HomeMy WebLinkAboutSuWa289sec4-5Alaska Resources Library & Information Services
Susitna‐Watana Hydroelectric Project Document
ARLIS Uniform Cover Page
Title:
Geology and soils characterization study, Study plan Section 4.5, 2014-
2015 Study Implementation Report. [ Main report ] SuWa 289
Author(s) – Personal:
Author(s) – Corporate:
MWH
AEA‐identified category, if specified:
November 2015; Study Completion and 2014/2015 Implementation Reports
AEA‐identified series, if specified:
Series (ARLIS‐assigned report number):
Susitna-Watana Hydroelectric Project document number 289
Existing numbers on document:
Published by:
[Anchorage : Alaska Energy Authority, 2015]
Date published:
October 2015
Published for:
Alaska Energy Authority
Date or date range of report:
Volume and/or Part numbers:
Study plan Section 4.5
Final or Draft status, as indicated:
Document type:
Pagination:
iv, 33 pages (main report only)
Related work(s): Pages added/changed by ARLIS:
Notes:
The following parts of Section 4.5 appear in separate electronic files: Attachment 1 ; Attachment 2
(two files) ; Attachment 3 ; Attachments 4-5 ; Attachment 6 ; Attachment 7 (5 files) ; Attachment 8 ;
Attachment 9.
All reports in the Susitna‐Watana Hydroelectric Project Document series include an ARLIS‐
produced cover page and an ARLIS‐assigned number for uniformity and citability. All reports
are posted online at http://www.arlis.org/resources/susitna‐watana/
Susitna-Watana Hydroelectric Project
(FERC No. 14241)
Geology and Soils Characterization Study
Study Plan Section 4.5
2014-2015 Study Implementation Report
Prepared for
Alaska Energy Authority
Prepared by
MWH
October 2015
2014-2015 STUDY IMPLEMENTATION REPORT GEOLOGY AND SOILS
CHARACTERIZATION STUDY (STUDY 4.5)
Susitna-Watana Hydroelectric Project Alaska Energy Authority
FERC Project No. 14241 Page i October 2015
TABLE OF CONTENTS
1. Introduction............................................................................................................................ 1
2. Study Objectives .................................................................................................................... 2
3. Study Area .............................................................................................................................. 3
4. Methods and Variances in 2014 ............................................................................................ 3
4.1. Review of Project Documentation ................................................................................. 3
4.2. Regional Geologic Analysis and Mineral Resources Assessment ................................. 3
4.2.1. Regional Geology ................................................................................................... 4
4.2.2. Dam Site Geology ................................................................................................... 4
4.3. Field Geologic and Geotechnical Investigations............................................................ 5
4.3.1. Drilling Program ..................................................................................................... 5
4.3.2. Groundwater and Ground Temperature .................................................................. 6
4.4. Seismic Hazard Evaluation ............................................................................................ 6
4.5. Long-Term Earthquake Monitoring System .................................................................. 7
4.6. Geologic and Engineering Analyses .............................................................................. 7
4.7. Variances from Study Plan............................................................................................. 8
4.8. Review of Project Documentation ................................................................................. 8
4.9. Field Geologic and Geotechnical Investigations............................................................ 8
4.10. Dam Site Geology .......................................................................................................... 9
4.10.1. Geologic Conditions ............................................................................................... 9
4.10.2. Abutment Stability ................................................................................................ 11
4.10.3. Groundwater ......................................................................................................... 11
4.10.4. Permafrost ............................................................................................................. 12
4.11. Reservoir Area Geology ............................................................................................... 12
4.11.1. Igneous and Volcanic Emplacement ..................................................................... 13
4.11.2. Late Quaternary Geology and Chronology ........................................................... 13
4.11.3. Groundwater ......................................................................................................... 13
4.11.4. Permafrost ............................................................................................................. 14
4.12. Seismic Hazard Study .................................................................................................. 14
5. Results ................................................................................................................................... 15
6. Discussion ............................................................................................................................. 17
2014-2015 STUDY IMPLEMENTATION REPORT GEOLOGY AND SOILS
CHARACTERIZATION STUDY (STUDY 4.5)
Susitna-Watana Hydroelectric Project Alaska Energy Authority
FERC Project No. 14241 Page ii October 2015
7. Conclusion ............................................................................................................................ 19
8. Literature Cited ................................................................................................................... 20
9. Tables .................................................................................................................................... 23
10. Figures .................................................................................................................................. 24
LIST OF TABLES
Table 5-1. Discontinuity Classes ................................................................................................. 23
Table 5-2. Summary of Joint Set Orientations from Outcrops .................................................... 23
LIST OF FIGURES
Figure 4.3-1. Dam Site Exploration Plan – 2014 ......................................................................... 25
Figure 4.3-2. Watana Dam Site Geotechnical Instrumentation ................................................... 26
Figure 5.3-1. Dam Site Bedrock Geology ................................................................................... 27
Figure 5.3-2. Groundwater Levels and Dam Site (DH12-3, DH12-8) ........................................ 28
Figure 5.3-3. Ground Temperature at Depth (DH12-1, DH12-4) ................................................ 29
Figure 5.4-1. Regional Geology; 1 of 2 (Fugro 2015b) ............................................................... 30
Figure 5.4-2. Regional Geology; 2 of 2 (Fugro 2015b) ............................................................... 31
Figure 5.5-1. Crustal Stress Orientations and Strain Ellipses (Fugro 2015b) .............................. 32
Figure 6-1. Shear/Alteration Zone at BS-27 ................................................................................ 33
2014-2015 STUDY IMPLEMENTATION REPORT GEOLOGY AND SOILS
CHARACTERIZATION STUDY (STUDY 4.5)
Susitna-Watana Hydroelectric Project Alaska Energy Authority
FERC Project No. 14241 Page iii October 2015
ATTACHMENTS
Attachment 1: Interim Mineral Resource Assessment Report
Attachment 2: Exploration and Testing Program Work Plan 2014-2015
This attachment includes some figures that contain Critical Energy Infrastructure
Information (CEII), which are being withheld from public viewing, in accordance
with FERC’s Order No. 630-A. DO NOT RELEASE.
Attachment 3: Preliminary Reservoir Slope Stability Assessment
Attachment 4: Geotechnical Data Report
This attachment contains PRIVILEGED information, which is being withheld from
public viewing, in accordance with FERC’s Order No. 769. DO NOT RELEASE.
Attachment 5: Dam Site Geology
This attachment contains PRIVILEGED information, which is being withheld from
public viewing, in accordance with FERC’s Order No. 769. DO NOT RELEASE.
Attachment 6: Regional Geologic Analysis
Attachment 7: Crustal Seismic Source Evaluation
Attachment 8: Seismic Network 2014 Annual Seismicity Report
Attachment 9: Seismic Monitoring Project January-June 2015 Report
2014-2015 STUDY IMPLEMENTATION REPORT GEOLOGY AND SOILS
CHARACTERIZATION STUDY (STUDY 4.5)
Susitna-Watana Hydroelectric Project Alaska Energy Authority
FERC Project No. 14241 Page iv October 2015
LIST OF ACRONYMS, ABBREVIATIONS, AND DEFINITIONS
Abbreviation Definition
AEA Alaska Energy Authority
AEC Alaska Earthquake Information Center
ANCSA Alaska Native Claims Settlement Act
ARD Acid Rock Drainage
CFR Code of Federal Regulations
DEM Digital Elevation Model
FEA Finite Element Analysis
FERC Federal Energy Regulatory Commission
ILP Integrated Licensing Process
IMASW Interferometric Multichannel Analysis of Surface Waves
ISR Initial Study Report
Ka kiloannus (thousand years)
Km Kilometer
LiDAR Light Detection and Ranging
M Magnitude
Ma Megaannus (million years)
Mi mile
OSL Optically Stimulated Luminescence
PMF Probably Maximum Flood
PM&E Protection, Mitigation, and Enhancement
PSHA Probabilistic Seismic Hazard Assessment
RCC Roller-Compacted Concrete
RSP Revised Study Plan
SCR Study Plan Completion Report
SPD Study Plan Determination
Work Plan Geotechnical Exploration Program Work Plan
2014-2015 STUDY IMPLEMENTATION REPORT GEOLOGY AND SOILS
CHARACTERIZATION STUDY (STUDY 4.5)
Susitna-Watana Hydroelectric Project Alaska Energy Authority
FERC Project No. 14241 Page 1 October 2015
1. INTRODUCTION
On December 14, 2012, Alaska Energy Authority (AEA) filed with the Federal Energy
Regulatory Commission (FERC or Commission) its Revised Study Plan (RSP) for the Susitna-
Watana Hydroelectric Project (FERC Project No. 14241), which included 58 individual study
plans (AEA 2012). Included within the RSP was the Geology and Soils Characterization Study,
Section 4.5. RSP Section 4.5 focuses on the methods for evaluating the geology and soils and
defining the existing geological conditions at the dam site, reservoir, and access road and
transmission line corridors. This is necessary for developing design criteria to ensure that the
proposed Project facilities and structures will be safe and adequate to fulfill their stated
functions. RSP 4.5 provided goals, objectives, and proposed methods for data collection
regarding this study.
On February 1, 2013, FERC staff issued its study determination (February 1 SPD) for 44 of the
58 studies, approving 31 studies as filed and 13 with modifications. RSP Section 4.5 was one of
the 31 study plans approved with no modifications.
Following the first study season, FERC’s regulations for the Integrated Licensing Process (ILP)
require AEA to “prepare and file with the Commission an initial study report describing its
overall progress in implementing the study plan and schedule and the data collected, including an
explanation of any variance from the study plan and schedule” (18 CFR 5.15(c)(1)). This
Geology and Soils Characterization Study Initial Study Report (ISR) was prepared in accordance
with FERC’s ILP regulations and details AEA’s status in implementing the study, as set forth in
the FERC-approved RSP as approved by FERC’s February 1 SPD (referred to herein as the
“Study Plan”).
Since filing the ISR in June 2014, AEA has continued to implement the FERC approved Study
Plan for the Geology and Soils Characterization Study. The various tasks undertaken since June
2014 include:
• Drilling in situ testing and instrumentation installation: two borings, cross-holes beneath
the Susitna River and two inclined borings on the lower right abutment at the dam site;
• Laboratory testing of rock samples;
• Geotechnical instrumentation monitoring at sites at the dam site;
• Dam site geologic mapping and fault rupture evaluation;
• Seismic Network Monitoring of earthquake activity in the Project area; and
• Crustal Seismic Source Evaluation.
In furtherance of the next round of ISR meetings and FERCs Study Plan Determination (SPD)
expected in 2016, this report describes AEA's overall progress in implementing the Geologic and
Soils Characterization Study during calendar year 2014 and early 2015. Rather than a
comprehensive reporting of all field work, data collection, and data analysis since the beginning
of AEA's study program, this report is intended to supplement and update the information
2014-2015 STUDY IMPLEMENTATION REPORT GEOLOGY AND SOILS
CHARACTERIZATION STUDY (STUDY 4.5)
Susitna-Watana Hydroelectric Project Alaska Energy Authority
FERC Project No. 14241 Page 2 October 2015
presented in Part A of the ISR for the Geologic and Soils Characterization Study through the
early 2015. It describes the methods and results of the primarily 2014 effort, and includes a
discussion of the results achieved.
2. STUDY OBJECTIVES
The overall goals of this study are to conduct a geology and soils evaluation to define the
existing geological conditions and resources at the dam site, reservoir, and access and
transmission line corridors; to develop designs and criteria to support the engineering feasibility
studies; and to provide baseline spatial data to the geomorphology, paleontological, cultural and
botanical resources and the probable maximum flood (PMF) and site-specific seismic hazard
studies. The study objectives are established in RSP Section 4.5.1 as follows:
• Identify the existing soil and geology at the proposed construction site, reservoir area,
and access road and transmission line corridors.
• Determine the potential effects of Project construction, operation, and maintenance
activities on the geology and soil resources (including mineral resources) in the Project
area including identification and potential applicability of protection, mitigation, and
enhancement (PM&E) measures.
• Identify known mineral resources and mineral potential of the Project area.
• Acquire soils and geologic information for the Project area for use in the preparation of a
supporting design report that demonstrates that the proposed structures are safe and
adequate to fulfill their stated functions.
The field investigation activities for each season will be coordinated with resource agencies and
Alaska Native Claims Settlement Act (ANCSA) Corporation landowners. A Geotechnical
Exploration Program Work Plan (Work Plan) will be developed that outlines the field programs
and information needed for submitting applications and obtaining land access permits from
applicable agencies and ANCSA Corporation landowners (MWH 2011; MWH 2012; MWH
2013c). The Work Plans identify field investigations and studies to be carried out to assess
potential impacts to geology and soil resources in the Project area, including the dam, reservoir,
and access road and transmission line corridors, and the general arrangement and foundation
conditions for the dam and appurtenance structures. FERC regulations require “evaluation of
unconsolidated deposits, and mineral resources at the project site” (18 CFR 5.6(d)(3)(ii)(A)). For
the Exhibit E, AEA must provide a report on the geological and soil resources in the proposed
Project area and other lands that would be directly or indirectly affected by the proposed action
and the impacts of the proposed Project on those resources. This study report provides the basis
of the information needed for the Exhibit E.
2014-2015 STUDY IMPLEMENTATION REPORT GEOLOGY AND SOILS
CHARACTERIZATION STUDY (STUDY 4.5)
Susitna-Watana Hydroelectric Project Alaska Energy Authority
FERC Project No. 14241 Page 3 October 2015
3. STUDY AREA
As established by RSP Section 4.5.3, the study area includes the dam site area, reservoir area,
construction material sources, tailwater downstream of the dam, access road and transmission
line corridors, airport facilities, and construction camp and permanent village sites.
As described in the ISR Overview (Section 1.4) filed in June 2014 and subsequently the
Proposal to Eliminate the Chulitna Corridor from Further Study filed with FERC September 17,
2014, AEA explained that it had decided to pursue the study of an additional alternative
north/south-oriented corridor alignment for transmission and access from the proposed dam site
to the Denali Highway, referred to as the “Denali East Corridor Option,” and to eliminate the
Chulitna Corridor from further study
4. METHODS AND V ARIANCES IN 2014
AEA implemented the methods as described in the approved Study Plan. Study methods
implemented along with discussion of the timing and staging of study efforts are described in the
following sections organized by the following study components:
• Review of Project Documentation
• Regional Geologic Analysis and Minerals Resources Assessment
• Geologic and Geotechnical Investigation and Testing Program Development
• Field Geologic and Geotechnical Investigations
• Reservoir-Triggered Seismicity
• Reservoir Slope Stability Study
• Geology and Engineering Analysis
4.1. Review of Project Documentation
The review of previous data and development of geo-referenced databases was discussed in the
2014 ISR, Section 4.1.1. In development of geologic and seismic characterization and feasibility
level interpretations, the data from previous studies were reviewed and were a factor in
completing the 2014-2015 technical memoranda and reports. This task was completed.
4.2. Regional Geologic Analysis and Mineral Resources
Assessment
Existing regional geologic mapping depicting both the dam site and the general 5 to 10 mile (3.1
to 6.2 km) vicinity were developed by Csejtey et al. (1978), Acres (1982a, 1982b), and Wilson et
al. (2009). The existing published maps were produced at a variety of scales, using various
methods, level of detail, or purposes. As a consequence, there are inconsistencies in the
completeness and accuracy of geologic mapping leading to areas of general disagreement across
2014-2015 STUDY IMPLEMENTATION REPORT GEOLOGY AND SOILS
CHARACTERIZATION STUDY (STUDY 4.5)
Susitna-Watana Hydroelectric Project Alaska Energy Authority
FERC Project No. 14241 Page 4 October 2015
the maps. The emphasis of most prior mapping exercises in the region was focused on
developing a geologic framework and mineral resource evaluations. At the proposed dam site
geologic mapping was highly focused but of limited aerial extent.
4.2.1. Regional Geology
Field investigations and geologic studies included regional crustal seismic source evaluation to
further the understanding of seismic conditions in the vicinity of the dam site, to evaluate and
collect additional field data to update the previous geologic interpretations of the site developed
during the 1980s (Acres, 1982b) and completion of a dam site area fault rupture evaluation of the
region surrounding the dam site. Additional details regarding the seismic hazard studies were
presented in the ISR Section 16. The 2014 geologic field studies identified and inspected a
number of exposures to identify rock type, collect structural (strike and dip) information, and to
understand distribution and deformation of rocks in the site area and vicinity. Data was collected
along an east-west transect along the Susitna River, from near the confluence with Tsusena
Creek downstream to near the confluence with Watana Creek upstream, and a north-south
transect along Watana Creek. Also in 2014, AEA acquired additional Light Detection and
Ranging (LiDAR) imagery coverage south of Fog Creek and for the upper Watana Creek areas
to augment the previous LiDAR coverage.
Regional mapping developed by Acres (1982b) was presented at a small scale of 1 inch equal to
1 mile (1:63,360). Due to the methods employed at that time, there are apparent registration
inaccuracies and map artifacts. AEA elected to allow the geologic boundaries and units in the
map to remain unadjusted, preserving the original mapping scheme and honoring the original
map scale. For example, the sedimentary rocks exposed along the Susitna River are generally
accepted as part of the Cretaceous sequence of the Kahiltna formation (i.e., Kalbas et al., 2007).
These rocks are shown on Acres (1982b) as map unit Kag: Cretaceous argillite; on Wilson’s
(2009) map these same rocks are shown as map unit Kjf: Jurassic-Cretaceous flysch. The update
based on field observations to the regional geologic map maintains the Acres (1982b)
classification scheme for clarity purposes to avoid potential confusion with other abbreviations.
However, field traverses along the Susitna River and Watana Creek may offer a somewhat
limited structural insight because it captures only a one-dimensional traverse characterization of
a three-dimensional landscape.
4.2.2. Dam Site Geology
Geologic mapping of rock outcrops at the dam site was performed on the north and south banks
(right and left abutments) of the river beginning about 2,000 feet (610m) upstream of the dam
axis, near the previously mapped geologic feature GF1; and extended to about 1,500 feet (457m)
downstream of the dam near geologic feature GF7. Measurements and observations of the rock
type and structure were collected while traversing the slopes on both banks of the river to assess
styles and patterns of structural deformation, and describe level of weathering and alteration.
Additional traverses were made along geologic features to assess the style and pattern of
structural deformation and to evaluate the possible displacement along existing planes of
weakness in bedrock.
2014-2015 STUDY IMPLEMENTATION REPORT GEOLOGY AND SOILS
CHARACTERIZATION STUDY (STUDY 4.5)
Susitna-Watana Hydroelectric Project Alaska Energy Authority
FERC Project No. 14241 Page 5 October 2015
Navigating and locating the positions of observations was managed using a Trimble GEO7X
GPS equipped with ArcGIS preloaded with maps that included topography, slopes angles,
geologic maps, etc., to provide a level of accuracy and to better facilitate navigation and
interpretations (MWH 2015b). The locations of outcrops (designated as OC1 to OC118),
observation points (designated as BS1 to BS35), and geologic structures were recorded in the
Trimble and numbered sequentially.
Mapping efforts in the dam site area, combined with information from the concurrent drilling, in
situ testing, and geophysical explorations, identified eight geologic features (GF1 to GF8) that
were used to update the interpretation of the geologic conditions at the dam site and present a
comprehensive geologic model using both previous and recently acquired data.
4.3. Field Geologic and Geotechnical Investigations
A comprehensive geologic and geotechnical exploration and testing program was developed to
provide the data necessary for engineering feasibility and for Exhibit E of the license application
(MWH 2013c). Therein the Work Plan detailed the planned phased exploration and testing
programs to be undertaken. The scope of the 2014 investigation program was abbreviated from
the original Work Plan and was focused on geologic characterization in the dam site and nearby
area, continuation of geotechnical instrumentation and seismic station network monitoring, and
assessment of structural geologic features and potential fault rupture at the dam site, as well as
crustal seismic source characterization. The 2014 investigation and testing program consisted of
the following:
• Delineate and characterize geology and soil resources including geologic features, rock
structure, and weathering/alternation with emphasis in the dam foundation area.
• Undertake physical laboratory testing, as well as petrographic analysis, to characterize
the properties of the geology and soils materials.
• Evaluate lineaments and potential fault rupture hazards relative to delineation of faults,
level of activity and significance to site-specific ground motion evaluations and safety for
the Project.
• Continue seismic monitoring to catalog earthquakes in the Project area to augment
stations in the Alaska Earthquake Information Center network to monitor and detect local
earthquakes.
4.3.1. Drilling Program
For the 2014 field exploration program, a limited field program was undertaken and focused on
evaluating the previously identified geologic features and shear zones (Acres 1982a, 1982b) that
had been postulated to be encountered in the dam, powerhouse and spillway foundations.
Four geotechnical borings were carried out to confirm presence of and characterize properties of
geologic features beneath the Susitna River and in the abutments at the dam site (Figure 4.3-1).
Two of the borings DH14-9 (683 ft.; 208m) and DH14-10 (692 ft.; 211m) were advanced under
the Susitna River in opposing directions in a crossing pattern to investigate the presence of a
2014-2015 STUDY IMPLEMENTATION REPORT GEOLOGY AND SOILS
CHARACTERIZATION STUDY (STUDY 4.5)
Susitna-Watana Hydroelectric Project Alaska Energy Authority
FERC Project No. 14241 Page 6 October 2015
postulated fault or shear zone beneath the river. Borings DH14-11 (230 ft.; 70m) and DH14-12
(175 ft.; 53m) were targeted to intersect northwest-trending geologic features GF4 and GF5
(Acres 1982b) on the lower to middle sections of the right abutment. Rock core drilling methods
were employed and each boring was water pressure tested and surveyed using both optical and
acoustic downhole televiewers. Laboratory tests were performed on selected core samples to
determine the engineering properties of rock materials. Groundwater and ground temperature
monitoring instruments were installed in each boring.
Data obtained from the drilling and in situ testing along with the surface geologic mapping was
utilized to interpret the geologic and foundation conditions beneath the proposed dam structure.
4.3.2. Groundwater and Ground Temperature
A geotechnical instrumentation monitoring program was developed to improve the
understanding of groundwater and ground temperature conditions at the dam site. This program
was initiated during the 2011-2012 field seasons. Field crews assessed and rehabilitated selected
instrumentation devices originally installed during the 1970s and 1980’s. Down hole
geotechnical instrumentation was also installed in new boreholes. Many of these instruments
were fitted with data logging equipment such that readings could be taken throughout the year.
Due to land access restrictions, the data logging equipment was removed from each of the
instrumented borings from November 2013 through May 2014.
Two instrumentation monitoring activities were conducted during the 2014 field season. In June
2014, a field visit was conducted to re-establish the data logging equipment removed in
November 2013 (Figure 4.3-2). The second field activity conducted in October 2014 was to
download data obtained over the 2014 summer season and to perform maintenance on the
instrumentation in preparation of collecting data over the following winter season.
4.4. Seismic Hazard Evaluation
During the 2012 and 2013 field seasons, lineament mapping and evaluation were performed in
connection with the crustal seismic source evaluation (Fugro 2013). During the 2014 field
season lineament mapping and evaluation continued with a focus on potential crustal seismic
source evaluations in or near the dam site that had not been previously evaluated. These efforts
also included the completion of a fault rupture evaluation in the vicinity of the proposed dam.
Additional details regarding these studies ae available in Section 16 of the ISR.
Lineament groups identified in desk-top studies from LiDAR imagery were evaluated in the field
to assess the possible genesis of the features. A set of questions and criteria were developed to
guide evaluation of each lineament. This assessment was used to eliminate lineaments that
showed strong evidence of being non-tectonic in origin or those that would not appreciably
contribute to the seismic hazard at the proposed dam site. The potential tectonic lineaments were
then assessed based on geomorphological characteristics and geologic relationships
The approach for evaluating surface rupture hazards at the dam site relies on four principal lines
of data analyses:
2014-2015 STUDY IMPLEMENTATION REPORT GEOLOGY AND SOILS
CHARACTERIZATION STUDY (STUDY 4.5)
Susitna-Watana Hydroelectric Project Alaska Energy Authority
FERC Project No. 14241 Page 7 October 2015
• Geomorphic evaluation of Quaternary and post-glacial faulting (i.e., lineament mapping
and analyses) to assess whether potential seismogenic faults are present,
• Field geologic transects to assess styles and patterns of structural deformation near the
site,
• Assessment of results of site-specific investigations of geologic structure in the dam
foundation, and
• Assessment of contemporary tectonic framework of the site region as an indication of the
potential for reactivation of site geologic features.
These evaluations collectively consider regional tectonic history, sub-regional deformation
patterns observed in Mesozoic and Cenozoic rocks, emplacement of intrusions and volcanics at
the dam site, crustal stress orientations from earthquake focal mechanisms, known active
faulting, plate motions, GPS data, geomorphic landform evaluations, and current understanding
of geologic features identified at the dam site.
4.5. Long-Term Earthquake Monitoring System
A long-term seismic monitoring system was established in the Project area to monitor and
document earthquake events (see RSP Section 16.6). The system was expanded in 2013 and
currently consists of seven instrumented locations (WAT-1 through WAT-7) within about 30
miles (48 km) of the dam site, four 6-component strong motion and broadband seismograph
station, and three 3-component broadband seismograph stations. At seismic station WAT-1,
located at the dam site, a high resolution GPS station has been co-located to track crustal motion
relative to the North American Plate. The monitoring system is linked and integrated into the
Alaska Seismographic Network operated by the Alaska Earthquake Information Center (AEC)
for real-time data acquisition, processing, and analysis.
During the 2014 field season, maintenance was performed on a number of the monitoring
stations. The seismic monitoring network continued to detect and provide event data on the
earthquakes in the Project area through June 2015, which is being analyzed by AEC. In June
2015, the number of seismograph stations comprising the monitoring network was reduced and
restoration of the sites at WAT2, WAT3, WAT4, and WAT5 (AEC 2015, Attachment 9).
4.6. Geologic and Engineering Analyses
Previous geologic and engineering analysis included provided a preliminary understanding of the
geology and soil resources in the Project area. Under this study, LiDAR data was acquired in the
proposed dam site and reservoir area that was used to identify suitable construction material
sources for dam construction, performed a preliminary assessment of the dam foundation and
slope stability relative to optimization of the general arrangement and feasibility development. A
preliminary assessment of reservoir rim slope stability and reservoir triggered seismicity was
conducted along with an initial mineral resources assessment and seismic hazard evaluation for
the Project area. Additionally, the collection of instrumentation data is being used to develop an
understanding of potential impacts to groundwater and ground temperature (i.e., presence of
2014-2015 STUDY IMPLEMENTATION REPORT GEOLOGY AND SOILS
CHARACTERIZATION STUDY (STUDY 4.5)
Susitna-Watana Hydroelectric Project Alaska Energy Authority
FERC Project No. 14241 Page 8 October 2015
permafrost), in particular at the dam site and a catalog of earthquake activity in the Project area
to define the background microseismicity and the contemporary stress regime.
Since the development of the ISR (2014), geologic studies have been conducted at the dam site
to continue geologic mapping observations, to evaluate the previously mapped geologic features,
assess the potential fault rupture hazard and/or the potential for reactivation of features within the
current tectonic framework. In addition, development of preliminary foundation and seismic
design parameters and foundation designs for the finite element analysis (FEA) were completed
for the roller-compacted concrete (RCC) dam in support of engineering feasibility studies.
4.7. Variances from Study Plan
There are no variations from the methods in the study plan, however due to schedule delays
because of land access restrictions some tasks anticipated to be competed sooner were not able to
be fully completed in 2014. Additionally, as noted above the study area also changed due to the
modification to the Project areas to include a new access corridor.
4.8. Review of Project Documentation
The existing geologic, geotechnical, and seismic documentation from the 1970s and 1980s which
had been brought into geo-referenced, geotechnical databases along with the newly obtained
geologic / geotechnical data were used in developing the geologic interpretation currently
depicted in the various reports, figures and drawings. A comprehensive presentation of the data
has been formulated and is presented in various technical memorandum and reports (MWH
2014, 2015b; Fugro 2015a).
The additional LiDAR digital elevation model (DEM) data obtained south of Fog Creek and in
the upper Watana Creek area were utilized to search for geomorphic features that might represent
tectonic in origin in the vicinity of the Talkeetna thrust fault or suture.
4.9. Field Geologic and Geotechnical Investigations
The field investigations performed at the dam site under the study plan have included 15 borings
and a total of 4708 feet (1435m) of drilling, primarily in bedrock, over three field seasons. In
2014, four borings (DH14-09b, DH14-10, DH14-11, DH14-12) were drilled totaling 1850 lineal
feet (564m) (one boring was abandoned as it did not penetrate rock). Continuous rock core
samples were collected and rock core sample were tested to determine physical and mechanical
properties. In situ testing and downhole logging was performed in each of the borings. Water
pressure testing and downhole televiewer surveys were conducted over the rock length in each
hole to evaluate in-situ conditions in the rock mass. Water pressure or Lugeon tests were
typically performed over a 20 foot long (6.1m) zone however where high RQDs and apparent
low rock mass permeability conditions appeared to be present, the test interval was increased to
30 or 50 feet (9m or 15m) in a few instances. Downhole logging was performed in rock in all
four (2014) borings utilizing both optical and acoustical televiewers.
Once these activities were completed, each of the borings, were instrumented with vibrating wire
piezometers and temperature acquisition cables to obtain data on groundwater levels and ground
2014-2015 STUDY IMPLEMENTATION REPORT GEOLOGY AND SOILS
CHARACTERIZATION STUDY (STUDY 4.5)
Susitna-Watana Hydroelectric Project Alaska Energy Authority
FERC Project No. 14241 Page 9 October 2015
temperature in the abutments of the proposed dam site. Currently there are 21 boring locations
with geotechnical instrumentation, 15 borings from the 2011-2014 investigations and six borings
from the earlier 1970s and 1980s investigations, primarily located in the abutments at the dam
site. A majority of the instruments are equipped with data loggers for recording daily
measurements that were recovered bi-annually or annually. Data was collected from borings
continuously after device installation, primarily over the period from 2012 through 2015 - except
for a data gap from November 2013 through May 2014, as noted above.
Over fifty core samples and approximately 500 lbs. (227 kg) of bulk samples were tested for
determine the engineering properties of the rock foundation and potential concrete aggregate
sources (Quarry A, M). Laboratory testing included strength, density, seismic velocity, moduli,
and poisson’s ratio tests and petrographic analysis. For the potential aggregate for concrete and
RCC mixes, tests included LA abrasion, soundness, freeze-thaw durability and mortar bar tests.
The mortar bar tests were conducted to assess the based on a few cementitious mixes.
The results of the geotechnical investigations and laboratory testing are included in the
Geotechnical Data Report (MWH 2015a, Attachment 4).
4.10. Dam Site Geology
Geologic mapping efforts were conducted in and around the dam foundation area to verify and
advance the understanding of the geology and soil resources, specifically to define and update
the understanding of geologic and foundation materials and conditions; identify, characterize,
and assess the significance of discontinuities (e.g., joints, fracture zones and shears), including
the previously identified “geologic features” on abutment and foundation stability and
foundation design. The mapping was also used to identify potential faults and evaluate the
potential for surface fault rupture; and to identify and characterize potential aggregate
construction material sources. Geologic mapping transects were performed on the north and
south banks (right and left abutments) of the Susitna River beginning about 2,000 feet (610m)
upstream of the dam axis near geologic feature GF1 and extended to about 1,500 feet (457m)
downstream of the dam near GF7.
Data acquisition consisted of obtaining representative measurements at rock outcrops distributed
throughout the site up to about Elevation 2300. At each outcrop, rock type, weathering
condition, color, strength, block dimensions, geologic relationships (Figure 5.3-2), and an
estimate of the GSI were recorded. Additionally, orientations of prominent joint sets were
measured, and characterized following ISRM criteria.
The details of the recent data collected and interpretations of the geology and soil resources and
conditions at the dam site were presented in the Dam Site Geology Technical Memorandum
(MWH 2015b; Attachment 5).
4.10.1. Geologic Conditions
Overburden on the abutments consists primarily of glacial deposits (e.g. till) and colluvium, and
talus. The till is primarily found on the upper slopes with talus and colluvium being dominant
below about Elevation 1900. Overburden thickness in the dam site area is generally less than 50
2014-2015 STUDY IMPLEMENTATION REPORT GEOLOGY AND SOILS
CHARACTERIZATION STUDY (STUDY 4.5)
Susitna-Watana Hydroelectric Project Alaska Energy Authority
FERC Project No. 14241 Page 10 October 2015
ft. (15m) but may reach 70 ft. (21m) or more [Golder 2013 (Attachment 6); MWH 2015b].
Below about Elevation 1900 ft., overburden has an apparent thickness typically between 15 and
20 ft. (4.6m and 6.1m).
Bedrock at the dam site is primarily underlain by Tertiary volcanic intrusions that range in
composition from diorite to granodiorite to quartz diorite. Extrusive volcanics, mostly an
andesite porphyry, is also present directly downstream of and at higher elevations above the left
abutment (> Elevation 2200). The andesite is similar in chemical composition to the diorite, and
both rock types are strong to very strong and competent. Bedrock is typically slightly to
moderately weathered at the top of rock and along discontinuities to depths of 50 to 80 ft. (15m
to 24m). Locally, bedrock has been hydrothermally altered. Where the diorite has been altered,
it is often associated with close fracturing or jointing, fracture zones, or shear zones, penetrating
the rock mass on either side of the discontinuities (Table 5-1). Hydrothermal alteration to
moderate or severe levels causes chemical breakdown of the feldspars and mafic minerals in the
host rock. In such instances, the rock can be weak to extremely weak and contain zones of rock
completely altered to clay minerals over several inches thick.
Two major joint sets and two minor joint sets were observed in outcrops and in the downhole
surveys conducted in the borings (Table 5-2). The dominant joint set trends northwest-southeast
(JS1), with joints dipping steeply to the southwest and northeast. The other major joint set (JS2)
trends northeast-southwest and is nearly perpendicular to dominant set. Fracture or shear
zones tend to parallel the dominant northwest-southeast (JS1) and to a lesser extent to JS3. The
two minor joint sets trends north - south and dips steeply to the west and east and a subhorizontal
set that dips less than 30°.
Previously identified “geologic features” (Acres 1982a, 1982b), shear and/or fracture zones
greater than 5 feet in width (e.g. GF4B, GF5), were investigated during these studies, several of
which cross beneath the proposed dam foundation (Figure 5.3-1). Topographic constraints,
along with the findings from geologic mapping and drilling, allowed refinements to be made to
the locations, widths and continuity of these fracture zones and shear zones are described as
follows:
• GF4B, located on the north abutment, consists of multiple fracture zones, a northwest-
southeast zone (parallel to JS1) that intersects a north-northwest trending fracture zone.
The individual fracture zones are less than about 10 feet wide (3m) and contain some
minor shear zones that are typically less than 12 inches wide (300mm).
• GF5 is comprised of multiple fracture zones with minor shear zones oriented parallel to
JS1. The individual fracture zones are 5 to about 10 feet wide (1.5 to 3.0m). Some of the
fracture zones contain minor shear zones that are typically less than 12 inches wide.
Although not directly observed at the surface, it appears that the gullies on the right abutment
correlated with geologic features GF4B and GF5, likely formed initially by the preferential
erosion of weak and relatively narrow fracture zones that have been widened and enhanced to
their present dimensions by erosion due to stress relief and freeze thaw processes.
In the immediate vicinity of the dam site, an evaluation was undertaken to assess the potential for
fault rupture to occur along seismogenic faults or re-activation of geologic features. Based on
2014-2015 STUDY IMPLEMENTATION REPORT GEOLOGY AND SOILS
CHARACTERIZATION STUDY (STUDY 4.5)
Susitna-Watana Hydroelectric Project Alaska Energy Authority
FERC Project No. 14241 Page 11 October 2015
this study there is a lack of evidence to support the likelihood of surface fault rupture or re-
activation, therefore; the potential for this to occur is considered extremely low given the
following:
• The apparent lack of continuity and small scale of structural geologic features at the site
(shear zones) upon which surface fault rupture could conceivably take place;
• The dominant northwest-southeast trend is unfavorably oriented with respect to the
contemporary tectonic stress regime, as the primary mode of tectonic deformation appear
to involve right-lateral strike slip structures with east-northeast strikes;
• The absence of any nearby crustal scale fault structures and any neotectonic or
paleoseismic evidence of Quaternary faulting; and,
• The absence of Quaternary faults mapped within about 15 miles of the dam site.
4.10.2. Abutment Stability
Overall the slopes at the dam site are stable. Minor shallow debris flows are evident in the
landscape, particularl y on the moderately dipping north facing slopes on the upper left abutment
where thawing of frozen glacial till overlying bedrock has occurred. Based on the geologic
mapping and drilling data obtained to date, overall the slopes at the dam site are stable.
Preliminary sliding stability analyses were performed to provide a general assessment of
abutment stability. The results of the 2D preliminary geologic analyses indicate that the
abutments have acceptable sliding stability under the reservoir loads (MWH 2014).
4.10.3. Groundwater
The groundwater table at the dam site typically follows the shape of the surface topography.
Groundwater movement in the subsurface is largely a function of movement through fractures
and joints in the rock mass or in some instances along the top of bedrock (MWH 2014). The
groundwater conditions are complicated by the presence of frozen ground particularly on the left
(south) abutment and in the lower right abutment (see subsection 5.3.4). On the right abutment,
the groundwater level is quite variable but is generally found within bedrock except for local
areas where artesian conditions were encountered in borings (e.g., DH84-8) (MWH 2015a;
Golder 2015). In the lower elevations, below about elevation 1800, table generally is 30 to 160
feet (9m to ≈50m) below the ground surface but may be deeper in places (Figure 5.3-2). On the
left abutment, where groundwater levels are influenced by permafrost, groundwater is deep
within the abutment, at a depth of about 170 to more than 200 feet (53m to >60m) except for the
“perched” water due to thawing of the active layer and the impermeable nature of the frozen
ground. Locally, isolated artesian conditions were observed at boring BH-12. Boring DH12-8
which is located just above the river level and was drilled south into the left abutment, the
groundwater level approximates the water level in the river. Groundwater levels general indicate
seasonal variations of about 10 to 20 feet (3 to 6.1m).
On the upper abutments and the upland plateau above the dam site, groundwater levels appear to
be much shallower, ranging from near ground surface to depths as much as 20 feet (6.1m).
Where overburden reaches considerable depths and multiple glacial and fluvial stratigraphic
2014-2015 STUDY IMPLEMENTATION REPORT GEOLOGY AND SOILS
CHARACTERIZATION STUDY (STUDY 4.5)
Susitna-Watana Hydroelectric Project Alaska Energy Authority
FERC Project No. 14241 Page 12 October 2015
units are present, the groundwater regime may be characterized by multiple aquifers (Harza-
Ebasco 1983).
The details of the recent data collected and interpretations of the groundwater conditions at the
dam site are presented in the in the Dam Site Geology Technical Memorandum (MWH 2015b).
4.10.4. Permafrost
Permafrost distribution in the Project area specifically in the vicinity of the dam site has been
characterized as “discontinuous” (50–90 percent) and is considered a warm permafrost, with the
lowest ground temperatures recorded being 30°F (-1.5°C). In the 1980s assessment, and the
recent site investigations at the proposed dam site, ground temperature monitoring was
performed to characterize the thermal conditions and to determine the extent of perennial frozen
ground. The ground temperature instrumentation data obtained at the dam site from borings
indicate that temperatures range from 30° to 38°F in the upper 250 feet (76m) below the ground
surface and that ground temperature is heavily influenced by slope aspect (i.e., sun angle) and
slope angle, as well as geologic material (MWH 2015b). In general, permafrost in the Project
area is associated with fine grained soil deposits but can also penetrate bedrock to appreciable
depths.
In the abutments of the proposed dam site, perennially frozen ground has been detected beneath
north-facing slopes, below Elevation 2100, and locally beneath the lower south-facing slopes,
adjacent to the Susitna River. Frozen ground is typically encountered within 10 ft. (3m) of the
surface and can extend to depths of approximately 240 ft. (73m), on the south (left) abutment
(Figure 5.3-3)(MWH 2015b). On the north (right) abutment, lower in the canyon which is
shielded from the sun’s radiation by the left abutment, frozen ground may extend to depths as
much as 50 ft. (15m) locally.
To the northeast of the proposed dam site, near the upland plateau above the river valley,
previous subsurface investigations and ground temperature monitoring of the thick sequence of
glacial and fluvial deposits was undertaken of a potential construction material source (Borrow
Area D). Numerous borings were completed and visible ice was observed in soil samples
collected to depths of up to 110 ft. (34m) in several borings. Periodic ground temperature
monitoring in borings revealed that frozen ground may be present locally to 70 ft. and the
temperature is very close to 32°F such that there is not enough latent heat capacity to refreeze
after disturbance (Harza-Ebasco 1983).
4.11. Reservoir Area Geology
Data was collected to further define and characterize the geology and soil resources in the
reservoir area over that which was reported in the ISR (2014). These studies had included
development of a landform based interpretation of the landscape, terrain units, as similar
geologic processes tend to result in landforms with similar environmental and geotechnical
properties; partial completion of an assessment of the mineral resources; and evaluated mass
wasting and erosion potential particularly post-impoundment along the proposed reservoir
shoreline (ISR 2014). Through the continuation of field studies, a clearer picture began to
develop of igneous and volcanic emplacement and late Quaternary chronology (Fugro 2015b).
2014-2015 STUDY IMPLEMENTATION REPORT GEOLOGY AND SOILS
CHARACTERIZATION STUDY (STUDY 4.5)
Susitna-Watana Hydroelectric Project Alaska Energy Authority
FERC Project No. 14241 Page 13 October 2015
4.11.1. Igneous and Volcanic Emplacement
The rocks that make up the dam site were formed by regional magmatism, plutonic intrusions
and volcanisms (Figures 5.4-1 and 5.4-2). Multiple ages of early Cenozoic (i.e., Tertiary)
volcanics intruded the Kahiltna formation as well as the Wrangellia terrain rocks and the
Talkeetna suture zone (Wilson et al, 2009). These volcanic rocks have a complex history as the
andesite and diorite vary in texture and composition, have gradational contacts, inclusions of
diorite have been observed within the andesite, and felsic dikes cut the diorite but not the
andesite, suggesting that the andesite is younger. Field observations and relationships confirm
multiple ages of volcanism, intrusion, or flows which intrusions likely occurred between 50 to 60
Ma. With igneous emplacement, there is a possibility that the geologic features and fractures
observed at the dam site may be derived from or during the emplacement process and may not
necessarily be associated with plate tectonics and thus of tectonic origin (Fugro 2015b).
4.11.2. Late Quaternary Geology and Chronology
Understanding the Quaternary geologic history in the middle and upper Susitna River basin is
important to understanding the resultant surficial geologic deposits, geomorphic processes, and
the stratigraphic and chronological relationships. During the Quaternary, the entire Project area
was covered by glacial ice or glacial lakes as late as about 17 ka, with ice receding and glacial
lakes decreasing in size through 12 ka to 11ka. Potential ice fee areas during the later stages of
the late Wisconsin advance lies to the east of Watana Creek on both sides of the Susitna River
and along the southeastern margin of the Talkeetna Mountains above the limits of Lake Ahtna.
Reconstruction of possible ice profiles suggest that the late glacial maximum ice thickness near
the dam site was at least several hundreds of feet as ice caps from both the North and South
Talkeetna Mountains coalesced with southwest flowing ice from the Alaska Range, as evidenced
by the strongly grooved landscape evident within the middle Susitna basin. As the ice began to
recede, contributions from the Alaska Range diminished and the Northern Talkeetna Mountains
ice sources became dominant flowing northeast towards Butte and Deadman Lakes. As
deglaciation proceeded, ice in the middle Susitna basin at the dam site thinned which is recorded
by the large ice-disintegration deposits between Tsusena and Deadman Creeks, north of the
Susitna River. Soil samples of this late stage deglaciation were collected in 2014 and from an
exposure on the banks of Deadman Creek, 2.5 miles (4 km) northeast of the dam site. Optically
Stimulated Luminescence (OSL) dating of this last stage of deglaciation suggests that the
Deadman Creek ice lobe must be older than 14 ka to 15 ka. Therefore it is likely that Quaternary
surfaces and deposits were formed during the post-late Wisconsin period of the latest Pleistocene
precede 15 ka (Fugro 2015b).
4.11.3. Groundwater
Groundwater conditions in the reservoir area are inferred based a general understanding of the
characteristics of terrain units found in the area as well as extrapolation of data obtained from the
dam site area. Typically, groundwater is located at a shallow depth, less than 20 feet (6.1m) in
the more impermeable deposits such as lacustrine, and alluvial fan deposits and very shallow,
less than 3 feet (1m) in organic and floodplain deposits. Perched groundwater is often associated
with areas where mass wasting processes, solifluction, debris flows and landslides are prevalent.
2014-2015 STUDY IMPLEMENTATION REPORT GEOLOGY AND SOILS
CHARACTERIZATION STUDY (STUDY 4.5)
Susitna-Watana Hydroelectric Project Alaska Energy Authority
FERC Project No. 14241 Page 14 October 2015
In fine grained glacial deposits, principally outwash and ablation and basal till, the groundwater
table can be shallow to deep (greater than 50 feet; >15m). Coarse grained deposits such as
eskers, kames, colluvium and bedrock the groundwater table is often deep.
Bedrock is exposed along much of the lower river valley slopes with colluvium and glacial till
and lacustrine deposits predominate in the uplands. Therefore it is assumed that in the lower
river valley slopes groundwater is considered to be deep while on the uplands groundwater is
shallow (3 to 20 feet; 1 to 6m) to moderately deep (20 to 50 feet; 6 to 15m). With filling of the
reservoir, the groundwater conditions will change, raising the groundwater table based on the
elevation of the reservoir.
4.11.4. Permafrost
Permafrost distribution in the greater Susitna-Watana proposed reservoir region has been
characterized as “discontinuous” (50–90 percent) and is considered warm permafrost, with
ground temperatures generally above 30°F. Permafrost is evidenced by ground ice, patterned
ground – stone nets, and shallow debris flows and landslides. Typi cally frozen ground is
associated with basal till, lacustrine and organic deposits and is influenced by slope aspect and
angle. The north-facing slopes and in some places, the lower south-facing steep slopes along the
Susitna River where fine-grained soil deposits are present appear to be underlain by perennially
frozen ground. In the Watana Creek area, which appears to be the most active area in terms of
slope stability, the instability of slopes underlain by lacustrine and basal till deposits is believed
to be associated with thawing of ice-rich surficial deposits. Thus gentle to moderate south-facing
slopes and upland areas on the north side of the river which are generally thought to be unfrozen,
are also underlain by discontinuous permafrost locally.
Based on the subsurface investigations at the proposed dam site, permafrost is associated with
fine grained soil deposits and can penetrate bedrock to appreciable depths. Frozen ground is
typically encountered within 10 ft. (3m) of the surface and can extend to depths of approximately
240 ft. (73m) on the south abutment. Elsewhere, away from the Susitna River channel, on the
upland area, previous subsurface investigations in a thick sequence of glacial and fluvial deposits
(Borrow Area D) encountered visible ice in soil samples collected to depths of up to 110 ft.
(34m) (Harza-Ebasco 1983).
4.12. Seismic Hazard Study
Seismic hazard studies conducted since the 2014 ISR were associated with completing the
crustal seismic sources assessment, conducting a fault rupture evaluation in the dam site
proximity (Fugro 2015b: Attachment 7, Section 5), and continuation of the seismic monitoring
network (Fugro 2015a, Attachment 8; AEC 2015, Attachment 9). The results of these work tasks
are described in detail in the 16.6 Site Specific Seismic Hazard Study Plan Completion Report
(SCR) (AEA 2015). The following is a summary of the results of the Seismic Hazard Study
pertinent to this study:
• The crustal seismic source evaluation indicate:
o A lack of evidence of major crustal Quaternary faults near the dam site.
2014-2015 STUDY IMPLEMENTATION REPORT GEOLOGY AND SOILS
CHARACTERIZATION STUDY (STUDY 4.5)
Susitna-Watana Hydroelectric Project Alaska Energy Authority
FERC Project No. 14241 Page 15 October 2015
o Detailed evaluations have not identified any evidence of potential Quaternary
faulting within at least 25 mi (40 km) of the Watana dam site.
o Within the current stress regime of the Talkeetna block, which includes the dam
site, the primary modes of tectonic deformation appear to involve right-lateral
strike slip structures with east-northeast strikes and dip slip or compressional
shortening along structures with northeast strikes or elongations (Figure 5.5-1).
o The Watana dam site area is subject to northwest-southeast oriented sub-
horizontal compressive stress associated with the on-going subduction of the
Pacific Plate. Crustal deformation related to the plate interactions have been
accommodated primarily by the Denali fault. Geologic evidence suggests that the
Talkeetna Block is relatively stable.
o Relative to the fault rupture evaluation at the dam site, the previously identified
“geologic features”, appear to be relatively minor structures and are least
favorable to reactivation in the contemporary stress regime.
• In 2014, a total of 1,387 earthquakes were recorded within the Project area of which 643
events were located in the crust at depths of less than 18.6 mi (30 km), and 744 events
were located deeper, within the subducting North American Plate (intraslab seismicity).
The crustal events ranged in magnitude from -0.5 to 3.0; the intraslab events from
magnitude 0.1 to 4.6 (Fugro 2015a, Attachment 8). Details of the maximum earthquakes
recorded are:
o The largest intraslab event, M4.6, occurred on November 29, 2014 at a depth of
37.9 mi (62.1 km), with an epicenter 24.5 mi (40 km) southeast of the proposed
dam site.
o The largest crustal event, M3.0, occurred on September 27, 2014 at a depth of 3.9
mi (6.2km), with an epicenter of 36.7 mi (59.2 km) northeast of the proposed dam
site.
• In the first six months of 2015, the largest intraslab earthquakes recorded were M4.5,
which occurred on March 5 and May 11 and occurred on at a depth of 40.9 mi (65.8 km)
and located 31.9 mi (51.4 km) southwest, and at a depth of 41.9 mi (67.4 km) located
20.3 mi (32.6 km) northeast of the dam site. The largest crustal earthquake, M2.9,
occurred on April 29 at a depth of 9.2 mi (14.9 km) located 19.4 mi (31.3 km) also
northeast of the proposed dam site (AEC 2015, Attachment 9).
For additional details on the results of the seismic hazard studies, see 16.6 Site Specific Seismic
Hazard Study Plan Completion Report and the various attachments (AEA 2015).
5. RESULTS
In 2014, in support of the geology and soil resources study plan, several additional technical
memoranda and reports were prepared. The Project documents that provide the details of the
subtasks include:
2014-2015 STUDY IMPLEMENTATION REPORT GEOLOGY AND SOILS
CHARACTERIZATION STUDY (STUDY 4.5)
Susitna-Watana Hydroelectric Project Alaska Energy Authority
FERC Project No. 14241 Page 16 October 2015
• Geology and Soils - Interim Mineral Resource Assessment Report (Golder 2014;
Attachment 1); this report describes the mineral resources in the Project area including
registered mineral claims, areas of significant acid rock drainage (ARD), and wildlife
mineral licks.
• Exploration and Testing Program Work Plan 2014-15 (MWH 2013c; Attachment 2); this
report describes the development of a phased geotechnical exploration and laboratory
testing program work plan for engineering feasibility and licensing.
• Preliminary Reservoir Slope Stability Technical Memorandum (MWH 2013b;
Attachment 3); this desk top study report presents a preliminary geomorphic assessment
of future reservoir rim erosion and stability.
• Geotechnical Data Report (MWH 2015a; Attachment 4); this report includes the data
acquired from the geotechnical field investigations performed at the proposed dam site
and laboratory testing programs from 2011 to 2014.
• Dam Site Geology Technical Memorandum (MWH 2015b; Attachment 5); this is a
feasibility level interim report that provides a characterization of the geologic conditions
at the proposed dam site; including the 2015 Watana Geotechnical Instrumentation Data.
• Regional Geologic Analysis Technical Memorandum (Golder 2013; Attachment 6); this
memorandum includes terrain unit analysis provides a databank upon which
interpretations concerning geomorphologic development of the landscape for the dam site
and reservoir area.
• Crustal Seismic Source Evaluation (Fugro 2015b; Attachment 7); the report includes the
identification and assessment of potential seismic sources in the Project area.
• Seismic Network 2014 Annual Seismicity Report (Fugro 2015a; Attachment 8); the
report summarizes seismic activity in the Susitna-Watana Project area and includes
analysis of the seismic data.
• Susitna-Watana Seismic Monitoring Project: January –June 2015 Quarterly Report (AEC
2015; Attachment 9); the report summarizes seismic activity in the Susitna-Watana area.
• Engineering Feasibility Report; the report summarizes the geologic and seismic
conditions at the proposed dam site, identifies construction material sources, provides
geologic, geotechnical and seismic design criteria used in engineering design, etc. (MWH
2014).
Based on the studies performed, the following conclusions can be drawn with respect to the
geology and soils resource characterization for the Project:
Bedrock in the immediate vicinity of proposed dam, powerhouse, spillway and appurtenance
structures consist of fresh to slightly weathered, blocky, strong to very strong diorite that is
locally altered and fractured and includes minor shears and shear zones. Fracture zones, shear
zones, and alteration zones tend to trend in a northwest-southeast direction (parallel to major
joint set JS1) and to a lesser extent tend to trend in a north south orientation (JS3). Previously
2014-2015 STUDY IMPLEMENTATION REPORT GEOLOGY AND SOILS
CHARACTERIZATION STUDY (STUDY 4.5)
Susitna-Watana Hydroelectric Project Alaska Energy Authority
FERC Project No. 14241 Page 17 October 2015
identified “geologic features”, shear and/or fracture zones greater than 5 feet (1.5m) in width
(e.g. GF4B, GF5) were interpreted to be over-represented in the geologic characterization
conducted in previous studies. Gullies associated with these geologic features, particularly those
on the right abutment (GF4B and GF5) appear to have be formed initially by the preferential
erosion of weak and relatively narrow fracture zones that have been widened and enhanced to
their present dimensions by erosion due to stress relief and freeze thaw processes. Individual
fracture zones are less than about 10 feet wide (3m) and contain some minor shear zones that are
typically less than 12 inches wide (300mm).
Based on the data from regional geology and seismology, geologic mapping, and drilling, major
faults capable of surface rupture associated with major earthquakes in the contemporary tectonic
environment are absent from the Watana dam site area. The fracture and shear zones observed at
the site are likely associated with mid-early Tertiary intrusive processes as evidenced by several
narrow northwest trending shear zones that appear to have been cross-cut by a felsic dike (Figure
6-1). Moreover, the potential for any reactivation of the geologic features which might transect
the dam footprint must be considered extremely low given the apparent lack of continuity and
small scale characteristics of these features, the dominant northwest strike of these features
which is unfavorably oriented with respect to the contemporary tectonic stress regime, the
absence of any nearby crustal scale fault structure, and the absence of Quaternary faults mapped
with about 15 miles (~25 km) of the dam site (see 16.6 Site Specific Seismic Hazard Study for
details; AEA 2015).
6. DISCUSSION
Significant progress has been made on characterizing the geology and soils resources in
accordance with study plan objectives and engineering design development at the proposed dam
site. Additional investigations are planned to complete the tasks outlined.
Some of the key Project-related conclusions that can be drawn from the data collected for
geology and soil resources characterization to date include:
Dam Site
• The proposed dam site lies within a relatively coherent structural block of folded
Kahiltna Basin rocks (Cretaceous age) that have been intruded by mid to early Cenozoic
igneous plutons. More recently the landscape was repeatedly covered by glacial ice and /
or lakes.
• The dam site is underlain by a fresh to slightly weathered, hard, strong dioritic rock. The
rock mass is locally fractured, sheared and altered and is characterized as blocky to very
blocky.
• Fracture zones, shear zones, and alteration zones generally trend in a northwest-southeast
direction and to a lesser extent in a north –south direction. The fracture and shear zones
are generally less than 2 feet wide but in a few locations the width can be up to 10 feet or
more (recognized as “geologic features”).
2014-2015 STUDY IMPLEMENTATION REPORT GEOLOGY AND SOILS
CHARACTERIZATION STUDY (STUDY 4.5)
Susitna-Watana Hydroelectric Project Alaska Energy Authority
FERC Project No. 14241 Page 18 October 2015
• Previously recognized “geologic features”, shear and/or fracture zones greater than 5 feet
in width, particularly those that would be encountered in the dam and spillway
foundations (e.g., GF5), have been over-represented in the previous characterization of
the dam site geologic conditions.
• Potential for surface fault rupture is considered extremely low because of the following
conditions:
o Apparent lack of continuity and small scale of structural geologic features upon
which surface fault rupture could occur.
o Identified shears within this area appear to be primarily associated with the mid-
early Tertiary intrusive rocks.
o The river at the dam site is not controlled by a major structural feature (e.g., fault
or wide shear or fracture zone).
o Field investigations have not identified any evidence of potential Quaternary
faulting within at least 15.5 miles (25 km) of the dam site.
o Potential sources of primary or secondary surface fault rupture at the dam site are
absent.
o The dominant northwest strike of the discontinuities and geologic features is
unfavorably oriented with respect to the contemporary tectonic stress regime.
• Groundwater levels at the dam site are generally moderate to deep in the right (north)
abutment where the ground is unfrozen. In the left abutment (south), groundwater levels
are complicated by the presence of frozen ground but are generally at about 170 feet
depth except for perched water.
• Perennially frozen ground, permafrost, is present at considerable depth in the left
abutment and at moderate depths in the lower right abutment. Ice-filled discontinuities in
bedrock will affect rock mass properties, strength and permeability, and will likely
impact foundation treatment during construction.
• Stripping of overburden materials and the excavation of bedrock will impact the geology
and soils resources, however, this would not likely result in loss of important geology and
soil resources. A significant portion of these resources would be used in Project-related
construction activities.
Reservoir Area
• Surficial deposits (glacial and fluvial materials) mask much of the bedrock in the area,
especially the lower portion of the proposed reservoir area.
• The reservoir area geology contains variable thicknesses of glacial till, lacustrine
deposits, colluvium, outwash and alluvium overlying igneous and metamorphic bedrock.
Till and lacustrine deposits dominate in the upland plateau areas while bedrock is
exposed along the lower river channel.
2014-2015 STUDY IMPLEMENTATION REPORT GEOLOGY AND SOILS
CHARACTERIZATION STUDY (STUDY 4.5)
Susitna-Watana Hydroelectric Project Alaska Energy Authority
FERC Project No. 14241 Page 19 October 2015
• Perennially frozen ground (permafrost), is evidenced by periglacial features, patterned
ground, exposures of frozen ground in debris flows, and thawing ice-rich deposits.
• Most active landslides and debris flows are associated with the thawing of frozen ground.
• Based on a preliminary study, eleven mining claims and three gold placer prospects have
been identified within the proposed reservoir.
• Geology and soil resources in the reservoir area would likely be affected by:
o Submergence of potential aggregate (sand and gravel) sources in the river
channel, mining claims and gold placer prospects by the impoundment of the
reservoir.
o Frozen ground beneath and adjacent to the reservoir, is anticipated to thaw as a
result of reservoir impoundment.
o Groundwater levels adjacent to the reservoir will rise to higher levels as a
function of reservoir impoundment.
o Due to thawing permafrost and changes in the groundwater levels, mass wasting
as a function of slope instability is likely to occur along the reservoir rim.
Access and Transmission Corridors
• This study has not been initiated and is incomplete.
7. CONCLUSION
While significant progress in completing study components is outlined above, the following
tasks remain to be completed
• Mineral Resources – an assessment of the mineral resources within the Project area was
initiated and an interim report prepared (Golder 2014, Attachment 1). The catalog of
claims and prospects will need to be updated.
• Geotechnical Exploration – field investigations and testing will be conducted in the future
to characterize the geology and soil resources, determine construction impacts, and
mitigate the impacts in the dam site area, reservoir area, construction material sources,
and access road and transmission line corridors.
o Reservoir area – studies will be completed to evaluate geology and soils resources
with respect to reservoir slope stability in the Watana Creek area where thawing
and degradation of the bluffs that will come in contact with the reservoir is
occurring.
o Access Road and Transmission Line Corridors - studies to evaluate the geology
and soils resources relative to develop and characterize the geologic conditions
and uncertainties, identify suitable construction material sources, and to identify
2014-2015 STUDY IMPLEMENTATION REPORT GEOLOGY AND SOILS
CHARACTERIZATION STUDY (STUDY 4.5)
Susitna-Watana Hydroelectric Project Alaska Energy Authority
FERC Project No. 14241 Page 20 October 2015
mitigation measures due to construction and operation on the geology and soils
resources.
• Relict Channel – studies to characterize and assess the potential for reservoir leakage
and/or piping as well as treatment alternatives in the buried valley area on the right
abutment, upstream of the dam will be deferred until detailed design.
Several preliminary studies related to geology and soils were completed as far as the study extent
outlined in the RSP.
8. LITERATURE CITED
Acres American. 1982a. Susitna Hydroelectric Project 1980–81 Geotechnical Report. Volumes 1
through 3. Prepared for Alaska Power Authority.
Acres American.1982b. Susitna Hydroelectric Project. 1982 Supplement to the 1980–81
Geotechnical Report. Volumes 1 and 2. Prepared for Alaska Power Authority.
Alaska Earthquake Center. 2015. Susitna-Watana Seismic Monitoring Project: January –June
2015 Report. Prepared for the Alaska Energy Authority. September 2015. (Attachment
9).
Alaska Energy Authority. 2012. Revised Study Plan: Susitna-Watana Hydroelectric Project
FERC Project No. 14241. December 2012. Prepared for the Federal Energy Regulatory
Commission by the Alaska Energy Authority. http://www.susitna-
watanahydro.org/study-plan.
Alaska Energy Authority. 2014. Geology and Soils Characterization Study, Study Plan Section
4.5: Initial Study Report. Susitna-Watana Hydroelectric Project FERC Project No. 14241.
Prepared for the Federal Energy Regulatory Commission.
Alaska Energy Authority. 2015. Site Specific Seismic Hazard Study, Study Plan Section 16.6:
Study Completion Report. Susitna-Watana Hydroelectric Project FERC Project No.
14241. Prepared for the Federal Energy Regulatory Commission.
Csejtey, B., Jr., Nelson, W.H., Hones, D.L., Silberling, N.J., Dean, R.M., Morris, M.S.,
Lanphere, M.A., Smith, J.G., and Silberman, M.L., (1978), Reconnaissance geologic map
and geochronology, Talkeetna Mountains quadrangle, northern part of Anchorage
quadrangle, and southwest corner of Healy quadrangle, Alaska. U.S. Geological Survey,
Open-File Report 78-558A, 60 p.
Fugro Consultants, Inc. 2012. Seismic Hazard Characterization and Ground Motion Analyses for
the Susitna-Watana Dam Site Area. Technical Memorandum 4. Prepared for MWH for
Alaska Energy Authority. February 2012.
2014-2015 STUDY IMPLEMENTATION REPORT GEOLOGY AND SOILS
CHARACTERIZATION STUDY (STUDY 4.5)
Susitna-Watana Hydroelectric Project Alaska Energy Authority
FERC Project No. 14241 Page 21 October 2015
Fugro Consultants, Inc. 2013. Lineament Mapping and Analysis for the Susitna-Watana Dam
Site. Technical Memorandum TM-08 (Report 13-08-TM). Prepared for MWH for
Alaska Energy Authority, March 2013
Fugro Consultants, Inc. 2014. Susitna-Watana Hydroelectric Project Seismic Monitoring Stations
Vs30 measurements. Technical Memorandum 14-12-TM. Prepared for MWH for Alaska
Power Authority. March 2014.
Fugro Consultants, Inc. 2015a. Seismic Network 2014 Annual Seismicity Report. Report No. 14-
32-REP. Prepared for MWH for Alaska Energy Authority. March 2015. (Attachment 8).
Fugro Consultants, Inc. 2015b. Crustal Seismic Source Evaluation. Report No. 14-33-REP.
Prepared for MWH for Alaska Energy Authority. May 2015. (Attachment 7).
Golder Associates, Inc., 2013, Regional Geologic Analysis. Technical Memorandum 9.
Prepared for MWH for the Alaska Energy Authority. April 2013. (Attachment 6).
Golder Associates, Inc. 2014. Geology and Soils – Interim Mineral Resources Assessment
Report. Prepared for MWH for Alaska Energy Authority. October 2015. (Attachment 1).
Golder Associates, Inc. 2015. 2015 Watana Geotechnical Instrumentation Data. Prepared for
MWH for Alaska Energy Authority. October 2015.
Harza-Ebasco. 1983. Watana Development Winter 1983 Geotechnical Exploration Program.
Prepared for the Alaska Power Authority. Volumes 1 and 2.
Kalbas, J.L., Ridgway, K.D., and Gehrels, G.E. 2007. Stratigraphy, depositional systems, and
provenance of the Lower Cretaceous Kahiltan assemblage, western Alaska Range: Basin
development in response to oblique collision. in Ridgway, K.D., Trop, J.M., Glen,
J.M.G., and O’Neill, J.M. eds., Tectonic Growth of a Collisional Continental Margin:
Crustal Evolution of Southern Alaska: Geological Society of America Special Paper 431,
p. 307-343.
MWH, 2011. Exploration and Testing Program Work Plan – Quarry A. Technical Memorandum
No. 1, Prepared for Alaska Energy Authority. July 2011.
MWH. 2012. Exploration and Testing Program Work Plan – 2012. Technical Memorandum No.
7. Prepared for the Alaska Energy Authority. July 2012.
MWH. 2013a. Preliminary Reservoir Triggered Seismicity. Technical Memorandum No. 10.
Prepared for the Alaska Energy Authority. March 2013.
MWH. 2013b. Preliminary Reservoir Slope Stability Assessment. Technical Memorandum No.
12. Prepared for the Alaska Energy Authority. September 2013. (Attachment 3).
MWH. 2013c. Exploration and Testing Program Work Plan 2014-2015. Technical Memorandum
No. 11. Prepared for the Alaska Energy Authority. December 2013. (Attachment 2).
2014-2015 STUDY IMPLEMENTATION REPORT GEOLOGY AND SOILS
CHARACTERIZATION STUDY (STUDY 4.5)
Susitna-Watana Hydroelectric Project Alaska Energy Authority
FERC Project No. 14241 Page 22 October 2015
MWH. 2014. Engineering Feasibility Report. Report 14-21-REP. Prepared for the Alaska
Energy Authority. December 2014.
MWH. 2015a. Geotechnical Data Report. Report 14-34-REP. Prepared for the Alaska Energy
Authority. Volumes 1 and 2. February 2015. (Attachment 4).
MWH. 2015b. Dam Site Geology. Technical Memorandum 14-31-TM. Prepared for Alaska
Energy Authority. October 2015. (Attachment 5).
Wilson. F. H., Hults, C.P., Schmoll, H.R., Haeussler, P.J., Schmidt, J.M., Yehle, L.A. and Labay
K.A. 2009. Preliminary Geologic Map of the Cook Inlet Region, Alaska. U.S. Geological
Survey Open-File Report 2009-1108, 54 p., 2 sheets.
2014-2015 STUDY IMPLEMENTATION REPORT GEOLOGY AND SOILS
CHARACTERIZATION STUDY (STUDY 4.5)
Susitna-Watana Hydroelectric Project Alaska Energy Authority
FERC Project No. 14241 Page 23 October 2015
9. TABLES
Table 5-1. Discontinuity Classes
Discontinuity
Type
Distinguishing
Characteristics Persistence Example
Joint
Generally planar breaks and
fractures; some with minor
infilling and mineralization.
Healed joints are also present.
Individual joints are typically
continuous from several feet to
more than 50 feet. Joints
generally occur as coplanar
joint sets with varied spacing
Joint Sets 1 and 2
Fracture Zone
Areas of very closely to closely
spaced (from less than 1 inch
and up to 8 inches) jointed rock
where no apparent relative
movement has occurred
Tens to thousands of feet
GF-1, GF-4, GF-5
Shear Zone
Zone of rock along which there
has been visible evidence of or
measurable displacement.
These zones are characterized
by breccia, gouge, and/or
slickensides indicating relative
movement.
Tens to thousands of feet
Table 5-2. Summary of Joint Set Orientations from Outcrops
Joint
Set Strike (Azimuth) Strike Average (Azimuth) Dip
JS1 270° to 330° 300° 80° SW to 70° NE
JS2 025° to 060° 040° 80° SE to 70° NW
JS3 340° to 020° 350° 70° E to 80° W
JS4 Variable Variable Less than 35°
2014-2015 STUDY IMPLEMENTATION REPORT GEOLOGY AND SOILS
CHARACTERIZATION STUDY (STUDY 4.5)
Susitna-Watana Hydroelectric Project Alaska Energy Authority
FERC Project No. 14241 Page 24 October 2015
10. FIGURES
2014-2015 STUDY IMPLEMENTATION REPORT GEOLOGY AND SOILS
CHARACTERIZATION STUDY (STUDY 4.5)
Susitna-Watana Hydroelectric Project Alaska Energy Authority
FERC Project No. 14241 Page 25 October 2015
Figure 4.3-1. Dam Site Exploration Plan – 2014
2014-2015 STUDY IMPLEMENTATION REPORT GEOLOGY AND SOILS
CHARACTERIZATION STUDY (STUDY 4.5)
Susitna-Watana Hydroelectric Project Alaska Energy Authority
FERC Project No. 14241 Page 26 October 2015
Figure 4.3-2. Watana Dam Site Geotechnical Instrumentation
2014-2015 STUDY IMPLEMENTATION REPORT GEOLOGY AND SOILS
CHARACTERIZATION STUDY (STUDY 4.5)
Susitna-Watana Hydroelectric Project Alaska Energy Authority
FERC Project No. 14241 Page 27 October 2015
Figure 5.3-1. Dam Site Bedrock Geology
2014-2015 STUDY IMPLEMENTATION REPORT GEOLOGY AND SOILS
CHARACTERIZATION STUDY (STUDY 4.5)
Susitna-Watana Hydroelectric Project Alaska Energy Authority
FERC Project No. 14241 Page 28 October 2015
Figure 5.3-2. Groundwater Levels and Dam Site (DH12-3, DH12-8)
2014-2015 STUDY IMPLEMENTATION REPORT GEOLOGY AND SOILS
CHARACTERIZATION STUDY (STUDY 4.5)
Susitna-Watana Hydroelectric Project Alaska Energy Authority
FERC Project No. 14241 Page 29 October 2015
Figure 5.3-3. Ground Temperature at Depth (DH12-1, DH12-4)
2014-2015 STUDY IMPLEMENTATION REPORT GEOLOGY AND SOILS
CHARACTERIZATION STUDY (STUDY 4.5)
Susitna-Watana Hydroelectric Project Alaska Energy Authority
FERC Project No. 14241 Page 30 October 2015
Figure 5.4-1. Regional Geology; 1 of 2 (Fugro 2015b)
2014-2015 STUDY IMPLEMENTATION REPORT GEOLOGY AND SOILS
CHARACTERIZATION STUDY (STUDY 4.5)
Susitna-Watana Hydroelectric Project Alaska Energy Authority
FERC Project No. 14241 Page 31 October 2015
Figure 5.4-2. Regional Geology; 2 of 2 (Fugro 2015b)
2014-2015 STUDY IMPLEMENTATION REPORT GEOLOGY AND SOILS
CHARACTERIZATION STUDY (STUDY 4.5)
Susitna-Watana Hydroelectric Project Alaska Energy Authority
FERC Project No. 14241 Page 32 October 2015
Figure 5.5-1. Crustal Stress Orientations and Strain Ellipses (Fugro 2015b)
2014-2015 STUDY IMPLEMENTATION REPORT GEOLOGY AND SOILS
CHARACTERIZATION STUDY (STUDY 4.5)
Susitna-Watana Hydroelectric Project Alaska Energy Authority
FERC Project No. 14241 Page 33 October 2015
Figure 6-1. Shear/Alteration Zone at BS-27
Felsic Dike
Diorite
Shear/alteration
zones in diorite only