Due May 17, 2013
5.14(i)
Dispute Panel Dispute Resolution Panel Technical
Conference May 22, 2013
5.14(j)
Dispute Panel Dispute Resolution Panel Findings Issued June 11, 2013 5.14(k)
FERC Director's Study Dispute Determination July 1, 2013 5.14(l)