Susitna-Watana Hydroelectric Project Document
ARLIS Uniform Cover Page
Title:
Ice processes in the Susitna River
SuWa 145
Author(s) – Personal:
Author(s) – Corporate:
Alaska Energy Authority
AEA-identified category, if specified:
Aquatic and fish resources study requests
AEA-identified series, if specified:
Series (ARLIS-assigned report number):
Susitna-Watana Hydroelectric Project document number 145
Existing numbers on document:
Published by:
[Anchorage] : Susitna-Watana Hydroelectric Project, [2012]
Date published:
5/07/12
Published for:
Date or date range of report:
Volume and/or Part numbers:
Final or Draft status, as indicated:
Document type:
Pagination:
5 p.
Related work(s):
Pages added/changed by ARLIS:
Notes:
All reports in the Susitna-Watana Hydroelectric Project Document series include an ARLIS-
produced cover page and an ARLIS-assigned number for uniformity and citability. All reports
are posted online at http://www.arlis.org/resources/susitna-watana/
Susitna-Watana Hydroelectric Project FERC #14241 Alaska Energy Authority
Ice Processes Study Request 5/07/12 Page 1
1.1. Title of proposed Study
Ice Processes in the Susitna River
1.2. Requestor of proposed study
AEA anticipates resource agencies will request this study.
1.3. Responses to study request criteria (18 CFR 5.9(b))
1.3.1. Describe the goals and objectives of the study and the information to be
obtained
• Document ice processes in the Susitna River.
• Model ice processes (including flow routing) in the Susitna River in order to estimate the
potential for changes for a range of project operations.
• Provide ice processes data to fisheries, Instream flow, riparian, geomorphology, and
groundwater studies.
• Assist Water Quality Modeling Study with reservoir ice predictions.
1.3.2. If applicable, explain the relevant resource management goals of the agencies
and Alaska Native entities with jurisdiction over the resource to be studied.
To be completed by the requesting entity.
1.3.3. If the requester is a not resource agency, explain any relevant public interest
considerations in regard to the proposed study.
Fisheries and aquatic resources are owned by the State of Alaska, and the Project could
potentially affect these public interest resources by affecting ice processes.
1.3.4. Describe existing information concerning the subject of the study proposal,
and the need for additional information.
Ice Process Documentation
• Ice processes were documented between the mouth of the Susitna River (RM 0) and the
dam site (RM 184) between 1980 and 1985. Both freeze-up and breakup progression
were monitored using aerial reconnaissance. Locations of ice bridges during freeze-up
and ice jams during breakup were recorded each season. One winter, a time-lapse
camera was installed in Devil Canyon in order to observe ice processes through the
narrow, turbulent rapids.
• Additional ice data were collected to calibrate a model. These included ice thicknesses,
top of ice elevations, air and water temperatures, slush ice porosity, and frazil density.
Susitna-Watana Hydroelectric Project FERC #14241 Alaska Energy Authority
Ice Processes Study Request 5/07/12 Page 2
• Other entities (National Weather Service, USGS, and Army Corps of Engineers) have
also collected ice thickness, breakup, and freeze-up data in various locations on the
river, although these data were not collected for the purpose of understanding the
potential effects of the dam. These data are available upon request from the agencies.
Ice Process Modeling
• Freeze-up and melt-out processes in the Middle River (between Gold Creek and
Talkeetna) were modeled using ICECAL, a numerical model developed by CRREL. The
model utilized the outputs from a temperature model developed for the river (SNTEMP),
and empirical data on frazil production and ice-cover progression derived from
observations. Both the Watana-only and Watana-Devil Canyon operations were
modeled for a range of meteorological conditions. The results of the model included
predictions of the extent of ice cover for cold, average, and warm winters, the timing of
ice cover progression for this range, and the inundated area below the ice cover for
selected cross-sections. Empirical data on frazil production and ice cover progression
was used to estimate changes in ice cover progression up to Talkeetna.
Need for Additional Information
• Additional documentation of ice processes is needed to verify that locations of ice
bridges, leads, ice jams, and timing of ice cover progression are similar to conditions
observed in the 1980s. Ice bridging, leads, and ice jams are all influenced by channel
geometry, and, in some cases, tributary mouth locations. In some cases, this geometry
may have changed. In addition, the location of early freeze-up season frazil production
varied significantly between study years. An assessment is needed to determine the
importance of the Upper and Middle Susitna River in frazil production for a range of
meteorological conditions.
• The ICECAL Model only simulated conditions upstream of Talkeetna. Under the
proposed operations scenario, winter discharges would be higher than the natural range
of variability downstream of the three-rivers confluence in Talkeetna.
• The ICECAL Model did not simulate flow fluctuations with a time-period shorter than one
week, whereas it is likely that daily flow fluctuations will be considered when determining
project operations.
• Updated fish habitat and geomorphology studies are needed to assess where ice
processes may be important. In addition, updated ice modeling is needed to assess
where project effects on fish habitat, geomorphology and riparian vegetation may be
concentrated.
• Details on reservoir ice processes for the current project configuration are not available.
1.3.5. Explain any nexus between project operations and effects (direct, indirect,
and/or cumulative) on the resource to be studied, and how the study results
would inform the development of license requirements.
Project operations have the potential to directly influence ice formation and breakup in the
following ways:
Susitna-Watana Hydroelectric Project FERC #14241 Alaska Energy Authority
Ice Processes Study Request 5/07/12 Page 3
• Increased winter water temperature released from the reservoir will limit ice cover for
some distance below the dam.
• The dam will restrict frazil ice produced in the upper basin from accumulating
downstream. There is evidence that frazil ice from the upper river contributes to ice front
progression on the lower river, thus the dam could slow ice cover progression in the
lower river.
• Increased winter flows will result in a more extensive ice cover and winter water stages
higher than the natural range of variability in the ice-covered reaches.
• Flow fluctuations in the winter have the potential to affect the stability of the winter ice
cover.
• Lower spring snowmelt flows will reduce the severity of breakup on the Middle River.
Higher water temperature releases from the reservoir may cause ice to thin and melt in
place earlier.
• The reservoir area will behave differently than the narrow channel in the winter.
Indirect effects of increased winter stages and decreased breakup stages include the following:
• Sediment transport during the winter may increase with increased flows, as well as
turbidity.
• Wetted perimeter will increase in the winter, and sloughs and side channels that are not
currently connected to the mainstem under winter flow conditions may become
inundated by mainstem flow. This could increase flow velocities and decrease
temperatures compared to winter conditions in sloughs that are currently fed by seeps.
• There is some evidence that ice jams are partially responsible for creating and
maintaining sloughs and some side channels in the Middle River. If ice-jam stages are
generally lower post-Project because of delayed snowmelt peaks, slough habitats may
experience less scour.
Utilizing the results of ice processes studies, modifications to Project operations to decrease the
likelihood of adverse effects owing to altered ice processes can be evaluated. Operational
modifications could include different reservoir release elevations to regulate temperature of flow
releases, limitations on load-following flow fluctuations during the winter, and limitations on
maximum winter flows.
1.3.6. Explain how any proposed study methodology (including any preferred data
collection and analysis techniques, or objectively quantified information, and a
schedule including appropriate field season(s) and the duration) is consistent
with generally accepted practice in the scientific community or, as appropriate,
considers relevant tribal values and knowledge.
Proposed study methods include the following:
• Aerial reconnaissance and GPS mapping of ice features, including ice jams, ice bridges,
frazil accumulations, and open leads during the breakup and freeze-up periods, Spring
2012-Spring 2014.
• Time-lapse camera monitoring of breakup and freeze-up at selected locations
corresponding to flow routing model instrumentation and key fish habitat, in coordination
with the fisheries studies.
Susitna-Watana Hydroelectric Project FERC #14241 Alaska Energy Authority
Ice Processes Study Request 5/07/12 Page 4
• Field data collection in the Susitna River, including ice thickness and elevation
measurements, Spring 2012-Spring 2014.
• Development and calibration of a dynamic thermal and ice processes model, in
coordination with the Water Quality Modeling Study. The model would provide the ability
to model river water temperature, ice cover progression and decay, ice cover extent and
thickness, and the effects of flow fluctuation on ice cover development and stability. The
model would also provide flow routing capability.
• Review and summarization of existing cold-regions hydropower projects and the effects
of their operations on ice-covered rivers.
Ice processes field observation standards follow those of EM-1110-2-1612, Ice Engineering,
developed by the Army Corps of Engineers. Modeling of dynamic ice-cover progression is still a
relatively underdeveloped field. A one-dimensional dynamic and thermal ice model (either
CRISSP1D, developed at Clarkson University, or River1D, developed at University of Alberta)
with flow routing capability will be adapted for the Susitna River between the dam site and
Talkeetna. Water temperature inputs to the river ice model will be obtained from empirical data
or the reservoir water temperature model. If necessary, CRISSP2D or River2D will be used to
model short reaches where additional ice process detail is needed. There isn’t currently an
accepted model that can predict dynamic ice processes on complex braided channels such as
found in the Lower Susitna River below the three rivers confluence. A largely empirical
approach, relying on repeat observations and simple models such as HEC-RAS, will be used to
assess the level of impacts expected in the Lower River. If this approach, in conjunction with
the results of the flow routing modeling (see Instream Flow Study) and water temperature
modeling (this study and Water Quality Modeling Study), indicates that additional information is
needed, then AEA will consult with stakeholders.
The one-dimensional ice model will also be used for flow routing and water temperature
modeling during the freeze-up, ice-covered, and melt-out period, approximately between
October and mid-May. Ice and flow routing effects to winter fish habitat, riparian vegetation,
geomorphology, and groundwater will be handled in the Instream Flow, Riparian Instream Flow,
Fluvial Geomorphology Modeling, and Groundwater-Related Aquatic Habitat studies,
respectively.
If applicable, the ice process study will provide river ice data to the Water Quality Model Study
to assist with reservoir ice modeling.
1.3.7 Describe considerations of level of effort and cost, as applicable, and why any
proposed alternative studies would not be sufficient to meet the stated information
needs.
Level of effort for field work will depend on the data needs of the chosen model, and related
disciplines such as fisheries, instream flow, riparian, geomorphology, and groundwater. Below
is a rough estimate of costs associated with field documentation and model development in
2013-2014, which are the major components of the ice study.
• Documentation of ice observations is anticipated to cost $850,000-$1.3 million for the
Spring 2013-Spring 2014 seasons (two breakup and one freeze-up, plus winter ice
thickness and elevation surveys). This does not include costs for additional transect
Susitna-Watana Hydroelectric Project FERC #14241 Alaska Energy Authority
Ice Processes Study Request 5/07/12 Page 5
surveys to augment model geometry, if that data becomes necessary.
• Assuming a year-long modeling effort will be required, development and calibration of
ice routines for the thermal and hydraulic model is anticipated to cost between $800,000
and $1.5 million. The cost will depend on the length of the modeled reach, and the
extent to which model code will need to be developed in order to adapt the model to the
Susitna River.
1.3.7. Literature Cited
Arctic Environmental Information and Data Center. 1984, "Assessment of the Effects of the
Proposed Susitna Hydroelectric Project on Instream Temperature and Fishery
Resources in the Watana to Talkeetna Reach." Draft Report for Harza-Ebasco for
Alaska Power Authority.
Harza-Ebasco, 1984, "Instream Ice Calibration of Computer Model. Document No. 1122. for
Alaska Power Authority.
R&M Consultants, Inc ,1981. "Ice Observations. 1980-81." for Acres American for Alaska Power
Authority.
R&M Consultants, Inc. 1982a. "Winter 1981-82, Ice Observations Report." for Acres American
for Alaska Power Authority.
R&M Consultants, Inc., 1982b, "Hydraulic and Ice Studies." for Acres American for Alaska
Power Authority.
R&M Consultants. Inc.,1983. "Susitna River Ice Study. 1982-83." For Harza-Ebasco for Alaska
Power Authority.
R&M Consultants, Inc., 1984. "Susitna River Ice Study, 1983-84," Draft Report for Harza-
Ebasco for Alaska Power Authority.
U.S. Army Corps of engineers, 2002, EM 1110-2-1612 Engineering and design, Ice
Engineering. Department of the Army. U.S. Army Corps of Engineers CECW-EH
Washington, DC 20314-1000.