Title:
Geomorphology study, Study plan Section 6.5 : Final study plan
SuWa 200
Author(s) – Personal:
Author(s) – Corporate:
Alaska Energy Authority
AEA-identified category, if specified:
Final study plan
AEA-identified series, if specified:
Series (ARLIS-assigned report number):
Susitna-Watana Hydroelectric Project document number 200
Existing numbers on document:
Published by:
[Anchorage : Alaska Energy Authority, 2013]
Date published:
July 2013
Published for:
Date or date range of report:
Volume and/or Part numbers:
Study plan Section 6.5
Final or Draft status, as indicated:
Document type:
Pagination:
81 p.
Related work(s):
Pages added/changed by ARLIS:
Notes:
All reports in the Susitna-Watana Hydroelectric Project Document series include an ARLIS-
produced cover page and an ARLIS-assigned number for uniformity and citability. All reports
are posted online at http://www.arlis.org/resources/susitna-watana/
Susitna-Watana Hydroelectric Project
(FERC No. 14241)
Geomorphology Study
Study Plan Section 6.5
Final Study Plan
Alaska Energy Authority
July 2013
FINAL STUDY PLAN GEOMORPHOLOGY STUDY 6.5
Susitna-Watana Hydroelectric Project Alaska Energy Authority
FERC Project No. 14241 Page 6.5-1 July 2013
6.5. Geomorphology Study
On December 14, 2012, Alaska Energy Authority (AEA) filed with the Federal Energy
Regulatory Commission (FERC or Commission) its Revised Study Plan (RSP), which included
58 individual study plans (AEA 2012). Included within the RSP was the Geomorphology Study,
Section 6.5. RSP Section 6.5 focuses on characterizing the geomorphology of the Susitna River
and evaluating the effects of the Project on the geomorphology and dynamics of the river.
On February 1, 2013, FERC staff issued its study plan determination (February 1 SPD) for 44 of
the 58 studies, approving 31 studies as filed and 13 with modifications. On April 1, 2013 FERC
issued its study plan determination (April 1 SPD) for the remaining 14 studies; approving one
study as filed and 13 with modifications. RSP Section 6.5 was the one study approved with no
modifications in FERC’s April 1 SPD. As such, in finalizing and issuancing Final Study Plan
Section 6.5, AEA has made no modifications to to this study from its Revised Study Plan.
6.5.1. General Description of the Proposed Study
6.5.1.1. Study Goals and Objectives
The overall goal of the Geomorphology Study is to characterize the geomorphology of the
Susitna River, and to evaluate the effects of the Project on the geomorphology and dynamics of
the river by predicting the trend and magnitude of geomorphic response. This will inform the
analysis of potential Project-induced impacts to aquatic habitats. The results of this study, along
with results of the Fluvial Geomorphology Modeling below Susitna-Watana Dam Study, will be
used in combination with geomorphic principles and criteria/thresholds defining probable
channel forms to predict the potential for alteration of channel morphology from Project
operation. This information will be used to assist in determining whether protection, mitigation,
or enhancement measures may be needed, and if so, what those measures may be. More specific
goals of the Geomorphology Study are as follows:
• Determine how the river system functions under existing conditions.
• Determine how the current system forms and maintains a range of aquatic and channel
margin habitats.
• Identify the magnitudes of changes in the controlling variables and how these will affect
existing channel morphology in the identified reaches downstream of the dam and in the
areas upstream of the dam affected by the reservoir.
• In an integrated effort with the Fluvial Geomorphology Modeling Study (Section 6.6)
determine the likely changes to existing habitats through time and space.
In order to achieve the study goals, the following objectives are required:
• Geomorphically characterize the Project-affected river channels and floodplain including:
o Delineate the Susitna River into geomorphically similar reaches.
o Characterize and map relic geomorphic forms from past glaciation and debris
flow events.
FINAL STUDY PLAN GEOMORPHOLOGY STUDY 6.5
Susitna-Watana Hydroelectric Project Alaska Energy Authority
FERC Project No. 14241 Page 6.5-2 July 2013
o Characterize and map the geology of the Susitna River, identifying controlling
features to channel and floodplain geomorphology.
o Identify and describe the primary geomorphic processes that create, influence, and
maintain mapped geomorphic features.
• Collect sediment transport data to supplement historical data to support the
characterization of Susitna River sediment supply and transport.
• Determine sediment supply and transport in Middle and Lower Susitna River Segments.
• Assess geomorphic stability/change Middle and Lower Susitna River Segments.
• Characterize the surface area versus flow relationships for riverine macrohabitat types
(1980s main channel, side channel, side sloughs, upland sloughs, tributaries and tributary
mouths) over a range of flows in the Middle Susitna River Segment.
• Conduct a reconnaissance-level geomorphic assessment of potential Project effects on the
Lower and Middle Susitna River Segments considering Project-related changes to stream
flow and sediment supply and a conceptual framework for geomorphic reach response.
• Conduct a phased characterization of the surface area versus flow relationships for
riverine macrohabitat types in the Lower Susitna River Segment including:
o Delineation of aquatic macrohabitat per 1980s definitions for selected sites.
o Comparison of 1980s versus existing macrohabitat areas and selected sites.
o Estimate potential change in macrohabitat areas base on initial estimates of
change in stage from Project operations.
o Optional – If Focus Areas are extended into the Lower Susitna River Segment,
perform development of macrohabitat wetted area versus flow relationships for
additional sites and flows.
• Characterize the proposed Watana Reservoir geomorphology and changes resulting from
conversion of the channel/valley to a reservoir.
• Assess large woody debris transport and recruitment, their influence on geomorphic
forms and, in conjunction with the Fluvial Geomorphology Modeling Study, effects
related to the Project.
• Characterize geomorphic conditions at stream crossings along access road/transmission
line alignments.
• Integration with the Fluvial Geomorphology Modeling Study to develop estimates of
Project effects on the creation and maintenance of the geomorphic features that comprise
important aquatic and riparian macrohabitats and other key habitat indicators, with
particular focus on side channels, side sloughs, and upland sloughs.
6.5.2. Existing Information and Need for Additional Information
An analysis of the Middle Susitna River Segment geomorphology and how aquatic habitat
conditions change over a range of stream flows was performed in the 1980s using aerial
photographic analysis (Trihey & Associates 1985). The AEA Susitna Water Quality and
FINAL STUDY PLAN GEOMORPHOLOGY STUDY 6.5
Susitna-Watana Hydroelectric Project Alaska Energy Authority
FERC Project No. 14241 Page 6.5-3 July 2013
Sediment Transport Data Gap Analysis Report (URS 2011) states that “if additional information
is collected, the existing information could provide a reference for evaluating temporal and
spatial changes within the various reaches of the Susitna River.” The gap analysis emphasizes
that it is important to determine if the conditions represented by the data collected in the 1980s
are still representative of current conditions and that at least a baseline comparison of current and
1980s-era morphological characteristics in each of the identified sub-reaches is required.
An analysis of the lower Susitna River Segment and how riverine habitat conditions change over
a range of stream flows was performed in the 1980s using aerial photographic analysis (R&M
Consultants, Inc. and Trihey & Associates 1985a). This study evaluated the response of riverine
aquatic habitat to flows in the Lower Susitna River Segment between the Yentna River
confluence (river mile [RM] 28.5) and Talkeetna (RM 98) (measured at Sunshine gage near RM
84) ranging from 13,900 cfs to 75,200 cfs. The study also included an evaluation of the
morphologic stability of islands and side channels by comparing aerial photography between
1951 and 1983. As with the Middle Susitna River Segment information, it is important to
determine if the conditions represented by the 1980s data are representative of current
conditions. Such a comparison should include not only an identification of change, but should
consider if the relative proportions of the various mesohabitat types have remained constant
within a reach. If the relative proportions of the various mesohabitat types have remained
constant in the various reaches, it provides a reasonable basis for using the 1980s data.
Considerable information is available from a variety of sources that will support the development
and execution of the Geomorphology Study. Much of the available information is from the
1980s studies associated with the earlier efforts to develop the Susitna Hydroelectric Project
(FERC No. 7114). In some cases, the older information will need to be replaced or
supplemented with newer information because the Susitna River is a dynamic system and
historical data such as cross-sections and aerial images in many areas will likely have changed
considerably since they were collected in the 1980s. However, when compared with current
information, these data provide valuable tools to understand the behavior and physical processes
driving the geomorphology of the Susitna River. Comparability of the two sets of data will
indicate that the fundamental relationships between channel form and fluvial process have
remained constant and thus provide a basis for using the historical data. Additional data and
analyses are needed to determine if historical data can be used to reflect current conditions and to
address some of the data gaps identified in the AEA Susitna Water Quality and Sediment
Transport Data Gaps Analysis Report (URS 2011). A more specific description of existing
information and the need for additional information for each geomorphology study component
are provided in the appropriate sections below.
6.5.3. Study Area
The study area for the Geomorphology Study is the Susitna River from its confluence with the
Maclaren River (RM 260) downstream to the mouth at Cook Inlet (RM 0). The study area has
been divided into three large-scale river segments:
• Upper Susitna River Segment: Maclaren River confluence (RM 260) downstream to the
proposed Watana Dam site (RM 184).
• Middle Susitna River Segment: Proposed Watana Dam site (RM 184) downstream to the
Three Rivers Confluence (RM 98).
FINAL STUDY PLAN GEOMORPHOLOGY STUDY 6.5
Susitna-Watana Hydroelectric Project Alaska Energy Authority
FERC Project No. 14241 Page 6.5-4 July 2013
• Lower Susitna River Segment: Three Rivers Confluence (RM 98) downstream to Cook
Inlet (RM 0).
Each of the 11 study components that make up the Geomorphology Study has a component-
specific study area often related to the three large-scale river segments identified above. The
study area and river segments are shown on Figure 6.5-1. Identification of the study area that
each study component addresses is provided in the discussion of each study component in
Section 6.5.4, Study Methods.
6.5.4. Study Methods
The methods for each of the 11 Geomorphology Study components are presented in this section.
6.5.4.1. Study Component: Delineate Geomorphically Similar (Homogeneous)
Reaches and Characterize the Geomorphology of the Susitna River
The goal of this study component is to geomorphically characterize the Project-affected river
channels including determination of geomorphically similar reaches. Portions of this effort were
performed in 2012 including development of the geomorphic classification system and initial
delineation of geomorphic reaches. The study area is the length of the Susitna River from its
mouth at Cook Inlet (RM 0), upstream to the proposed Watana Dam site (RM 184), and
upstream of the proposed Watana Dam site, including the reservoir inundation zone and on
upstream to the Maclaren River confluence (RM 260). The tributary mouths along the Susitna
River and in the reservoir inundation zone that may be affected by the Project are also included
in the study area.
One of the major factors that is relevant to the geomorphic characterization and subsequent
classification of the Susitna River and the potential for the Project to affect geomorphology, and
hence habitat, is changes in the volume of sediment in storage within discrete types of storage
units, that can generally be separated into mid-channel and bank-attached units. Storage of
sediment for varying durations within discreet types of storage zones is an integral part of any
fluvial system (Schumm 1977; Montgomery and Buffington 1993). The types of sediment
storage units and the rates of change within the storage zones provide a measure of the sediment
flux within the system (Harvey et al. 2003; Harvey and Trabant 2006). Order-of-magnitude
changes in sediment storage within a given reach of the river, or for the river as a whole, as well
as the rates of change in the various types of sediment storage zones can be assessed by GIS-
based comparisons of time-sequential aerial photography. Suitable aerial photography appears to
be available for the 1950s, 1980s, and the present (2012).
On the Susitna River, the end members of a continuum could include long-duration sediment
storage in vegetated islands and floodplains that persist for multiple decades at one end and
short-duration sediment storage in braid bars that change on an almost daily basis at the other
end of the continuum. Sediment storage is directly incorporated into the preliminary geomorphic
classification developed for the Susitna River (Section 6.5.4.1.2.2.1). Within single channel
(SC) reaches, sediment storage zones include unvegetated mid-channel bars, vegetated islands,
and discontinuous and continuous vegetated floodplain segments. Within multiple channel (MC)
reaches, sediment storage zones include unvegetated braid bars, vegetated islands, and
floodplains.
FINAL STUDY PLAN GEOMORPHOLOGY STUDY 6.5
Susitna-Watana Hydroelectric Project Alaska Energy Authority
FERC Project No. 14241 Page 6.5-5 July 2013
6.5.4.1.1. Existing Information and Need for Additional Information
This effort will support the understanding of the conditions in the Susitna River by applying a
geomorphic classification system based on form and process. It will also support efforts by other
studies, including the Fish and Aquatics Instream Flow (Section 8.5), Riparian Instream Flow
(Section 8.6), Characterization and Mapping of Aquatic Habitats (Section 9.9), and Ice Processes
(Section 7.6) studies by providing a basis to stratify the river into reaches based on current
morphology and their potential sensitivity to the Project. A delineation of the Susitna River into
reaches was performed in the 1980s for the Middle Susitna River Segment (Trihey & Associates
1985) and the Lower Susitna River Segment(R&M Consultants, Inc. and Trihey & Associates
1985a).
6.5.4.1.2. Methods
This effort consists of identification of a geomorphic classification system, conducting the
delineation of geomorphic reaches based on the identified classification system and
characterization of the geomorphology of the Susitna River.
6.5.4.1.2.1. Identification and Development of Geomorphic Classification System
The first step in the geomorphic reach delineation effort is the identification of the system to be
used to classify and delineate the reaches. Classification of the river segments is required to
provide a basis for communication among the various disciplines and to identify relatively
homogeneous river segments that can then be used as a basis for extrapolation of results and
findings from more spatially-limited studies. Numerous river classifications exist (Leopold and
Wolman 1957; Schumm 1963, 1968; Mollard 1973; Kellerhals et al. 1976; Brice 1981; Mosley
1987; Rosgen 1994, 1996; Thorne 1997; Montgomery and Buffington 1997; Vandenberghe
2001), but no single classification has been developed that meets the needs of all investigators.
Several factors have prevented the achievement of an ideal geomorphic stream classification, and
foremost among these has been the variability and complexity of rivers and streams (Mosley
1987; Juracek and Fitzpatrick 2003). Problems associated with the use of existing morphology
as a basis for extrapolation (Schumm 1991) further complicates the ability to develop a robust
classification (Juracek and Fitzpatrick 2003). For purposes of classifying the Susitna River,
available classification systems are being reviewed, and a specific system is being developed that
borrows elements from several classification systems. The classification scheme considers both
form and process. Development of this system is being coordinated with the Fish and Aquatics
Instream Flow Study (FA-IFS) (Section 8.5, Riparian Instream Flow Study (R-IFS) (Section
8.56, Ice Processes (Section 7.6), and Characterization and mapping of Aquatic Habitats (Section
9.9) so it is consistent with their needs. These studies may require further stratification to identify
specific conditions of importance to their efforts, in which case these studies will further divide
the river into subreaches. However, the overall reach delineations developed in the
Geomorphology Study will be used consistently across all studies requiring geomorphic reach
delineations.
6.5.4.1.2.2. Geomorphic Reach Delineation
The Lower Susitna River Segment (RM 0 to RM 98), the Middle Susitna River Segment (RM 98
to RM 184), and the Upper Susitna River Segment to the Maclaren River confluence (RM 184 to
FINAL STUDY PLAN GEOMORPHOLOGY STUDY 6.5
Susitna-Watana Hydroelectric Project Alaska Energy Authority
FERC Project No. 14241 Page 6.5-6 July 2013
RM 260) will be delineated into large-scale geomorphic reaches (a few to many miles) with
relatively homogeneous characteristics, including channel width, entrenchment, ratio, sinuosity,
slope, geology/bed material, single/multiple channel, braiding index, and hydrology (inflow from
major tributaries) for the purpose of stratifying the river into study segments. Stratification of
the river into relatively homogeneous reaches will permit extrapolation of the results of sampled
data at representative sites within the individual reaches.
Because there are several studies that required reach delineation for planning 2012 field
activities, an initial delineation primarily based on readily available information (most recent
high-quality aerials, bed profile from the 1980s, geomorphic descriptions from the 1980s, and
geologic mapping) was developed in April 2012. As additional information is developed, such as
current aerial photographs and transects, the delineation will be refined and the various
morphometric parameters will be included in the delineation. Coordination with the Mainstem
(Open-water) Flow Routing Model (Section 8.5.4.3) Study is being conducted to obtain cross-
section channel/floodplain data. Coordination with the Fish and Aquatics Instream Flow Study
(FA-IFS)(Section 8.5), Riparian Instream Flow Study (R-IFS)(Section 8.6), Fluvial Geomorphic
Modeling Study, and Ice Processes in the Susitna River Study (Ice Processes Study) (Section
7.6) is being conducted to ensure that the river stratification is performed at a scale appropriate
for those studies.
A reconnaissance-level site visit of the Susitna River was conducted for a portion of the Susitna
River in October, 2012. A more complete reconnaissance will be conducted in early 2013 after
break-up. The 2012 reconnaissance was coordinated with other studies to provide an opportunity
for multidisciplinary interaction. Representatives from the Fish and Aquatics Instream Flow
Study (Section 8.5), Riparian Instream Flow Study (Section 8.6), Riparian Vegetation Study
Downstream of Susitna-Watana Dam Study (Section 11.6) and Groundwater Study (Section 7.5)
participated in the 2012 reconnaissance. The 2013 reconnaissance will take a similar
multidisciplinary approach. For the 2013 reconnaissance it is anticipated that the
Geomorphology Study team will be joined by representatives from the FA-IFS (Section 8.5), R-
IFS (Section 8.6), Ice Processes Study (Section 7.6), and Characterization and Mapping of
Aquatic Habitats Study (Section 9.9). The purpose of this site visit will be to provide key team
members an overview of the river system. This will be extremely useful for all components of
the geomorphology studies because it will permit team members to verify on the ground
assessments that have been made from remotely sensed information.
6.5.4.1.2.2.1. Initial Geomorphic Reach Classification System
Classification of the identified Upper, Middle and Lower Susitna River Segments into
reasonably homogeneous reaches is required to provide a basis for extrapolation of the results of
process-based analyses of existing conditions and predictions of likely geomorphic changes in
response to the Project at selected study locations to those reaches. To support development of
study plans for a variety of resource areas, an initial reach classification was performed with the
information available in 2012. This classification will be reviewed and updated in 2013 if
necessary as new information from the Geomorphology Study and Fluvial Geomorphology
Modeling Study, as well as several other studies, becomes available. The initial geomorphic
reach classification scheme is described below.
FINAL STUDY PLAN GEOMORPHOLOGY STUDY 6.5
Susitna-Watana Hydroelectric Project Alaska Energy Authority
FERC Project No. 14241 Page 6.5-7 July 2013
From a practical viewpoint, Schumm (2005) has suggested that rivers and streams can be divided
into two principal types: regime and non-regime. Regime channels, which are defined as those
that flow on and in sediments transported by the river during the present hydrologic regime, and
whose morphology is controlled primarily by the interactions of the flow regime and the
sediment supply (Leopold et al. 1964; Schumm 1977), can be further subdivided on the basis of
patterns (straight, meandering, wandering, braided, anastomosing). Non-regime channels can be
further subdivided into constrained, where the form of the channel is forced by non-alluvial
factors such as bedrock, colluvium, glacial deposits or extreme flood deposits (Montgomery and
Buffington 1997; Tinker and Wohl 1998; O’Connor and Grant 2003), or unstable, which can
include degrading (Schumm et al. 1984; Darby and Simon 1999), aggrading (Schumm 1977) or
avulsing (Schumm et al. 2000) channels.
Based on Schumm’s (2005) classification scheme, the factors used in the initial geomorphic
classification of the individual reaches of the Susitna River include the following:
1. Channel planform (single channel: straight, meandering; multiple channels: braided,
anastomosing) – identified from topographic mapping, aerial photography
2. Constraints (bedrock, colluvium, moraines, alluvial fans, glaciolacustrine and
glaciofluvial sediments) – identified from geologic mapping
3. Confinement (width of the floodplain and modern alluvium in relation to the width of the
active channel(s)) – identified from geologic mapping, Light Detection and Ranging
(LiDAR) based topography, hydraulic modeling
4. Gradient and bed materials – derived from various sources of survey data, 1980s data
Based on available information, the individual reaches within the three river segments were
classified as follows:
Single Channel (SC):
SC1– Laterally confined with no sediment storage in bars, islands, or floodplain
SC2 – Laterally confined with limited sediment storage in mid-channel bars and non-continuous
bank-attached floodplain segments
SC3 – Laterally confined with sediment storage in mid-channel bars, vegetated islands, and
continuous floodplain segments
Multiple Channels (MC):
MC1 – Moderately wide floodplain with significant sediment storage in braid bars and vegetated
islands
MC2 – Wide floodplain with significant sediment storage in braid bars and vegetated islands
MC3 – Wide floodplain width with vegetated floodplain segments separated by anastomosed
channels with downstream base level controls
MC4 – Delta distributary channels
6.5.4.1.2.2.2. Initial Geomorphic Delineation
Application of the classification scheme described above to the three river segments of the study
area resulted in the geomorphic reaches and reach types presented in Table 6.5-1. Maps showing
the geomorphic reaches are presented on Figure 6.5-2, 6.5-3, and 6.5-4 for the Upper, Middle,
FINAL STUDY PLAN GEOMORPHOLOGY STUDY 6.5
Susitna-Watana Hydroelectric Project Alaska Energy Authority
FERC Project No. 14241 Page 6.5-8 July 2013
and Lower Susitna River segments, respectively. The Upper Susitna River Segment was divided
into six reaches, with three reaches identified as SC1 reach type and three geomorphic reaches
identified as SC2 reach type. The Middle Susitna River Segment was divided into eight reaches
with one geomorphic reach classified as SC1 (Devils Canyon), five as SC2, one as SC3, and one
as MC1/SC2 geomorphic reach types. The latter designation represents the fact that the
downstream most geomorphic reach of the Middle Susitna River Segment, MR-8, is a transition
reach from a single channel to multiple channel. The Lower Susitna River Segment was divided
into six reaches with the upper two reaches classified as MC1, the next two reaches classified as
MC3, the fifth reach classified as SC2, and the downstream-most reach classified as MC4.
It should be kept in mind that as more information becomes available, the geomorphic reach
delineations and classifications will be reevaluated and adjusted if necessary.
6.5.4.1.2.3. Geomorphic Characterization of the Susitna River
Based on information collected and developed in support of the reach delineation (Section
6.5.4.1.2.1), mapping of current and historical (1980s and 1950s) fluvial geomorphic features
(Section 6.5.4.4) and as part of the field studies conducted in the Fluvial Geomorphology
Modeling Study (Section 6.6.4.1.2.9), the geomorphology of the Middle and Lower Susitna
River Segments will be characterized. The characterization will be directed toward identifying
processes and controls that create, influence and maintain the fluvial geomorphic features that
comprise the river and floodplain and represent the important aquatic habitats that may be
affected by the Project. The role of large woody debris, ice processes, floodplain vegetation and
extreme events as well as the more typical hydrologic events and sediment loading will be
considered in development of the understanding of the processes that create and influence the
geomorphic features of the Susitna River. Of particular importance will be the features that
represent both the within-channel (bars, islands, side channels) and the off-channel
macrohabitats (side channels, side sloughs and upland sloughs) and the meso- and micro-scale
habitats within these features.
Using the available geologic mapping, topographic mapping, recent (2012) and historical (1980s
and 1950s) aerial photographs and the 2011 Mat-Su LiDAR in conjunction with fieldwork
conducted in 2013 during the Focus Area fieldwork the following will be mapped and
characterized:
• Geology of the Susitna River corridor with identification of controlling features such as
locations where the river is laterally confined or vertically controlled
• Relic geomorphic forms from past glaciation, paleofloods and debris flow events with
particular attention paid to coarse grained deposits that can serve as lateral or vertical
controls
• Identify from aerials and aerial reconnaissance major locations of recent and historic
mass wasting
• Overlay the mapping of areas of frequent ice jam events from the Ice Processes Study
(Section 7.6)
• Identification of coarse deposits at tributary confluences that may influence the profile of
the Susitna River
FINAL STUDY PLAN GEOMORPHOLOGY STUDY 6.5
Susitna-Watana Hydroelectric Project Alaska Energy Authority
FERC Project No. 14241 Page 6.5-9 July 2013
Using this information as well as thalweg profiles generated from the cross-section and
bathymetric surveys performed in 2012 and 2013, aerial photo analysis of channel change from
the 1950s to 2012, bed material sampling, floodplain soil profiles, LWD mapping and
characterization, dating of floodplain surfaces, an understanding of the fluvial processes that
govern the behavior of the Middle and Lower Susitna River will be developed. This
understanding will be reviewed and updated as various study results are made available. This
would include information such as determination of flows required for bed material mobilization,
effective discharge, comparison of 1980s and current cross-section profiles, sediment balance,
and 1-D bed evolution modeling, This will provide a basis for developing a thorough
understanding of the current river system dynamics and thus the framework for interpreting
potential Project effects which will be derived from the results of modeling and other analyses
that reflect the changes in the hydrologic and sediment supply regimes due to construction and
operation of the Project.
6.5.4.1.2.4. Information Required
The following available existing information will be needed to conduct this study:
• Historical aerial photographs
• Information on bed material size
• Location and extent of lateral and vertical geologic controls
• Drainage areas of major tributaries
• Topographic mapping, including USGS survey quadrangle maps and LiDAR
• Geologic mapping
• 1980s cross-sections
The following additional information will need to be obtained to conduct this study:
• Current high resolution aerial photography
• Field observations made during a site reconnaissance
• Extended flow record for the Susitna River and tributaries being developed by USGS
• Current cross-sections
• Profile of the river (thalweg or water surface)
• Field data collected in the Fluvial Modeling Geomorphology Study
6.5.4.1.3. Study Products
The results of the Delineate Geomorphically Similar Reaches study component will be included
in the Geomorphology Report. Information provided will include the following:
• A geomorphic classification system developed specifically for the Susitna River that
considers both form and physical processes.
FINAL STUDY PLAN GEOMORPHOLOGY STUDY 6.5
Susitna-Watana Hydroelectric Project Alaska Energy Authority
FERC Project No. 14241 Page 6.5-10 July 2013
• A delineation of the Susitna River into reaches of similar geomorphic characteristics,
which has been coordinated with other relevant studies (FA-IFS (Section 8.5), R-IFS
(Section 8.6), Ice Processes (Section 7.6), and Characterization and Mapping of Habitat
(Section 9.9) studies). The delineation will include broad large-scale reaches and further
delineation into sub-reaches.
• Tables of morphometric parameters describing the physical characteristics of each reach
developed from the analysis of aerial photographs, LiDAR, bed profiles, bed material
samples, geologic mapping, and transect surveys.
In addition, an ArcGIS shapefile will be provided with the following information:
• Mapping of the segments and reaches overlaid on recent aerial photography and
topographic mapping.
6.5.4.2. Study Component: Bedload and Suspended Load Data Collection at
Tsusena Creek, Gold Creek, and Sunshine Gage Stations on the Susitna
River, Chulitna River near Talkeetna and the Talkeetna River near Talkeetna
The goal of this study component is to empirically characterize the Susitna River sediment
supply and transport conditions. This effort is being performed by USGS. The effort described
is for 2012 and 2013. The effort in 2013 may be modified in 2013 based on experience gained
from the 2012 work. The study covers the Susitna River from RM 84 (Sunshine Station)
upstream to RM 182 (Tsusena Gage) and the Chulitna River and Talkeetna Rivers near their
confluences with the Susitna River. Figure 6.5-5 identifies the location of the study gages and
other existing and historical USGS gages in the Susitna River basin. The collection of the
sediment transport data was completed in 2012 per the 2012 study plan. The data will be
available from the USGS in early 2013. The Talkeetna River near Talkeetna was added for 2013
after review of 1980s data and after comments from agency review of the PSP. Suspended
sediment and flow were collected at the Talkeetna by the USGS as part of the USGS National
monitoring network.
6.5.4.2.1. Existing Information and Need for Additional Information
The collection of the data described in this study component will supplement sediment transport
data collected in the 1980s. The additional data are needed to determine if historical data can be
used to reflect current conditions or if there have been shifts in the rating curves that might be
related to climate change, glacial surges, or other as yet unidentified causes and to address some
of the data gaps identified in the Susitna Water Quality and Sediment Transport Data Gaps
Analysis Report (URS 2011).
The USGS published a summary report on sediment transport data collected in the 1980s (USGS
1987). The data collected includes suspended sediment measurements and bedload
measurements for the Susitna River near Talkeetna, Susitna River at Sunshine, Susitna River at
Susitna Station, Chulitna River near Talkeetna, Talkeetna River near Talkeetna, and Yentna
River near Susitna Station. The suspended load is divided into a silt/clay component and a sand
component. The bedload transport is divided into two fractions: sand and gravel. The report
also presents rating curves developed from data collected between 1981 through 1985. The
FINAL STUDY PLAN GEOMORPHOLOGY STUDY 6.5
Susitna-Watana Hydroelectric Project Alaska Energy Authority
FERC Project No. 14241 Page 6.5-11 July 2013
USGS estimated the annual sediment load for Water Year 1985 for the various components of
the sediment load by applying the rating curves to the mean daily flow record.
Table 6.5-2 presents the sediment loads estimated by the USGS for Water Year 1985 (October
1984 through September 1985). This information suggests that the Chulitna River contributes the
majority of the sediment load at the Three Rivers Confluence. The relative contributions are 61
percent for the Chulitna River, 25 percent for the Susitna River, and 14 percent for the Talkeetna
River. Of note is the relatively small amount of the gravel load contributed by the Susitna River
to the Three Rivers Confluence (about 4 percent, compared to 83 percent from the Chulitna
River and 13 percent from the Talkeetna River, based on the 1985 data).
This study will provide information on current transport conditions and support assessment of
Project effects on sediment supply. Sediment data derived from the gages will be used to
provide sediment inputs at model boundaries. This information will be used by several study
components in this study as well as the Fluvial Geomorphology Modeling below Watana Dam
Study.
6.5.4.2.2. Methods
The following scope of work was provided by USGS:
• Operate and maintain the stream gages.
• Maintain datum at the site.
• Record stage data every 15 minutes.
• Make discharge measurements during visits to maintain the stage-discharge rating curve
and to define the winter hydrograph.
• Store the data in USGS databases.
• Collect at least five suspended sediment samples at Susitna River above Tsusena Creek,
at Gold Creek, and at Sunshine; the Chulitna River near Talkeetna and the Talkeetna
River near Talkeetna during the year for concentration and size analysis (collect in 2012
and 2013).
• Collect at least five bed material samples during the year at Susitna River above Tsusena
Creek, at Gold Creek, and at Sunshine; and the Chulitna River near Talkeetna for bedload
transport determination and size analysis (collect in 2012 and 2013, except Talkeetna
River near Talkeetna will be collected in 2013 only).
• Collect at least five bedload samples during the year at Susitna River at Gold Creek,
Susitna River at Sunshine, Susitna River above Tsusena Creek, and the Chulitna River
near Talkeetna for bedload transport determination and size analysis (collect in 2012 and
2013, except Talkeetna River near Talkeetna will be collected in 2013 only).
• Operate and maintain the stream gages at the Susitna River near Denali and the Chulitna
River near Talkeetna (2012 and 2013).
• Operate a stage-only gage at a site upstream from Deadman Creek. Logistics at this site
may preclude continuous operation or telemetry of the information (2012 and 2013).
FINAL STUDY PLAN GEOMORPHOLOGY STUDY 6.5
Susitna-Watana Hydroelectric Project Alaska Energy Authority
FERC Project No. 14241 Page 6.5-12 July 2013
• Compile suspended and bedload data, including calculation of sediment transport ratings
and daily loads, in a technical memorandum delivered to AEA during federal fiscal year
(FFY) 2013 for the 2012 data and FFY 2014 for the 2013 data, and as early as March of
the following year, if possible. Provisional results from sampling will be available as
soon as lab data are available. Provisional results from sediment load computations will
be made available as soon as possible.
The bedload and suspended sediment data will be combined with existing rating curves to
identify the differences and similarities between the historical and current data sets. This
information will be used to evaluate whether the historical data sets are representative of current
conditions in the Susitna River at Gold Creek, the Susitna River at Sunshine, the Chulitna River
near Talkeetna and the Talkeetna River near Talkeetna. If the historical data are not
representative of current conditions, a decision will be made as to whether the 1980s data may be
adjusted or shifted to represent current conditions or whether only the current data should be
used in developing sediment transport relationships.
Based on review of the 1980s sediment transport data, including the information previously
presented in Table 6.5-2, the Talkeetna River is a significant source of sediment to the Lower
Susitna River Segment. Therefore, collection of sediment transport data for the Talkeetna River
near Talkeetna will be conducted in 2013. This will allow for better understanding of the
sediment transport balance in Geomorphic Reach LR-1 (the portion of the Susitna River between
the Three Rivers Confluence and Sunshine Station).
6.5.4.2.3. Study Products
The results of the Bedload and Suspended Load Data Collection at Tsusena Creek, Gold Creek,
and Sunshine Gage Stations on the Susitna River, and Chulitna River near Talkeetna and the
Talkeetna River near Talkeetna and Sunshine gage stations study component will be included in
the Geomorphology Report. Information provided will include the following:
• Calculation of discharge, suspended sediment discharge, and bedload discharge.
• Tabulation of all discharge, suspended sediment, bedload, and bed material sampling
results.
• Data sheets reflecting field measurements.
• Comparison of historical and 2012 sediment transport measurements to determine if
historical sediment transport rating curves can be expected to accurately represent current
conditions.
• Narrative on data collection activities including description of methods, any difficulties
encountered, and recommendations for data collection in 2013.
• Posting of near real-time stage and discharge data on the USGS website:
http://waterdata.usgs.gov/ak/nwis/.
• Publication of the data in the USGS annual Water-Resources Data for the United States
report (http://wdr.water.usgs.gov/).
In addition, an ArcGIS shapefile will be provided with the following information:
• Location of gage stations and measurement transects (if different from gage location).
FINAL STUDY PLAN GEOMORPHOLOGY STUDY 6.5
Susitna-Watana Hydroelectric Project Alaska Energy Authority
FERC Project No. 14241 Page 6.5-13 July 2013
6.5.4.3. Study Component: Sediment Supply and Transport Middle and Lower
Susitna River Segments
The objective of this study component is to characterize the sediment supply and transport
conditions in the Susitna River between the proposed Watana Dam site (RM 184) and the
Susitna Station gage (RM 28). This includes the mainstem Susitna River and its tributaries. The
Three Rivers Confluence (RM 98) separates the Middle Susitna River Segment from the Lower
Susitna River Segment. Initial estimates for the Lower Susitna River Segment Sediment Balance
are being developed in 2012 as part of the Reconnaissance-Level Assessment of Project Effects
on Lower and Middle Susitna River Segment (Section 6.5.4.6). The remaining efforts, which
include refined estimates of the Middle Susitna River Segment sediment balance, bed material
mobilization, and effective discharge, will be conducted in 2013. The 2013 effort will provide
estimates of sediment supply that will be used in the bed evolution modeling efforts described in
Section 6.6.
6.5.4.3.1. Existing Information and Need for Additional Information
The Project will reduce sediment supply to the reach of the Susitna River downstream from the
dam, and will also alter the timing and magnitude of the flows that transport the sediment.
Information provided in the Pre-Application Document (PAD) (AEA 2011) suggests that peak
flows may be reduced in magnitude and occur later in the season, and the flows will tend to be
higher during the non-peak flow season under Project conditions. Sediment transport data are
available along the mainstem Susitna River and several of the major tributaries between the
proposed Watana Dam site (RM 184) and Susitna Station (RM 28) (URS 2011) that can be used
to perform an initial evaluation of the sediment balance along the study reach under existing
conditions. The results of this study component will provide the initial basis for assessing the
potential for changes to the Middle and Lower Susitna River segments’ sediment balance, and
the associated changes to geomorphology, because it will permit quantification of the magnitude
in the reduction of sediment supply below the dam. The studies will also support the Fluvial
Geomorphology Modeling below Watana Dam Study through development of sediment supply
information that will be required as input to the model.
6.5.4.3.2. Methods
The methods section is divided into five subsections: (1) Initial Lower Susitna River Segment
Sediment Balance, (2) Middle Susitna River Segment Sediment Balance, (3) Characterization of
Bed Material Mobilization, (4) Effective Discharge, and (5) Information Required.
Development of the sediment balance for both the Lower Susitna River Segment (RM 98 to RM
28) and Middle Susitna River Segment (RM 184 to RM 98) will consider various techniques to
characterize the sediment supply to each reach, the sediment transport capacity through the
reaches, and deposition/storage within the reaches. Sources of sediment supply are expected to
include the mainstem Susitna River, contributing tributaries, and identified locations of mass
wasting. Potential procedures to estimate sediment supply include the use of regional sediment
supply relationships (e.g., regression equations based on watershed area) and calculation of
differences in sediment loads between gaging stations. While it is recognized that the gages are
spatially separated, the comparison of the loads at the gages will permit an assessment of
whether there is significant storage or loss of sediment between gages. If the data indicate that
FINAL STUDY PLAN GEOMORPHOLOGY STUDY 6.5
Susitna-Watana Hydroelectric Project Alaska Energy Authority
FERC Project No. 14241 Page 6.5-14 July 2013
there is little difference between the gages, then it can be reasonably concluded that there is
sufficient supply of sediment within the reach between gages to support an assumption of
transport capacity limitation rather than supply limitation. The sediment transport measurements
collected by USGS, both historical and current, will be used to develop bedload and suspended
load rating curves to facilitate translation of the periodic instantaneous measurements into yields
over longer durations (e.g., monthly, seasonal, and annual). Since gradations of transported
material will be available, the data will allow for differentiation of transport by size fraction.
The sediment balance will be quantified by developing sediment load versus water discharge
rating curves for each portion of the sediment load (i.e., wash load, total bed material load,
bedload) using the available data or transport capacity calculations based on the hydraulic
modeling results, as appropriate. The rating curves will then be integrated over the relevant
hydrographs to estimate the total sediment load, and the resulting total sediment loads will then
be compared to determine if each segment of the reach between the locations represented by the
rating curves is net aggradational (i.e., more sediment is delivered to the reach than is carried
past the downstream boundary) or degradational (i.e., more sediment is carried out of the reach
than is delivered from upstream and lateral sources).
Previous studies have documented the potential for bias in suspended load rating curves due to
scatter in the relationship between sediment concentration or load and flow (Walling 1977a). Part
of the scatter is often caused by hysteresis in the sediment load versus discharge relationship,
where the loads on the rising limb are higher than on the falling limb due to availability of
material and coarsening of the surface layer during the high-flow portion of the hydrograph
(Topping et al. 2010). Bias is also introduced in performing linear least-squares regressions
using logarithmically-transformed data and then back-transforming the predicted sediment loads
to their arithmetic values (Walling 1977b; Thomas 1985; Ferguson 1986, Koch and Smillie
1986). The hysteresis effect can be accounted for by applying separate (or perhaps, shifting)
rating curves through rising and falling limbs of flood hydrographs (Guy 1964; Walling 1974;
Wright et al. 2010). Bias in the regression equations can be removed using the Minimum
Variance Unbiased Estimator (MVUE) bias correction for normally distributed errors, or the
Smearing Estimator (Duan 1983) when a non-normal error distribution is identified. These
methods were recommended by Cohn and Gilroy (1991) and have been endorsed by the USGS
Office of Surface Water (1992). Once the sediment measurements are available for review, the
potential for bias in the sediment rating curves will be considered and addressed as appropriate.
The rating curves for the mainstem Susitna stations, for gaged tributary stations, and those
developed for contributing ungaged areas between stations will be used to develop the sediment
balance for the pre-Project hydrology for representative wet, average, and dry years and warm
and cold Pacific Decadal Oscillation (PDO) phases. (The inclusion of the warm and cold PDO
phases was requested by NOAA-NMFS and USFWS in the May 31, 2012, study requests; the
rationale for the request was discussed at the June 14, 2012, Water Resources TWG meeting and
it was agreed that the PDO phases would be included in the suite of representative annual
hydrologic conditions.) The sediment balance will be calculated based on the assumption that
the sediment load in the Susitna River is currently in a state of equilibrium. To develop the
sediment balance for the post-Project condition, the historical (pre-Project) sediment rating curve
developed for the river immediately below the Watana Dam site (Tsusena Creek) will be reduced
by 100 percent for the bedload and 90 percent for the suspended load on a preliminary basis. If
the reservoir trap efficiency analysis discussed below indicates that a substantially different
FINAL STUDY PLAN GEOMORPHOLOGY STUDY 6.5
Susitna-Watana Hydroelectric Project Alaska Energy Authority
FERC Project No. 14241 Page 6.5-15 July 2013
amount of sediment will pass through the reservoir, the sediment load curves will be adjusted
accordingly.
6.5.4.3.2.1. Initial Sediment Balance (Lower Susitna River Segment)
The primary purpose of the Initial Sediment Balance evaluation for the Lower Susitna River
Segment performed in 2012 is to help evaluate the potential for the Project to alter sediment
transport conditions and channel response in the Lower Susitna River Segment. The results of
this evaluation will provide the basis for assessing the need to perform additional 1-D and 2-D
modeling and other studies related to potential channel change downstream from RM 75. The
Lower Susitna River Segment Sediment Balance depends on the sediment supply from the
Middle Susitna River Segment of the Susitna, the Chulitna and Talkeetna rivers, and other local
tributaries along the reach, and the transport capacity along the reach. The total sediment supply
to the Lower Susitna River Segment under pre-Project conditions is being evaluated using the
sediment rating curves developed from the historical data (and 2012 data, if available) for the
Susitna River at Gold Creek and near Talkeetna gages on the mainstem, and the below canyon
near Talkeetna and near Talkeetna gages on the Chulitna and Talkeetna rivers, respectively. The
historical rating curves for the Sunshine and Susitna Station gages, updated with any new
sediment transport data collected by USGS under the Bedload and Suspended Load Data
Collection at Tsusena Creek, Gold Creek, and Sunshine Gage Stations on the Susitna River, the
Chulitna River near Talkeetna and the Talkeetna River near Talkeetna (Section 6.5.4.2), are
being used to estimate the sediment loads in the river in the vicinity of RM 84 and RM 26.
6.5.4.3.2.2. Middle Susitna River Segment Sediment Balance
A more detailed sediment balance will also be developed in 2013 for the Middle Susitna River
Segment between the proposed Watana Dam site (RM 184) and the Three Rivers Confluence
(RM 98/98.5) using the available data, and when available, the hydraulic and sediment transport
modeling results for this portion of the study reach. Estimates of the contributions to the
sediment supply from the Upper Susitna River Segment identified mass wasting locations, bank
erosion, and contributing tributaries downstream of the dam will be an important aspect of this
analysis. An estimate of the volume of sediment from bank erosion will be made utilizing a
comparison of the channel location and area developed in the Assess Geomorphic Change
Middle and Lower Susitna River Segments study component (see Section 6.5.4.4) and
comparison of cross-sections surveyed in the 1980s and in 2012. The cross-sections may also be
used to determine if there has been a loss or gain in sediment supply from aggradation or
degradation of the bed in the Middle Susitna River Segment. Tributary sediment loading will be
estimated as part of the Fluvial Geomorphology Modeling Study (see Section 6.6.4.1.2.6).
Potential procedures to estimate the Middle Susitna River Segment sediment supply include the
use of watershed area and regional sediment supply relationships and the determination of the
differences on a seasonal or annual basis between the sediment loads estimated for the Susitna
River at the Tsusena Creek and Gold Creek gage locations. Past USGS sediment data may be
available for Indian River and Portage Creek, which could also be used to assist in the estimation
of the Middle Susitna River Segment sediment supply inputs. If data being collected by USGS
for the Bedload and Suspended Load Data Collection at Tsusena Creek, Gold Creek, and
Sunshine Gage Stations on the Susitna River, the Chulitna River near Talkeetna, and the
Talkeetna River near Talkeetna are available in time for this analysis, the 2012 data from
FINAL STUDY PLAN GEOMORPHOLOGY STUDY 6.5
Susitna-Watana Hydroelectric Project Alaska Energy Authority
FERC Project No. 14241 Page 6.5-16 July 2013
Tsusena Creek will be compared to the 2012 Gold Creek data to estimate the sediment inflow
between these two locations. This will allow development of a sediment rating curve from the
1985 data for the Susitna River at Tsusena Creek (representative of sediment transport at the
Watana Dam site).
6.5.4.3.2.3. Characterization of Bed Material Mobilization
Bedload transport, particularly for the gravel and cobble size-fractions, is the key process that
determines the dynamic behavior of the river bed both in the mainstem and in the side channel
that is important to fish habitat. In coarse-grained rivers such as the Susitna River, a coarse
surface layer is present that is typically not mobile over the full range of flows; thus, significant
bedload transport does not occur. An important part of the geomorphology study will involve
quantification of the range of flows over which bed mobilization occurs, and the potential change
in duration of those flows under Project conditions. The approximate discharge at which
bedload mobilization begins in the Susitna River near the proposed dam and at selected locations
in the Middle and Lower Susitna River Segments will be estimated using the USGS empirical
sediment rating curves, incipient motion calculations (i.e., estimates of the critical discharge at
which bed material begins to mobilize), and field observations. The resulting estimates of the
critical discharge will be used to assess the frequency and duration of bed mobilization under the
pre- and post-Project condition hydrology. This will be performed on both a monthly and annual
basis at the selected locations for a range of flow years.
The concept of incipient motion as advanced by Shields (1936) relates the critical shear stress for
particle motion (τc) to the dimensionless critical shear stress (τ*c) and the unit weight of
sediment (γs), the unit weight of water (γ), and the median particle size of the bed material (D50).
One key limitation of this relation is the specification of τ*c (often referred to as the Shields
parameter), which can range by a factor of three (Buffington and Montgomery 1997). The large
range in published values for τ*c is caused largely by the difficulty in defining and identifying
when bed material motion actually begins. To work around this limitation, Parker (Parker et al.
1982) defined a reference Shields stress (τ*r) that corresponds to a dimensionless transport rate
W* = 0.002, corresponding to a very low, but measurable transport rate. For this relationship, W*
is a function of the unit bedload and the total boundary shear stress, both of which are relatively
simple parameters to calculate from field data if bedload and discharge measurements are
included. (In the NOAA-NMFS and USFWS Study Plan Requests, it was proposed that the bed
material mobilization analysis be calibrated based on the use of tracers. This topic was discussed
at the Water Resources TWG held on June 14, 2012. AEA’s consultants indicated that the use of
tracers in a large river such as the Susitna would not be practical due to the difficulty in locating
the tracers after mobilization. Therefore, the use of tracers is not included in the proposed study
plan.)
Another limitation of the original Shields equation is that is does not consider hiding effects in
substrate with a broad range of particle sizes. Hiding effects result in mobilization of the larger
particles at lower shear stresses than would occur in uniform-sized substrate. This is due to the
larger substrate projecting farther into the flow than if they were surrounded by similarly sized
particles. Conversely, the smaller particles are mobilized at higher-than-expected shear stresses
because they are sheltered by the larger particles. Meyer-Peter, Muller, and Einstein recognized
this effect in developing their original bedload transport equations, and numerous researchers
have continued to evaluate and provide relationships that account for this effect (Parker et al,
FINAL STUDY PLAN GEOMORPHOLOGY STUDY 6.5
Susitna-Watana Hydroelectric Project Alaska Energy Authority
FERC Project No. 14241 Page 6.5-17 July 2013
1982; Andrews 1978; Neill 1969; and many others). In a general sense, these relationships
indicate that the original Shields equation only applies directly to the median (D50) substrate size,
and the substrate mixture is effectively immobile at shear stresses less than that required to
mobilize the median size. These relationships do, however, indicate varying degrees of selective
transport in which at least some of the finer particles mobilize at shear stresses less than that
required to mobilize the median size. The strength of this effect is marginally different among
the different relationships, most likely due to difference in the specific characteristics of material
used to develop them. For purposes of this study, the Parker et al. (1982) relationship will most
likely be used because it applies to relatively clean (i.e., low percentages of sand and finer
material) gravel and cobble substrate. If it is found that the substrate in specific areas contains
more than about 20 percent sand, the Wilcock and Crowe (2003) relationship will be used
because it takes into account effects of large amounts of sand in increasing the mobility of the
gravel/cobble fraction.
Because of the uncertainty in defining appropriate values of the Shields critical shear stress for
the median particles size, bed material mobilization at various locations along the study reach
will be characterized using the reference shear approach of Parker, following the methods of
Mueller et al. (2005). Data collected by USGS, which will include the necessary series of
coupled flow and bedload transport measurements, will be used to formulate a series of bedload
rating curves. These curves will then provide a basis for estimating τ* that corresponds to a
dimensionless transport rate W* = 0.002 for bed material mobilization.
6.5.4.3.2.4. Effective Discharge
The concept of effective discharge, as advanced by Wolman and Miller (1960), relates the
frequency and magnitude of various discharges to their ability to do geomorphic work by
transporting sediment. They concluded that events of moderate magnitude and frequency
transport the most sediment over the long-term, and these flows are the most effective in forming
and maintaining the planform and geometry of the channel. Andrews (1980) defined the
effective discharge as “the increment of discharge that transports the largest fraction of the
annual sediment load over a period of years.”
Estimates of the potential change in effective discharge between historic and post-Project
conditions provides a basis for predicting whether the bankfull channel capacity will change due
to the Project, and if so, the likely trajectory and magnitude of the changes. The concept of
effective discharge, as advanced by Wolman and Miller (1960), relates the frequency and
magnitude of various discharges to their ability to do geomorphic work by transporting sediment.
They concluded that events of moderate magnitude and frequency transport the most sediment
over the long-term, and these flows are the most effective in forming and maintaining the
planform and geometry of the channel.
Alluvial rivers adjust their shape in response to flows that transport sediment. Numerous authors
have attempted to relate the effective discharge to the concepts of dominant discharge, channel-
forming discharge, and bankfull discharge, and it is often assumed that these discharges are
roughly equivalent and correspond to approximately the mean annual flood peak (Benson and
Thomas 1966; Pickup 1976; Pickup and Warner 1976; Andrews 1980, 1986; Nolan et al. 1987;
Andrews and Nankervis 1995). Quantification of the range of flows that transport the most
sediment provides useful information to assess the current state of adjustment of the channel and
FINAL STUDY PLAN GEOMORPHOLOGY STUDY 6.5
Susitna-Watana Hydroelectric Project Alaska Energy Authority
FERC Project No. 14241 Page 6.5-18 July 2013
to evaluate the potential effects of increased discharge and sediment delivery on channel
behavior. Although various investigators have used only the suspended sediment load and the
total sediment load to compute the effective discharge, the bed material load should generally be
used when evaluating the linkage between sediment loads and channel morphology because it is
the bed material load that has the most influence on the morphology of the channel (Schumm
1963; Biedenharn et al. 2000).
For purposes of this study, the effective discharge will be computed for the Susitna River below
Tsusena Creek, at Gold Creek, and at Sunshine. This will be performed by dividing the full
range of flows at each location into at least 30 logarithmic classes (Biedenharn et al. 2000) and
then computing the sediment transport capacity at the average discharge within each flow class
using the previously described rating curves. The bed material transport in each flow class over
the long-term will be determined by multiplying the individual transport rates by the
corresponding flow duration, which is derived from mean daily flow duration curves. The
effective discharge is the flow, or range of flows, where the incremental bed material transport is
greatest. Effective discharges will be determined for both the pre- and post-Project conditions. If
the post-Project value is lower than the pre-Project value, it provides an indication that the
morphology of the channel will change because there is a reasonably well identified relationship
between the effective discharge and the size of the channel.
6.5.4.3.2.5. Information Required
The following available existing information will be needed to conduct this study:
• Current and historical aerial photographs.
• Historical suspended sediment and bedload data for the Susitna River and contributing
tributaries.
• Flow records for the Susitna River and contributing tributaries.
The following additional information will need to be obtained to conduct this study:
• Suspended and bedload data for the Susitna River at Tsusena Creek and Gold Creek
being performed by USGS.
• Extended flow record for the Susitna River and gaged tributaries within the study area
being developed by USGS.
• Estimated flows for the ungaged tributaries within the study area.
• Extended flow records for the Susitna River and tributaries being developed by USGS.
• Collection of bed material samples throughout the Middle and Lower River Segments, as
well as contributing tributaries.
• Hydraulic conditions in the Susitna River from the Hydraulic Routing Model.
• Surveys of channel geometry for contributing tributaries to simulate hydraulic conditions.
FINAL STUDY PLAN GEOMORPHOLOGY STUDY 6.5
Susitna-Watana Hydroelectric Project Alaska Energy Authority
FERC Project No. 14241 Page 6.5-19 July 2013
6.5.4.3.3. Study Products
The results of the Sediment Supply and Transport Middle and Lower Susitna River Segments
study component will be included in the Geomorphology Report. Information provided will
include the following:
• Tabular and graphical summary of available discharge and sediment transport data.
• Description of procedures used to develop sediment transport rating curves from
suspended load and bedload data, including development of curves for specific sediment
size-classes.
• Graphical and numerical relationships for sediment discharge rating curves.
• Narrative describing procedures used to perform effective discharge and bed mobilization
calculations.
• Determination of total sediment load delivered to the Susitna River for pre- and post-
Project conditions (the latter based on preliminary assumption that 100 percent bedload
and 90 percent of suspended load will be trapped behind the Project dam; this estimate
can be refined if the trap efficiency analysis indicates substantially different results).
• Estimate of Middle Susitna River Segment sediment supply inputs from local tributaries
and other sources.
• Tabular and graphical representation and comparison of the duration and frequency of
bed material mobilization in the Middle and Lower Susitna River Segments for pre- and
post-Project conditions.
• Estimates of the effective discharge for the pre- and post-Project conditions, and the
likely effects on channel morphology.
• Estimates of the overall sediment transport balance along the reach and the likely effects
on channel morphology, particularly with respect to aggradation/degradation trends and
changes in braiding potential. In reaches with net sediment deficit, results from the bed
mobilization analysis will also be considered in assessing degradation tendencies.
6.5.4.4. Study Component: Assess Geomorphic Change Middle and Lower Susitna
River Segments
The goal of this study component is to compare existing, 1980s and 1950s geomorphic feature
data from aerial photo analysis to characterize channel stability and change and the distribution
of geomorphic features under unregulated flow conditions. The effort will include use of the
best available aerial photographs from the 1950s to provide a longer range assessment of channel
change. The acquisition of the current aerials for the Middle Susitna River Segment was initiated
in 2012 as part of the Aquatic Habitat and Geomorphic Mapping of the Middle Susitna River
Segment Using Aerial Photography study (Section 6.5.4.5) and for the Lower Susitna River
Segment as part of the Riverine Habitat Area versus Flow Lower Susitna River Segment (Section
6.5.4.7). Digitization of the geomorphic features from the 1980s and 2012 aerial, determination
of geomorphic feature areas, and qualitative assessment of channel change were conducted in
2012 for the flows that aerials could be obtained. Due to a combination of weather and flows
conditions, not all aerials originally planned for acquisition in 2012 were obtained. The
FINAL STUDY PLAN GEOMORPHOLOGY STUDY 6.5
Susitna-Watana Hydroelectric Project Alaska Energy Authority
FERC Project No. 14241 Page 6.5-20 July 2013
acquisition of the aerials is discussed further in Sections 6.5.4.4.2.1 and 6.5.4.4.2.2. The
remainder of the effort described will be conducted in 2013. The study area extends from the
mouth of the Susitna River (RM 0) at Cook Inlet to the proposed Watana Dam site (RM 184).
6.5.4.4.1. Existing Information and Need for Additional Information
An analysis of the Middle Susitna River Reach geomorphology and how aquatic habitat
conditions changed over a range of stream flows was performed in the 1980s using aerial
photographic analysis (Trihey & Associates 1985). A similar analysis was performed for the
Lower Susitna River Segment (R&M Consultants, Inc. and Trihey & Associates 1985a).
The1980s Lower Susitna River Segment study also included an evaluation of the morphologic
stability of islands and side channels by comparing aerial photography between 1951 and 1983.
An analysis of channel changes of the Middle River was presented in Geomorphic Change in the
Middle Susitna River Since 1949 (Labelle et al. 1985). In this document, aerial photographs and
other data from the late 1940s through the early 1980s was evaluated to determine historical
change in the Middle Susitna River Segment including the important off-channel macrohabitats
identified in the 1980s studies (side channels, side sloughs, and upland sloughs).
The AEA Susitna Water Quality and Sediment Transport Data Gap Analysis Report (URS 2011)
states that “if additional information is collected, the existing information could provide a
reference for evaluating temporal and spatial changes within the various reaches of the Susitna
River.” The gap analysis emphasizes that it is important to determine if the conditions
represented by the data collected in the 1980s are still representative of current conditions and
that at least a baseline comparison of current and 1980s-era morphological characteristics in each
of the identified sub-reaches is required.
Understanding existing geomorphic conditions and how laterally stable/unstable the channels
have been over recent decades provides a baseline set of information needed to provide a context
for predicting the likely extent and nature of potential changes that will occur due to the Project.
Results of this study may also be used in the Riparian Instream Flow (Section 8.6) and Ice
Processes (Section 7.6) studies to provide the surface areas of bars likely to become vegetated in
the absence of ice-cover formation. This would be accomplished by evaluating the areas of
exposed bars within river segments over a range of flows and developing exposed bar area
discharge curves that could then be used to assess the impacts of the Project flows on bar
inundation by both flows and ice. Increases in areas that would be both inundation- and ice-free
are likely to permit vegetation establishment and persistence.
Determination of the rate that area occupied by the channel is converted to floodplain and
islands, and area occupied by floodplain and islands is converted to channel will provide
information useful in identifying LWD recruitment rates and characterizing floodplain dynamics
important to the Riparian Instream Flow Study (Section 8.6). Therefore, a “turnover” analysis is
included as part of this study component.
6.5.4.4.2. Methods
This study component has been divided into the Middle and Lower Susitna River Segments
because the available information differs. The analysis of geomorphic change will be conducted
for a single representative discharge.
FINAL STUDY PLAN GEOMORPHOLOGY STUDY 6.5
Susitna-Watana Hydroelectric Project Alaska Energy Authority
FERC Project No. 14241 Page 6.5-21 July 2013
6.5.4.4.2.1. Middle Susitna River Segment
The orthorectified digital images of the historical 1983 black and white aerial photographs for
the Middle River at a flow of 12,500 cfs were acquired for the area from RM 98 to RM 150 (RM
150 was the limit of the coverage from the 1980s effort). Additional historical aerials were
acquired to allow delineation of the geomorphic features from RM 150 to 184. The September 6,
1983, aerials flown at a flow of 12,500 cfs, as measured at the Gold Creek Gage, were used for
the historical condition. From RM 98 to RM 150, color aerials from July 19–20, 1980, at flows
ranging between 31,800 and 35,900 cfs (as measured at Gold Creek), not collected as part of the
original Susitna Project effort, were used to digitize geomorphic features from RM 150 to RM
184. The 1980s orthorectified digital images of historical aerials were also acquired for the
Upper River from RM 184 to RM 260. The aerials from RM 184 to RM 252 were from the same
July19–20, 1980 acquisition as the RM 150 to RM 184 aerials. From RM 252 to RM 260, color
aerials from August 24, 1981 were obtained. The flow at Gold Creek on this date was 35,000
cfs.
Acquisition of the 2012 aerials was targeted at a flow of 12,500 cfs; however, due to a
combination of late season high flows and poor weather, the actual 2012 aerials were collected at
flows of 13,300 cfs for RM 98 to RM 135 and 18,100 cfs for RM 136 to RM 184. Table 6.5-3
summarizes the 2012 aerial photo data collection effort for the Lower, Middle, and Upper
Susitna River segments and indicates the RMs and discharges at which various sets of photos
were obtained. The higher flow for the RM 136 to RM 184 should not create problems with
digitizing geomorphic features, except that the areas of the gravel bars will require adjustment
prior to comparison with 1980s information for use in 2013. Completion of aerial collection at
the targeted flows will be performed in 2013, so the final information is expected to be based on
flows closer to the target of 12,500 cfs.
In 2012, for the both the 1983 and 2012 aerials, each feature was digitized as a polygon (without
slivers) using ArcGIS software. Associated metadata were developed for both sets of digitized
geomorphic features. The primary geomorphic features that are visible between the 1980s and
current images, including the main channel, side channels, and sloughs were digitized from the
aerial database just described. In addition, the presence and extent of mid-channel bars, vegetated
bar areas, and changes at tributary deltas were digitized.
The information developed from digitizing the aerials is being used to analyze and compare the
geomorphology for 1980s and current conditions. From RM 98 to RM 184, Geographic
Information System (GIS) software is being used to compare the 2012 versus 1980s total surface
area associated with each geomorphic feature. Results will be compiled into tables and graphs, as
appropriate, to show the difference in surface areas of the feature types between 2012 and the
1980s photography. The lead geomorphologist has trained the staff performing the digitization to
ensure appropriate application of the geomorphic definitions. Since this 34-mile river segment
below the proposed Watana Dam site (RM 150 to RM 184) was not analyzed in the 1980s, the
historical aerials are at a higher discharge, 30,000 cfs compared to 12,500 cfs, and the area of
exposed gravel will not be comparable to the 2012 aerials at a lower flow without adjustment. It
may be more appropriate to compare this 1980s RM 150 to RM 184 information with the results
of the 2012 aerials collected at 23,200 cfs. A final decision on the 2012 aerials used from RM
150 to 184 for comparison with the 1980s will be made in 2013 after the 2013 supplemental
aerial photo acquisition effort is conducted. (The 2013 supplemental aerial photo acquisition
FINAL STUDY PLAN GEOMORPHOLOGY STUDY 6.5
Susitna-Watana Hydroelectric Project Alaska Energy Authority
FERC Project No. 14241 Page 6.5-22 July 2013
effort will be performed to fill in flow rates and areas that were scheduled for collection in 2012
but were not collected due to a combination of weather and flow conditions.)
In 2013, orthorectified digital versions of historical 1950s aerials will be acquired and the
geomorphic features digitized. Acquisition of these aerials and performing the effort is
dependent on locating a set of historical aerials from the 1950s or early 1960s that are of
sufficient quality to provide for meaningful comparison between the other two datasets (1980s
and current).
The change in channel planform over the length of the river (main channel location, side channel
location, bars, channel and side channel width, channel and side channel location) will first be
qualitatively assessed between the 1980s and 2012. This will be performed to assist in selection
of the proposed Focus Areas. The geomorphic reach delineations will be reviewed in terms of the
information on channel change and geomorphic reach limits adjusted if necessary to properly
characterize channel stability. Reaches will be identified that are relatively stable versus those
that are more dynamic. Reaches that would be most susceptible to channel change (e.g., width or
planform change) with changes in the flow or sediment regime resulting from the Project or
Project operations will be qualitatively identified because these are currently the most dynamic.
In 2013, a quantitative evaluation of channel change in the Middle River will be performed by
conducting a “turnover” analysis (Note: the turnover analysis was added to the RSP as a result of
comments on the PSP from the EPA submitted November 14, 2012). The digitized maps of the
geomorphic features will be used to determine how much of the area covered by water in the
1950s and 1980s is land in 2012 versus still covered by water, taking into account river stage for
the aerials not collected at ~12,500 cfs, and how much of the area covered by water today was
land versus covered by water in the 1980s and 1950s. This analysis will be performed on a
geomorphic reach basis. This information will be used to calculate a “turnover rate” (water to
land and land to water, in acres per year) for each reach, for the periods between the 1950s and
the1980s, and between the 1980s and 2012 aerial imagery. The resulting reach-scale data will be
used to define the reach-scale turnover rate values. The resulting quantitative data on turnover
rate will be compared with hydrologic conditions, events at upstream glaciers, and other
potential factors such as the occurrence of earthquakes to determine potential differences in the
turnover rates from the two periods. Spatially, the turnover rates will be compared between
reaches and channel types to determine if there is a difference in turnover between the various
reaches and associated channel types.
Depending upon the results of the riverine geomorphic analysis, additional historical
photographic analysis may be requested as part of future geomorphic studies, but this additional
analysis is not included at this time. Additional analysis of historical aerial photographs and the
corresponding flows that occurred between 1950s and 2012 could be pertinent if substantial
changes in the riverine habitat types (surface area, locations, etc.) are identified during
comparison of the 2012, 1980s, and 1950s photography. A decision on whether to acquire
additional aerials will be made in Q4 2013. While the long-term changes in river morphology are
the result of a range of flows, if significant changes are identified between pairs of aerial
photographs, review of the hydrologic record frequently identifies events that are more than
likely to have been morphogenetically significant. This type of additional aerial photo analysis
could provide more specific information on the flow magnitude(s) and other conditions (for
example, ice formation) that may cause substantial geomorphic channel adjustments.
FINAL STUDY PLAN GEOMORPHOLOGY STUDY 6.5
Susitna-Watana Hydroelectric Project Alaska Energy Authority
FERC Project No. 14241 Page 6.5-23 July 2013
6.5.4.4.2.2. Lower Susitna River Segment
In 2012, orthorectified digital images of the 36,600-cfs (as measured at Sunshine Station)
September 6, 1983, set of Lower Susitna River Segment aerial photographs were obtained for the
Lower Susitna River Segment from RM 0 to RM 98. Acquisition of 2012 aerials for the Lower
Susitna River Segment at a targeted flow of approximately 36,600 cfs was planned. Due to a
combination of weather and flows conditions, the Lower River aerials were acquired at several
different times for flows ranging from 38,100 cfs to 46,900 cfs. For determining geomorphic
features, these flows are considered to be within the target range.
The extent of the side channels, main channel, anabranches and braid plain in the Lower Susitna
River Segment, including the Three Rivers Confluence area, were digitized for both the 1980s
and 2012 aerials. Planform shifts of the main channel and side channels are being identified
between the 1983 and current aerial photography. This work was performed in 2012 to help in
confirmation or adjustment of the downstream study limit for the Fluvial Modeling
Geomorphology Study. Geomorphic features that are visible between the 1983 and 2012 images,
including the presence and extent of individual side channels, side channel complexes, vegetated
islands or bar complexes, and tributary deltas, were mapped and characterized. In areas where
the mainstem channel consists of a dynamic braid plain mostly void of stabilizing vegetation, the
effort was directed at defining the edges of the active channel rather than detailing the myriad of
channels within the active area. Portions of the area within the braid plain were identified as bar
island complexes and side channel complexes. Major sloughs and side channels along the Lower
Susitna River Segment margins were included in the digitizing effort.
In 2013, orthorectified digital versions of historical 1950s aerials will be acquired and the
geomorphic features digitized. Acquisition of these aerials and performing the effort is
dependent on locating a set of historical aerials from the 1950s or early 1960s that are of
sufficient quality to provide for meaningful comparison between the other two datasets (1980s
and current). The geomorphic change over the length of the river (main channel location, side
channel location, bars, channel and side channel width, channel and side channel location) will
be qualitatively assessed between the 1980s and current conditions. Reaches will be identified
that are relatively stable versus those that are more dynamic. Reaches that would be most
susceptible to channel change (e.g., width or planform change) with changes in the flow or
sediment regime resulting from the Project or Project operations will be qualitatively identified.
In 2013, a quantitative evaluation of channel change in the Lower River will be performed by
conducting a “turnover” analysis (Note: the turnover analysis was added to the RSP as a result of
comments on the PSP from the EPA submitted November 14, 2012). The digitized maps of the
geomorphic features will be used to determine how much of the area covered by water in the
1950s and 1980s is land in 2012 versus still covered by water, taking into account river stage for
the aerials not collected at ~36,600 cfs, and how much of the area covered by water today was
land versus covered by water in the 1980s and 1950s. This analysis will be performed on a
geomorphic reach basis. This information will be used to calculate a “turnover rate” (water to
land and land to water, in acres per year) for each reach for the periods between the 1950s and
the1980s, and between the 1980s and 2012 aerial imagery. The resulting reach-scale data will be
used to define the reach-scale turnover rate values. The resulting quantitative data on turnover
rate will be compared with hydrologic conditions, events at upstream glaciers, and other
potential factors such as the occurrence of earthquakes to determine potential differences in the
FINAL STUDY PLAN GEOMORPHOLOGY STUDY 6.5
Susitna-Watana Hydroelectric Project Alaska Energy Authority
FERC Project No. 14241 Page 6.5-24 July 2013
turnover rates from the two periods. Spatially, the turnover rates will be compared between
reaches and channel types to determine if there is a difference in turnover between the various
reaches and associated channel types.
Depending on the results of the riverine geomorphic analysis, additional historical photographic
analysis may be requested as part of future geomorphic studies, but this additional analysis is not
included at this time. Additional analysis of historical aerial photographs and the corresponding
flows that occurred between the 1950s and 2012 could be pertinent if substantial changes in the
riverine habitat types (surface area, locations, etc.) are identified during comparison of the 2012,
1980s and 1950s photography. While the long-term changes in river morphology are the result of
a range of flows, if significant changes are identified between pairs of aerial photographs, review
of the hydrologic record frequently identifies events that are more than likely to have been
morphogenetically significant. This type of additional aerial photo analysis could provide more
specific information on the flow magnitude(s) and other conditions (for example, ice formation)
that may cause substantial geomorphic channel adjustments. A decision on whether to acquire
additional aerials will be made in Q4 2013.
6.5.4.4.2.3. Information Required
The following available existing information will be needed to conduct this study:
• Historical 1980s orthorectified aerial photographs for the Middle and Lower Susitna
River Segments.
• Historical 1950s orthorectified aerial photographs for the Middle and Lower Susitna
River Segments.
The following additional information will be needed to conduct this study:
• Obtain recent or develop 2012 orthorectified aerial photos in the Middle and Lower
Susitna River Segments at a flow similar to the historic aerials (12,500 cfs Middle
Susitna River Segment and 36,600 cfs Lower Susitna River Segment) (acquired in 2012).
• Supplemental aerials Middle River to be collected in 2013 for any areas with gaps in
2012 coverage at the 12,500 cfs target flow.
6.5.4.4.3. Study Products
The results of the Assess Geomorphic Change Middle and Lower Susitna River Segment
component will be included in the Geomorphology Report. Information provided will include
the following (Note: 1950s products are dependent on suitable aerials being available from the
1950s):
• Maps showing riverine geomorphic features outlined in the Middle and Lower Susitna
River Segments for the 1950s, 1980s, and 2012 for flows of approximately 12,500 cfs
and 36,600 cfs, respectively.
• Maps showing the distribution of all riverine geomorphic features for the three dates and
for the Middle and Lower Susitna River Segments.
• Overlay map of 1950s, 1980s, and 2012 riverine geomorphic features to qualitatively
assess the level of change in the channel morphology over the past three decades.
FINAL STUDY PLAN GEOMORPHOLOGY STUDY 6.5
Susitna-Watana Hydroelectric Project Alaska Energy Authority
FERC Project No. 14241 Page 6.5-25 July 2013
• Tabular and graphical representation of the areas for each riverine geomorphic feature
type by geomorphic reaches within the Middle and Lower Susitna River Segments.
• Qualitative assessment of the level of geomorphic change within each geomorphic reach
over the lengths of the Middle and Lower Susitna River Segments including
identification of stable versus non-stable areas.
• Quantitative assessment of geomorphic change based on conducting a turnover rate
analysis identifying the area of channel converted to land and land converted to channel
for the periods of 1950s to 1980s and 1980s to 2012.
In addition, an ArcGIS shapefile will be provided with the following information:
• 1950s, 1980s, and 2012 orthorectified aerial imagery on GIS layer for the Middle and
Lower Susitna River Segments.
• Digitized polygons for each riverine habitat feature type in the Middle and Lower Susitna
River Segments.
6.5.4.5. Study Component: Riverine Habitat versus Flow Relationship Middle Susitna
River Segment
The goal of this study component is to delineate existing and 1980s riverine macrohabitat types
and develop wetted habitat area data over a range of flows to quantify riverine macrohabitat
surface area versus flow relationships. The habitat areas will be determined for the riverine
macrohabitats as defined in the 1980s (main channel, side channel, side slough, upland slough,
tributary mouth and tributary).
It is noted that the macrohabitats being delineated in this study component is one of five levels of
nested and tiered habitat classification being applied to the Middle Susitna River Segment. The
system is presented in Table 9.9-4 of the Characterization and Mapping of Aquatic Habitats
(Section 9.9). The classification levels include rivers segment, geomorphic reach, macrohabitats,
mesohabitat, and edge habitat. The Geomorphology Study has defined the Susitna River
segments and geomorphic reaches. The effort in this section will map approximately 50 percent
of the macrohabitat in the Middle River. The results will be provided to the habitat
characterization study (Section 9.9) to add macrohabitat subcategories not defined in the 1980s
classification scheme. These include split main channel, multiple split main channel, backwater,
and beaver complex. The habitat characterization study (Section 9.9) will also conduct the
mapping for the fourth and fifth levels of the classification scheme.
The study area extends from the Three Rivers Confluence area (RM 98) to the Watana Dam site
(RM 184). Sixteen study sites representing approximately 50 percent of the river studied in the
1980s were studied in the 2012 study. Due to a combination of weather and flow conditions, not
all aerials intended to be acquired in 2012 were flown (Table 6.4-3 summaries the 2012 aerial
photo acquisition). Therefore, development of the riverine habitat area versus flow relationships
for the current condition will continue into 2013. The 2012 effort does supply the information
necessary for reach stratification and selection of proposed Focus Areas in the Middle River.
Additionally, all or part of the remaining portion of the Middle Susitna River Segment may be
studied in 2013–2014, depending on the outcome and recommendations from the 2012 study as
well as the finalization of instream flow Focus Areas.
FINAL STUDY PLAN GEOMORPHOLOGY STUDY 6.5
Susitna-Watana Hydroelectric Project Alaska Energy Authority
FERC Project No. 14241 Page 6.5-26 July 2013
6.5.4.5.1. Existing Information and Need for Additional Information
An analysis of the Middle Susitna River Segment and how riverine habitat conditions change
over a range of stream flows was performed in the 1980s using aerial photographic analysis
(Trihey & Associates 1985). This study evaluated the response of riverine aquatic habitat to
flows in the Middle Susitna River Segment between the Three Rivers Confluence (RM 98) and
Devils Canyon (RM 150) ranging from 5,100 cfs to 23,000 cfs (measured at Gold Creek gage
[approximately RM 134]).
Understanding existing geomorphic conditions, how aquatic macrohabitat changes over a range
of stream flows, and how stable/unstable the geomorphic conditions have been over recent
decades provides a baseline set of information needed to provide a context for predicting the
likely extent and nature of potential changes that will occur due to the Project. Results of this
study will also provide the basis for macrohabitat mapping to support the Fish and Aquatics
Instream Flow Study (Section 8.5) and will be used in the Ice Processes Study (Section 7.6) to
provide the surface areas of bars likely to become vegetated in the absence of ice-cover
formation.
6.5.4.5.2. Methods
Aerial photography obtained in 2012 were combined with 1980s and other information to create
a digital, spatial representation (i.e., GIS database) of riverine habitat. The result was intended to
be a quantification of the area of the riverine habitat types for three flow conditions for the
historical 1980s condition and the current 2012 condition. Due to a combination of weather and
flow conditions, only portions of two out of the three flows were collected (aerials for high and
medium flows were collected, but no aerial low flows were collected). A supplemental data
collection effort will be conducted in 2013 to complete the acquisition of aerials for all three
flows for the entire Middle Susitna River Segment.
The results for the information available in 2012 will be analyzed and presented in January 2013
as riverine habitat versus area relationships at three spatial levels: for the Middle Susitna River
Segment, for the geomorphic reaches in the Middle Susitna River Segment, and for individual
habitat study sites (This includes all ten proposed Focus Areas and seven additional sites studied
in the 1980s that are not proposed Focus Areas). Comparison between the results from the 1980s
and 2012 are being made. The historical information is only being developed for the reach from
RM 98 to RM 150 because the delineation of habitat in the Devils Canyon section, RM 150 to
RM 184, was not performed in the 1980s.
The methods for this study component have been divided into three tasks: aerial photography,
digitize riverine habitat types, and riverine habitat analysis.
6.5.4.5.2.1. Aerial Photography
Portions of new color aerial photography of the Middle Susitna River Segment (RM 98 to RM
184) at stream flows corresponding to those analyzed in the Trihey & Associates study (1985)
(stream flow at the Gold Creek gage [15292000]) were obtained in 2012 to provide the
foundation for the aquatic habitat and geomorphic mapping of the Middle Susitna River
Segment, as well as to provide a resource for other studies. The aerials collected included RM 98
to RM 107 at 23,200 cfs, RM 98 to RM 135 at 13,300 cfs, and RM 136 to RM 184 at 18,100 cfs.
FINAL STUDY PLAN GEOMORPHOLOGY STUDY 6.5
Susitna-Watana Hydroelectric Project Alaska Energy Authority
FERC Project No. 14241 Page 6.5-27 July 2013
It was the intent of the study plan to obtain three sets of aerial photography in 2012 at the
following approximate discharges: 23,000 cfs; 12,500 cfs; and 5,100 cfs. (Note: seven sets of
aerial photographs were flown and evaluated in the 1985 study at the stream flows of 5,100 cfs;
7,400 cfs; 10,600 cfs; 12,500 cfs; 16,000 cfs; 18,000 cfs; and 23,000 cfs). The combination of
weather conditions and river flows only allowed the 23,000 cfs and a portion of the 12,500 cfs
set of aerials to be collected in 2012. No aerials were obtained for the lowest flow of 5,100 cfs as
ice and snow cover formed prior to the Susitna River dropping to this level. In order to provide a
complete set of current aerial imagery, the 23,000 cfs aerials were collected for the entire study
are from RM 0 to RM 260. The aerial photography was collected in 2012 at a scale of 1:12,000
and with a pixel resolution of 1 foot or better. Images to be collected in 2013 will be flown at the
same scale and resolution. The flow levels intended to be collected in 2013 will be the
remainder of the 12,500 cfs acquisition and all of the 5,100 cfs acquisition. If weather and
discharge conditions have not occurred that allowed for collection of the aerials at the specified
discharges by September 1 of 2013, a more opportunistic approach to obtaining the aerials will
be instituted and alternate flows may be substituted for the 12,500 cfs and 5,100 cfs discharges to
insure that a medium and low flow set of images are collected by the end of 2013.
Digital orthorectified images of the 1980s 12,500 cfs aerial photos will be obtained to serve as
the base map for overlaying the digitized riverine habitat types from the1980s map book (Trihey
and Associates 1985).
6.5.4.5.2.2. Digitize Riverine Habitat Types
For the 2012 effort, 17 study sites totaling 26.3 river miles were selected from the 1980s effort
The 17 sites represent over 50 percent of the 49 miles (RM 100 to RM 149) of the Middle
Susitna River Segment with aquatic habitat delineated in the 1980s. The selected sites are listed
in Table 6.5-4. Selection of the sites was based on consideration of habitat and geomorphic
characteristics of the reach and a visual qualitative side-by-side comparison of the aerials to
ensure that the selected reaches were also representative of the level of change that has occurred
over the period of comparison. The sites include the seven proposed Focus Areas, as identified in
Section 6.6.1.2.4, in this portion of the Middle Susitna River Segment. Aerial photography for
both 1980s and present condition was obtained for the entire reach so that additional areas may
be digitized in the future if warranted.
The Middle Susitna River Segment upstream of RM 150 was not studied in the 1980s; however,
the current habitat features are to be delineated on 50 percent of the portion of the Segment
encompassing Geomorphic Reaches MR-1 and MR-2. Six sites were selected, representing a
variety of conditions and totaling 9.0 miles of the total 17.5 miles of combined Geomorphic
Reaches MR-1 and MR-2. These sites include three proposed Focus Areas identified in Section
6.6.4.1.2.4. and represent approximately 50 percent of Geomorphic Reaches MR-1 and MR-2.
Coordination has occurred and will continue to occur with AEA’s Spatial Data Contractor to
digitize (within the aerial photography analysis study reaches) the riverine habitat types from
RM 98 to RM 150 defined in the 1980s from hard copy maps found in the Middle Susitna River
Segment Assessment Report (Trihey & Associates 1985). Each habitat type has been digitized as
a polygon (without slivers). The digitized habitat types are overlaid on a digital orthorectified
image of the 1980s 12,500 cfs black and white aerial. The habitat types were classified into the
following categories: main channel, side channel, side sloughs, upland sloughs, and tributary
mouths.
FINAL STUDY PLAN GEOMORPHOLOGY STUDY 6.5
Susitna-Watana Hydroelectric Project Alaska Energy Authority
FERC Project No. 14241 Page 6.5-28 July 2013
In 2012, riverine habitat types for the identified study sites were delineated and digitized from
the 2012 aerials at the selected 23,000 cfs and for portions sites of the 12,500 cfs. Sites included
the 17 sites identified for the 1980s digitization effort as well as six additional sites between RM
166.5 and RM 184, identified in coordination with the FA-IFS (Section 8.5), the R-IFS (Section
8.6), Ice Processes Study (Section 7.6), and other pertinent studies. The habitat types were
digitized from the orthorectified photography using ArcGIS software (each habitat type must be
a polygon without slivers). Riverine habitat was classified using the same classification
categories used in the Trihey & Associates study (1985) main channel, side channel, side
sloughs, upland sloughs, and tributary mouths.
In 2013, the digitization of the riverine habitat types and determination of the areas will be
completed. This will include acquisition of the remaining portions of the 12,500 cfs and all of the
5,100 cfs orthorectified aerial photos.
6.5.4.5.2.3. Riverine Habitat Analysis
The information developed in the previous task are being used to develop relationships for
riverine habitat versus flow for the specified reaches and habitat study sites. The relationships
will be developed for both 1980s and 2012 and 2013 aerials. The riverine habitat type surface
area versus flow relationships between the 1980s and current conditions are being compared at
both a site and reach scale to determine if changes in the relationships have occurred. The
comparison can only be performed for a portion of the reach, since the 1980s study did not cover
the entire Middle Susitna River Segment. This effort will be completed in December 2012 and
reported on in January 2012 for the 23,000 cfs and the portion of the 12,500 cfs aerials collected
in 2012.
From RM 98 to RM 150, GIS software was used to compare the 2012/2013 versus 1980s total
surface area associated with each delineated riverine habitat type at each measured flow. Results
are being compiled into tables and graphs, as appropriate, to show the difference in surfaces area
of the feature types between 2012/2013 and the 1980s photography and to show the change in
riverine habitat types versus flow. To ensure accurate comparison to the 1980s data set, not only
are the same approximate flows be compared, but the same definitions are being used for each of
the riverine habitat features that are delineated (see above). The Lead Geomorphologist has
provided training to the staff performing the delineation to ensure appropriate application of the
habitat definitions.
Since the 34-mile river segment below the proposed Watana Dam site (RM 150 to RM 184) was
not analyzed in the 1980s, this portion of the river is a new assessment (2012/2013 photography
only) that will not be compared to past studies. However, the methods for analyzing riverine
habitat types over the range of flows remain the same as for the downstream reach (23,000 cfs;
12,500 cfs; and 5,100 cfs). For Geomorphic Reaches MR-3 and MR-4, which include Devils
Canyon and the river immediately upstream, no habitat sites have been selected for study. This
reach has a high level of lateral and vertical control, the areas associated with riverine habitat
types have likely experienced little change. Results of the study component Assess Geomorphic
Change Middle and Lower Susitna River Segments (Section 6.5.4.4) will determine whether
there has been change in geomorphic features in this portion of the Middle Susitna River
Segment.
FINAL STUDY PLAN GEOMORPHOLOGY STUDY 6.5
Susitna-Watana Hydroelectric Project Alaska Energy Authority
FERC Project No. 14241 Page 6.5-29 July 2013
Habitat features are being compared and contrasted quantitatively and a qualitative assessment
will be made of the similarity of the sites in 2012/2013 compared to the 1980s in order to assess
the stability of the study sites. The results for the sites with 2012 aerials will be reported on in
January 2013. A decision will also be made as to whether the remaining portions of the Middle
Susitna River Segment, beyond the original selected study sites analyzed in 2012, will be
digitized and analyzed in 2013–2014.
6.5.4.5.2.4. Information Required
The following available existing information will be needed to conduct this study:
• Historical 1980s orthorectified aerial photographs for the Middle Susitna River Segment.
• USGS flow records for the past 10 years for the Susitna River at Gold Creek.
The following additional information will be needed to conduct this study:
• Obtain (fly) 2012/2013 orthorectified aerial photos in the Middle Susitna River Segment
at 5,100; 12,500; and 23,000 cfs (corresponds to 1980s flow) (partially completed in
2012).
• Obtain orthorectified digital images of 1980s black and white aerial photos in the Middle
Susitna River Segment at 12,500 cfs base map aerial (completed in 2012).
6.5.4.5.3. Study Products
The results of the Riverine Habitat Versus Flow Relationship Middle Susitna River Segment
component will be included in the Geomorphology Report. Information provided will include
the following:
• Tabulation of the riverine habitat types versus flow on a reach and individual site basis
for the 1980s and 2012/2013 conditions.
• Graphical representation of the riverine habitat type area versus flow relationships by
reaches for both the 1980s and 2012/2013 data.
• Assessment of the change and similarity in riverine habitat types between the 1980s and
2012 and conclusions on site stability to aid the Instream Flow Study in site selection and
determination of the applicability of the 1980s data to represent current conditions.
In addition, an ArcGIS shapefile will be provided with the following information:
• Orthorectified 2012/2013 aerial imagery of the Middle Susitna River Segment at 5,100
cfs; 12,500 cfs; and 23,000 cfs.
• Orthorectified 1983 aerial imagery of the Middle Susitna River Segment from RM 98 to
RM 150 at 12,500 cfs.
• Digitized polygons representing the 1980s riverine habitat types for the Middle Susitna
River Segment at 5,100 cfs; 12,600 cfs; and 23,000 cfs from RM 98 to RM 150 (Middle
Susitna River Segment below Devils Canyon).
• Digitized polygons representing the current (2012/2013) riverine habitat types for the
Middle Susitna River Segment at 5,100 cfs; 12,500 cfs; and 23,000 cfs from RM 98 to
FINAL STUDY PLAN GEOMORPHOLOGY STUDY 6.5
Susitna-Watana Hydroelectric Project Alaska Energy Authority
FERC Project No. 14241 Page 6.5-30 July 2013
RM 150 (Middle Susitna River Segment below Devils Canyon) and RM 150 to 184
(Middle Susitna River Segment in Devils Canyon and above Devils Canyon).
6.5.4.6. Study Component: Reconnaissance-Level Assessment of Project Effects on
Lower and Middle Susitna River Segments
The goal of the Reconnaissance-Level Assessment of Project Effects on Lower and Middle
Susitna River Segments study component is to utilize comparison of pre- and post-Project flows
and sediment transport conditions to estimate the likelihood for potential post-Project channel
change in the Lower and Middle Susitna River Segments. The study area for this effort is the
Lower Susitna River Segment from RM 98 to RM 0 and the Middle Susitna River Segment from
RM 184 to RM 98. The initial effort involves the Lower River and was started in 2012 and will
be completed in early 2013. The results of this effort will help determine what additional analysis
of Project effects may be warranted in the Lower Susitna River Segment for the 2013–2014
studies. The initial Middle River assessment will be performed in Q3 2013. Continued
application of the framework to both the Lower and Middle Susitna River segments as additional
information on with-Project hydrology, sediment transport, and the geomorphology of the
system are developed by the various studies will provide additional context for identification of
Project effects including interpretation of and integration with the Fluvial Geomorphology
Modeling Study results.
6.5.4.6.1. Existing Information and Need for Additional Information
An analysis of the Lower Susitna River Segment and how riverine habitat conditions change
over a range of stream flows was performed in the 1980s using aerial photographic analysis
(R&M Consultants, Inc. and Trihey and Associates 1985a). This study evaluated the response of
riverine aquatic habitat to flows in the Lower Susitna River Segment reach between the Yentna
River confluence (RM 28.5) and Talkeetna (RM 98) (measured at Sunshine gage [approximately
RM 84]) ranging from 13,900 cfs to 75,200 cfs. The study also included an evaluation of the
morphologic stability of islands and side channels by comparing aerial photography between
1951 and 1983.
In another study, 13 tributaries to the lower Susitna River were evaluated for access by spawning
salmon under existing and with proposed stream flows for the original hydroelectric project
(R&M Consultants, Inc. and Trihey and Associates 1985b). The study contains information
regarding fish run timing, mainstem and tributary hydrology, and morphology. Based on the
results of this study, it was concluded that passage for adult salmon was not restricted under
natural flow conditions nor was it expected to become restricted under the proposed Project
operations.
An analysis of channel changes of the Middle River was presented in Geomorphic Change in the
Middle Susitna River Since 1949 (Labelle et al. 1985). In this document, aerial photographs and
other data from the late 1940s through the early 1980s was evaluated to determine historical
change in the Middle Susitna River Segment including the important off-channel macrohabitats
identified in the 1980s studies (side channels, side sloughs, and upland sloughs).
The AEA Susitna Water Quality and Sediment Transport Data Gap Analysis Report (URS 2011)
states that “if additional information is collected, the existing information could provide a
reference for evaluating temporal and spatial changes within the various reaches of the Susitna
FINAL STUDY PLAN GEOMORPHOLOGY STUDY 6.5
Susitna-Watana Hydroelectric Project Alaska Energy Authority
FERC Project No. 14241 Page 6.5-31 July 2013
River.” The gap analysis emphasizes that it is important to determine if the conditions
represented by the data collected in the 1980s are still representative of current conditions, and
that at least a baseline comparison of current and 1980s morphological characteristics in each of
the identified subreaches is required.
Results of this study in Q1 of 2013 will provide the initial basis for assessing the potential for
changes to the Lower Susitna River Segment reach morphology due to the Project in order to
help inform the evaluation of the downstream limit for the Fluvial Geomorphology Modeling
Study. Additional studies will be planned for 2013–2014 to continue further downstream in the
Lower River if the results of this study identify a potential for important aquatic habitat and
channel adjustments in response to the Project below RM 84. In addition to providing the initial
assessment for informing the evaluation of the downstream limit for the Fluvial Geomorphology
Modeling Study, the assessments presented in this study component will also assist in the overall
evaluation of Project effects. This is why the effort was extended upstream to include the Middle
Susitna River Segment in response to comments filed November 14, 2012 by NMFS and
USFWS on the PSP (NMFS and USFWS).
The Stream Flow Assessment portion of this study component includes a concurrent flow and
stage analysis for the Susitna River in the area of the Talkeetna and Chulitna confluences. This
analysis was added in response to a comment filed November 14, 2012 on the PSP concerning
the potential for Project to affect erosion in the area of the Town of Talkeetna (Teich, Cathy).
Issues associated with geomorphic resources in the Lower and Middle Susitna River Segments
for which information appears to be insufficient were identified in the PAD (AEA 2011),
including the following:
• G16: Potential effects of reduced sediment load and changes to sediment transport as a
result of Project operations within the Lower Susitna River Segment.
• F19: The degree to which Project operations affect flow regimes, sediment transport,
temperature, and water quality that result in changes to seasonal availability and quality
of aquatic habitats, including primary and secondary productivity.
6.5.4.6.2. Methods
6.5.4.6.2.1. Stream Flow Assessment
Pre-Project and available post-Project hydrologic data are being compared in 2012 and the
results will be reported on in January 2013. This includes a comparison of the monthly and
annual flow duration curves (exceedance plots) and plots/tables of flows by month (maximum,
average, median, minimum) for the Susitna River at Gold Creek, Susitna River at the Sunshine
and Susitna Station gaging stations. These analyses are being conducted for the major tributaries
provided in the extended record including the Chulitna River near Talkeetna, the Talkeetna River
near Talkeetna, and the Yentna River near Susitna Station. In 2013, additional hydrologic
indicators may be used to further illustrate and quantify the comparison between pre- and post-
Project stream flows. The pre-Project data analysis includes the 61-year extended record
prepared by USGS. The post-Project condition is based on initial runs of the Operations Model
and the Initial Flow Routing Model developed by the engineering studies. The Operations Model
provides Project releases and the routing model provides estimates of hourly flow and stage from
the base of the dam at RM 184 to the downstream limit of the model near RM 84.
FINAL STUDY PLAN GEOMORPHOLOGY STUDY 6.5
Susitna-Watana Hydroelectric Project Alaska Energy Authority
FERC Project No. 14241 Page 6.5-32 July 2013
Using the extended record currently prepared by USGS, a flood-frequency and flood-duration
analysis for pre- and post-Project annual peak flows is being performed. The flood-frequency
analysis is being performed using standard hydrologic practices and guidelines as recommended
by USGS (1982). The pre-Project analysis was completed in November 2012 and the post-
Project analysis will be completed by the end of December 2012. The results of both analyses
were be compared and reported on in January 2013.
A concurrent flow and stage analysis will be conducted in Q4 of 2013 to determine the potential
for Project-induced changes in flows and stage on the Susitna River that may have the potential
to alter the erosion patterns in the area of the town of Talkeetna. A technical memorandum will
be prepared identifying the analysis procedures and results. If this initial analysis indicates that
the changes in flows and stage on the Susitna River may be sufficient to alter the flow patterns
during peak flows on the Talkeetna and Chulitna rivers, then a plan will be developed to further
study this potential Project effect in 2014. It is expected that if implemented, this additional
effort would include extending a branch of the Mainstem (Open-water) Flow Routing Model up
the Talkeetna River and possibly the Chulitna River. As part of this effort, 2012 aerial photos
acquired prior to the September 2012 high flows and after the high flows will be evaluated to
determine the extent of erosion from the September 2012 high flow event. This aerial photo
comparison will provide an indication of current erosion that is typical of a high flow event for
pre-Project conditions.
6.5.4.6.2.2. Sediment Transport Assessment
The sediment transport data collected by USGS (See Section 6.5.4.2) are used to develop
bedload, total bed material, and wash load rating curves to facilitate translation of the periodic
instantaneous measurements into yields over longer durations (e.g., monthly, seasonal, and
annual). This information is being used to perform an overall sediment balance for each
component of the sediment load. This information will be developed as part of the Sediment
Supply and Transport Middle and Lower Susitna River Segment study (see Section 6.5.4.3). The
initial sediment balance will be completed in December 2012 and reported on in January 2013 to
inform the review of the downstream study limit (See Section 6.6.3.2) with more detailed work
effort conducted throughout 2013 and 2014 to support the Fluvial Geomorphology Modeling
Study (Section 6.6).
6.5.4.6.2.3. Integrate Sediment Transport and Flow Results into Conceptual Framework
for Identification of Geomorphic Reach Response
Prediction of Project-induced changes to river morphology in an alluvial river is fundamentally
based on the magnitudes and directions of change in the driving variables, hydrology, and
sediment supply. Initial, qualitative assessment of change can be based on Lane’s (1955)
equality:
Qw.S~Qs.D50,
where Qw is the flow, S is the slope, Qs is the sediment transport and D50 is the median size of the
bed material. A change in any one of the variables will require a change in the others to maintain
the balance.
Use of the expansion of Lane’s relation by Schumm (1977) allows the response to the changes in
driving variables to be expressed in terms of channel morphometric parameters such as channel
FINAL STUDY PLAN GEOMORPHOLOGY STUDY 6.5
Susitna-Watana Hydroelectric Project Alaska Energy Authority
FERC Project No. 14241 Page 6.5-33 July 2013
width (b), depth (d), slope (S), meander wavelength (λ), width-depth ratio (F) and sinuosity (P).
For example, a potential range of changes in response to the Project in the vicinity of the Three
Rivers Confluence where flows will be reduced and sediment supply could be effectively
increased could be expressed as follows:
Qw-, Qs+ ~ b±, d-,λ±,S+,P-,F+
where + represents an increase, – represents a decrease and ± represents indeterminacy.
Application of these qualitative relations assumes that the river is alluvial and that the form and
characteristics of the channel are the result only of the interaction of the flows and the sediment
load. Where non-fluvial factors such as bedrock outcrop or coarse-grained paleo-flood deposits
limit the adjustability of the channel, the ability to predict the direction and magnitude of channel
change in response to changes in the water and sediment load below dams is reduced (Miller
1995; Grant and Swanson 1995; Grant et al. 2003).
Using the data developed for the pre- and post-Project flood frequency, flood duration, and
sediment load, the geomorphic response of the Susitna River in a conceptual framework along
the longitudinal profile of the river system from the Lower and Middle Susitna River Segments
will be predicted. The work will be initially performed for the Lower River Segment and
completed in January of 2013 in order to support evaluation of the downstream study limit for
the Fluvial Geomorphology Modeling Study (Section 6.6.3.2). The initial effort on the Middle
River will be performed in Q3 of 2013. The conceptual framework developed by Grant et al.
(2003) that relies on the dimensionless variables of the ratio of sediment supply below the dam to
that above the dam and the fractional change in frequency of sediment transporting flows is
being used to predict the nature and magnitude of the response of the geomorphic reaches in the
Lower and Middle Susitna River Segments. Other analytical approaches are also being
considered to evaluate potential for geomorphic adjustments of the reaches in the river segments
due to the Project. These include an evaluation of morphologic changes based on changes to the
degree and intensity of braiding using Germanoski’s (1989) modified braiding index (MBI) that
has been used to predict channel responses to anthropomorphically-induced changes in Alaskan,
glacial-fed rivers including the Toklat, Robertson, and Gerstle Rivers (Germanoski 2001). As
demonstrated by Germanoski and Schumm (1993), Germanoski and Harvey (1993), and Harvey
and Trabant (2006), the following are the expected directions of responses in the MBI values to
significant changes in bed material gradation and sediment supply:
• If the D50 increases and there is a supply of sediment, then MBI increases.
• If the D50 increases and there is a significant decrease in the supply of sediment, then
MBI decreases.
• If the bed aggrades, then MBI increases.
• If the bed degrades, then MBI decreases.
Specific MBI values for braided reaches of the Susitna River under existing conditions are being
developed from aerial photography, and the likely changes in values in response to the Project
will be assessed. Prediction of the direction, if not the magnitude of changes, provide useful
information for assessing likely Project effects on geomorphic features that form instream
habitats. It also provides context to assist in interpreting and assessing the validity of results from
the bed evolution models and other analytical tools.
FINAL STUDY PLAN GEOMORPHOLOGY STUDY 6.5
Susitna-Watana Hydroelectric Project Alaska Energy Authority
FERC Project No. 14241 Page 6.5-34 July 2013
6.5.4.6.2.4. Literature Review on Downstream Effects of Dams
To assist in the assessment of potential Project effects on the geomorphology of the Susitna
River, a search and review of literature on the downstream effects of dams will be conducted.
There is considerable literature on this topic for dams within the United States as well as around
the world. Grant et al. (2003) identified in the previous section in one such reference, with
others including, but not limited to Sabo et al. (2012), Clipperton et al. (2003), Schmidt and
Wilcock (2000), Shields et al. (2000), Freidman et al. (1998), Collier et al. (1996), and Williams
and Wolman (1984). Efforts will be made to locate information on specific dams within the
region and in other similar cold region environments around the world. Information could be
used to extend or complement field studies as well as reduce the uncertainty associated with
study results and conclusions.
6.5.4.6.2.5. Information Required
The following available existing information will be needed to conduct this study:
• Historical suspended sediment and bedload data for the Susitna River.
• Flow records for the Susitna River.
• Characterization of bed material from previous studies.
The following additional information will need to be obtained to conduct this study:
• Suspended and bedload data for the Susitna River at Tsusena Creek and Gold Creek
being performed by USGS.
• Extended flow record for the Susitna River and gaged tributaries within the study area
being developed by USGS.
• Channel morphologic data for existing conditions including, width, depth, width/depth
ratios, and MBIs.
6.5.4.6.3. Study Products
The results of the Reconnaissance-Level Assessment of Project Effects on Lower Susitna River
Segment Channel Sediment component will be included in the Geomorphology Report.
Information provided will include the following:
• Pre- and post-Project comparison of hydrologic parameters for the Susitna River at
Sunshine and at Susitna Station, including:
o Monthly and annual flow duration curves
o Annual peak flow frequency
o Monthly flow statistics (maximum, average, median, minimum)
• Summary of changes in sediment transport for pre- and post-Project conditions in the
Lower Susitna River Segment.
• Results of the assessment of anticipated Project effects on the Lower Susitna River
Segment based on the analytical framework in Grant et al. (2003) and other indicators of
potential channel change such as the MBI by Germanoski (1989).
FINAL STUDY PLAN GEOMORPHOLOGY STUDY 6.5
Susitna-Watana Hydroelectric Project Alaska Energy Authority
FERC Project No. 14241 Page 6.5-35 July 2013
6.5.4.7. Study Component: Riverine Habitat Area versus Flow Lower Susitna River
Segment
The goal of this study component is to conduct an initial assessment of the potential for Project
effects associated with changes in stage to alter Lower Susitna River Segment riverine habitat.
This effort was conducted in 2012. If the decision is made to continue detailed studies of Project
effects into the Lower Susitna River, then this effort will be expanded to include mapping of the
1980s aquatic macrohabitat type in the Lower Susitna River Segment and the development of the
wetted macrohabitat versus flow relationships.
6.5.4.7.1. Existing Information and Need for Additional Information
An analysis of the Lower Susitna River Segment and how riverine habitat conditions change
over a range of stream flows was performed in the 1980s using aerial photographic analysis
(R&M Consultants, Inc. and Trihey and Associates 1985a). This study evaluated the response of
riverine aquatic habitat to flows in the Lower Susitna River Segment reach between the Yentna
River confluence (RM 28.5) and Talkeetna (RM 98) (measured at Sunshine gage at
approximately RM 84) ranging from 13,900 cfs to 75,200 cfs. Results of this study will provide
the initial basis for assessing the potential for changes to the Lower Susitna River Segment reach
morphology due to the Project. Additional studies will be planned for 2013–2014 if the results of
this study and other studies identify a potential for important aquatic habitat and channel
adjustments in response to the Project.
6.5.4.7.2. Methods
This study component is divided into three tasks: Riverine Habitat-Flow Relationship
Assessment, Synthesis of the 1980s Aquatic Habitat Information, and Contingency Analysis to
Compare Wetted Channel Area. The third task is optional and dependent on a determination if
comparison of riverine habitat in the Lower Susitna River Segment under pre- and post-Project
flows is warranted for additional flow conditions and determination of whether aquatic resource
studies need to be continued further downstream in the Lower Susitna River Segment.
6.5.4.7.2.1. Change in River Stage Assessment
A tabular and graphical comparison of the change in water surface elevations associated with the
results of the pre- and post-Project stream flow assessment (Section 6.5.6.2.1) was developed
using the stage-discharge relationships (rating curves) for the Sunshine and Susitna Station
gaging stations. This comparison included monthly and annual stage duration curves
(exceedance plots) and plots/tables of stage by month (maximum, average, median, minimum).
Additional parameters to describe and compare the pre- and post-Project water surface elevations
may be performed in 2013. A graphical plot of a representative cross-section at each gaging
station was developed with a summary of the changes in stage (water surface elevation) for the
two flow regimes. If possible, the location of the active channel and the floodplain will also be
identified on the cross-section. Changes in stage will be related to exposure of bars through the
previously developed bar area discharge curves, thereby providing the link between both
vegetation and ice impact assessments. The stage change information was also used to estimate
and compare the areas of the various riverine habitat types for the existing and with-Project
conditions over a range of flow frequencies.
FINAL STUDY PLAN GEOMORPHOLOGY STUDY 6.5
Susitna-Watana Hydroelectric Project Alaska Energy Authority
FERC Project No. 14241 Page 6.5-36 July 2013
The availability of USGS winter gage data with respect to discharge and ice elevation/thickness
was investigated. Coordination with the Ice Processes (Section 7.6) occurred to obtain
information on ice elevation/thickness. This information was summarized and will be analyzed
in Q1 2013 to make an initial assessment of discharge effects on ice elevation.
6.5.4.7.2.2. Synthesis of the 1980s Aquatic Habitat Information
A synthesis/summary of the 1980s Response of Aquatic Habitat Surface Area to Mainstem
Discharge Relationships in the Yentna to Talkeetna Reach of the Susitna River (R&M
Consultants, Inc. and Trihey & Associates 1985a) was performed and will be provided with the
January 2013 technical memorandum. A synthesis/summary of the Assessment of Access by
Spawning Salmon into Tributaries of the Lower Susitna River (R&M Consultants, Inc. and
Trihey & Associates, 1985b) was also performed and will be included in the January 2103
technical memorandum. Data have been summarized with respect to the anticipated pre- and
post-Project flow changes, where applicable.
6.5.4.7.2.3. Site Selection and Stability Assessment
Five sites in the Lower Susitna River Segment were selected from the Yentna to Talkeetna reach
map book (R&M Consultants, Inc. and Trihey and Associates 1985a) at the approximately
36,600 cfs flow at Sunshine Gage to study in 2012. These sites were selected in coordination
with the FA-IFS and the R-IFS. A side-by-side comparison of the sites using the 1983 36,600-
cfs aerials and the 2011 aerials from the Mat-Su Borough LiDAR project were used to
qualitatively assess site stability. Only sites that had been relatively stable during the period from
the 1980s to present were selected. The five sites selected were: Side Channel IV-4 (SC IV-4),
Willow Creek (SC III-1), Goose Creek (SC II-4), Montana Creek (SC II-1) and Sunshine Slough
(SC I-5).
6.5.4.7.2.4. Aerial Photography Analysis, Riverine Habitat Study Sites
(RM 28 to RM 98)
Using GIS and the September 6, 1983 aerials for the 36,600-cfs flow, mainstem and side channel
riverine habitat was digitized from the 1985 map book (R&M Consultants, Inc. and Trihey &
Associates 1985a) for the selected sites. Each area associated with a habitat type was digitized
as a polygon (without slivers). To provide a comparison with current conditions, aerials flown at
approximately 36,600 cfs were obtained (actual flows ranged from 38,100 cfs to 46,900 cfs).
The current wetted areas of the riverine habitat types, as defined in the 1980s analysis, were
delineated for the selected sites.
In January 2013, the difference in wetted surface area of the main channel and side channel
riverine habitats (as defined in R&M Consultants, Inc. and Trihey & Associates 1985a ) will be
compared between the 1983 and current conditions. The areas of the riverine habitat types,
along with the initial 2012 results of the Assess Geomorphic Change Middle and Lower Susitna
River Segments study component (Section 6.5.4.4), will be compared and contrasted
quantitatively, and a qualitative assessment will be made of the similarity of the 1980s sites
compared to the 2012 sites. The assessment of site stability will help determine the applicability
of Lower Susitna River Segment riverine habitat information developed in the 1980s to
supplement information being developed in the current Project studies.
FINAL STUDY PLAN GEOMORPHOLOGY STUDY 6.5
Susitna-Watana Hydroelectric Project Alaska Energy Authority
FERC Project No. 14241 Page 6.5-37 July 2013
6.5.4.7.2.5. Additional Aerial Photography Analysis, Riverine Habitat Study Sites (RM
28 to RM 98)
Based on the results of the comparison of riverine habitat areas at the selected study sites for the
Lower Susitna River Segment and results of the Assess Geomorphic Change Middle and Lower
Susitna River Segments study component (Section 6.5.4.4), a determination of whether to
perform a similar effort and comparison for up to two additional discharges will be made
(discharges corresponding to the analysis of wetted habitat areas in the Lower Susitna River
Segment include 75,200 cfs; 59,100 cfs; 36,600 cfs; 21,100 cfs; and 13,900 cfs). This decision
will be made in coordination with the FA-IFS (Section 8.5), R-IFS (Section 8.6), Ice Processes
Study (Section 7.6), Characterization and Mapping of Aquatic Habitats Study (Section 9.9), and
licensing participants.
If the decision is made to analyze riverine habitat at two additional discharges, the flows will be
selected and the associated habitat areas digitized from the 1985 map book. New aerial
photographs will be obtained at the selected discharges. If a decision is made to extend studies
further downstream in the Lower Susitna River Segment, additional sites for delineation may be
selected. The process, schedule, and criteria for extending the studies further in the Lower
Susitna River Segment is described in Section 6.6.3.2 based on geomorphic criteria and in
Section 8.5.3 based on results of the Mainstem (Open-water) Flow Routing Model. The
geomorphic criteria will be evaluated in Q1 2013 and again in Q1 2014. The Mainstem Flow
Routing Model trigger will be evaluated in Q1 2013.
The riverine habitat types at the selected sites will be delineated and digitized on these images to
represent the current condition. The difference in wetted surface area of the main channel and
side channel riverine habitats will be compared between the 1983 and current conditions for the
two additional discharges. Additional sites for delineation of existing aquatic macrohabitat
beyond those identified in the 1980s may be included in the optional effort if results of the
interim flow and fish and aquatics studies require this information. (The USFWS Study Plan
Request included digitizing the riverine habitat types for three flows in the Lower Susitna River
Segment. This topic was discussed at the Water Resources TWG meeting held on June 14, 2012.
It was explained that the current proposal by AEA is to digitize riverine habitat for a single flow
in 2012, then based on decisions on whether to continue Focus Area studies into the Lower
Susitna River Segment and how far those studies would be carried downstream, the optional
aerial photo analysis identified in this task would be performed in 2013. USFWS agreed at the
meeting that this approach was appropriate.)
6.5.4.7.2.6. Information Required
The following available existing information will be needed to conduct this study:
• Historical 1980s orthorectified aerial photographs for the Lower Susitna River Segment.
• USGS flow record for the Sunshine and Susitna Station gages including measurement
notes, rating curves, stage shifts, cross-sections, and information on ice thickness.
The following additional information will need to be obtained to conduct this study:
• Results of Study Component, Assess Geomorphic Change Middle and Lower Susitna
River Segments (Section 6.5.4.4).
FINAL STUDY PLAN GEOMORPHOLOGY STUDY 6.5
Susitna-Watana Hydroelectric Project Alaska Energy Authority
FERC Project No. 14241 Page 6.5-38 July 2013
6.5.4.7.3. Study Products
The results of the Riverine Habitat Area versus Flow Lower Susitna River Segment component
will be included in the Geomorphology Report. Information provided will include the following:
• Comparison of pre- and post-Project stage at the Susitna River at Sunshine and the
Susitna Station gages associated with the flow duration curves (monthly and annual) and
monthly statistics.
• Summary of available USGS measurements of ice elevation/thickness to identify the
need to perform analysis of the discharge effect on ice elevation.
• Narrative describing the synthesis of the 1980s aquatic habitat versus flow relationships
and the anticipated post-Project flow changes.
• Results for the selected flow of the comparison of the riverine habitat areas, by type, for
the selected sites for 1980s and current aerial imagery.
In addition, an ArcGIS shapefile will be provided with the following information:
• Digitized polygons of the 1980s and current riverine habitat surface areas at the selected
sites.
6.5.4.8. Study Component: Reservoir Geomorphology
The goal of this study component is to characterize changes resulting from conversion of the
channel and portions of the river valley to a reservoir. For the majority of this study component
(Sections 6.5.4.8.2.1, 6.5.4.8.2.2 and 6.5.8.4.3) the study area extends from the proposed Watana
Dam site (RM 184) upstream to include the reservoir inundation zone and the portion of the river
potentially affected by backwater and delta formation in the river, which is currently assumed to
correspond to approximately five miles above the reservoir maximum pool (at approximately
RM 238). This portion of the proposed study area is shown in Figure 6.5-6. For the Bank and
Boat Wave Erosion downstream of Watana Dam (Section 6.5.4.8.2.4) portion of the study
component, the study area extends from the proposed Watana Dam (RM 184) downstream to the
Three Rivers Confluence (RM 98). This study area corresponds to the entire Middle Susitna
River Segment. Specific objectives of the Reservoir Geomorphology study component include
the following:
• Estimate reservoir sediment trap efficiency and reservoir longevity.
• Estimate the Susitna River and inflow tributary delta formation with respect to potential
effects on upstream fish passage.
• Estimate erosion and beach formation in the Watana Reservoir drawdown zone and
shoreline area.
• Evaluate the resistance of the Susitna River banks to boat wave erosion under Project
operations and if the assessment indicates the lower portion of the bank is not sufficiently
armored and/or boat activity may cause an increase in erosion of the upper part of the
bank, the magnitude of the potential effects will be estimated.
FINAL STUDY PLAN GEOMORPHOLOGY STUDY 6.5
Susitna-Watana Hydroelectric Project Alaska Energy Authority
FERC Project No. 14241 Page 6.5-39 July 2013
6.5.4.8.1. Existing Information and Need for Additional Information
Construction and operation of the proposed Project will impound a reservoir for approximately
41.5 miles upstream from the dam. The reservoir will likely trap essentially all of the coarse
sediment load and much of the fine sediment load that enters the impoundment from the
upstream Susitna River. The coarse sediment load will form a delta at the head of the reservoir
that will be re-worked by seasonal fluctuations of the reservoir elevation.
Similar to the mainstem Susitna River delta at the head of the reservoir, deltas of varying size
will likely form where tributaries enter the reservoir. The amount and distribution of sediment
deposits may affect the connectivity of the surface flows between the reservoir and the tributary
channels, which may, in turn, block fish passage into the tributaries. The available information
does not contain data describing the magnitude and size distribution of the annual sediment loads
from the tributaries that enter the reservoir, a potentially significant data gap.
Operation of the Project would result in seasonal and daily water-level fluctuations in Watana
Reservoir, which will result in beach formation and erosion and/or mass wasting of soils within
the impoundment. The results of the erosion potential portion of this study will provide
information on the extent of these processes and the potential for alterations to Project operations
or erosion control measures to reduce erosion and mass wasting.
6.5.4.8.2. Methods
The methods are divided into three areas: reservoir trap efficiency and sediment accumulation
rates, delta formation, and reservoir erosion. (In the Study Plan comments, NOAA-NMFS and
USFWS requested that a description of reservoir sediment removal procedures be included in the
Geomorphology effort. At the Water Resources TWG meeting held June 14, 2012, AEA’s
consultants indicated that there are no plans for removal of sediment deposited in the reservoir
because no feasible procedures for accomplishing this on a large reservoir with a substantial
permanent pool currently exist. The reservoir will have a finite life as a result of sedimentation
and this will be estimated as part of the Reservoir Geomorphology study component.
6.5.4.8.2.1. Reservoir Trap Efficiency and Sediment Accumulation Rates
Inflowing sediment loads from the mainstem Susitna River will be determined by integrating the
bedload and suspended load equations developed for the Susitna River at Tsusena Creek over the
extended hydrologic record for the Susitna River. Due to the short record at this station, the
information collected at Vee Canyon and the bedload and suspended load data collected at Gold
Creek will be used to further refine Tsusena sediment rating curves. The methods described in
the Empirically Characterize Susitna River Sediment Supply and Transport study component
will be used to develop the incoming sediment load.
Sediment loading from the significant tributaries within the reservoir may also affect reservoir
life. The reservoir tributary loading will be accounted for in the sediment load data collected for
the Susitna River at Tsusena Creek. Similarly, if the sediment loading from the reservoir
perimeter is substantial, it will be incorporated into the analysis. Potential additional sediment
loading resulting from glacial surge will be investigated in the Glacier and Runoff Changes
Study (Section 7.7.4.4, Analyze Potential Changes in Sediment Delivery to Watana Reservoir).
If this investigation indicates that the increased sediment load can actually be delivered in
FINAL STUDY PLAN GEOMORPHOLOGY STUDY 6.5
Susitna-Watana Hydroelectric Project Alaska Energy Authority
FERC Project No. 14241 Page 6.5-40 July 2013
substantial quantities to Watana Reservoir, more detailed analyses of the increased loading will
be performed and a sediment loading scenario accounting for glacial surge will be added to the
reservoir trap efficiency and sediment accumulation analysis. This would include an estimate of
the reduction in reservoir life that could result from sediment loading associated with periodic
glacial surges.
Due to the relatively large storage capacity of the proposed reservoir, it is reasonable to assume
that all sand and coarser sediment size fractions delivered to the reservoir will be trapped, while
a substantial amount of the fine-grained, colloidal sediments associated primarily with glacial
outwash will pass through the reservoir into the downstream river. When applied over a long-
term horizon, the amount of trapped sediment can be used to evaluate the impacts of
sedimentation on reservoir storage capacity. If the analysis indicates that a substantial amount of
fine sediment will deposit in the reservoir, consolidation of the deposits will also be considered
in the analysis. (Note that consolidation of sands and gravels is minimal.) Potential methods for
estimating the trap efficiency of the fine sediment include the relationships from Einstein (1965)
and Li and Shen (1975). The latter method may be the most appropriate because it accounts for
the tendency of suspended particles to be carried upward in the water column due to turbulence.
Estimates of the trap efficiency for the fine sediment will be made using the Brune (1953)
method. The Brune (1953) method that was recommended by Strand and Pemberton (1987) for
use in large or normally-ponded reservoirs (Morris et al. 2007) can be used to check the
reasonableness of results obtained from the other methods, although this method does not
provide a means of separating the behavior of different particle sizes in the inflowing load. Chen
(1975) may also be another method to check the reasonableness of the trap efficiency
determination. The Churchill (1948) method is also commonly used to estimate reservoir trap
efficiency; however, this method is more applicable for settling basins, small reservoirs, and
flood-retarding structures and should probably not be used for this study. The proposed methods
will provide a basis for estimating the quantity of the various size fractions that either pass
through or are trapped in the reservoir. If the initial analyses indicate that a more sophisticated
approach is necessary to obtain reasonable trap efficiencies, consideration will be given to using
a numerical model such as Environmental Fluid Dynamics Code (EFDC) (Hamrick 1992) model
to refine the estimates.
6.5.4.8.2.2. Delta Formation
Estimation of the formation of deltas on the mainstem Susitna River and its tributaries as they
enter the proposed Watana Reservoir will require estimation of sediment load. Although the
USGS measurements in the Bedload and Suspended Load Data Collection at Tsusena Creek,
Gold Creek, and Sunshine Gage Stations study component target three locations along the
Susitna River, sediment transport estimates will be needed at additional locations, including
ungaged tributaries. Because of the potential impacts on fish movement into the tributaries,
ungaged tributaries that require study will be identified in coordination with the Fish studies. In
these locations, reconnaissance will be performed to characterize the sediment transport regime
and to identify appropriate methods of calculating yields. In cases where bed material delivery
to the proposed reservoir could produce deltas with the potential to affect upstream fish
migration, surveys of tributary channel geometry and bed material gradations based on samples
collected during the reconnaissance will be coupled with selected bed material transport
functions to calculate sediment yield rating curves. Long-term flow hydrographs synthesized for
FINAL STUDY PLAN GEOMORPHOLOGY STUDY 6.5
Susitna-Watana Hydroelectric Project Alaska Energy Authority
FERC Project No. 14241 Page 6.5-41 July 2013
the ungaged tributaries will be needed from other studies for each of the selected tributaries to
calculate sediment yields. Alternate approaches to quantifying sediment yield, such as previous
studies of regional sediment yields (Guymon 1974) may also be considered.
To estimate the development of the deltas, the sediment yield results can be coupled with the
physical constraints imposed by Project operations (i.e., variation in lake levels) on the topset
and foreset slopes of the deltas to simulate growth and development of deltas throughout the
period of the license (USBR 1987; Morris and Fan 1998). The volume of sediments deposited
will be distributed within the topographic constraints of the reservoir fluctuation zone identified
for the period when mainstem and tributaries are delivering significant sediment load.
Consideration will be given to which portion of the sediment load would form the delta deposits
based on settling characteristics.
6.5.4.8.2.3. Reservoir Erosion
Erosion and mass wasting potential will be assessed within the reservoir fluctuation zone and
along the shoreline for 100 vertical feet above the proposed full pool elevation. The following
potential erosion processes will be evaluated:
• Mass wasting.
• Surface erosion from sheetwash.
• Wave erosion (wind and boat wakes if motorized boat recreation is permitted).
• Solifluction, freeze-thaw, and thawing of permafrost.
• Beach/bank development at full pool.
• Erosion by ice movement on the reservoir surface.
The following existing spatial data will be collected:
• Topography (LiDAR as available).
• Geo-rectified aerial photography and recent stereo pairs to evaluate existing mass wasting
sites.
• Geologic and soil mapping, including work done for the Susitna Hydroelectric Project
(Acres 1982) and subsequent mapping by USGS and the Alaska Division of Geologic
and Geophysical Surveys. This task will be coordinated with the Geology and Soils
Study.
• Vegetation mapping; this task will be coordinated with the Botanical Resources Study.
In addition, the following information will be obtained from other resource study leads:
• Expected reservoir surface elevation fluctuations (seasonal, daily, maximum hourly
lowering rate) from the Project Operation Study.
• Expected motorized watercraft recreational use data (if any, from the Recreation and
Aesthetic Resources Study).
• Daily air temperature (maximum/minimum) and wind (speed, direction) data from the
Water Quality Modeling Study (Section 5.6).
FINAL STUDY PLAN GEOMORPHOLOGY STUDY 6.5
Susitna-Watana Hydroelectric Project Alaska Energy Authority
FERC Project No. 14241 Page 6.5-42 July 2013
• Expected ice development and movement within the reservoir from the Ice Processes
Study (Section 7.6).
The existing spatial data will be evaluated to determine if sufficient geologic and soil data are
available to evaluate erosion and mass wasting potential. The mass wasting work will be
coordinated with the Geology and Soils Study and geotechnical investigations of the dam site
and reservoir area that are planned under the geotechnical exploration and testing program. The
geotechnical investigations for the dam site and reservoir will cover large, deep rotational and
block failures; the Reservoir Erosion Study will cover shallow translational slides (added in
response to the FERC comment letter dated May 31, 2012). The initial investigation will be
completed by spring 2013. If additional soil/geologic mapping or data on soil characteristics are
needed, field mapping and sample collection will occur during summer 2013 in coordination
with the Geology and Soils, and Geotechnical studies. This work could include mapping or
collection of soil properties of interest in representative areas, including soil texture, depth,
permafrost presence/absence, infiltration capacity, and cohesion.
The spatial data (topography, geology, soils, vegetation) will be used to prepare an erosion and
mass wasting hazard map of the reservoir shoreline and inundation area. Areas with similar
slope, soil, aspect, and potential wave fetch will be delineated. Areas above and below the full
pool elevation will be mapped separately.
The erosion potential for representative erosion/mass wasting hazard polygons will be evaluated
as follows:
• Mass wasting – evaluate potential for mass wasting based on slope gradient, soil
properties, and anticipated pore pressures/fluctuations. This work will be carried out in
coordination with the geotechnical investigation of the dam site and reservoir area. A
GIS-based model such as SHALSTAB may be used to analyze shallow translational
slides if sufficient data exist.
• Surface erosion from sheetwash – estimate surface erosion potential using WEPP and/or
RUSLE.
• Wind (aeolian) erosion from exposed reservoir and delta surfaces and the floodplain
downstream of Watana Dam – evaluate using the USDA-NRCS WEQ (Wind Erosion
Equation) or WEPS (Wind Erosion Production System) to provide information on dust
production for the recreation and aesthetics studies (in response to request by USDOI-
NPS in a letter dated May 24, 2012).
• Wave erosion (wind and boat wakes if motorized boat recreation is permitted) – estimate
erosive energy of waves based on methods in Finlayson (2006) and Sherwood (2006).
• Solifluction, freeze-thaw, and thawing of permafrost – evaluate potential based on soil
properties, seasonal reservoir water elevations, and daily maximum/minimum
temperatures.
• Beach/bank development at full pool – use the beach development model in Penner
(Penner 1993; Penner and Boals 2000).
• Erosion by ice movement on the reservoir surface – evaluate potential for ice erosion
based on reservoir elevation and coordination with the Ice Processes Study (Section 7.6).
FINAL STUDY PLAN GEOMORPHOLOGY STUDY 6.5
Susitna-Watana Hydroelectric Project Alaska Energy Authority
FERC Project No. 14241 Page 6.5-43 July 2013
6.5.4.8.2.4. Bank and Boat Wave Erosion downstream of Watana Dam
It has been suggested that Project operations may cause increased bank erosion, i.e., cumulative
to ongoing erosion associated with boat waves, particularly during load-following operations.
(This effort was added based on requests from the agencies at the Water Resources TWG
meeting on June 14, 2012.) Load-following will primarily occur during the winter months when
flows are relatively low (in the range of 5,000 cfs to 14,500 cfs). Boat activity is relatively
infrequent (or not present due to ice conditions) during this period; thus, cumulative impacts of
these two processes are very unlikely. Based on preliminary information, it appears that the
lower portion of the bank that would be affected by the load-following operations is well
armored with cobble-sized material; thus, additional erosion due to the load-following alone is
unlikely. The Project may reduce flows and the associated river stage during the runoff period in
late spring and summer. During the initial phases of the study, data will be collected to assess
the amount of armoring of the portion of the banks that will be affected by load -following to
assess whether or not bank erosion in this zone is likely. In addition, the bank material
characteristics in the range of stages during the periods of frequent boat activity will be assessed
under existing conditions and Project operations to determine if changes associated with the
Project could cause an increase in bank erosion. If the information indicates the lower portion of
the bank is not sufficiently armored and/or boat activity may cause an increase in erosion of the
upper part of the bank, the magnitude of the potential effects will be investigated. Factors that
may be considered include the following:
• The potential effects of rapid changes in stage, and the associated pore-water pressures on
bank stability during the load-following period.
• The typical wave climate and frequency of use of the types of boats that operate in the
reach (it is assumed that the boat types and frequency of use will be available from the
Recreation studies).
• The change in erosion potential associated with the boat waves due to the change in stage
under Project operations during the period of primary boat activity.
6.5.4.8.3. Study Products
The results of the Reservoir Geomorphology component will be included in the Geomorphology
Report. Information provided will include the following:
• Determination of average annual trap efficiencies for sediment by general size
characterization (clays, silts, sands, and gravels).
• Estimate of average annual sediment loading to the reservoir from the potential primary
sources including the upstream Susitna River, reservoir tributaries, and shoreline erosion.
• Estimate of reservoir life based on extrapolation of the sedimentation rate.
• Sediment outflow rating curves to serve as downstream supply for the Fluvial
Geomorphology Modeling Study.
• Discussion of the tributary delta formation processes and characterization of the
estimated size, vertical extent, and morphology (topset and foreset slopes) of the deltas at
the selected tributary mouths.
FINAL STUDY PLAN GEOMORPHOLOGY STUDY 6.5
Susitna-Watana Hydroelectric Project Alaska Energy Authority
FERC Project No. 14241 Page 6.5-44 July 2013
• Discussion of potential erosion areas within the proposed reservoir, including erosion
type, relative erosion potential, Project-related factors affecting erosion, and potential
mitigation measures.
• Map showing reservoir erosion hazard areas (completed in coordination with the Geology
and Soils and Geotechnical studies).
In addition, an ArcGIS shapefile will be provided with the following information:
• Identification of all tributaries studied for potential tributary delta formation.
• Estimated footprint of delta formation for the selected tributaries.
• Reservoir erosion hazard map units.
6.5.4.9. Study Component: Large Woody Debris
The goal of this study component is to assess the potential for Project construction and
operations to affect the input, transport, and storage of large woody debris in the Susitna River.
Specific objectives include the following:
• Evaluation of large woody debris recruitment in the Middle and Lower Susitna River
Segments’ channels (including upstream of Watana Reservoir).
• Characterization of the presence, extent, and function of large woody debris downstream
of the Watana Dam site.
• Estimation of the amount of large woody debris that will be captured in the reservoir and
potential downstream effects of Project operation.
• Work in conjunction with the Fluvial Geomorphology Modeling Study to estimate
potential Project effects on large woody debris recruitment and associated changes in the
processes that create and influence the geomorphic features linked to important aquatic
habitats of the Middle and Lower Susitna River Segments.
The study area for the Large Woody Debris study component includes the Susitna River from the
mouth (RM 0) upstream to the confluence with the Maclaren River (RM 260).
6.5.4.9.1. Existing Information and Need for Additional Information
The role of large woody debris in the development of channel morphology and aquatic habitat
has been widely studied in meandering and anastomosing channels. Large wood and wood jams
can create pool habitat, affect mid-channel island and bar development, and create and maintain
anastomosing channel patterns and side channels (Abbe and Montgomery 1996, 2003; Fetherston
et al. 1995; Montgomery et al. 2003; Dudley et al. 1998; Collins et al. 2012). In addition, large
wood can provide cover and holding habitat for fish and help create habitat and hydraulic
diversity (summary in Durst and Ferguson 2000). Despite the wealth of large woody debris
research, little is known of the role of large woody debris in the morphology and aquatic biology
of braided, glacial rivers. Large woody debris may play a role in island formation and
stabilization, as well as side channel and slough avulsion and bank erosion, although the role of
large woody debris in altering hydraulics in the lower Susitna River may be limited due to the
size of the river (J. Mouw, ADF&G, personal communication, May 14, 2012).
FINAL STUDY PLAN GEOMORPHOLOGY STUDY 6.5
Susitna-Watana Hydroelectric Project Alaska Energy Authority
FERC Project No. 14241 Page 6.5-45 July 2013
Construction and operation of the Project has the potential to change the input, transport,
stability, and storage of large woody debris downstream of the Watana Dam site by changes to
the flow regime, ice processes, and riparian stand development, and interruption of wood
transport through the reservoir. An assessment of the source, transport, and storage of large
woody debris in the Susitna River and the role of large woody debris in channel form and aquatic
habitat is needed to evaluate the magnitude of these effects. Construction and operation of the
Project will likely alter large woody debris input and transport downstream of the Watana Dam
site. An assessment of the source, transport, and storage of large woody debris in the Susitna
River and the role of large woody debris in channel form and aquatic habitat would provide data
on the current status of large wood in the river which, in conjunction with data from the studies
of hydrology, geomorphology, riparian and aquatic habitat, and ice processes, would be used to
determine the potential effects of Project operations on large wood resources. The information
can also be used to determine whether protection, mitigation and enhancement (PM&E)
measures are necessary, such as a large woody debris management plan and handling of wood
that accumulates in the reservoir.
6.5.4.9.2. Methods
Available recent and historic high-resolution aerial photography will be used to assess large
woody debris characteristics in the Susitna River between the mouth and the Maclaren River. It
is anticipated that large woody debris input, transport, and storage characteristics will vary along
the length of the river. Four reaches have been initially delineated with distinct characteristics:
downstream of the Three Rivers Confluence; between the Three Rivers Confluence and Devils
Canyon; Devils Canyon; and upstream of Devils Canyon. However, the Geomorphic Reaches
delineated in the Delineate Geomorphically Similar (Homogenous) Reaches (Section 6.5.4.1)
study component will be used as a basis for final reach determination.
Large woody debris will be inventoried to the extent practical on the aerial photographs.
Information regarding the sources of large woody debris, locations of large woody debris in the
river channel, and the relationship of large woody debris to channel or slough habitat and
geomorphic features will be collected and correlated with bank erosion and riparian vegetation
mapping from the geomorphology mapping and riparian habitat mapping studies to identify
potential recruitment methods (Mouw 2011; Ott et al. 2001). If adequate historic aerial
photographs are available, the stability of large wood pieces and jams between photo years will
be assessed in representative areas of the river.
It is likely not possible to identify all wood on the aerial photographs. As a supplement to large
woody debris information obtained from aerial photographs, a reconnaissance assessment of
large woody debris in the Susitna River between the proposed Watana Dam Site and Willow was
made in coordination with aquatic/riparian habitat mapping June 2012. This assessment
suggested that the primary large woody debris input mechanisms in the Middle Susitna River are
wind throw, wind snap, ice snap, and bank erosion. Wood was observed in association with
scour pool, islands heads, side channels, and channel margins. The Chulitna River appears to
provide a large amount of woody debris to the Susitna River downstream from Three Rivers,
where the Susitna becomes braided with both stable, racked log jams and single non-stable piece
of wood.
Field studies of large woody debris will take place during 2013–2014 to (1) verify the large
wood data collected from the aerial photographs at 4–5 representative sites in each of the four
FINAL STUDY PLAN GEOMORPHOLOGY STUDY 6.5
Susitna-Watana Hydroelectric Project Alaska Energy Authority
FERC Project No. 14241 Page 6.5-46 July 2013
reaches discussed above, and (2) provide more detailed field information on large wood input,
stable/key piece size, large wood/aquatic habitat function, and large wood stability in the river
within each of the Focus Areas. It is anticipated that the following types of large woody debris
data will be collected as part of a field inventory of large wood in 2013–2014:
• GPS location (to correlate with geomorphology, aquatic, and riparian habitat mapping
from other studies).
• Wood size class (diameter, length, volume).
• Root wad status of attachment.
• Single piece, accumulation, or log jam.
• Decay class.
• Species if known.
• Input mechanism if known (windthrow, bank erosion, ice processes, etc.).
• Channel location (side; mid channel; side channel inlet, middle, outlet; associated with
island or bar – and where on island or bar, etc.).
• Wood orientation in channel.
• In wetted or bankfull channel or potential input (leaning over bankfull channel).
• Function (scour pool, bar forming, island forming, side channel inlet protection, bank
protection, aquatic cover, etc.) and associated geomorphic features.
• For log accumulations and jams: key piece size.
• Area/grain size of any associated sediment deposits.
The aerial photograph and field inventories of large wood will be used to determine large wood
input processes, large wood transport and storage, and how large wood is functioning in the
Susitna River to influence geomorphic, riparian, and aquatic habitat processes. Based on
estimated large wood input and transport upstream of the Watana Dam site, the potential effects
of reservoir operation on trapping upstream large wood will be assessed. In addition, the
potential for operation of the Project to alter large wood input and transport downstream of the
dam site will be analyzed. Modeling of the interaction between large woody debris and bedload
transport/geomorphic processes will take place at selected Focus Areas utilizing the 2-D models
described in Section 6.6. The analysis will require coordination with other geomorphology
component studies, and the sediment transport, ice processes, riparian habitat, aquatic habitat,
and instream flow studies.
6.5.4.9.3. Study Products
The results of the large woody debris component will be included in the Geomorphology Report.
Information provided will include the following:
• Existing large woody debris input mechanisms and source areas.
• Existing large woody debris loading by geomorphic zone.
FINAL STUDY PLAN GEOMORPHOLOGY STUDY 6.5
Susitna-Watana Hydroelectric Project Alaska Energy Authority
FERC Project No. 14241 Page 6.5-47 July 2013
• Observations and discussion of how large woody debris is currently functioning in the
Susitna River, including a discussion of interactions with riparian and aquatic/fish
habitat, geomorphic processes (sediment transport/channel forming processes), ice
processes, and flows.
• Discussion of potential for Project construction and operation to affect large woody
debris input and transport in the Susitna River.
• Map showing current large woody debris loading.
In addition, an ArcGIS shapefile will be provided with the following information:
• Location of large woody debris mapped from aerial photographs and during field visits.
6.5.4.10. Study Component: Geomorphology of Stream Crossings along Transmission
Lines and Access Alignments
The goals of this study component are to characterize the existing geomorphic conditions at
stream crossings along access road/transmission line alignments and to determine potential
geomorphic changes resulting from construction, operation, and maintenance of the roads and
stream crossing structures.
6.5.4.10.1. Existing Information and Need for Additional Information
Development of the Watana Dam will require road transportation from either the Denali
Highway or the railroad near Gold Creek or Chulitna to the dam site as well as a transmission
line from the powerhouse to an existing transmission line intertie. Construction, use, and
maintenance of the roads and transmission lines have the potential to affect stream
geomorphology if stream crossing structures constrict flow or alter transport of sediment or large
wood, or if sediment is delivered to the streams from erosion of the road prism.
Three different access/transmission alignments are currently being considered (Figure 6.5-7).
Work currently underway may refine or change the number of alignments that are finally
considered for the project, and may include upgrades to existing road systems (e.g., Denali
Highway). The Geomorphology of Stream Crossings along Transmission Lines and Access
Alignments study area will include the corridors that are under consideration at the beginning of
the study work in 2013.
The three alignments currently under consideration are designated as Denali, Chulitna, and Gold
Creek. The Alaska Department of Transportation and Public Facilities (ADOT&PF) evaluated
potential access corridors, including the Denali and Chulitna options (HDR 2011). The analysis
considered the number of stream crossings as one criterion, among many others, during the
screening process, but a detailed analysis of the geomorphic effects of the stream crossings on
bedload transport, large woody debris, and channel functions was not conducted.
A road in the Denali alignment would cross Seattle Creek and Brushkana Creek, two major
drainages within the Nenana River watershed, and Deadman Creek within the Susitna River
watershed. A road in this alignment would require a total of 15 stream crossings. A Gold Creek
access alignment would require 23 stream crossings. The major streams that would be crossed
by the Gold Creek access alignment include Gold Creek, Fog Creek, and Cheechako Creek.
Smaller streams crossed include tributaries to Prairee and Jack Long creeks, and a number of
FINAL STUDY PLAN GEOMORPHOLOGY STUDY 6.5
Susitna-Watana Hydroelectric Project Alaska Energy Authority
FERC Project No. 14241 Page 6.5-48 July 2013
unnamed tributaries to the Susitna River. A road in the Chulitna alignment would require about
30 stream crossings including the Indian River, and Thoroughfare, Portage, Devils, Tsusena, and
Deadman creeks. The Chulitna alignment would also cross 10 small, unnamed tributaries of
Portage Creek, three small tributaries of Devils Creek, seven smaller tributaries to the Upper
Susitna River Segment, and two tributaries of Tsusena Creek. Construction of Project access
roads and transmission lines would require stream crossing structures. Stream crossing
structures have the potential to affect stream geomorphology in the following ways:
• Altering hydraulics upstream and downstream of the crossing if flow is constricted. This
can lead to sediment deposition upstream of the crossing or bank erosion/channel incision
downstream.
• Altering migration of streams across a floodplain.
• Inhibiting movement of large woody debris.
• Increasing sediment delivered to a stream if road erosion is occurring near stream
crossings.
Data collected during this study will help determine the potential for proposed stream crossings
to affect stream hydraulics, morphology, sediment transport, and large woody debris transport.
This analysis will also provide data needed for design of appropriate stream crossing structures
and PM&E measures to minimize effects.
6.5.4.10.2. Methods
The following data would be obtained from existing sources:
• Topography at stream crossings.
• Aerial photography of stream crossings.
• Crossing design – information on the culvert or bridge characteristics planned at each
crossing will be obtained from Project engineering designs (HDR 2011 and subsequent
reports).
• Road design – information on the proposed road prism in the vicinity of stream crossings
will be obtained from Project engineering designs, including surfacing, gradient,
expected traffic levels, and road prism width.
A field assessment of each stream crossing along routes being considered will be made during
the summer of 2013. Fieldwork will be carried out in conjunction with the Aquatic Resources
Study (Access Alignment, Transmission Alignment and Construction Area component), if
possible. The following geomorphic information will be collected for each stream crossing:
• Stream characteristics – gradient, wetted and bankfull width, and depth.
• Substrate characteristics – existing substrate size and description of relative sediment
loading (based on field evidence of fresh deposits, large gravel bars, etc.).
• Existing large woody debris size and loading.
• Geomorphic channel type (Rosgen classification is recommended by USFS in its study
request dated May 31, 2012) and confinement.
FINAL STUDY PLAN GEOMORPHOLOGY STUDY 6.5
Susitna-Watana Hydroelectric Project Alaska Energy Authority
FERC Project No. 14241 Page 6.5-49 July 2013
• Existing and potential for bank erosion will be measured or evaluated for a minimum of
100 feet upstream and downstream of each proposed crossing.
• Potential for channel migration will be evaluated from aerial photographs if available,
supplemented by field/aerial observations.
The potential effects of stream crossings on geomorphology will be analyzed based on stream
characteristics and the proposed design of crossing structures. The evaluation will include the
following:
• Channel morphology, sediment dynamics – the hydraulic characteristics and bedload
transport capacity of existing channel and of proposed crossing structures will be
estimated and compared. Guidelines in the existing stream crossing design Memorandum
of Agreement (MOA) will be considered (ADOT&PF 2001).
• Channel migration zone – the existing channel migration zone will be mapped for alluvial
channels that show evidence of migration across the floodplain. Effects of proposed
crossing structures on channel migration will be analyzed.
• Large woody debris transport – potential effects on large woody debris transport will be
evaluated based on channel crossing type and width. The potential for culvert plugging
will be ranked based on observed large woody debris size in the stream and proposed
culvert size.
• Erosion and delivery of road sediment to stream – erosion from any unpaved roads will
be estimated using the WEPP or SEDMODL algorithms. Wind (aeolian) erosion from
unsurfaced areas (roads, parking areas, airstrip, etc.) will be evaluated using the U.S.
Environmental Protection Agency (EPA) methodology (AP-42) to provide information
on dust production for the recreation and aesthetics studies. (This effort was added in
response to a request by USDOI-NPS in a letter dated May 24, 2012.)
6.5.4.10.3. Study Products
The results of the Geomorphology of Stream Crossings along Transmission Lines and Access
Alignments component will be included in the Geomorphology Report. This will include a
discussion of the potential effects of road/transmission alignments on the following:
• Channel migration zones (potential effects of crossings on stream and vice versa)
• Channel aggradation/erosion upstream and downstream of crossing
• Blocking large woody debris transport
• Increased turbidity/sediment input to streams
6.5.4.11. Study Component: Integration of Fluvial Geomorphology Modeling with the
Geomorphology Study
The Geomorphology and Fluvial Geomorphology Modeling studies are inextricably linked, and
in reality, should be viewed as a single, integrated study. The efforts of the Geomorphology
Study identify the specific geomorphic (and habitat-related) processes that require further
quantification, identify a significant portion of the data needs, and provides the basic information
FINAL STUDY PLAN GEOMORPHOLOGY STUDY 6.5
Susitna-Watana Hydroelectric Project Alaska Energy Authority
FERC Project No. 14241 Page 6.5-50 July 2013
and context for performing the Fluvial Geomorphology Modeling Study. During the Fluvial
Geomorphology Modeling Study, results from the Geomorphology Study will be used in
conjunction with knowledge of the specific needs of the other resource teams to ensure that the
models are developed in an appropriate manner to address the key issues and to provide a reality
check on the model results. After completion of the modeling, the study team will use the results
from both studies in an integrated manner to provide interpretations with respect to the issues
that must be addressed, including predictions of potential changes to key geomorphic features
that comprise the aquatic and riparian habitat. This information will be provided to the other
resource teams for use in their evaluation of potential Project effects.
6.5.4.11.1. Existing Information and Need for Additional Information
The existing information required for this study component was previously described above
under the other ten components of the Geomorphology Study, and includes the results from those
study components.
6.5.4.11.2. Methods
Results from the previously described Geomorphology Study components will be compiled and
used by the Fluvial Geomorphology Modeling Study team to guide development of the models
and interpretation of the model results. During the modeling phase, close coordination will occur
between the two teams, and with the other resource teams, to insure that the relevant information
is being used in an appropriate manner and that the results being obtained from the baseline
models are consistent with the observed behavior of the river. Since there will be considerable
overlap between the Geomorphology and Fluvial Geomorphology teams, this coordination
between these two teams will be seamless and ongoing throughout the study.
Specific aspects of the Geomorphology Study that will be used to guide development of the
models and interpretation of the model results for the Fluvial Geomorphology Modeling Study,
particularly as they relate to the habitat indicators, include the following:
• The reach delineations under Section 6.5.4.1 will define and provide descriptions of the
geomorphically- and ecologically-significant macro-scale characteristics of each segment
of the study reach. As described in Section 6.6, the 1-D bed evolution model will be used
to quantify the reach-scale hydraulic and sediment transport conditions in the study reach
over the range of flows for both existing and Project conditions to expand and refine
these descriptions. The initial descriptions will guide development of the model,
specifically by defining geomorphically similar reaches where model input parameters
such as bed material gradations and hydraulic roughness coefficients are similar. The
descriptions will also guide interpretation of the model results by defining reaches where
the responses to Project actions are expected to be similar, providing a framework for
evaluating and summarizing reach-scale processes that affect geomorphic features and
associated habitat.
• The bedload and suspended sediment load data being collected by the USGS under
Section 6.5.4.2 will be used to calibrate and verify the predicted transport rates in the bed
evolution model, and to assess the natural variability in transport rates on a seasonal and
annual basis under existing and historic conditions.
FINAL STUDY PLAN GEOMORPHOLOGY STUDY 6.5
Susitna-Watana Hydroelectric Project Alaska Energy Authority
FERC Project No. 14241 Page 6.5-51 July 2013
• Data from the Sediment Supply and Transport Study Component (Section 6.5.4.3) will
provide tributary sediment input boundary conditions for both the existing and project
conditions the bed evolution models.
• Results from the Assess Geomorphic Change Study Component (Section 6.5.4.4) will be
used to provide a macro-scale understanding of the changes in geomorphic and habitat
features over the past several decades. In particular, the Turnover Rate analysis that is
part of this study component will provide a measure of the lateral sediment input to the
mainstem due to bank and bar erosion.
• The stream flow analysis under the Reconnaissance-level Assessment of Project Effects
study component (Section 6.5.4.6) will provide a basis for assessing seasonal and annual
hydrologic variability under existing and Project conditions to guide both development of
the hydrologic input data for the bed evolution model, and interpretation of the temporal
variability in model results, particularly for the long-term model runs. The sediment
transport analysis portion of this study component will be used to ensure that baseline
model results accurately reflect the historic and existing sediment balance along the study
reach.
• Information from the Large Woody Debris study component (Section 6.5.4.7) will be
considered in establishing channel roughness parameters for the hydraulic model, and if
appropriate, significant LWD clusters will be considered in establishing the local
erodibility of banklines along the project reach.
• Sediment trap efficiency results from the Reservoir Geomorphology Study Component
(Section 6.5.4.8) will provide the upstream sediment input boundary conditions for the
Project-conditions bed evolution model.
6.5.4.11.3. Study Products
The following specific items will be provided from this study to assist the Fluvial
Geomorphology Modeling Study and other resources teams with their analysis. A detailed
description of how the results from the Geomorphology and Fluvial Geomorphology Modeling
Studies will be integrated, and specifically, how the modeling results will be used to update and
refine the Geomorphology Study results is presented in Section 6.6.4.3.
• Reach delineations, description of key geomorphic attributes and characterization of the
geomorphology of the Susitna River.
• Identification of processes that create and influence the geomorphic features that help
comprise the aquatic and riparian habitat.
• Bedload and suspended sediment load rating curves at key gages (Gold Creek/above
Talkeetna, Tsusena Creek (if available), Chulitna River above Talkeetna, Talkeetna River
near Talkeetna, Sunshine, Susitna Station) based on USGS field data. Separate curves
will be developed for each of the following sediment size ranges:
o Gravel/cobble bedload
o Sand bedload
o Suspended sand load
FINAL STUDY PLAN GEOMORPHOLOGY STUDY 6.5
Susitna-Watana Hydroelectric Project Alaska Energy Authority
FERC Project No. 14241 Page 6.5-52 July 2013
o Wash load.
• Estimates of annual load of each of the above sediment size ranges passing each gage for
the extended flow record under existing and Project conditions.
• Summary of key changes in geomorphic features/units (i.e., island/bar evolution, main
channel width and form, bank erosion, changes in side channels, side sloughs, upland
sloughs) based on historical aerial photography.
• Estimates of historic LWD loading rates from upstream and lateral sources.
• Estimates of trap efficiency of the proposed reservoir.
6.5.5. Consistency with Generally Accepted Scientific Practice
The methods described for geomorphology are similar to those used for other recent
hydroelectric project licensing procedures and follow current scientific literature (see Literature
Cited, Section 6.5.8).
• The Geomorphic Classification component will use a combination of the numerous river
classifications that currently exist (Leopold and Wolman 1957; Schumm 1963, 1968;
Mollard 1973; Kellerhals et al. 1976; Brice 1981; Mosley 1987; Rosgen 1994, 1996;
Thorne 1997; Montgomery and Buffington 1997; Vandenberghe 2001).
• The Bedload and Suspended Load Data Collection component will be conducted by
USGS using its currently accepted field methods.
• The Sediment Supply and Transport in the Middle and Lower Susitna River Segments
component will use published USGS sediment and flow data and USGS-endorsed
correction factors to develop rating curves (Cohn and Gilroy 1991; Duan 1983). Bed
mobilization and effective discharge will be computed using currently recognized
methods (Mueller et al. 2005; Biedenharn et al. 2000).
• The Geomorphic Change Analysis and Habitat versus Flow components will use geo-
rectified aerial and satellite images to compare the river between years and flows. These
methods are widely used to compare changes in river systems.
• The Reconnaissance-Level Assessment of Geomorphic Change in the Lower Susitna
River Segment will utilize published USGS flow and sediment data and the analytical
framework developed by Grant et al. (2003).
• The Reservoir Geomorphology Study will use several widely-accepted methods to
calculate sediment trap efficiency (Churchill 1948; Brune 1953; Einstein 1965; Miller
1953; Lara and Pemberton 1965; Chen 1975). The delta formation study will use
methods developed and applied at similar projects (e.g., Boundary Hydroelectric Project,
FERC 2144) to analyze delta formation. Reservoir erosion will use models and analysis
methods developed and widely used for either general erosion (e.g., SHALSTAB,
WEPP/RUSLE) or for reservoir-based beach development (Penner 1993; Penner and
Boals 2000).
• The Large Woody Debris Study component and large wood inventory will be based on
widely used methods (Schuett-Hames et al. 1999).
FINAL STUDY PLAN GEOMORPHOLOGY STUDY 6.5
Susitna-Watana Hydroelectric Project Alaska Energy Authority
FERC Project No. 14241 Page 6.5-53 July 2013
• The Geomorphology of Stream Crossings along Transmission and Access Alignments
component will use guidelines from the existing stream crossing design MOU
(ADOT&PF 2001) along with site-specific analyses of channel dynamics.
6.5.6. Schedule
The schedule for conducting the Geomorphology Study is presented in Table 6.5-5. The
Geomorphology Study includes several efforts that were conducted in 2012. This included both
analysis and field efforts. One of the two field efforts in the Geomorphology Study is the USGS
data collection effort (Section 6.5.4.2). It was conducted in the late spring and summer of 2012.
A total of five sets of sediment transport data were collected at the Susitna River above Tsusena
Creek, Susitna River near Talkeetna (substituted for Gold Creek), and the Susitna River at
Sunshine and four sets on the Chulitna River below canyon. Provisional results of the data
collection effort will be delivered to the other studies as soon as they are available from the lab
during fall 2012. Suspended and bedload data, including calculation of sediment transport ratings
and daily loads, will be compiled in a technical memorandum delivered early in 2013.
The other primary 2012 field effort in the Geomorphology Study is the collection of aerial
photographs (Sections 6.5.4.4 for Lower Susitna River Segment and 6.5.4.5 for Middle Susitna
River Segment). Collection of aerial photographs was included in the 2012 effort to support the
digitization of aquatic habitat types, geomorphic features and to access channel change. This
information in turn helps support the site selection process for other studies. Due to the
combination of weather and flow conditions during 2012, only the 23,00cfs aerial photography
was acquired in 2012. Performing the digitization of the 2012 aerial photography was dependent
on the AEA SDC being able to fly the aerials at the appropriate discharge. The remainder of the
effort—12,500 cfs and 5,100 cfs aerial photography—will be collected in 2013. Consequently,
only the digitization of the aquatic habitat features associated with the 23,000 cfs flow was
performed in 2012. Therefore, 2012 study products only include the 23,000 cfs condition. The
acquisition, digitization and analysis work associated with the 12,500 and 5,100 cfs flows will be
performed in 2013.
The other study components in the Geomorphology Study that include 2012 efforts are
Delineation of Geomorphically Similar River Segments (Section 6.5.4.1), Sediment Supply and
Transport Middle and Lower Susitna River Segments (Section 6.5.4.3), Reconnaissance-Level
Assessment of the Project Effects on the Lower River Channel (Section 6.5.4.6) and Riverine
Habitat Versus Flow Lower River Segment. The 2012 portion of the geomorphic reach
delineation has been completed and is summarized in this document (Section 6.5.4.1).
Continued refinement and determination of morphometric parameters for the reaches will be
ongoing in 2013 as additional information becomes available. The remaining three efforts
require information from the operations modeling (Engineering Study) consisting of downstream
flows and stages associated with Project operations. This information was available the end of
November 2012. Therefore, completion of the identified 2012 efforts has been delayed until
January and early February of 2013. The delivery of these 2012 study results in this timeframe
will allow their use in the collaborative process that will occur in Q1 and early Q2 of 2013
associated with vetting the selection of the proposed Focus Areas and in evaluating the need to
extend detailed ISF and Geomorphology Study limits further downstream in the Lower Susitna
River Segment.
FINAL STUDY PLAN GEOMORPHOLOGY STUDY 6.5
Susitna-Watana Hydroelectric Project Alaska Energy Authority
FERC Project No. 14241 Page 6.5-54 July 2013
Table 6.5-3 shows the schedule for the performance and completion of the Geomorphology
Study. This schedule shows components of the Geomorphology Study that have early
component performed in 2012 or early 2013 (in the case of studies that have been delayed per
the discussion in the previous paragraph) and then a second effort that is performed in late 2013
and 2014. This is due to the 2012 efforts being conducted with best available information to
provide primarily results to inform the development and execution of other studies. The 2013
effort also includes optional aerial photograph acquisition in the Lower River and assisted
mapping of macrohabitat types if studies are extended into the Lower River. The subsequent
2013 and 2014 efforts are performed to incorporate additional information collected in 2013 and
to assess the effects of altered sediment supply and flow regimes for the alterative operational
scenarios.
The Initial Study Report (ISR) and the Updated Study Report (USR) explaining the actions taken
and data collected to date will be due within one and two years, respectively, of FERC’s Study
Plan Determination.
6.5.7. Relationship with Other Studies
A flow chart (Figure 6.5-8) describes study interdependencies and outlines the information and
products required from other studies and the timing of delivery to successfully complete the
Geomorphology Study on schedule. In the study interdependencies chart, the studies providing
input are listed in the five sided boxes at the top of the chart. The corresponding Sections are
provided in parentheses. The rectangular boxes below the five sided boxes list the major
information and products that the other studies will provide to the Geomorphology Study. The
primary studies that the Geomorphology Study will require information from and the associated
information are listed below and in Table 6.5-6.
• Mainstem (Open-water) Flow Routing Study (Section 8.5.4.3)
o Current and historical cross-sections
o Thalweg Profile
o Results of flow routing to Sunshine Station
• Fluvial Geomorphology Modeling Study (Section 6.6)
o Bed material sizes
o Geomorphic field assessment and observations
o Geomorphic feature mapping at Focus Areas
• Ice Processes Study (Section 7.6)
o Ice effects on banks, side channels, bed scouring and river stage
• Riparian Instream Flow Study (Section 8.6)
o Riparian/floodplain sedimentation rates
o Dating of surfaces
o Floodplain soil profiles and depth
• Reservoir Operations Modeling (Engineering)
FINAL STUDY PLAN GEOMORPHOLOGY STUDY 6.5
Susitna-Watana Hydroelectric Project Alaska Energy Authority
FERC Project No. 14241 Page 6.5-55 July 2013
o Results of operations modeling
• Water Modeling Quality Study (Section 5.6)
o Reservoir sediment trap efficiency for alternative scenarios
Studies that are considered secondary sources of to the Geomorphology Study information
include the Geology and Soils Characterization Study (Section 4.5), and Riparian Vegetation
Study Downstream of the Proposed Susitna-Watana Dam (Section 11.6). The USGS will
provide the extended hydrologic record for 11 gage locations for a period of 61 years. This
information will be used as the hydrologic record for analysis of existing stream flow
characteristics and will also provide the flows to be used by the Reservoir Operations Study
(Engineering) and the Mainstem (Open-water) Flow Routing Study (Section 8.5.4.3) to generate
flow conditions in the Middle and Lower River Segments for the with-Project conditions.
In the chart, the timing of delivery of each type of information or study product to the
Geomorphology study is provided in parentheses by quarter and year. For example, “(Q4-12)”
indicates the information will be provided in the fourth quarter of 2012. Table 6.5-6 provides
these interdependencies in tabular form including the study providing the information or product
and which area of the Geomorphology Study requires the information or product and the timing.
The chart indicates which areas of the Geomorphology Study require the information. The
Geomorphology Study areas are identified in the blue ellipses. To simplify the chart, study
components have been lumped into areas. The study components associated with each area
identified in the blue ellipses are listed below.
Geomorphic reach classification and delineation:
• Delineate geomorphically similar (homogeneous) reaches (Section 6.5.4.1)
Aerial photo analysis of geomorphic features and riverine habitat:
• Riverine habitat versus flow relationship Middle Susitna River Segment (Section 6.5.4.5)
• Riverine habitat area versus flow Lower Susitna River Segment (Section 6.5.4.7)
Geomorphic assessment:
• Bedload and suspended load data collection (Section 6.5.4.2)
• Sediment supply and transport Middle and Lower Susitna River Segments
(Section6.5.4.3)
• Assess geomorphic change Middle and Lower Susitna River Segments (Section 6.5.4.4)
• Reconnaissance-level assessment of project effects on Lower and Middle Susitna River
Segment channel (Section 6.5.4.6)
• Reservoir geomorphology (Section 6.5.4.8)
• Large woody debris (Section 6.5.4.9)
• Geomorphology of stream crossings along transmission lines and access alignments
(Section 6.5.4.10)
The chart also shows products and information the Geomorphology Study will provide to other
studies and the timing of their delivery. Table 6.5-7 provides these study interdependencies in
FINAL STUDY PLAN GEOMORPHOLOGY STUDY 6.5
Susitna-Watana Hydroelectric Project Alaska Energy Authority
FERC Project No. 14241 Page 6.5-56 July 2013
tabular form including the area of the Geomorphology Study providing the information and
which study requires the information or study product. In the flow chart the products and
information the Geomorphology Study will provide are identified in the rectangles below the
study area ellipses. The quarter and year that the products and information will be provided to
other studies is indicated in the parentheses adjacent to each item. At the bottom of the chart, the
studies that require the information from the Geomorphology Study are listed in the five sided
boxes. Included in parentheses adjacent to each study is the section of the RSP that the product
or information will support. The primary studies requiring information from the Geomorphology
Study and the associated information they will require are listed below. The information they
will require is identified in Table 6.5-7 (Note: Tables 6.6-6 and 6.6-7 provide a detailed list of 1-
D and 2-D model output and other information the Fluvial Geomorphology Modeling and
Geomorphology Studies will provide to other studies):
• Fish and Aquatics Instream Flow Study Fish (Section 8.5)
• Riparian Instream Flow Study (Section 8.6)
• Fluvial Geomorphology Modeling Study (Section 6.6)
• Characterization and Mapping of Aquatic Habitats Study (Section 9.9)
• Aesthetic Resources Study (Section 12.6)
• River Recreation Flow and Access Study (Section 12.7)
In addition to these studies, other studies may utilize input from the Geomorphology Study to
help identify their downstream study limits.
6.5.8. 2012 Study Efforts
The Geomorphology Study (Section 6.5) has several study components that include 2012 study
efforts to help prepare or refine various aspects of the Study Plans. Table 6.5-8 lists these study
components, the portions of the studies that support development of the study plan, and the
aspect of the study plan they support. These 2012 efforts were intended to be completed by
November 2012 to provide support for the Study Plan development; however, several
circumstances have resulted in portions of the efforts not being completed in November 2012.
Table 6.5-8 also identifies efforts completed in time to fully support development of the study
plan and which were partially completed. Efforts not fully completed prior to filing of the study
plan, will be completed in December 2012 and reported on in January 2013. The results of the
2012 Geomorphology Study will support Water Resources Technical Workgroup (TWG)
meetings to be held in February and March 2013 involving review and finalization of the
proposed Focus Areas and the downstream study limit.
6.5.9. Level of Effort and Cost
Initial planning level estimates of the costs to perform the components of the Geomorphology
Study are provided in Table 6.5-9. The total effort for the Geomorphology Study, including
Component 2, Sediment Data Collection, to be performed by the USGS, is estimated to cost
between approximately $1.6 and $2.1 million.
FINAL STUDY PLAN GEOMORPHOLOGY STUDY 6.5
Susitna-Watana Hydroelectric Project Alaska Energy Authority
FERC Project No. 14241 Page 6.5-57 July 2013
6.5.10. Literature Cited
Acres. 1982. Susitna Hydroelectric Project, Reservoir Slope Stability. Prepared for Alaska
Power Authority, Anchorage, Alaska. March 1982.
Abbe, T.B., Montgomery, D.R. 1996. Large woody debris jams, channel hydraulics and habitat
formation in large rivers. Regulated Rivers: Research & Management 12, 201–221.
Abbe, T.B., Montgomery, D.R. 2003. Patterns and processes of wood debris accumulation in the
Queets River basin, Washington. Geomorphology 51, 81–107.
ADF&G/ADOT&PF. 2001. Memorandum of agreement between Alaska Department of Fish
and Game and Alaska Department of Transportation and Public Facilities for the design,
permitting, and construction of culverts for fish passage. Signed 8/7/2001.
Alaska Energy Authority (AEA). 2011. Pre-Application Document: Susitna-Watana
Hydroelectric Project FERC Project No. 14241. December 2011. Prepared for the Federal
Energy Regulatory Commission by the Alaska Energy Authority, Anchorage, Alaska.
Andrews, E.D., 1980. Effective and Bankfull Discharges of Streams in the Yampa River Basin,
Colorado and Wyoming. Journal of Hydrology, 46(1980), pp. 311-330.
Andrews, E.D., 1986. Downstream Effects of Flaming Gorge Reservoir on the Green River,
Colorado and Utah. Geological Society of American Bulletin, v. 97, August, pp. 1012-
1023.
Andrews, E.D. and Nankervis, J.M., 1995. Effective discharge and the design of channel
maintenance flows for gravel-bed rivers. American Geophysical Union, v. 89, pp. 151-
164.
Benson, M.A. and Thomas, D.M., 1966. A definition of dominant discharge. Bulletin of the
International Association of Scientific Hydrology 11, pp. 76-80.
Biedenharn, D.S., Copeland, R.R., Thorne, C.R., Soar, P.J., Hey, R.D., and Watson, C.C., 2000.
Effective Discharge Calculation: A Practical Guide. Coastal and Hydraulics Laboratory,
U.S. Army Engineer Research and Development Center, Vicksburg, Mississippi,
ERDC/CHL TR-00-15, August.
Brice, J.C., 1981. Stability of relocated stream channels. Federal Highway Commission Report
FHWA/RD-80/158, 177 p.
Brune, G.M. 1953. Trap efficiency of reservoirs. Transactions of the American Geophysical
Union, Vol. 34(3). 407 – 418.
Buffington, J. M., and D. R. Montgomery. 1997. A systematic analysis of eight decades of
incipient motion studies, with special reference to gravel-bedded rivers, Water Resour.
Res., 33, 1993–2029.
Chen, C.N. 1975. Design of sediment retention basins, Proceedings, National Symposium on
Urban Hydrology and Sediment Control, University of Kentucky, pp. 58 – 68.
Churchill, M.A. 1948. Discussion of “Analysis and Use of Reservoir Sedimentation Data” by
L.C. Gottschalk. Proceedings of the Federal Interagency Sedimentation Conference,
Denver Colorado. 139 – 140.
FINAL STUDY PLAN GEOMORPHOLOGY STUDY 6.5
Susitna-Watana Hydroelectric Project Alaska Energy Authority
FERC Project No. 14241 Page 6.5-58 July 2013
Clipperton, G.K., C.W. Koning, A.G.H. Locke, J.M. Mahoney, and B. Quazi. 2003. Instream
Flow Needs Determinations for the South Saskatchewan River Basin, Alberta, Canada.
Alberta Environment, Publication No. T/719.
Collier, M.C., R.H. Webb, and J.C. Schmidt, 1996. A primer on the Downstream Effects of
Dams. U.S. Geological Survey, Circular 1126. 108 pp.
Cohn, T.A., and E.J. Gilroy. 1991. Estimating Loads from Periodic Records. U.S.
GeologicalSurvey Branch of Systems Analysis Technical Report 91.01. 81 pp.
Collins, B.D., D.R. Montgomery, K.L. Fetherston, and T.B. Abbe. 2012. The floodplain large-
wood cycle hypothesis: A mechanism for the physical and biotic structuring of temperate
forested alluvial valleys in the North Pacific coastal ecoregion. Geomorphology 139–
140:460–470.
Darby, S.E. and Simon, A. (eds), 1999. Incised River Channels. Wiley, Chichester, 442 p.
Duan, N. 1983. Smearing Estimate: A Nonparametric Retransformation Method. Journal of the
American Statistical Association, Vol. 78(383): 605–610.
Dudley, S. J., J. C. Fischenich, and S. R. Abt. 1998. Effect of woody debris entrapment on flow
resistance. Journal of the American Water Resources Association 34: 1189-1198.
Durst, J.D. and J. Ferguson. 2000. Large woody debris, an annotated bibliography, Compiled for
the Region III Forest Practices Riparian Management Committee. Compiled for Alaska
Dept. of Fish & Game, Habitat & Restoration Division.
Einstein, H.A. 1965. Final Report Spawning Grounds. University of California Hydrologic
Engineering Laboratory. 16 pages, 2 tables, 10 figures.
Ferguson, R.I. 1986. River Loads Underestimated by Rating Curves. Water Resources Research,
Vol. 22(1): 74–76.
Fetherston, K.L., Naiman, R.J., Bilby, R.E. 1995. Large woody debris, physical process, and
riparian forest development in montane river networks of the Pacific Northwest.
Geomorphology 13, 133–144.
Finlayson, D.P., 2006. The Geomorphology of Puget Sound Beaches. Ph.D. Dissertation,
University of Washington, Seattle, WA. 216pp. Available at
http://david.p.finlayson.googlepages.com/pugetsoundbeaches.
Friedman, J.M., W.R. Osterkamp, M.L. Scott, and G.T. Auble, 1998. Downstream Effects of
Dams on Channel Geometry and Bottomland Vegetation: Regional Patterns in the Great
Plains. Wetlands, v. 18, no. 4, December, pp. 619 – 631.
Grant, G.E. and F.J. Swanson. 1995. Morphology and processes of valley floors in mountain
streams, Western Cascades, Oregon. In Natural and Anthropogenic Influences in Fluvial
Geomorphology, AGU Geophysical Monograph 89, 83-102.
Grant, G.E., J.C. Schmidt, and S.L. Lewis. 2003. A geological framework for interpreting
downstream effects of dams on rivers. AGU, Geology and Geomorphology of the
Deschutes River, Oregon, Water Science and Application 7.
FINAL STUDY PLAN GEOMORPHOLOGY STUDY 6.5
Susitna-Watana Hydroelectric Project Alaska Energy Authority
FERC Project No. 14241 Page 6.5-59 July 2013
Germanoski, D., 1989. The effects of sediment load and gradient on braided river
morphology. Unpublished Ph.D. dissertation, Colorado State University, Fort Collins,
CO, 407 p.
Germanoski, D. and Harvey, M.D., 1993. Asynchronous terrace development in degrading
braided channels. Physical Geography, v. 14(4), pp. 16-38.
Germanoski, D. and Schumm, S.A., 1993. Changes in braided river morphology resulting from
aggradation and degradation. The Journal of Geology, v. 101, pp. 451-466.
Germanoski, D., 2001. Bar Forming Processes in Gravel-bed Braided Rivers, with Implications
for Small-scale Gravel Mining. In Anthony, D.J., Harvey, M.D., Laronne, J.B., and
Mosley, M.P. (eds), Applying Geomorphology to Environmental Management, pp. 3-32.
Guy, H.P. 1964. An Analysis of Some Storm-Period Variables Affecting Stream Sediment
Transport. U.S. Geological Survey Professional Paper No. 462E.
Guymon, G.L. 1974. Regional Sediment Yield Analysis of Alaska Streams. ASCE Journal of
the Hydraulics Division, Vol. 100(1). 41 – 51.
Hamrick, J.M. 1992. A Three-Dimensional Environmental Fluid Dynamics Computer Code:
Theoretical and Computational Aspects, Special Report 317. The College of William and
Mary, Virginia Institute of Marine Science. 63 pp.
Harvey, M.D., Mussetter, R.A., Anthony, D.J., 2003. Island Aging and Dynamics in the Snake
River, Western Idaho, USA. Abstract: Proceedings of Hydrology Days 2003, American
Geophysical Union, Fort Collins, Colorado.
Harvey, M.D. and Trabant, S.C., 2006. Evaluation of Bar Morphology, Distribution, and
Dynamics as Indices of Fluvial Processes in the Middle Rio Grande. Abstract for Middle
Rio Grande Endangered Species Collaborative Program, First Annual Symposium,
Albuquerque, New Mexico, April.
HDR. 2011. Watana transportation access study, Project No. 82002. Draft report prepared for
the Alaska Department of Transportation and Public Facilities. November 29, 2011.
Juracek, K.E. and Fitzpatrick, F.A., 2003. Limitation and implications of stream classification.
Jour. of American Water Res. Assn, v. 83, no. 3, June, pp. 659-670.
Kellerhals, R., Church, M., and Bray, D.I., 1976. Classification and analysis of river processes.
Jour. of Hydraulic Div. Proc. 102, pp. 813-829.
Koch, R.W. and G.M. Smillie. 1986. Bias in Hydrologic Prediction Using Log-Transformed
Regression Models. Journal of the American Water Resources Association, Vol. 22: 717–
723.
Labelle, J.C., M. Arend, L. Leslie, W. Wilson, 1985. Geomorphic Change in the Middle Susitna
River since 1949. Report by Arctic Environmental Information and Data Center.
Prepared for the Alaska Power Authority.
Lane, E.W. 1955. The importance of fluvial morphology in hydraulic engineering. Proc. ASCE,
Vol. 81, Paper 745, pp. 1-17.
FINAL STUDY PLAN GEOMORPHOLOGY STUDY 6.5
Susitna-Watana Hydroelectric Project Alaska Energy Authority
FERC Project No. 14241 Page 6.5-60 July 2013
Lara, J.M., and E.L. Pemberton. 1965. Initial Unit Weight of Deposited Sediments.
Proceedings of the Federal Interagency Sedimentation Conference, 1963. Miscellaneous
Publication No. 970. USDA, Agriculture Research Service. Washington, D.C. 818 –
845.
Leopold, L.B. and Wolman, M.G., 1957. River channel patterns: Braided meandering and
straight. U.S. Geol. Survey Prof. Paper 282-B, 47 p.
Leopold, L.B., Wolman, M.G., and Miller, J.P., 1964. Fluvial Processes in Geomorphology.
Freeman Co., San Francisco, California and London, 522 p.
Li, R.M. and H.W. Shen, 1975. Solid Particle Settlement in Open-Channel Flow, ASCE J Hyd
Div, V 101, NY7, pp 917-931.
Miller, A.J., 1995. Valley morphology and boundary conditions influencing spatial patterns of
flood flow. In Natural and Anthropogenic Influences in Fluvial Geomorphology, AGU
Geophysical Monograph 89, 57-82.
Miller, C.R. 1953. Determination of the Unit Weight of Sediment for Use in Sediment Volume
Computations. U.S. Bureau of Reclamation. Denver, Colorado.
Mollard, J.D., 1973. Airphoto interpretation of fluvial features: Fluvial processes and
sedimentation. Edmonton, Proceedings of Hydrology Symposium, Univ. Alberta, pp.
341-380.
Montgomery, D.R. and Buffington, J.M., 1997. Channel-reach morphology in mountain
drainage basins. Geological Survey America, Bulletin, v. 109, pp. 596-611.
Montgomery, D.R., Collins, B.D., Buffington, J.M., Abbe, T.B. 2003. Geomorphic effects of
wood in rivers. In: Gregory, S.V., Boyer, K.L., Gurnell, A.M. (Eds.), The Ecology and
Management of Wood in World Rivers. American Fisheries Society, Bethesda, MD, pp.
21–47.
Morris, G.L., G. Annandale, and R. Hotchkiss, 2007. Reservoir Sedimentation, in Sedimentation
Engineering, Processes, Measurements, Modeling and Practice, ASCE Manuals and
Reports on Engineering Practice No 110, pp 579-612.
Morris, G.L. and J. Fan. 1998. Reservoir Sedimentation Handbook. McGraw-Hill Book Co.
New York.
Mosley, M.P., 1987. The classification and characterization of rivers. In Richards, K. (ed),
River Channels, Oxford, Blackwell, pp. 295-320.
Mouw, J. 2011. Hydrologic controls on the recruitment of riparian plants and the maintenance of
floodplain wildlife habitat. Retrieved from Alaska Section of the American Water
Resources Association 2011 Conference Proceedings Website:
http://www.awra.org/state/alaska/proceedings/2011abstracts/
Mueller, E. R., J. Pitlick, and J. M. Nelson. 2005. Variation in the reference Shields stress for
bedload transport in gravelbed streams and rivers, Water Resources Research, Vol 41,
W04006, doi:10.1029/2004WR003692.
FINAL STUDY PLAN GEOMORPHOLOGY STUDY 6.5
Susitna-Watana Hydroelectric Project Alaska Energy Authority
FERC Project No. 14241 Page 6.5-61 July 2013
Nolan, K.M., Lisle, T.E., and Kelsey, H.M., 1987. Bankfull discharge and sediment transport in
northwestern California. A paper delivered at Erosion and Sedimentation in the Pacific
Rim, IAHS Publication No. 165, International Association of Hydrological Sciences,
Washington, D.C.
O’Connor, J.E. and Grant, G.E. (eds), 2003. A Peculiar River: Geology, Geomorphology, and
Hydrology of the Deschutes River, Oregon. Amer. Geophysical Union, Water Science
and Application 7, Washington, D.C., 219 p.
Ott, R. A. M. A. Lee, W. E. Putman, O., K. Mason, G. T. Worum, and D. N. Burns. 2001. Bank
erosion and large woody debris recruitment along the Tanana River, interior Alaska
Report to: Alaska Department of Environmental Conservation Division of Air and Water
Quality Prepared by: Alaska Department of Natural Resources Division of Forestry and
Tanana Chiefs Conference, Inc. Forestry Program Project No. NP-01-R9. July 2001.
Parker, G., P. C. Klingeman, and D. G. McLean. 1982. Bedload and size distribution in paved
gravel-bed streams, J. Hyd. Div. Am. Soc. Civ. Eng., 108(HY4), 544– 571.
Penner, L. A., R.G. Boals, 2000. A Numerical Model for Predicting Shore Erosion Impacts
Around Lakes and Reservoirs, Canadian Dam Association, pp 75 – 84.
Penner, L. A., 1993. Shore Erosion and Slumping on Western Canadian Lakes and Reservoirs, A
Methodology for Estimating Future Bank Recession Rates, Environment Canada,
Monitoring Operations Division.
Pickup, G. and Warner, R.F., 1976. Effects of hydrologic regime on magnitude and frequency of
dominant discharge. Journal of Hydrology, v. 29, pp. 51-75.
Pickup, G., 1976. Adjustment of stream channel shape to hydrologic regime. Journal of
Hydrology, v. 30, pp. 365-373.
R&M Consultants, Inc. and Trihey & Associates. 1985a. Response of Aquatic Habitat Surface
Areas to Mainstem Discharge in the Yentna to Talkeetna Reach of the Susitna River.
Prepared under contract to Harza-Ebasco, for Alaska Power Authority, document No.
2774, June.
R&M Consultants, Inc. and Trihey & Associates. 1985b. Assessment of access by spawning
salmon into tributaries of the Lower Susitna River. Prepared under contract to Harza-
Ebasco, for Alaska Power Authority, document No. 2775, June.
Rosgen, D.L., 1994. A classification of natural rivers. Catena. 22, pp. 169-199.
Rosgen, D.L., 1996. Applied river morphology. Wildland Hydrology books. Pagosa Springs,
CO.
Sabo, J.L., K. Bestgen, W. Graf, T. Sinha, E.E. Wohl, 2012. Dams in the Cadillac Desert:
downstream effects in a geomorphic context. Annals of the New York Academy of
Sciences, 1249: 227-246.
Schmidt, J. C., and P. R. Wilcock, 2008. Metrics for assessing the downstream effects of dams,
Water Resour. Res., 44, W04404, doi:10.1029/2006WR005092.
FINAL STUDY PLAN GEOMORPHOLOGY STUDY 6.5
Susitna-Watana Hydroelectric Project Alaska Energy Authority
FERC Project No. 14241 Page 6.5-62 July 2013
Schuett-Hames, D. A. E. Pleus, J. Ward, M. Fox, J. Light. 1999. TFW monitoring program
method manual for the large woody debris survey. Timber Fish & Wildlife TFW-AM9-
99-004. June 1999.
Schumm, S.A., 1963. A tentative classification of alluvial river channels. U.S. Geol. Survey
Circ. 477, 10 p.
Schumm, S.A., 1968. River adjustment to altered hydrologic regimen, Murrumbidgee River and
paleochannels, Australia. U.S. Geol. Survey Prof. Paper 598, 65 p.
Schumm, S.A., 1977. The Fluvial System. John Wiley & Sons, New York, 338 p.
Schumm, S.A., 1991. To Interpret the Earth. Cambridge Univ. Press, Cambridge, U.K., 133 p.
Schumm, S.A., 2005. River Variability and Complexity. Cambridge Univ. Press, Cambridge,
U.K., 220 p.
Schumm, S.A., Dumont, J.F., and Holbrook, J.M., 2000. Active Tectonics and Alluvial Rivers.
Cambridge Univ. Press, Cambridge, U.K., 275 p.
Schumm, S.A., Harvey, M.D., and Watson, C.C., 1984. Incised Channels. Initiation, Evolution,
Dynamics, and Control. Water Res. Publ., Littleton, Colorado, 200 p.
Sherwood, C., 2006. Demonstration Sediment-Transport Applets. Available at:
http://woodshole.er.usgs.gov/staffpages/csherwood/sedx_equations/sedxinfo.html.
Shields, A., 1936. Application of similarity principles and turbulence research to bedload
movement. California Institute of Technology, Pasadena; Translation from German
Original; Report 167.
Shields, F.D., Jr, A. Simon, and L.J. Steffen. 2000. Reservoir effects on downstream river
channel migration. Environmental Conservation 27(1): 54-66.
Strand, R.I. and E.L. Pemberton, 1987. Reservoir Sedimentation, U.S. Bureau of Reclamation,
Design of Small Dams, Third Edition, Appendix A, pp 529-564.
Thomas, R.B. 1985. Estimating Total Suspended Sediment Yield with Probability Sampling.
Water Resources Research, Vol. 21(9): 1381– 1388.
Thorne, C.R., 1997. Channel types and morphological classification. In Thorne, C.R., Hey,
R.D., and Newson, M.D. (eds), Applied Fluvial Geomorphology for River Engineering
and Management. Chichester, Wiley, pp. 175-222.
Tinker, K.J. and Wohl, E.E. (eds), 1998. Rivers Over Rock: Fluvial Processes in Bedrock
Channels. Amer. Geophysical Union, Geophysical Monograph 17, Washington, D.C.,
323 p.
Topping, D.J., D M. Rubin, P. E. Grams, R. E. Griffiths, T. A. Sabol, N. Voichick, R. B. Tusso,
K. M. Vanaman, and R. R. McDonald. 2010. Sediment Transport During Three
Controlled-Flood Experiments on the Colorado River Downstream from Glen Canyon
Dam, with Implications for Eddy-Sandbar Deposition in Grand Canyon National Park,
U.S. Geological Survey, Open-File Report 2010-1128, 123 pp.
Trihey & Associates. 1985. Response of Aquatic Habitat Surface Areas to Mainstem Discharge
in the Talkeetna-To Devil Canyon Segment of the Susitna River, Alaska. Prepared under
contract to Harza-Ebasco, for Alaska Power Authority, document No. 2945.
FINAL STUDY PLAN GEOMORPHOLOGY STUDY 6.5
Susitna-Watana Hydroelectric Project Alaska Energy Authority
FERC Project No. 14241 Page 6.5-63 July 2013
United States Bureau of Reclamation (USBR). 1987. Design of Small Dams. A Water
Resources Technical Publication. U.S. Government Printing Office. Washington, D.C.
URS. 2011. AEA Susitna Water Quality and Sediment Transport Data Gap Analysis Report.
Prepared by Tetra Tech, URS, and Arctic Hydrologic Consultants. Anchorage, Alaska. 62
p.+ Appendixes.
U.S. Geological Survey (USGS). 1982. Guidelines for determining flood flow frequency.
Bulletin 17B, Hydrology Subcommittee, Interagency advisory committee on water data.
USGS, 1987. Sediment Transport Characteristics of the Selected Streams in the Susitna River
Basin, Alaska: Data for Water Year 1985 and Trends in Bedload Transport 1981-85.
Open-File Report 87-229. Prepared in cooperation with the Alaska Power Authority, 50
pp.
USGS. 1992. Recommendations for Use of Retransformation Methods in Regression Models
Used to Estimated Sediment Loads [“The Bias Correction Problem”]. Office of Surface
Water Technical Memorandum No. 93.08. December 31.
Vandenberghe, J., 2001. A typology of Pleistocene cold-based rivers. Quatern. Internl. 79, pp.
111-121.
Walling, D.E. 1974. Suspended Sediment and Solute Yields from a Small Catchment Prior to
Urbanization. Institute of British Geographers Special Publication No. 6: 169–192.
Walling, D.E. 1977a. Limitations of the Rating Curve technique for Estimating Suspended
Sediment Loads, with Particular Reference to British Rivers. In: Erosion and Solid Matter
Transport in Inland Waters, Proceedings of Paris Symposium, July 1977. IAHS
Publication No. 122: 34– 48.
Walling, D.E. 1977b. Assessing the Accuracy of Suspended Sediment Rating Curves for a Small
Basin. Water Resources Research, Vol. 13(3): 531–538.
Williams, G.P., and Wolman, M.G., 1984. Downstream Effects of Dams on Alluvial Rivers. U.S.
Geological Survey Professional Paper No. 1286. 88 pp.
Wolman, M.G. and Miller, J.P., 1960. Magnitude and frequency of forces in geomorphic
processes, Journal of Geology, vol. 68, no. 1, pp. 54-74.
Wright, S. A., D. J. Topping, D. M. Rubin, and T. S. Melis. 2010. An approach for modeling
sediment budgets in supply‐limited rivers, Water Resour. Res., 46, W10538,
doi:10.1029/2009WR008600.
FINAL STUDY PLAN GEOMORPHOLOGY STUDY 6.5
Susitna-Watana Hydroelectric Project Alaska Energy Authority
FERC Project No. 14241 Page 6.5-64 July 2013
6.5.11. Tables
Table 6.5-1. Initial geomorphic reach classifications.
Reach Designation Upstream Limit RM) Down- stream Limit (RM) Reach Classifi- cation
Slope (ft/mi) Lateral Constraints
Upper Susitna River Segment (UR)
UR-1 260 248 SC2 NA Quaternary Basin Fill
UR-2 248 233 SC1 NA Quaternary Basin Fill
UR-3 233 223 SC1 NA Quaternary Basin Fill
UR-4 223 206 SC2 NA Granodiorite
UR-5 206 201 SC1 NA Quaternary Basin Fill
UR-6 201 184 SC2 NA Quaternary Basin Fill
Middle Susitna River Segment (MR)
MR-1 184 182 SC2 9 Gneiss
MR-2 182 166.5 SC2 10 Quaternary Basin Fill
MR-3 166.5 163 SC2 17 Granites
MR-4 163 150 SC1 30 Granites
MR-5 150 145 SC2 12 Moraine and Turbidites
MR-6 145 119 SC3 10 Moraines
MR-7 119 104 SC2 8 Moraines
MR-8 104 98.5 MC1/SC2 8 Holocene Lacustrine and Alluvial Terrace
deposits (Reach is a transition from SC2 to MC1
as the Three Rivers Confluence is approached)
Lower Susitna River Segment (LR)
LR-1 98.5 84 MC1 5 Upper Pleistocene Outwash, Moraine and
Lacustrine deposits
LR-2 84 61 MC1 5 Upper Pleistocene Outwash, Moraine and
Lacustrine deposits
LR-3 61 40.5 MC3 4 Glaciolacustrine and Moraine deposits
LR-4 40.5 28 MC3 2 Glaciolacustrine and Moraine deposits
LR-5 28 20 SC2 2 Glaciolacustrine and Moraine deposits
LR-6 20 0 MC4 1.4 Glaciolacustrine and Holocene Estuarine
deposits
FINAL STUDY PLAN GEOMORPHOLOGY STUDY 6.5
Susitna-Watana Hydroelectric Project Alaska Energy Authority
FERC Project No. 14241 Page 6.5-65 July 2013
Table 6.5-2. Estimated Water Year 1985 annual sediment loads for the Susitna River and major tributaries (based on
USGS 1987).
Gage Station Drainage Area (sq. mi.)
Annual Water Yield (ac.ft.)
Estimated Annual Sediment Load (million tons)
Silt and Clay Sand Gravel Total
Susitna River near Talkeetna 6,320 6,720,000 1.79 1.48 0.019 3.29
Chulitna River near Talkeetna 2,580 6,122,000 4.46 2.99 0.355 7.81
Talkeetna River near Talkeetna 2,006 3,083,000 0.81 0.90 0.054 1.76
Total of the three stations near
Talkeetna
10,906 15,925,000 7.06 5.37 0.430 12.9
Susitna River at Sunshine 11,100 17,600,000 8.94 6.03 0.155 15.1
Difference (Sunshine minus near
Talkeetna stations)
194 1,675,000 1.88 0.66 -0.275 2.20
FINAL STUDY PLAN GEOMORPHOLOGY STUDY 6.5
Susitna-Watana Hydroelectric Project Alaska Energy Authority
FERC Project No. 14241 Page 66 July 2013
Table 6.5-3. Summary of 2012 aerial photo acquisition for the Upper, Middle, and Lower Susitna River segments.
Aerial Coverage (RM) Date
Discharge Target (cfs) Actual Discharge (cfs)
From To Gold Creek Sunshine Station Gold Creek Sunshine Station
Upper River
241 184 09/30/2012 NA1 --- 18,100 ---
264 224 10/20/2012 NA1 --- 5,000 ---
Middle River
107 98.5 07/27/2012 23,000 --- 23,200 ---
135 98.5 09/10/2012 12,500 --- 13,300 ---
136 184 9/30/2012 12,500 --- 18,100 ---
Lower River
98.5 54 07/27/2012 --- 59,100 --- 54,000
98.5 74 09/10/2012 --- 36,600 --- 38,100
74 0 09/30 - 10/01/20122 --- 36,600 --- 41,700 to 46,900
18 1 10/10/2012 --- 59,100 --- 53,700
68 30 10/10/2012 --- 59,100 --- 53,700
Notes:
1 Aerials are only being used for delineation of geomorphic features and channel change in the Upper River, target flow not required
2 Due to cloud cover, this set of aerials is a combination of photos from 9/30/2012 and 10/01/2012
FINAL STUDY PLAN GEOMORPHOLOGY STUDY 6.5
Susitna-Watana Hydroelectric Project Alaska Energy Authority
FERC Project No. 14241 Page 67 July 2013
Table 6.5-4. Middle Susitna River Segment aquatic habitat sites from 1980s to be digitized.
Site Name River Mile (RM) Length
(Miles) Downstream RM
Upstream RM
Whiskers Slough1 100.7 102.0 1.3
Slough 4 105.0 106.5 1.5
Slough 5 107.0 108.5 1.5
Slough 6A1 112.0 113.0 1.0
Slough 8 113.4 115.4 2.0
Oxbow II 118.5 120.5 2.0
Slough 8A1 124.3 126.6 2.3
Slough 9 128.0 129.5 1.5
Side Channel 10A 131.0 132.8 1.8
Side Channel 10 133.0 134.3 1.3
Slough 111 134.3 136.8 2.5
Gold Creek 136.8 138.3 1.5
Indian River 138.5 139.5 1.0
Slough 211 140.0 142.6 2.6
Slough 22 144.0 145.0 1.0
Fat Canoe Island 146.5 147.5 1.0
Portage Creek1 148.3 148.8 0.5
MR-2 Narrow1,2 168.5 170.0 1.5
MR-2 Wide1,2 170.7 172.5 1.8
MR-2 Straight2 173.2 174.9 1.7
MR-2 Tributary2 176.0 176.8 0.8
MR-2 Island Bend2 178.1 180.3 2.2
Below Dam1,2 182.0 183.0 1.0
TOTAL LENGTH - - 35.3
Notes:
1 Proposed Focus Area (see Section6.6.4.1.2.4 and Table 6.6-5)
2 Site not studied in the 1980s
FINAL STUDY PLAN GEOMORPHOLOGY STUDY 6.5
Susitna-Watana Hydroelectric Project Alaska Energy Authority
FERC Project No. 14241 Page 68 July 2013
Table 6.5-5. Schedule for implementation of the Geomorphology Study.
Activity 2012 2013 2014 2015
1 Q 2 Q 3 Q 4 Q 1 Q 2 Q 3 Q 4 Q 1 Q 2 Q 3 Q 4 Q 1Q 2Q
Develop Geomorphic Classification System / Finalize Classification System ●
Initial Geomorphic Reach Delineation / Finalize Delineation ● ●
Identify and Map Paleo Geomorphic Features and Geology / Field Verify / ●
Determine Morphometric Parameters (sinuosity, slope, topwidth, etc…) ●
Identify Key Governing Geomorphic Processes ●
Acquire Aerial Photo / Complete Aerial Acquisition (not Completed in 2012) /
Digitize 1980s Habitat and Geomorphic Features ● ●
Digitize 2012 Habitat and Geomorphic Features / Complete Habitat Effort ● / ●
Assess Habitat Area Change 1980s to 2012 ● ●
Assess Channel Change 1980s to 2012 ● ●
Initial Flow Assessment / Final Flow Assessment ● / ●
Determine Effective Discharge and Characterization of Bed Mobilization ●
Initial Sediment Balance / Detailed Sediment Balance for Modeling ● / ●
Recon. Level Assess. of Potential L. and M. Susitna River Segment Change ● ● ●
Optional 2013 aerial photo and macrohabitat mapping – Lower River ●
Large Woody Debris ●
Reservoir Geomorphology ●
Geomorphology of Stream X-ings along Access & Transmission Line Corridor ●
Integration with & Support of Interpreting Fluv. Geomorph. Modeling Results ●
Initial Study Report /Updated Study Report Δ ▲
Legend: Planned Activity
● Technical Memorandum or Interim Product
Δ Initial Study Report
▲ Updated Study Report
FINAL STUDY PLAN GEOMORPHOLOGY STUDY 6.5
Susitna-Watana Hydroelectric Project Alaska Energy Authority
FERC Project No. 14241 Page 69 July 2013
Table 6.5-6. Information and products required by the Geomorphology Study from other studies.
Source of Product or Information Information or Product to be Provided Timing
Information or Products Required for: Geomorphic Reach Classification and Delineation
Mainstem (Open-water) Flow Routing Model (Section
8.5.4.3)
Current and historical cross-sections Q4-12
Thalweg profile Q4-12
Fluvial Geomorphology Modeling Study (Section
6.6.4.1.2.8)
Bed material sizes Q3-13
External: GINA / Mat-Su Borough LiDAR Q4-12
Internal: Geomorphology Study (Sections 6.5.4.5 &
6.5.4 .7) 1980s and 2012 aerials Q4-12 &
Q4-13
Information or Products Required for: Aerial Photo Analysis of Geomorphic Features and Riverine Habitat
Mainstem (Open-water) Flow Routing Model (Section
8.5.4.3)
Current cross-sections Q4-12
Internal: Geomorphology Study (Sections 6.5.4.5 &
6.5.4.7) 1980s and 2012 aerials Q4-12 &
Q4-13
Trihey & Associates 1985 1980s habitat mapping Middle Susitna River Segment Q4-12
R&M Consultants, Inc., and Trihey and Associates
1985a) 1980s habitat mapping Lower Susitna River Segment Q4-12
Information or Products Required for: Geomorphic Assessment
External: USGS USGS extended flow record Q3-12
USGS sediment transport data 1980s and 2012 Q4-12
Mainstem (Open-water) Flow Routing (Section 8.5.4.3)
Results of operations modeling - preliminary Q4-12
Results of operations modeling – alternative scenarios Q4-14
Results of flow routing to Sunshine Station -
Preliminary
Q4-12
Results of flow routing to Sunshine Station –
Alternative Scenarios
Q4-14
Internal: Geomorphology Study Model (Section
6.5.4.8..2.1)
Initial estimates of reservoir sediment trap efficiency Q3-13
Water Quality Modeling Study (Section 5.6) Reservoir sediment trap efficiency for alt. scenarios Q2-14
Ice Processes Study (Section 7.6) Ice effects on: banks, side channels, scouring and
stage
Q1-14
Geology & Soils Characterization Study (Section 4.5) Soils and mass wasting in reservoir area Q1-14
Riparian Vegetation Study Downstream of the
Proposed Susitna-Watana Dam Study (Section 11.6)
Vegetation mapping in the reservoir area Q1-14
Recreation Resources Study (Section 12.5) Expected boat use in the reservoir and river Q2-14
FINAL STUDY PLAN GEOMORPHOLOGY STUDY 6.5
Susitna-Watana Hydroelectric Project Alaska Energy Authority
FERC Project No. 14241 Page 70 July 2013
Table 6.5-7. Information and products the Geomorphology Study will provide to other studies.
Study the Product or Information is Provided to Information or Product to be Provided Timing
Information or Products Provided by: Geomorphic Reach Classification and Delineation
Fish and Aquatics Instream Flow Study (Section 8.5)
Riparian Instream Flow Study (Section 8.6)
Characterization and Mapping of Aquatic Habitats
(Section 9.9)
Fluvial Geomorphology Modeling Study (Section 6.6)
Initial geomorphic reach delineation Q4-12
Final geomorphic reach delineation Q4-13
Collaboration on Focus Area selection Q4-13
Morphometric parameters Q1-13
Information or Products Provided by: Aerial Photo Analysis of Geomorphic Features and Riverine Habitat
Fish and Aquatics Instream Flow Study (Section 8.5)
Riparian Instream Flow Study (Section 8.6)
Characterization and Mapping of Aquatic Habitats
(Section 9.9)
Fluvial Geomorphology Modeling Study (Section 6.6)
Digitized 2012 riverine habitat areas –Middle River
Q4-12 &
Q4-13
Digitized 2013 riverine habitats – Middle River
Optional 2013 riverine habitat areas – Lower River
Digitized 1980s habitat areas
Habitat stability 1980s to 2012
Chanel Change 1980s to 2012 / geomorphic features Q1-13
Information or Products Provided by: Geomorphic Assessment
Fish and Aquatics Instream Flow Study (Section 8.5)
Riparian Instream Flow Study (Section 8.6)
Characterization and Mapping of Aquatic Habitats
(Section 9.9)
Fluvial Geomorphology Modeling Study ( Section 8.6)
River Recreation Flow & Access Study (Section 12.7)
Reconnaissance level assessment of potential channel
change in the Lower Susitna River Segment Q1-13
LWD Study Q3-14
Fluvial Geomorphology Modeling Study (Section 6.6)
Fish and Aquatics Instream Flow Study (Section 8.5)
Riparian Instream Flow Study (Section 8.6)
Flow assessment (flood frequency and flow duration) Q1-13 &
Q-14
Characterization of bed mobilization Q4-13 &
Q4-14 Effective discharge determination
Sediment transport assessment and balance Q4-12 &
Q4-13
Fluvial Geomorphology Modeling Study (Section 6.6)
Reservoir geomorphology and tributary deltas Q3-14
Fish and Aquatics Instream Flow Study (Section 8.5)
Riparian Instream Flow Study (Section 8.6)
Characterization and Mapping of Aquatic Habitats
(Section 9.9)
Aesthetic Resources Study (Section 12.6) Aeolian transport of dust Q3-14
Fluvial Geomorphology Modeling Study (Section 6.6) Identifications of key physical processes Q2-13 &
Q4-13 Riparian Instream Flow Study (Section 8.6)
Fluvial Geomorphology Modeling Study (Section 6.6) Integration with Fluvial Geomorphology Modeling
Study (see Tables 6.6-6 and 6.6-7 for detailed list of
information)
Q4-14 Fish and Aquatics Instream Flow Study (Section 8.5)
Riparian Instream Flow Study (Section 8.6)
River Recreation Flow & Access Study (Section 12.7)
FINAL STUDY PLAN GEOMORPHOLOGY STUDY 6.5
Susitna-Watana Hydroelectric Project Alaska Energy Authority
FERC Project No. 14241 Page 71 July 2013
Table 6.5-8. Summary of 2012 Geomorphology Study efforts to support preparation and refinement of the Study Plan.
Study Component Portion of Study Component of Interest Aspect of Study Plan Preparation or Refinement Supported Status
Delineate Geomorphically Similar (Homogenous)
Reaches and Characterize the Geomorphology of
the Susitna River (Section 6.5.4.1)
Initial geomorphic reach delineation
Part of classification system used to
stratify study area for various study site
selection efforts
Yes
Sediment Supply and Transport Middle and Lower
Susitna River Segments (Section 6.5.4.3)
Initial sediment balance for the Lower
River for pre- and post-Project
conditions
Part of criteria to identify downstream
limit of studies in the Lower Susitna
River Segment
Completed pre-Project condition
Developing with-Project
1/131
Assess Geomorphic Change in the Middle and
Lower Susitna River Segments (Section 6.5.4.4)
Site stability in the Middle Susitna River
Segment
Site selection in the Middle River
Segment, applicability of 1980s data
Products in review
1/131
Channel change in the Lower River
Susitna River Segment
Downstream study limit in the Lower
River, applicability of 1980s data
Products in review
1/131
Reconnaissance-Level Assessment of Project
Effects on the Lower and Middle Susitna River
Segments (Section 6.5.4.6)
Initial assessment of potential Project
effects on the geomorphology of the
Lower Susitna River Segment
Downstream study limit in the Lower
River
Awaiting with-Project hydrology and
sediment transport assessments
1/131
Riverine Habitat Area versus Flow Lower Susitna
River Segment (Section 6.5.4.7)
Initial assessment of potential Project
effects on habitat area vs. flow
relationships
Downstream study limit in the Lower
River
Finalizing analysis
1/131
Notes:
1 Technical work will be completed by end of December 2012 and reported on in January 2013
FINAL STUDY PLAN GEOMORPHOLOGY STUDY 6.5
Susitna-Watana Hydroelectric Project Alaska Energy Authority
FERC Project No. 14241 Page 72 July 2013
Table 6.5-9. Geomorphology Study costs.
Study Component Estimated Cost Range
1 Geomorphic River Segment Delineation $60,000 to $80,000
2 Sediment Data Collection $450,000 to $600,000
3 Sediment Supply and Transport Assessment $80,000 to $110,000
4 Geomorphic Change Middle and Lower Susitna River Segments $180,000 to $240,0001
5 Riverine Habitat Middle Susitna River Segment $200,000 to $300,0001
6 Recon Assessment Lower Susitna River Segment Project Effects $80,000 to $100,000
7 Riverine Habitat Lower Susitna River Segment $100,000 to $150,0001
8 Reservoir Geomorphology $140,000 to $180,000
9 Large Woody Debris $100,000 to $130,000
10 Geomorphology of Stream Crossings $80,000 to $140,000
11 Integration Fluvial Geomorphology Modeling with the Geomorphology Study $50,000 to $60,000
1 Includes acquisition of orthorectified aerial imagery
FINAL STUDY PLAN GEOMORPHOLOGY STUDY 6.5
Susitna-Watana Hydroelectric Project Alaska Energy Authority
FERC Project No. 14241 Page 73 July 2013
6.5.12. Figures
Figure 6.1-1. Conceptual framework for the Susitna-Watana Instream Flow Study depicting integration of habitat
specific models and riverine processes to support integrated resource analyses; and integration of riverine processes to
develop fish and aquatic habitat specific models.
FINAL STUDY PLAN GEOMORPHOLOGY STUDY 6.5
Susitna-Watana Hydroelectric Project Alaska Energy Authority
FERC Project No. 14241 Page 74 July 2013
Figure 6.5-1. Susitna River Geomorphology study area and large-scale river segments.
FINAL STUDY PLAN GEOMORPHOLOGY STUDY 6.5
Susitna-Watana Hydroelectric Project Alaska Energy Authority
FERC Project No. 14241 Page 75 July 2013
Figure 6.5-2. Upper Susitna River Segment geomorphic reaches.
FINAL STUDY PLAN GEOMORPHOLOGY STUDY 6.5
Susitna-Watana Hydroelectric Project Alaska Energy Authority
FERC Project No. 14241 Page 76 July 2013
Figure 6.5-3. Middle Susitna River Segment geomorphic reaches.
FINAL STUDY PLAN GEOMORPHOLOGY STUDY 6.5
Susitna-Watana Hydroelectric Project Alaska Energy Authority
FERC Project No. 14241 Page 77 July 2013
Figure 6.5-4. Lower Susitna River Segment geomorphic reaches.
FINAL STUDY PLAN GEOMORPHOLOGY STUDY 6.5
Susitna-Watana Hydroelectric Project Alaska Energy Authority
FERC Project No. 14241 Page 78 July 2013
Figure 6.5-5. USGS Susitna River basin gaging stations and 2012 measurement locations.
FINAL STUDY PLAN GEOMORPHOLOGY STUDY 6.5
Susitna-Watana Hydroelectric Project Alaska Energy Authority
FERC Project No. 14241 Page 79 July 2013
Figure 6.5-6. Susitna-Watana Geomorphology Study reservoir geomorphology study area.
FINAL STUDY PLAN GEOMORPHOLOGY STUDY 6.5
Susitna-Watana Hydroelectric Project Alaska Energy Authority
FERC Project No. 14241 Page 80 July 2013
Figure 6.5-7. Susitna-Watana access corridors.
FINAL STUDY PLAN GEOMORPHOLOGY STUDY 6.5
Susitna-Watana Hydroelectric Project Alaska Energy Authority
FERC Project No. 14241 Page 81 July 2013
Figure 6.5-8. Study interdependencies for the Geomorphology Study.