HomeMy WebLinkAboutSuWa254Alaska Resources Library & Information Services
Susitna-Watana Hydroelectric Project Document
ARLIS Uniform Cover Page
Title:
SuWa 254
Susitna-Watana Hydroelectric Project, FERC Project no. 14241-000; Filing
of Initial Study Plan Meetings transcripts and additional information in
response to October 2014 Initial Study Plan Meetings
Author(s) – Personal:
Wayne Dyok
Author(s) – Corporate:
Alaska Energy Authority
AEA-identified category, if specified:
November 14, 2014 technical memorandum filings
AEA-identified series, if specified:
Series (ARLIS-assigned report number): Existing numbers on document:
Susitna-Watana Hydroelectric Project document number 254
Published by: Date published:
[Anchorage, Alaska] : Alaska Energy Authority, [2014] November 14, 2014
Published for: Date or date range of report:
Volume and/or Part numbers:
Final or Draft status, as indicated:
Document type: Pagination:
Cover letter 4 p.
Related work(s): Pages added/changed by ARLIS:
Attachments A-N (SuWa 255-268)
Notes:
All reports in the Susitna-Watana Hydroelectric Project Document series include an ARLIS-
produced cover page and an ARLIS-assigned number for uniformity and citability. All reports
are posted online at http://www.arlis.org/resources/susitna-watana/
November 14, 2014
Ms. Kimberly D. Bose
Secretary
Federal Energy Regulatory Commission
888 First Street, N.E.
Washington, D.C. 20426
Re: Susitna-Watana Hydroelectric Project, Project No. 14241-000
Filing of Initial Study Plan Meetings Transcripts and Additional Information in
Response to October 2014 Initial Study Plan Meetings
Dear Secretary Bose:
By letter dated January 28, 2014, the Federal Energy Regulatory Commission
(Commission or FERC) modified the procedural schedule for the preparation and review
of the Initial Study Report (ISR) for the proposed Susitna-Watana Hydroelectric Project,
FERC Project No. 14241 (Project).1 As required by the Commission’s January 28 letter,
the Alaska Energy Authority (AEA) filed the ISR with the Commission on June 3, 2014
and conducted ISR meetings on October 15, 16, 17, 21, 22, and 23, 2014. Attached as
Attachments A-1 through F-2 are the written transcripts (along with the agenda and
PowerPoint presentations) for these ISR meetings.
During the October ISR meetings, AEA and licensing participants identified
certain technical memoranda and other information that AEA would file with the
Commission by November 15, 2014. In accordance, AEA is filing and distributing the
following technical memoranda and other information:
• Attachment G: Glacier and Runoff Changes (Study 7.7) and Fluvial
Geomorphology (Study 6.5) - Assessment of the Potential for Changes in
Sediment Delivery to Watana Reservoir Due to Glacial Surges Technical
Memorandum. This technical memorandum documents AEA’s analysis of the
potential changes to sediment delivery from the upper Susitna watershed into
the Project’s reservoir from glacial surges.
• Attachment H: Riparian Instream Flow (Study 8.6) and Fluvial
Geomorphology (Study 6.6) - Dam Effects on Downstream Channel and
Floodplain Geomorphology and Riparian Plant Communities and Ecosystems
− Literature Review Technical Memorandum. This literature review technical
1 Letter from Jeff Wright, FERC Office of Energy Projects, to Wayne Dyok, Alaska Energy Authority,
Project No. 14241-000 (issued Jan. 28, 2014).
2
memorandum synthesizes historic physical and biologic data for the Susitna
River floodplain vegetation (including 1980s studies), studies of hydro project
impacts on downstream floodplain plant communities, and studies of un-
impacted floodplain plant community successional processes.
• Attachment I: Susitna River Fish Distribution and Abundance Implementation
Plan, Appendix 3. Protocol for Site-Specific Gear Type Selection, Version 5.
In accordance with the fish distribution and abundance studies, as described in
Revised Study Plan (RSP) Sections 9.5 and 9.6 and in the Fish Distribution
and Abundance Implementation Plan, this appendix establishes the protocol
for site-specific gear type selection for fish surveys. Throughout study plan
implementation, AEA has updated this appendix as needed to provide
consistent direction to all field teams. Version 1 of Appendix 3 was originally
filed with the Fish Distribution and Abundance Implementation Plan in March
2013. That version was updated twice (Versions 2 and 3) during the 2013
field season to accommodate protocol changes that related to FERC’s April 1,
2013 Study Plan Determination, field permits, and lessons learned during
study implementation. Version 4 was the protocol used for the 2014 field
season and was updated with respect to the prioritization of gear use and
based on 2013 data collected. This version herein, Version 5, will be followed
during the 2015 field season.
• Attachment J: Fish Distribution and Abundance in the Upper and
Middle/Lower Susitna River (Studies 9.5 and 9.6): Draft Chinook and Coho
Salmon Identification Protocol. This document established a Chinook and
coho salmon identification protocol to support accurate and consistent field
identification across field teams. It will allow for additional quality control
and assurance of field identification calls and for estimation and reporting of
any field identification error that may occur in future sampling efforts.
• Attachment K: Characterization and Mapping of Aquatic Habitats (9.9),
Errata to Initial Study Report Part A - Appendix A, Remote Line Mapping,
2012. This errata provides a corrected version of map book for Remote Line
Mapping, 2012. The version filed with the ISR (June 3, 2014) used a data
query to build the maps in geomorphic reaches MR-1 to UR-5 that mistakenly
did not include side slough habitat, so that no side sloughs were depicted on
the Appendix A maps 1 through 21. This version was corrected by including
side slough habitat in the data query for geomorphic reaches MR-1 to UR-5.
This version now includes side sloughs.
• Attachment L: Characterization and Mapping of Aquatic Habitats Study 9.9,
Revised Map Book for 2012 Remote Line Mapping. This map book represents
an update to the version published on June 3, 2014 with the Study 9.9 Initial
Study Report and the errata provided concurrently with this filing (see
Attachment K). The maps presented include all macrohabitat and mesohabitat
line identifications available in the 2012 Remote Line Mapping ArcGIS
3
shapefile. This map book should be considered a full replacement for
previous versions and represents the final product for the 2012 remote line
habitat mapping effort.
• Attachment M: Study of Fish Passage Barriers in the Middle and Upper
Susitna River and Susitna Tributaries (Study 9.12), Fish Passage Criteria
Technical Memorandum. This technical memorandum presents a proposed
final list of fish species that will be included in the fish barrier analysis as well
as depth, leaping and velocity passage criteria for selected fish species. AEA
previously consulted with the federal agencies and other licensing participants
regarding the information within the technical memorandum during a March
19, 2014 Fisheries Technical Meeting.
In addition to the technical memoranda and other information identified above,
AEA is filing a short errata (Attachment N) to the Mercury Assessment and Potential for
Bioaccumulation Study (Study 5.7), Evaluation of Continued Mercury Monitoring
Beyond 2014 Technical Memorandum. This technical memorandum, which was
originally filed on September 30, 2014, evaluates the need for continued monitoring of
mercury data beyond 2014 and whether the existing data collection efforts are sufficient
to satisfy objectives for characterizing baseline mercury conditions in the Susitna River
and tributaries (RSP Section 5.7.1). Since the filing of this TM and based upon the
ongoing QA/QC of the data reported in that TM, AEA discovered errors in the TM. The
attached TM corrects those errors. Additionally, the errata corrects corresponding errors
in the Mercury Assessment and Potential for Bioaccumulation presentation presented
during the October 16, 2014 ISR meeting.
Finally, AEA notes that data collected during the Study Plan implementation, to the
extent they have been verified through AEA’s quality assurance and quality control (QAQC)
procedures and are publicly available, can be accessed at http://gis.suhydro.org/isr_mtg. On
November 14, 2014, AEA posted the following data to this website:
• Baseline Water Quality Data (Study 5.5), 2013 QAQC water quality data
and DVRs per the Quality Assurance Project Plan.
• Breeding Survey Study of Landbirds and Shorebirds (Study 10.16),
cumulative 2013-2014 data.
• Characterization and Mapping of Aquatic Habitats (Study 9.9), ArcGIS
shapefile “ISR_9_9_AQHAB_RemoteLineMapping_2012.shp” used to
generate the maps in Attachment L.
4
AEA appreciates the opportunity to provide this additional information to the
Commission and licensing participants, which it believes will be helpful in determining
the appropriate development of the 2015 study plan as set forth in the ISR. If you have
questions concerning this submission please contact me at wdyok@aidea.org or (907)
771-3955.
Sincerely,
Wayne Dyok
Project Manager
Alaska Energy Authority
Attachments
cc: Distribution List (w/o Attachments)