HomeMy WebLinkAboutSuWa113Alaska Resources Library & Information Services
Susitna-Watana Hydroelectric Project Document
ARLIS Uniform Cover Page
Title:
Susitna-Watana hydro cost of power : Alaska Energy Authority compares
estimates to Dr. Colt's report
SuWa 113
Author(s) – Personal:
Author(s) – Corporate:
Alaska Energy Authority
AEA-identified category, if specified:
Briefing and Technical Documents
AEA-identified series, if specified:
Series (ARLIS-assigned report number):
Susitna-Watana Hydroelectric Project document number 113
Existing numbers on document:
Published by:
[Anchorage] : Alaska Energy Authority, Susitna-Watana
Hydroelectric Project, [2012]
Date published:
September 4, 2012
Published for:
Date or date range of report:
Volume and/or Part numbers:
Final or Draft status, as indicated:
Document type:
Pagination:
7 p.
Related work(s):
Pages added/changed by ARLIS:
Notes:
All reports in the Susitna-Watana Hydroelectric Project Document series include an ARLIS-
produced cover page and an ARLIS-assigned number for uniformity and citability. All reports
are posted online at http://www.arlis.org/resources/susitna-watana/
Page 1 of 7
9/4/12
Susitna-Watana Hydro Cost of Power
Alaska Energy Authority Compares Estimates to Dr. Colt’s Report
The Alaska Energy Authority (AEA) welcomes public interest and discussion of the Susitna-Watana
Hydroelectric Project. The project has the potential to have a tremendous impact on Alaska’s renewable
energy supply, providing 50 percent of the Railbelt’s energy needs for more than 100 years--long-term,
stable energy for generations of Alaskans.
In a recent discussion paper, Dr. Steve Colt calculates the retail cost of power from Susitna-Watana
Hydro during the first year of operation at a much higher rate than the Alaska Energy Authority (AEA).
An analysis reveals that almost the entire discrepancy between AEA and Dr. Colt’s estimates come from
three critical assumptions: capital cost of the project, rate structure and cost of debt.
This brief report will outline each of these assumptions and demonstrate why AEA’s analysis is more
accurate. The report addresses one assumption at a time, walking through three steps to full correction.
In order to compare like costs, this paper will focus on the wholesale cost of power from Susitna-Watana
Hydro. Dr. Colt estimates this to be $0.34 per kWh (Dr. Colt then adds $0.06 for distribution costs to
estimate a retail rate of $0.40).
Step Colt Step 1 Step 2 Step 3
1 Capital Costs (millions of
$2012)
5,500$ 4,763$ 4,763$ 4,763$
1 Annual GWh 2,375 2,800 2,800 2,800
2 Ratemaking Type
Utility
Hybrid
Utility
Hybrid
Cash-
Flow
Cash-
Flow
2 Debt/Capital Payback Years 50 50 30 30
2 TIER 1.3 1.3 0 0
2 Capital Reserve Years 0 0 1 1
3 Long Term Debt Rate 6%6%6%5%
3 Short Term Debt Rate 6%6%6%2%
Summary of Correction Steps
Page 2 of 7
9/4/12
Step 0: Comparing the Initial Models
Dr. Colt and AEA each generated cost of power estimates in separate cost models. In order to produce a
comparison of wholesale costs for this paper, AEA used Dr. Colt’s assumptions in its own model. The
results from AEA’s model with Dr. Colt’s assumptions were verified and produced nearly mathematically
equivalent results to Dr. Colt’s model. As represented in the above figure, Dr. Colt’s expected wholesale
price is $0.34 per kWh in the first year of project operation, and AEA’s is $0.17. Both costs change over
time.
Step 0 consists of the recreation of Dr. Colt’s assumptions within AEA’s model. In the above figure, Dr.
Colt’s calculated cost is labeled “Colt” and AEA’s is labeled “AEA”. This report will compare each
successive step to these initial models. The corrected wholesale cost of power will be reflected in each
figure.
$-
$0.05
$0.10
$0.15
$0.20
$0.25
$0.30
$0.35
$0.40 2024 2026 2028 2030 2032 2034 2036 2038 2040 2042 2044 2046 2048 2050 2052 2054 2056 2058 2060 2062 2064 2066 2068 2070 2072 Wholesale Cost (nominal $ per kWh) Step 0: Susitna-Watana Hydro Cost of Power
Colt
AEA
Page 3 of 7
9/4/12
Step 1: Correcting the Capital Costs and Power Output
Dr. Colt uses an outdated capital cost estimate and annual power output to calculate the wholesale cost
of power. Dr. Colt’s analysis includes the cost of transmission upgrades that are necessary regardless of
whether Susitna-Watana Hydro is built. The AEA cost estimate includes transmission infrastructure costs
required to get the produced power to the Railbelt grid.
• Dr. Colt utilized 2,500,000 MWh for the yearly amount of energy from the project with a 5% loss
rate. His net power output estimate is 2,375,000 MWh per year.
• Dr. Colt uses a capital cost of $5.0 billion in 2008 dollars and using his inflation rate of 2.4% it
becomes $5.5 billion in 2012 dollars.
• AEA recently updated its project plan to optimize performance of Susitna-Watana Hydro.
o The project estimated height: 750-feet tall
o Annual average energy : 2,800,000 MWh
o Estimated project cost: $4.76 billion and includes transmission infrastructure to the
Railbelt Grid.
$-
$0.05
$0.10
$0.15
$0.20
$0.25
$0.30
$0.35
$0.40 2024 2026 2028 2030 2032 2034 2036 2038 2040 2042 2044 2046 2048 2050 2052 2054 2056 2058 2060 2062 2064 2066 2068 2070 2072 Wholesale Cost (nominal $ per kWh) Step 1: Susitna-Watana Hydro Cost of Power
Colt
Colt: Step 1
AEA
Page 4 of 7
9/4/12
Step 2: Correcting the Rate Structure
Dr. Colt appears to use a hybrid rate structure, combining elements of a regulated utility model and the
cash-flow rate structure that AEA would use for Susitna-Watana Hydro.
If Susitna-Watana Hydro was developed by a regulated utility it would be subject to the jurisdiction of
the Regulatory Commission of Alaska (RCA). As a state corporation with a public purpose, AEA is not
subject to RCA regulation. The RCA determines what costs must be passed on to consumers to
guarantee the financial health of the utilities. The RCA will require depreciation of a utility-owned
project to be passed onto the consumers as part of an approved rate structure (similar to what is
included in Dr. Colt’s analysis). Dr. Colt’s method for modeling Susitna-Watana Hydro causes the costs to
ratepayers to be front-loaded and unrealistically high in the beginning years of the project operation.
This scenario is successfully avoided through AEA ownership, similar to the Bradley Lake Hydroelectric
Project.
There are many variables that contribute to a final rate structure and finance plan that are not yet
determined. The AEA modeling uses preliminary assumptions about rate structure and financing that
AEA considers reasonable and includes all costs of the project. The rate structure that AEA uses provides
lower cost of power in early years.
• Dr. Colt models the project with a 50-year financial life with straight-line depreciation. This
annual depreciation is included in the rate base. AEA uses a more conservative 30-year financial
life and does not include depreciation directly in the rate base.
$-
$0.05
$0.10
$0.15
$0.20
$0.25
$0.30
$0.35
$0.40 2024 2026 2028 2030 2032 2034 2036 2038 2040 2042 2044 2046 2048 2050 2052 2054 2056 2058 2060 2062 2064 2066 2068 2070 2072 Wholesale Cost (nominal $ per kWh) Step 2: Susitna-Watana Hydro Cost of Power
Colt
Colt: Step 1
Colt: Step 2
AEA
Page 5 of 7
9/4/12
• A regulated utility would calculate its interest costs against the remaining capital yet to be
depreciated. In his hybrid approach, Dr. Colt calculates the interest costs against the remaining
principal on the debt. AEA does not include the cost of capital directly in the rate base.
• AEA uses a cash-flow rate structure to capture project capital costs in the cost of power. The
annual principal and interest payments on debt are included directly in the rate base instead of
depreciation and interests cost.
• Colt uses a Times Interest Earnings Ratio (TIER) to ensure that the project has sufficient cash
flow to make debt payments. A TIER is generally allowed by RCA to rate-regulated cooperative
utilities, and often required by their lenders to ensure the overall economic health of the utility.
AEA’s rate modeling assumes the financing will include one year of capital reserve to ensure
sufficient cash flow to make debt payments. AEA’s Susitna-Watana model is similar to the
financing model used for the AEA-owned Bradley Lake Hydroelectric Project without assuming
the same level of State assistance.
Step 3: Correcting the Interest Rate
Dr. Colt assumes 6% interest rates for long-term debt and construction financing. A 6% interest rate may
be expected if Susitna-Watana Hydro were constructed by a utility. AEA anticipates that it will secure a
large portion of Susitna-Watana Hydro financing though sources that offer rates lower than utility bond
rates. The estimated long-term interest rate is 5%. AEA also expects that if it obtains construction
financing, AEA could secure short-term bridge financing at a 2% rate.
$-
$0.05
$0.10
$0.15
$0.20
$0.25
$0.30
$0.35
$0.40 2024 2026 2028 2030 2032 2034 2036 2038 2040 2042 2044 2046 2048 2050 2052 2054 2056 2058 2060 2062 2064 2066 2068 2070 2072 Wholesale Cost (nominal $ per kWh) Step 3: Susitna-Watana Hydro Cost of Power
Colt
Colt: Step 1
Colt: Step 2
Colt: Step 3
AEA
Page 6 of 7
9/4/12
Results
When AEA corrects Dr. Colt’s cost of power calculation with these three simple steps it results in a cost
of power that is very close to its own estimate. There are still a number of assumptions that differ
between Dr. Colt’s discussion paper and AEA’s analysis, each accounting for a small difference in the
cost of power. These assumptions include operation and maintenance costs, the timing of capital spent,
the treatment of the interest costs during the final year of construction, underwriting costs and the
inflation rate.
The future cost of power from the Susitna-Watana Hydro is adjusted for inflation to compare to current
power costs. This is done by converting the future costs of power into 2012 dollars using a forecasted
inflation rate. Dr. Colt uses a 2.40% interest rate while AEA uses a 2.75% rate; both inflation rates are
reasonable forecasts. Adjusting for inflation reveals that the real cost of power from Susitna-Watana
Hydro will continue to decrease over time. AEA expects that the average cost of power for the first 50
years of the project will be $0.05 per kWh.
$-
$0.05
$0.10
$0.15
$0.20
$0.25
$0.30 2024 2026 2028 2030 2032 2034 2036 2038 2040 2042 2044 2046 2048 2050 2052 2054 2056 2058 2060 2062 2064 2066 2068 2070 2072 Wholesale Cost ($2012 per kWh) Real 2012 Dollars: Susitna-Watana Hydro Cost of Power
Colt
Colt: Step 1
Colt: Step 2
Colt: Step 3
AEA
Colt Step 1 Step 2 Step 3 AEA
Year 1 Rate (Nominal)0.34$ 0.25$ 0.20$ 0.16$ 0.17$
Year 1 Rate ($2012)0.26$ 0.19$ 0.15$ 0.12$ 0.13$
10 Year Ave Rate ($2012)0.23$ 0.17$ 0.14$ 0.11$ 0.11$
25 Year Ave Rate ($2012)0.19$ 0.14$ 0.12$ 0.09$ 0.09$
50 Year Ave Rate ($2012)0.13$ 0.10$ 0.07$ 0.06$ 0.05$
Susitna-Watana Hydro Wholesale Cost of Power ($/kWh)
Page 7 of 7
9/4/12
The calculations and analysis performed by AEA assume the state’s contributions for design and
permitting of the project are capitalized when project financing is secure allowing this initial state
investment to be recouped. The analysis presented in this paper does not assume future state grants
for construction of the project. While state financial investment to lower the cost of power is
anticipated, that policy decision is subject to future legislative appropriation.
The Alaska Energy Authority is a public corporation of the state whose mission is to reduce the cost of
energy in Alaska. Susitna-Watana Hydro will provide reliable, renewable energy for Alaska. More
information can be found at http://www.akenergyauthority.org and http://susitna-watanahydro.org.