HomeMy WebLinkAboutSuWa207sec10-7Alaska Resources Library & Information Services
Susitna-Watana Hydroelectric Project Document
ARLIS Uniform Cover Page
Title:
Dall's sheep distribution and abundance, Study plan Section 10.7 : Initial
study report
SuWa 207
Author(s) – Personal:
Author(s) – Corporate:
Prepared by Alaska Department of Fish and Game and ABR, Inc. - Environmental Research &
Services
AEA-identified category, if specified:
Draft initial study report
AEA-identified series, if specified:
Series (ARLIS-assigned report number):
Susitna-Watana Hydroelectric Project document number 207
Existing numbers on document:
Published by:
[Anchorage : Alaska Energy Authority, 2014]
Date published:
February 2014
Published for:
Alaska Energy Authority
Date or date range of report:
Volume and/or Part numbers:
Study plan Section 10.7
Final or Draft status, as indicated:
Draft
Document type:
Pagination:
iii, 14 p.
Related work(s):
Pages added/changed by ARLIS:
Notes:
All reports in the Susitna-Watana Hydroelectric Project Document series include an ARLIS-
produced cover page and an ARLIS-assigned number for uniformity and citability. All reports
are posted online at http://www.arlis.org/resources/susitna-watana/
Susitna-Watana Hydroelectric Project
(FERC No. 14241)
Dall’s Sheep Distribution and Abundance
Study Plan Section 10.7
Initial Study Report
Prepared for
Alaska Energy Authority
Prepared by
Alaska Department of Fish and Game and
ABR, Inc.—Environmental Research & Services
February 2014 Draft
INITIAL STUDY REPORT DALL’S SHEEP DISTRIBUTION AND ABUNDANCE STUDY (10.7)
TABLE OF CONTENTS
Executive Summary ..................................................................................................................... iii
1. Introduction ....................................................................................................................... 1
2. Study Objectives................................................................................................................ 1
3. Study Area ......................................................................................................................... 1
4. Methods and Variances in 2013 ....................................................................................... 2
4.1. Aerial Surveys ......................................................................................................... 2
4.1.1. Variances......................................................................................... 2
4.2. Mineral Lick Surveys .............................................................................................. 2
4.2.1. Variances......................................................................................... 3
4.3. Analysis of Historical Data ..................................................................................... 3
4.3.1. Variances......................................................................................... 3
5. Results ................................................................................................................................ 3
5.1. Aerial Surveys ......................................................................................................... 4
5.2. Mineral Lick Surveys .............................................................................................. 4
5.3. Analysis of Historical Data ..................................................................................... 4
6. Discussion........................................................................................................................... 5
6.1. Aerial Surveys ......................................................................................................... 5
6.2. Mineral Lick Surveys .............................................................................................. 5
6.3. Analysis of Historical Data ..................................................................................... 6
7. Completing the Study ....................................................................................................... 6
8. Literature Cited ................................................................................................................ 7
9. Tables ................................................................................................................................. 8
10. Figures .............................................................................................................................. 10
Susitna-Watana Hydroelectric Project Alaska Energy Authority
FERC Project No. 14241 Page i February 2014 Draft
INITIAL STUDY REPORT DALL’S SHEEP DISTRIBUTION AND ABUNDANCE STUDY (10.7)
LIST OF TABLES
Table 7.3-1. Dall’s Sheep Survey Data for GMU Subunit 13E, 2013. ........................................... 8
Table 5.1-2. Dall’s Sheep Population Composition Data for GMU Subunit 13E, 2013. ............... 8
Table 5.2-1. Number of Dall’s Sheep Observed at Two Mineral Licks during Site Visits in May
and June, 2013. ....................................................................................................................... 8
Table 5.3-1. Summer Survey Data for Dall’s Sheep in the Watana Creek Hills, 1968–2013. ....... 9
LIST OF FIGURES
Figure 3-1. Dall’s Sheep Study Area, 2013. ................................................................................. 11
Figure 4.1-1. Dall’s Sheep Survey Areas, 1980s and 2013. ......................................................... 12
Figure 5.1-1. Locations of Dall’s Sheep Observed on Aerial Surveys, 2013. .............................. 13
Figure 5.2-1. Maximum Daily Number of Individual Sheep Visible in Photos of the Jay Creek
Mineral Lick, 2013. ............................................................................................................... 12
LIST OF ACRONYMS, ABBREVIATIONS, AND DEFINITIONS
Abbreviation Definition
ADF&G Alaska Department of Fish and Game
AEA Alaska Energy Authority
APA Alaska Power Authority
FERC Federal Energy Regulatory Commission
GMU Game Management Unit
ILP Integrated Licensing Process
ISR Initial Study Report
PRM Project River Mile
Project Susitna-Watana Hydroelectric Project No. 14241
RSP Revised Study Plan
SPD study plan determination
Susitna-Watana Hydroelectric Project Alaska Energy Authority
FERC Project No. 14241 Page ii February 2014 Draft
INITIAL STUDY REPORT DALL’S SHEEP DISTRIBUTION AND ABUNDANCE STUDY (10.7)
EXECUTIVE SUMMARY
Dall’s Sheep Distribution and Abundance Study 10.7
Purpose The goal of this study is to obtain sufficient information on population size,
summer distribution, and current use of mineral licks by Dall’s sheep to
evaluate potential Project-related effects on the species. The study’s four
objectives are to (1) estimate the current minimum population size of Dall’s
sheep in the study area, (2) delineate the summer range of Dall’s sheep in the
study area, (3) evaluate the current condition of mineral licks in and near the
Project area, and (4) analyze and synthesize data from historical and current
studies of Dall’s sheep in the study area.
Status Data collection occurred according to plan in summer 2013 and is scheduled
for completion in summer 2014.
Study
Components
Fixed-wing airplane surveys to document sheep distribution and develop a
minimum population estimate were carried out in July 2013. Mineral licks
were visited in May and June 2013 to provide a qualitative assessment of lick
condition and levels of use. Historical and current data for Dall’s sheep were
reviewed and synthesized to examine patterns of habitat use in the study area,
changes in population size, and use of the Jay Creek and Watana Creek
mineral licks.
2013 Variances During the site visit to the Jay Creek mineral lick in late May 2013, the study
team deployed a time-lapse camera to record sheep presence on the main cliff
face of the mineral lick, thereby providing a greater volume of data on lick use
than would have resulted from the two site visits proposed in RSP Section
10.7.4. The data obtained from time-lapse photography provided additional
information to use in achieving the study objective regarding characterization
of mineral lick use.
Steps to
Complete the
Study Plan
As explained in the cover letter to this draft ISR, AEA’s plan for completing
this study will be included in the final ISR filed with FERC on June 3, 2014.
Highlighted
Results and
Achievements
Observers counted 512 Dall’s sheep in the study area during aerial surveys in
July 2013. Ram/ewe and lamb/ewe ratios were similar among the three survey
blocks. Dall’s sheep were observed at the Jay Creek and Watana Creek
mineral licks during site visits in May and June. Comparison of historical and
current data shows a decline in the sheep population in the study area since the
1980s.
Susitna-Watana Hydroelectric Project Alaska Energy Authority
FERC Project No. 14241 Page iii February 2014 Draft
INITIAL STUDY REPORT DALL’S SHEEP DISTRIBUTION AND ABUNDANCE STUDY (10.7)
1. INTRODUCTION
On December 14, 2012, Alaska Energy Authority (AEA) filed with the Federal Energy
Regulatory Commission (FERC or Commission) its Revised Study Plan (RSP) for the Susitna-
Watana Hydroelectric Project No. 14241 (Project), which included 58 individual study plans
(AEA 2012). On February 1, 2013, FERC staff issued its study plan determination (February 1
SPD) for 44 of the 58 studies, approving 31 studies as filed and 13 with modifications. RSP
Section 10.7, the Dall’s Sheep Distribution and Abundance Study (Sheep Study), was one of the
31studies approved with no modifications. RSP Section 10.7 described the goals, objectives, and
proposed methods for data collection regarding Dall’s sheep.
On February 1, 2013, FERC staff issued its study plan determination (February 1 SPD) for 44 of
the 58 studies, approving 31 studies as filed and 13 with modifications. RSP Section 10.7 was
one of the 31 approved with no modifications.
Following the first study season, FERC’s regulations for the Integrated Licensing Process (ILP)
require AEA to “prepare and file with the Commission an initial study report describing its
overall progress in implementing the study plan and schedule and the data collected, including an
explanation of any variance from the study plan and schedule.” (18 CFR 5.15(c)(1)) This Initial
Study Report (ISR) on the Dall’s Sheep Distribution and Abundance Study has been prepared in
accordance with FERC’s ILP regulations and details AEA’s status in implementing the study, as
set forth in the FERC-approved RSP (referred to herein as the “Study Plan”).
2. STUDY OBJECTIVES
The goal of this study is to obtain sufficient information on the minimum population size,
summer distribution, and current use of mineral licks by Dall’s sheep—an important species of
big game in the Project area—to use in evaluating potential Project-related effects and
identifying measures to avoid, minimize, or otherwise mitigate those effects.
The study objectives are established in RSP Section 10.7.1:
1) Estimate the current minimum population size of Dall’s sheep in the study area.
2) Delineate the summer range of Dall’s sheep in the study area.
3) Evaluate the current condition of mineral licks in and near the Project area.
4) Analyze and synthesize data from historical and current studies of Dall’s sheep in the
study area, as a continuation of the 2012 study (AEA 2012a).
3. STUDY AREA
As established by RSP Section 10.7.3, the study area, consists of that portion of Game
Management Unit (GMU) Subunit 13E located east of the Parks Highway and south of the
Denali Highway, encompassing the proposed Project facilities, potential access and transmission
Susitna-Watana Hydroelectric Project Alaska Energy Authority
FERC Project No. 14241 Page 1 February 2014 Draft
INITIAL STUDY REPORT DALL’S SHEEP DISTRIBUTION AND ABUNDANCE STUDY (10.7)
line corridors, and reservoir inundation zone (Figure 3-1). All suitable Dall’s sheep habitat
within the study area was surveyed by airplane and the mineral licks at Jay Creek and Watana
Creek were visited on the ground.
4. METHODS AND VARIANCES IN 2013
The study comprised three components:
• Aerial surveys for summer distribution and minimum population estimation.
• Inspection of the Jay Creek and Watana Creek mineral licks to assess their current
condition and general level of use.
• Analysis of historical (1980s) data and synthesis with current Alaska Department of Fish
and Game (ADF&G) monitoring results.
4.1. Aerial Surveys
AEA implemented the methods described in the Study Plan, with no variances.
The study team enlisted the services of experienced biologists and fixed-wing survey pilots in
July 2013 to document sheep distribution and to develop a minimum population estimate. The
survey covered all suitable sheep habitat in the study area and followed standard ADF&G
protocols for summer surveys after lambing and before the sheep hunting season begins in early
August. Optimal survey conditions include a lack of turbulence, a lack of precipitation, minimal
glare from direct sunlight, and clear visibility with no portion of the study area obscured by
clouds or fog.
The study team divided the aerial survey study area into three survey blocks, based on the
distribution of suitable habitat in GMU Subunit 13E: the Chulitna Mountains block southeast of
Cantwell, the West Kosina Hills block south of the proposed reservoir inundation zone, and the
Watana Creek Hills block north of the proposed reservoir inundation zone (Figure 4.1-1). The
team surveyed each block using a small fixed-wing aircraft (Piper PA-18 “Super Cub”) flown
along elevation contours at altitudes of 300–700 feet above ground level and airspeeds of 60–80
mph. If necessary for adequate coverage, the team completed two flight passes in areas with
rough terrain. The study team classified sheep into the following categories: rams, lambs, ewes
and ewe-like sheep. In addition to ewes, the ewes and ewe-like sheep category may include
yearling rams, which are sometimes difficult to distinguish from ewes.
4.1.1. Variances
No variances from the methods described in the Study Plan were necessary in 2013.
4.2. Mineral Lick Surveys
AEA implemented the methods described in the Study Plan, with the exception of the variance
described below in Section 4.2.1.
Susitna-Watana Hydroelectric Project Alaska Energy Authority
FERC Project No. 14241 Page 2 February 2014 Draft
INITIAL STUDY REPORT DALL’S SHEEP DISTRIBUTION AND ABUNDANCE STUDY (10.7)
The study team visited the Jay Creek and Watana Creek mineral licks (Figure 3-1) twice in 2013,
once during May (May 28–29) and once in June (June 19–20), to provide a qualitative
assessment of lick condition and levels of use. AEA contractors performed these site visits rather
than ADF&G personnel. Results were compared with those from ground-based surveys of
mineral licks conducted in the 1980s (Tankersley 1984). Conducting site visits in both 2013 and
2014 will provide information on annual variability, and the results of the 2013 visits will be
used to determine the timing of the 2014 field visits.
4.2.1. Variances
During the site visit to the Jay Creek mineral lick in May 2013, the study team deployed a time-
lapse camera to record sheep presence on the main cliff face of the mineral lick, thereby
providing a greater volume of data on lick use than would have resulted from the two site visits
proposed in RSP Section 10.7.4. The time-lapse camera (Model PC900 from Reconyx, Inc.,
Holmen, WI) was programmed to record photographs at 10-minute intervals for 24 hours each
day, although the cliff was only visible in photos taken during daylight hours. The study team
placed the camera approximately 600 m from the main cliff face at the lick. That distance was
relatively far for distinguishing sheep in the photographs but, because of local topography, the
location selected was the best one from which to photograph the cliff face. The data obtained
from the time-lapse photography provide additional information to use in achieving the study
objective regarding characterization of mineral lick use.
4.3. Analysis of Historical Data
AEA implemented the methods as described in the Study Plan, with no variances.
The study team reviewed and synthesized data from historical and current studies of Dall’s sheep
in the study area, as a continuation of the 2012 study (AEA 2012a). Aerial survey data and
mineral lick observation data were compiled from various sources, including ADF&G
management reports (Didrickson 1980; Kavalok 2005; Peltier 2011), the final report for the APA
Project study in the 1980s (Tankersley 1984), and unpublished survey data and maps. Historic
and current survey and observation data for Dall’s sheep were summarized to determine habitat
use within the Project area, changes in population size, and use of the Jay Creek and Watana
Creek mineral licks.
4.3.1. Variances
No variances from the methods described in the Study Plan were necessary in 2013.
5. RESULTS
Data developed in support of this study are available for download in the following file at
http://gis.suhydro.org/reports/isr:
• ISR_10_7_DASH_Data_2013.accdb.
Susitna-Watana Hydroelectric Project Alaska Energy Authority
FERC Project No. 14241 Page 3 February 2014 Draft
INITIAL STUDY REPORT DALL’S SHEEP DISTRIBUTION AND ABUNDANCE STUDY (10.7)
5.1. Aerial Surveys
The study team counted a total of 512 Dall’s sheep in the study area over 32 survey hours (38
total flight hours) flown during July 11–30, 2013 (Figure 5.1-1). The weather was clear and calm
during all survey flights, providing excellent survey conditions. The majority of the sheep (54
percent) were counted in the Chulitna Mountains. That survey block was the largest (2,520 km2)
and had the most rugged terrain, so two flight passes (one higher and one lower) often were
required to cover the area adequately. The Watana Creek Hills survey block was the smallest
(522 km2) and only 41 sheep were counted in that area. A count of 194 sheep was recorded in the
West Kosina Hills, the third survey block (Table 5.1-1). The ram/ewe and lamb/ewe ratios were
similar among the three survey blocks, ranging from 62.6 to 63.6 rams per 100 ewes and 22.0 to
33.3 lambs per 100 ewes (Table 5.1-2).
5.2. Mineral Lick Surveys
Dall’s sheep were observed at the Jay Creek and Watana Creek mineral licks during site visits in
May and June 2013 (Table 5.2-1). During the first visit on May 28–29, three rams were observed
near the Watana Creek lick and another seven sheep were visible on the surrounding mountains.
Three rams and one ewe were observed at the Jay Creek lick on the May visit. During the
observation period, two of the rams left the cliff above Jay Creek and moved to the mountains
north of the lick.
During the second site visit (June 19–20), two rams were observed near the Watana Creek lick
and at least 15 other sheep were observed in the surrounding area. Two sheep were observed in a
previously undescribed low-elevation mineral lick north of Watana Creek, approximately 1.2
miles northwest of the Watana Creek lick. Seven sheep (two rams, three ewes, one yearling, and
one lamb) were present at the Jay Creek Lick on June 20. During the observation period, one
ewe, the yearling, and both rams departed the lick and moved into the mountains to the northwest
of the lick.
The time-lapse camera deployed at the Jay Creek lick on May 29 was knocked at an angle on
May 30, most likely by a brown bear, but the majority of the main cliff face at the lick on the
west side of the creek was still visible in photos. The long distance and displaced camera made
identifying sheep in photos challenging, but sheep in open habitat were visible under good light
conditions. The daily maximum number of sheep visible in each photo varied from 1–2 in late
May and early June to 4 on June 10. The peak count from the photos was five sheep on June 18
(Figure 5.2-1). No sheep were visible in photos during June 12–14. On June 15, at least three
sheep were visible on the hill east of Jay Creek, opposite the lick.
5.3. Analysis of Historical Data
Historical survey data for GMU 13E were compiled from ADF&G Dall’s sheep management
reports (Didrickson 1980, Kavalok 2005, Peltier 2011), the APA Project final report on Dall’s
sheep (Tankersley 1984), and unpublished data in ADF&G files.
Susitna-Watana Hydroelectric Project Alaska Energy Authority
FERC Project No. 14241 Page 4 February 2014 Draft
INITIAL STUDY REPORT DALL’S SHEEP DISTRIBUTION AND ABUNDANCE STUDY (10.7)
6. DISCUSSION
6.1. Aerial Surveys
Survey conditions were excellent for the Dall’s sheep surveys in July 2013. The total number of
sheep observed in the Watana Creek Hills was lower than has been documented in previous
years and was less than a third of the population size documented during the 1983 sheep survey
for the APA Project (Table 5.3-1; Tankersley 1984). The population in the Talkeetna Mountains
(including the Watana Creek Hills) has not rebounded from the severe decline that occurred after
the harsh winter of 1999–2000 (Peltier 2011). The ram/ewe ratio was higher in the Watana Creek
Hills during the 2013 survey than has been observed historically in that area (Table 5.3-1), but
was similar to the ram/ewe ratios observed in the Chulitna Mountains and West Kosina Hills
survey blocks in 2013 (Table 5.1-2).
The 2013 survey areas in the Chulitna Mountains and West Kosina Hills were more extensive
than were the survey areas covered historically, including the 1980s sheep surveys for the APA
Project (Figure 4.1-1). Although a change in population size has not been documented in those
two survey areas, it is likely that sheep there also experienced a population decline in the winter
of 1999–2000, along with the Watana Creek Hills and other surveyed portions of the Talkeetna
Mountains (Peltier 2011).
The majority of the sheep counted in the Chulitna Mountains survey area in 2013 were west of
the Jack River and north of the East Fork of the Chulitna River (Figure 5.1-1). The 1980s
surveys in the Chulitna Mountains covered only the peaks east and south of that area because of
their proximity to the transportation corridors proposed at that time (Figure 4.1-1). In the surveys
conducted in July 1980 and June 1983, 72 and 52 sheep were counted, respectively, in that
portion of the Chulitna Mountains (ADF&G unpublished data; Tankersley 1984). In the July
2013 survey, 66 sheep were counted in the same area covered by the 1980s surveys. The results
of the 2013 West Kosina Hills survey are not comparable to the results from the 1980 and 1981
surveys due to differences in the areas surveyed (Figure 4.1-1; ADF&G unpublished data).
6.2. Mineral Lick Surveys
During APA Project studies conducted in the 1980s, between 0 and 31 sheep were observed
daily using the various locations comprising the Jay Creek mineral lick (Tankersley 1984). Some
marked sheep remained at the lick for two to 15 days. Sheep of various sex and age classes used
the lick, but only rams were present until May 28 and few rams were present after June 14. When
at the lick, sheep spent 57.5% of the time on the main cliff face west of the creek. During the
much less intensive observations conducted in 2013, the maximum count at the lick was seven
sheep at one time, similar to the maximum count of five sheep in the time-lapse photos. The
time-lapse photo counts are most likely undercounts of the total number of sheep using the lick,
however, because only sheep in the open portions of the main cliff face were visible in the
photos. Nevertheless, the observations in 2013 indicated that fewer sheep were using the Jay
Creek lick than in the 1980s, consistent with the decline in the local sheep population observed
in the time series of aerial surveys described above.
Susitna-Watana Hydroelectric Project Alaska Energy Authority
FERC Project No. 14241 Page 5 February 2014 Draft
INITIAL STUDY REPORT DALL’S SHEEP DISTRIBUTION AND ABUNDANCE STUDY (10.7)
6.3. Analysis of Historical Data
Periodic aerial surveys of Dall’s sheep in summer have been conducted by ADF&G in the
Watana Creek Hills since 1968 to develop minimum population estimates. Between 130 and 209
sheep were counted in the Watana Creek Hills during summer surveys from 1968 to 1994,
whereas only 50 sheep were counted in the same area in 2003 (Table 5.3-1). Sheep populations
in the Talkeetna Mountains (including the Watana Creek Hills) declined steeply after the winter
of 1999–2000 and have since remained stable but low (Peltier 2008; Peltier 2011). Winter
surveys in March 1968, 1981, and 1983 documented 97, 56, and 87 sheep, respectively, in the
Watana Creek Hills (ADF&G unpublished data). Sightability of sheep is low during winter, so
winter surveys are typically used to delineate winter range and are not used as population
indices.
Dall’s sheep were studied more extensively in the Project region from 1977 to 1983 with
additional survey areas in the northern portion of the West Kosina Hills (directly south of the
proposed Watana impoundment) and in the Chulitna Mountains north and west of the proposed
access corridors (Figure 4.1-1; ADF&G unpublished data; Tankersley 1984). In 1977, 34 sheep
were observed on Mount Watana (in the northern portion of the West Kosina Hills). No sheep
were counted on Mount Watana during sheep surveys conducted in July 1980 or March and July
1983 (ADF&G unpublished data; Tankersley 1984). In July 1980 and March 1981, nine and 22
sheep were counted, respectively, in the northern portion of the West Kosina Hills. However, the
results of these surveys are not comparable due to differences in the areas surveyed (Figure
4.1-1; ADF&G unpublished data).
A portion of the Chulitna Mountains north of the proposed Chulitna access corridor and west of
the proposed Denali access corridor was surveyed in July 1980 and in March and June 1983,
yielding counts of 72, 30, and 52 sheep, respectively (Figure 4.1-1; ADF&G unpublished data;
Tankersley 1984). Most of the sheep were found in the East Fork of the Jack River and the upper
Tsusena Creek drainage. No sheep were found within 2.5 miles of the proposed access corridors
(ADF&G unpublished data; Tankersley 1984).
During the 1980s research, mineral licks were identified on lower Jay Creek and upper Watana
Creek (Tankersley 1984). Sheep used those licks mainly between mid-May and mid-June. A
total of 21 sheep in the Watana Creek Hills were color-marked with paint pellets in April 1983.
At least 31 percent of the sheep population observed in the Watana Creek Hills in 1983 traveled
5 miles or more to the Jay Creek lick (Tankersley 1984).
7. COMPLETING THE STUDY
[As explained in the cover letter to this draft ISR, AEA’s plan for completing this study will be
included in the final ISR filed with FERC on June 3, 2014.]
Susitna-Watana Hydroelectric Project Alaska Energy Authority
FERC Project No. 14241 Page 6 February 2014 Draft
INITIAL STUDY REPORT DALL’S SHEEP DISTRIBUTION AND ABUNDANCE STUDY (10.7)
8. LITERATURE CITED
AEA (Alaska Energy Authority). 2012a. W-S1: Big-game movement and habitat use study for
the Susitna–Watana Hydroelectric Project, FERC Project No. 14241. Draft final version
(March 21, 2012). Alaska Energy Authority, Anchorage.
AEA. 2012b. Revised Study Plan: Susitna-Watana Hydroelectric Project FERC Project No.
14241. December 2012. Prepared for the Federal Energy Regulatory Commission by the
Alaska Energy Authority, Anchorage, Alaska. http://www.susitna-
watanahydro.org/study-plan.
Didrickson, J. C. 1980. Game Management Units 13 and 14—Talkeetna Mountains. In R.
Hinman, editor. Annual report of survey-inventory activities: Part III. Deer, elk, marine
mammals, mountain goats, and sheep. Vol. X. Alaska Department of Fish and Game.
Juneau, Alaska. 99 pp.
Kavalok, T. P. 2005. Units 13A, 13E, 14A (north), and 14B Dall sheep management report.
Pages 80–90 in C. Brown, editor. Dall sheep management report of survey and inventory
activities 1 July 2001–30 June 2004. Alaska Department of Fish and Game. Project 6.0.
Juneau, Alaska.
Peltier, T. C. 2008. Units 13A, 13E, 14A (North) and 14B Dall sheep management report. Pages
90–97 in P. Harper, editor. Dall sheep management report of survey-inventory activities 1
July 2004–30 June 2007. Alaska Department of Fish and Game. Project 6.0. Juneau,
Alaska.
Peltier, T. C. 2011. Units 13A, 13E, 14A (North) and 14B Dall sheep management report. Pages
72–79 in P. Harper, editor. Dall sheep management report of survey-inventory activities 1
July 2007–30 June 2010. Alaska Department of Fish and Game. Project 6.0. Juneau,
Alaska.
Tankersley, N. 1984. Susitna Hydroelectric Project, final report, big game studies, Vol. VIII—
Dall sheep. Report by Alaska Department of Fish and Game, Anchorage, for the Alaska
Power Authority, Anchorage. 91 pp.
Susitna-Watana Hydroelectric Project Alaska Energy Authority
FERC Project No. 14241 Page 7 February 2014 Draft
INITIAL STUDY REPORT DALL’S SHEEP DISTRIBUTION AND ABUNDANCE STUDY (10.7)
9. TABLES
Table 7.3-1. Dall’s Sheep Survey Data for GMU Subunit 13E, 2013.
Note:
1 The number of ewes includes young rams and yearlings of both sexes.
Table 5.1-2. Dall’s Sheep Population Composition Data for GMU Subunit 13E, 2013.
Survey Block Rams/100 Ewes1 Lambs/100 Ewes % Lambs in Flock Total Sheep Sheep/Hour
Chulitna Mountains 62.7 22.0 12% 277 11.5
Watana Creek Hills 63.6 22.7 12% 41 18.6
West Kosina Hills 62.6 33.3 17% 194 33.3
Note:
1 The number of ewes includes young rams and yearlings of both sexes.
Table 5.2-1. Number of Dall’s Sheep Observed at Two Mineral Licks during Site Visits in May and June, 2013.
Jay Creek Watana Creek Total
May 28–29 4 31 7
June 19–20 7 22 9
Notes:
1 Seven other sheep were visible in the general area.
2 At least 15 other sheep were visible in the general area.
Survey Block Survey Dates Rams Ewes1 Lambs Total Sheep Count Time (hr)
Chulitna Mountains July 11–13 94 150 33 277 24.05
Watana Creek Hills July 29–30 14 22 5 41 2.20
West Kosina Hills July 27–29 62 99 33 194 5.83
TOTAL 170 271 71 512 32.08
Susitna-Watana Hydroelectric Project Alaska Energy Authority
FERC Project No. 14241 Page 8 February 2014 Draft
INITIAL STUDY REPORT DALL’S SHEEP DISTRIBUTION AND ABUNDANCE STUDY (10.7)
Table 5.3-1. Summer Survey Data for Dall’s Sheep in the Watana Creek Hills, 1968–2013.
Year Rams Rams/
100 Ewes Ewes1 Lambs Lambs/
100 Ewes
% Lambs
in Flock
Total Sheep Observed
Sheep/ Hour
1968 16 – 134 33 – – 183 –
1973 10 7.9 126 40 31.7 23% 176 –
1976 4 4.2 96 30 31.3 23% 130 –
1977 4 3.5 115 33 28.7 22% 152 –
1978 5 3.3 150 34 22.7 18% 189 –
1980 28 26.9 104 42 40.4 24% 174 69.6
1981 39 30.7 127 43 33.9 21% 209 63.3
1982 19 13.3 143 38 26.6 19% 200 –
1983 34 35.4 96 19 19.8 13% 149 33.1
1994 38 38.8 98 23 23.5 14% 159 72.3
1999 24 42.9 56 17 30.4 18% 97 44.1
2003 10 30.3 33 7 21.2 14% 50 21.7
2008 17 58.6 29 17 58.6 27% 63 26.3
2011 15 42.9 35 12 34.3 19% 62 38.8
2013 14 63.6 22 5 22.7 12% 41 18.6
Note:
1 The number of ewes includes young rams and yearlings of both sexes.
Sources: Didrickson 1980; Kavalok 2005; Peltier 2011; ADF&G unpublished data.
Susitna-Watana Hydroelectric Project Alaska Energy Authority
FERC Project No. 14241 Page 9 February 2014 Draft
INITIAL STUDY REPORT DALL’S SHEEP DISTRIBUTION AND ABUNDANCE STUDY (10.7)
10. FIGURES
Susitna-Watana Hydroelectric Project Alaska Energy Authority
FERC Project No. 14241 Page 10 February 2014 Draft
INITIAL STUDY REPORT DALL’S SHEEP DISTRIBUTION AND ABUNDANCE STUDY (10.7)
Figure 3-1. Dall’s Sheep Study Area, 2013.
Susitna-Watana Hydroelectric Project Alaska Energy Authority
FERC Project No. 14241 Page 11 February 2014 Draft
INITIAL STUDY REPORT DALL’S SHEEP DISTRIBUTION AND ABUNDANCE STUDY (10.7)
Figure 4.1-1. Dall’s Sheep Survey Areas, 1980s and 2013.
Susitna-Watana Hydroelectric Project Alaska Energy Authority
FERC Project No. 14241 Page 12 February 2014 Draft
INITIAL STUDY REPORT DALL’S SHEEP DISTRIBUTION AND ABUNDANCE STUDY (10.7)
Figure 5.1-1. Locations of Dall’s Sheep Observed on Aerial Surveys, 2013.
Susitna-Watana Hydroelectric Project Alaska Energy Authority
FERC Project No. 14241 Page 13 February 2014 Draft
INITIAL STUDY REPORT DALL’S SHEEP DISTRIBUTION AND ABUNDANCE STUDY (10.7)
Susitna-Watana Hydroelectric Project Alaska Energy Authority
FERC Project No. 14241 Page 14 February 2014 Draft
Figure 5.2-1. Maximum Daily Number of Individual Sheep Visible in Photos of the Jay Creek Mineral Lick,
2013.