Susitna-Watana Hydroelectric Project Document
ARLIS Uniform Cover Page
Title:
SuWa 275
Report to the legislature 2014
Author(s) – Personal:
Author(s) – Corporate:
Susitna-Watana Hydroelectric Project ; Alaska Energy Authority
AEA-identified category, if specified:
Annual reports
AEA-identified series, if specified:
Series (ARLIS-assigned report number): Existing numbers on document:
Susitna-Watana Hydroelectric Project document number 275
Published by: Date published:
[Anchorage] : Susitna-Watana Hydroelectric Project, [2014] 2014
Published for: Date or date range of report: Alaska Legislature
Volume and/or Part numbers:
Final or Draft status, as indicated:
Document type: Pagination:
13 p.
Related work(s): Pages added/changed by ARLIS:
Notes:
All reports in the Susitna-Watana Hydroelectric Project Document series include an ARLIS-
produced cover page and an ARLIS-assigned number for uniformity and citability. All reports
are posted online at http://www.arlis.org/resources/susitna-watana/
1 REPORT TO THE LEGISLATURE 2014
REPORT TO THE LEGISLATURE 2014
2 REPORT TO THE LEGISLATURE 2014
In 2011, the Alaska Energy Authority formally entered the Federal Energy Regulatory
Commission licensing effort for Susitna-Watana Hydro. Since then, the Susitna-Watana
Hydro team has executed three field seasons, which included an estimated cumulative
500 field personnel, with a stellar safety record.
We had drilling crews in the field during fall of 2014 confirming the quality of the
rock at the proposed project site and verifying that there are no active faults at the
dam site. The board of consultants – international experts in dam design and safety –
confirmed that the proposed method of construction is safe and viable.
Crews have confirmed many of the trends learned during the 1980s. As you will see
in this report, the Susitna River system is an extremely stable river system. Although
the population counts have changed, fish distribution trends remain consistent. Devils Canyon, located
22-32 river miles downriver from the proposed project site, remains a natural impediment to fish passage.
Chinook salmon remain the only fish documented within 30 miles of the proposed project site and the
number spawning upriver from Devils Canyon represents less than half of a percent of the total run.
Our financial advisory firm, experienced in financing large projects across the U.S., has provided scenarios
that allow the state to use a blend of options to finance the development of the project – rather than
fully fund it through the capital budget – and recoup its investment through the sale of power. It has
been confirmed that Susitna-Watana Hydro can provide power at wholesale, 50-year average rates at
approximately 7 cents per kilowatt hour.
We have worked with Cook Inlet Region Inc. and the Cook Inlet village corporations on a multi-year, field-
season access permit and continue to foster those relationships.
Susitna-Watana Hydro remains a potentially valuable project, but we recognize the fiscal realities facing
our state and there are tough decisions to be made. The project is at a critical decision-making point and
during the coming months we will look to Governor Walker and the Alaska Legislature for policy direction.
Sara Fisher-Goad, Executive Director
Alaska Energy Authority
Letter from Executive Director
Table of Contents
Letter from Executive Director ....................2
Susitna-Watana Hydro at a Glance .............3
Key Accomplishments and Milestones .......4
2014 Field Studies .......................................6
Project Economics .....................................12
Expenditures .............................................13
Sara Fisher-Goad,
Executive Director
Alaska Energy Authority
3 REPORT TO THE LEGISLATURE 2014
TALKEETNA
ANCHORAGE
WASILLA
Talkeetna River
MacLaren Riv e r
Oshetn
a
Ri
ver
FAIRBANKS
COOK INLET
Ch
u
li
t
na RiverYen
t
n
a
Ri
v
e
r
87 River Miles Downstream
Susitna River22 to 32 River Miles Downstream
DEVILS CANYON
SUSITNA-WATANA DAMSUSITNA-WATANA DAM
Susitna-Watana Hydro at a Glance
Location:
River mile 184,
above Devils Canyon
Size:
735-foot-high dam
Reservoir:
About 42 miles long,
average width of 1 mile
Estimated Supply:
About 50 percent of Railbelt
electrical demand
Cost:
$5.65 billion
Annual Energy:
2,800,000 MWh
Licensing:
Federal Energy Regulatory Commission
Project Life:
100+ years, providing
long-term, stable rates
4 REPORT TO THE LEGISLATURE 2014
Key Accomplishments and Milestones
The Susitna-Watana Hydro team has worked to prioritize field efforts based on the level of funding
received through the annual capital budgets. 2014 marked a year of intensive and specific research
and data collection on high-priority studies like Chinook salmon. Additional progress was made with
land-access agreements, meeting licensing milestones and advancing the engineering and design.
Land-Access Agreement
Alaska Energy Authority (AEA) reached a critical land-access agreement in 2014 with Cook Inlet
Region Inc. (CIRI) and six Cook Inlet village corporations to allow AEA access to land in order to
further Susitna-Watana Hydro environmental studies.
“Completing this monumental task has been a historic achievement requiring much commitment,
time, effort and willingness to compromise for the greatest good for the greatest number of people,”
said Greg Encelewski, president of the Ninilchik Natives Association.
The cooperative land-use agreement paved the way for ongoing scientific research needed to meet
crucial Federal Enery Regulatory Commision (FERC) licensing requirements and continue valuable
stakeholder outreach efforts.
Stakeholder Engagement
In the spring and early summer, AEA held a series of six public meetings in the communities of Wasilla,
Fairbanks, Glennallen, Kenai, Anchorage and Talkeetna. The meetings were well-attended and
members of the community had the opportunity to provide comments and ask questions about the
project directly to project team members.
In recognition of the level of activity in Talkeetna associated with field seasons, the project team
opened an office in Talkeetna to provide information and access to both local residents and visitors.
The Susitna-Watana Hydro stakeholder team participated in regular meetings with CIRI and the Cook
Inlet village corporations in 2014, discussing everything from the land-access permit, hosting site
tours, drilling permits, project updates and economic development opportunities. AEA, CIRI and
Tyonek Native Corporation held a site inspection of the summer geotechnical drilling program.
The project team also presented to numerous groups, associations and NGOs throughout 2014 to
present information gathered as part of the environmental field effort and licensing status.
Further, AEA assisted the Copper River-Ahtna Intertribal Resource Conservation District with a
successful proposal for a U.S. Department of Agriculture Conservation Innovation grant. AEA
provided an in-kind match by providing public data from Susitna-Watana Hydro environmental
studies. This grant will afford the opportunity to develop local technical expertise in wildlife habitat
and forestry management benefiting forage vegetation for moose.
5 REPORT TO THE LEGISLATURE 2014
Licensing Milestones
AEA continued to meet the FERC licensing milestones, most notably filing the Initial Study Report in June
2014. More than 8,600 pages of information provided a detailed status report of AEA’s progress, including
the implementation of the 58 FERC-approved individual studies.
An overview of the Initial Study Report is available here.
Engineering
In January 2015, AEA is anticipated to release the draft engineering feasibility report. The AEA team
has been working with dam safety experts, the utilities and FERC to design a safe and effective project.
The board of consultants, a group of international dam design and safety experts required by FERC, has
endorsed the roller-compacted concrete construction method and the dam design and configuration.
The 2014 drilling program showed no active seismic faults at the dam site and verified the quality of the rock.
Research was conducted so that the project would be designed to withstand the maximum probable flood and
seismic events.
AEA worked with the utilities throughout the year to optimize the project and energy production. The
overall capacity rating of the three proposed turbines has been reduced to 459 megawatts while maintaining
the same energy production of 2,800,000 megawatt hours of annual energy, or roughly half of the Railbelt’s
current demand.
Health and Safety
The Heath, Safety and Environment (HSE) team worked with contractors to ensure a solid safety culture
starting with a project kickoff and following up with compliance reviews and daily briefings to ensure a safe and
successful field season. With more than 200 people in the field working a combined 116,732 hours in remote
areas accessible only by helicopter, the season had just one OSHA-recordable incident.
During routine field visits, the HSE coordinator conducted health and safety and permit compliance checks of
camp facilities, aircraft and watercraft, as well as observations of crews as they worked. The main goal of these
checks was to assure that personnel were following guidelines set forth in their health and safety plans and
land-access permits, working safely and watching out for their fellow employees.
Economic Impacts of Licensing Activity
• Susitna-Watana Hydro maintained a 65 percent
Alaska hire rate, capitalizing on hydroelectric
experience in the Pacific Northwest while
providing jobs to Alaskans.
• In 2014, nearly $7 million was earned in Alaska
wages. This includes subcontractors, camp
support services, helicopter pilots, boat operators,
biologists, drill operators and more.
6 REPORT TO THE LEGISLATURE 2014
2014
Field
Studies
The 2014 study season involved more than 200 field scientists, geologists, biologists, drillers and
archaeologists to further data collection as part of the FERC-approved study plan. Fieldwork efforts
focused heavily on fish, water quality and wildlife studies, along with geotechnical programs that included
core-drilling studies and ongoing geotechnical investigations.
Data collection has been completed for 13 of the FERC-approved studies.
AEA strives to use innovative and creative methods to
reduce costs and time to complete the FERC-required studies. One successful example is that AEA used
a new data collection approach to characterize bed material of the Susitna River by photographing the
river during the clear-water winter conditions.
Modeling efforts for project operation, water quality, ice, sediment transport and instream flow are
underway. The models have been used to simulate 50 years of existing conditions and one potential
operational scenario. All of this helps feed into the development and operational scenarios of the project.
Through collaboration with the Alaska Department of Fish and Game (ADF&G), more is understood about
moose and caribou habitat, movements, populations and productivity in the Susitna Basin than ever
before. This provides valuable game-management data. As part of the Susitna-Watana Hydro study effort,
mixing between the Nelchina and Delta caribou herds was documented.
In 2014, AEA completed data collection for 13 FERC-approved studies
• Water Quality
• Bioaccumulation of Mercury
• Ice Processes
• Glacial and Runoff Changes
• Salmon Escapement
• Aquatic Habitat Characterization
• Fish Passage Barriers
• Large Carnivores
• Terrestrial Furbearers
• Little Brown Bat
• Wood Frog
• Subsistence
• Probable Maximum Flood
7 REPORT TO THE LEGISLATURE 2014
Advancing Understanding Through Science
The goal of the scientific research and resulting data is to better characterize the environment in and around the
proposed project area.
The information gathered through the Susitna-Watana Hydro field effort is a valuable resource to the state and
to other privately pursued energy projects in the region. Studies to date not only continue to inform project
efforts, but have also significantly advanced the volume and quality of science available for local and state
agencies to better manage existing natural resources in the Susitna Basin.
In a collaborative effort with the ADF&G, GPS radio-collars for moose and caribou are providing fine-scale
data on habitat use and movement that benefit state management programs in an important hunting area.
Dall’s sheep surveys are providing data in an area where populations have experienced a decline in the last
decade and where current population-status information has been sparse. Area studies of eagles and other
raptors are producing crucial insight into regional population trends of species that are subject to federal
management oversight.
The fisheries studies have further documented the distribution of invasive northern pike in the lower Susitna
River, expanded distribution data for species such as Chinook salmon, lake and rainbow trout and contributed
more than 4,500 tissue samples to the ADF&G Gene Conservation Lab. AEA worked closely with the ADF&G to
maximize the value of state dollars invested in Chinook salmon research and to not duplicate study efforts.
Through the expansive 2014 studies and subsequent Initial Study Report meetings, the Susitna-Watana Hydro
project’s fieldwork efforts have greatly expanded public knowledge and understanding of the Susitna Basin.
Today, as a direct result of these studies, Alaskans have an unprecedented amount of publicly available data,
images and information about the area and its inhabitants.
8 REPORT TO THE LEGISLATURE 2014
Confirming Historical Trends and Defining Areas of Impact
During the 1980s, a three-phase, two-dam project was extensively studied by the Alaska Power Authority and
a license application was filed with FERC. In 1986, the application was withdrawn, mainly due to the declining
price of oil and impacts on the state budget.
As part of the current licensing effort, AEA reviewed the historical information and has used it not only as
baseline data, but also to identify trends in areas like fish and aquatics. Today, despite advancements in
technology and superior data collection methods, recent studies, including those conducted as part of the
2014 field season, continue to confirm findings similar to those documented more than 30 years ago.
A Stable River System
The Susitna River is in a state termed “dynamic equilibrium.” This means that characteristics of the
river are changing at the same time. As you can see from this series of photos, the river has remained
remarkably consistent during the past six decades. There also is very little human development along
most of the Susitna River. The data collection during the 1980s plays an even more important role
and augments any recent data collection.
1951 Aerial 1983 Aerial 2012 Aerial
9 REPORT TO THE LEGISLATURE 2014
Fish Distribution
Chinook salmon remain the only documented anadromous fish above Devils Canyon. Devils Canyon is a
10-mile stretch of rapids that begins 32 miles from the proposed dam site that acts as a natural fish barrier.
The number of Chinook salmon estimated to make it up river past Devils Canyon represent less than half of a
percent of the total Susitna River escapement.
Chinook salmon and Devils Canyon
Only one salmon species has been documented within 30 miles of the project site.
Of the Chinook tagged at Curry, 94 percent headed up the tributaries; 6 percent stayed in the main stem.
23352 10 4
2012 Chinook salmon tagged
18603 3 1
2013 Chinook salmon tagged
11622 2 1
2014 Chinook salmon tagged
Curry Devils Canyon
Above Devils Canyon Above Project Site
Tagged Chinook Salmon and Devils Canyon
Only one salmon species has been documented within 30 miles of the project site.
Yentna River Basin � 20%
Lower Susitna River & Other Tributaries � 20%
2012-2014
• 97-99% Spawn in Tributaries
• 0.6-2.7% Spawn in Mainstem
Lower Susitna River
• <0.5% Spawn in Mainstem
Middle Susitna River
Chulitna River
Basin � 20%
Middle Susitna River and Tributaries below Devils Canyon � 5%
Deshka River
Basin � 15%
Talkeetna River Basin � 20%
Upper Susitna
River above Dam < 0.5%
Middle Susitna River above Devils Canyon < 0.5%
2013 Chinook Salmon SpawningDistribution by Basin
Chinook Spawning
2013
DC
Salmon Spawning
Studies are showing that
salmon for the most part use
the Susitna River as a corridor
to get to their preferred
spawning habitat in the side
channels and tributaries. In
fact, 97 to 99 percent of the
Chinook tagged in the lower
Susitna River spawned in
tributaries. Ninety-three to
97 percent of Coho tagged
in the lower Susitna River
spawned in tributaries. Yentna River Basin � 20%
Lower Susitna River & Other Tributaries � 20%
2012-2014
• 97-99% Spawn in Tributaries
• 0.6-2.7% Spawn in Mainstem
Lower Susitna River
• <0.5% Spawn in Mainstem
Middle Susitna River
Chulitna River
Basin � 20%
Middle Susitna River and Tributaries below Devils Canyon � 5%
Deshka River
Basin � 15%
Talkeetna River Basin � 20%
Upper Susitna
River above Dam < 0.5%
Middle Susitna River above Devils Canyon < 0.5%
2013 Chinook Salmon SpawningDistribution by Basin
Chinook Spawning
2013
DC
10 REPORT TO THE LEGISLATURE 2014
Defining Potential Areas of Impacts
The Susitna Basin includes the Deshka, Yentna, Chulitna, Talkeetna and Susitna rivers and numerous tributaries
that feed into the river system. The Susitna River at the proposed dam site represents 16 percent of the total flow
contribution and 11 percent of the annual bed material load contributions (silt).
The geomorphology studies have shown that potential impacts from the project are attenuated as the flows from
the other contributing rivers enter the Susitna. There would be insignificant water quality or geomorphic impacts
below the Yentna River confluence and no further modeling is proposed in this reach.
If the project is pursued, the main area of study should remain the Middle River, from the Chulitna and Talkeetna
River confluences, upstream to the potential dam site.
DC
Average Annual Bed MaterialLoad Contributions
Susitna River at
Susitna Station ≈ 100%
(97% Sand/3% Gravel)
Yentna River � 55%
(97% Sand/3% Gravel)
Ungaged Tributaries < 1%
Sunshine to Susitna Station
(Primarily Sand)
Ungaged Tributaries < 1%Gold Creek to Sunshine
(30% Sand/70% Gravel)
Ungaged Tributaries < 1%
Watana Dam toGold Creek
(30% Sand/70% Gravel)
Chulitna River � 26%
(87% Sand/13% Gravel)Talkeetna River � 7%
(95% Sand/5% Gravel)
Susitna River at Watana Dam � 11%
(99% Sand/1% Gravel)
Yentna River � 40%
Ungaged Tributaries � 4%Watana Dam toGold Creek
Chulitna River � 18%
DC
Susitna River at Susitna Station ≈ 100%
Ungaged Tributaries < 1%Sunshine to Susitna Station
(Primarily Sand)
Ungaged Tributaries < 1%Gold Creek to Sunshine
(30% Sand/70% Gravel)
Talkeetna River � 7%
(95% Sand/5% Gravel)
(99% Sand/1% Gravel)
Yentna River � 40%
Ungaged Tributaries � 10%Sunshine to
Susitna Station
Ungaged Tributaries � 4%
Gold Creek to Sunshine
Ungaged Tributaries � 4%Watana Dam toGold Creek
Chulitna River � 18%Talkeetna River � 8%
Susitna River at Watana Dam � 16%
Average Annual Flow Contributions
DC
Average Annual Bed MaterialLoad Contributions
Susitna River at
Susitna Station ≈ 100%
(97% Sand/3% Gravel)
Yentna River � 55%
(97% Sand/3% Gravel)
Ungaged Tributaries < 1%
Sunshine to Susitna Station
(Primarily Sand)
Ungaged Tributaries < 1%Gold Creek to Sunshine
(30% Sand/70% Gravel)
Ungaged Tributaries < 1%
Watana Dam toGold Creek
(30% Sand/70% Gravel)
Chulitna River � 26%
(87% Sand/13% Gravel)Talkeetna River � 7%
(95% Sand/5% Gravel)
Susitna River at Watana Dam � 11%
(99% Sand/1% Gravel)
Yentna River � 40%
Ungaged Tributaries � 4%Watana Dam toGold Creek
Chulitna River � 18%
DC
Susitna River at Susitna Station ≈ 100%
Ungaged Tributaries < 1%Sunshine to Susitna Station
(Primarily Sand)
Ungaged Tributaries < 1%Gold Creek to Sunshine
(30% Sand/70% Gravel)
Talkeetna River � 7%
(95% Sand/5% Gravel)
(99% Sand/1% Gravel)
Yentna River � 40%
Ungaged Tributaries � 10%Sunshine to
Susitna Station
Ungaged Tributaries � 4%
Gold Creek to Sunshine
Ungaged Tributaries � 4%Watana Dam toGold Creek
Chulitna River � 18%Talkeetna River � 8%
Susitna River at Watana Dam � 16%
Average Annual Flow Contributions
11 REPORT TO THE LEGISLATURE 2014
Social Sciences
A component of the FERC-approved study plan is to better understand the historical and current human use of the
Susitna region. This includes subsistence, cultural resources, archeology, ethnogeography, recreation, health and more.
In 2014, the project team completed the Ahtna Ethnogeography Study to better understand the traditional use
of the region. The work included interviewing Ahtna elders to discuss traditional uses and to document Ahtna
placenames. Athabascan groups and territorial boundaries were documented, as well as cultural resources,
artifacts, traditional routes and trails. AEA is following proper federal and state regulations on the protection of this
information and the locations of significant cultural importance.
A similar study effort is planned for the Dena’ina people.
Scientific Innovation
Alaska presents a unique environment
and opportunities for innovative study
methods.
When posed with the question of how
to study a river system that freezes in
the winter, AEA and its contractors
pioneered winter sampling
approaches, including nighttime
behavior of fish.
12 REPORT TO THE LEGISLATURE 2014
Project Economics
AEA has remained committed to providing accurate and thorough Susitna-Watana Hydro licensing and
cost estimates. In January 2013, the most probable cost of the project was $5.2 billion (Jan. 2013 $). As
part of the engineering feasibility report, the most probable cost estimate was updated to $5.65 billion
(July 2014 $), with a range of potential costs from $4.46 to $6.8 billion. The significant components of the
cost increase included inflation and updated costs of construction based on the current design.
AEA hired a financial management firm with international large project development experience to develop
financing options. Susitna-Watana Hydro is anticipated to be financed through a combination of bonds and
lending sources and not fully funded by the capital budget, post FERC hydropower license. In addition, it is
anticipated that the state would be repaid on its initial investment through the sale of power. The state has
experience with this type of model, with the financing of the Bradley Lake Hydroelectric project.
With all scenarios, it is fully anticipated that Susitna-Watana Hydro could provide wholesale, 50-year-average
power at approximately 7 cents per kilowatt hour. Based on natural gas price forecasts, the Susitna-Watana
Hydro power costs would be less than power generated using natural gas within nine years.
$0.0
January 2013 July 2014
$1.0
$2.0
$3.0
$4.0
$5.0
$6.0
Comparing Cost Estimates Components of Cost Update
Construction
$235 million
Inflation
$174 million
Licensing
$57 million
Susitna-Watana vs. Natural Gas Power Costs
$0.25
$0.20
$0.15
Power Cost (Real $2013 per kWh)$0.10
$0.05
2029203120332035203720392041204320452047204920512053$-
AKLNG Natural Gas Generation
Susitna-Watana Generation
Break even after 9 years
$0.0
January 2013 July 2014
$1.0
$2.0
$3.0
$4.0
$5.0
$6.0
Comparing Cost Estimates Components of Cost Update
Construction
$235 million
Inflation
$174 million
Licensing
$57 million
13 REPORT TO THE LEGISLATURE 2014
Susitna-Watana Hydroelectric Project
Status Report as of Dec. 31, 2014
Project Costs (in thousands)
FY2009-
FY2011
Actual
FY2012
Actual
FY2013
Actual
FY2014
Actual
FY2015
To DateActivity Total Encumbrance
Budgeted &
Committed
Funds Total
Site Determination &
Pre-Feasibility (Prior to
Pre-Application Document)
2,487.0 4,011.3 --- 6,498.3 -- 6,498.3
Personnel - 625.7 1,432.4 2,427.1 412.6 4,897.8 - 2,144.4 7,042.2
Licensing Costs - -
Engineering Feasibility Study - 1,244.3 7,304.0 5,051.6 2,103.5 15,703.3 1,378.1 643.9 17,725.3
Board of Consultants - - 418.6 322.6 15.3 756.6 131.8 263.3 1,151.6
Detailed Engineering Design - --------
Utility Corridor, Dept. of
Transportation Analysis
- 450.8 94.8 91.9 - 637.5 143.1 - 780.6
FERC Licensing Support - 510.0 1,032.6 674.6 76.5 2,293.7 187.7 417.6 2,899.0
Office of Project Management
& Permitting
- 165.7 1,519.0 1,054.7 614.7 3,354.1 1,638.3 82.5 5,074.9
Resource & Feasibility Studies - 4,915.7 25,008.0 47,828.1 9,947.5 87,699.2 13,737.2 9,079.3 110,515.7
Project Management Consult.- 533.3 136.3 7.0 - 676.6 -- 676.6
Technical Assistance - 104.0 24.2 -- 128.1 -- 128.1
Permitting - 2.0 458.9 2,206.2 619.8 3,286.9 141.5 219.0 3,647.4
Logistical Support - 134.3 6,434.3 13,364.6 6,304.2 26,237.4 901.1 359.4 27,497.9
GIS - 199.2 415.6 276.3 80.7 971.9 136.7 67.6 1,176.2
Website and Public Info Library - 40.8 69.0 75.2 5.7 190.7 34.3 50.0 275.0
Communications - 9.6 223.6 162.3 45.7 441.2 148.1 463.8 1,053.1
Legal - 1,084.5 1,309.1 1,600.6 54.2 4,048.3 640.0 234.1 4,922.5
Travel - 29.1 64.7 48.1 26.2 168.2 -25.6 193.8
Project Office - 106.4 172.8 143.5 63.6 486.3 33.0 231.7 750.9
Unallocated - ------63.7 63.7
Total Project Costs 2,487.0 14,166.6 46,117.9 75,334.4 20,370.2 158,476.0 19,250.8 14,345.9 192,072.8
Funding Sources FY2009-
FY2011 FY2012 FY2013 FY2014 FY2015 Total
Railbelt Energy Fund 1,528.1 65,700.0 --67,228.1
General Fund 9,644.7 -- 95,200.0 20,000.0 124,844.7
Total Funding Sources 11,172.8 65,700.0 - 95,200.0 20,000.0 192,072.8
Expenditures 11,075.7 64,088.2 - 76,477.6 6,834.4 158,476.0
Encumbrances 37.8 1,036.9 - 14,733.3 3,442.8 19,250.8
Balance by Appropriation
(Budgeted & Committed)
59.2 574.9 - 3,989.0 9,722.7 14,345.9
Expenditures
SUSITNA-WATANAHYDRO.ORG