HomeMy WebLinkAboutHVDCRuralAK.J.Grovespolarconsult alaska, inc. Engineering Consulting engineers surveyors energy consultantsCivil, Environmental, EnergyHVDC Transmission for Alaska2008 Rural Energy ConferenceGirdwood, Alaska Joel D. Groves, P.E.polarconsult alaska, inc.ENGINEERS - SURVEYORS - ENERGY CONSULTANTS1503 W. 33rd Avenue, Suite 310Anchorage, Alaska(907) 258-2420www.polarconsult.netearle@polarconsult.net polarconsult alaska, inc. Engineering Consulting engineers surveyors energy consultantsCivil, Environmental, EnergyThe Rural Energy Problem: Summary of Causes¾Multiple isolated villages ¾Redundant Infrastructure¾Lack of Economy of Scale¾Expensive Infrastructure¾Precludes use of local energy resources¾Precludes connecting villages to build scale¾Result is reliance on Diesel and High Costs polarconsult alaska, inc. Engineering Consulting engineers surveyors energy consultantsCivil, Environmental, EnergyAffordable Transmission as a Solution¾Affordable village interties¾Build economies of scale¾Eliminate some infrastructure¾Reach out to more local energy resourcesÆParadigm shift in Rural Alaskan Energy¾Improved reliability¾Less reliance on diesel¾Lower and more stable costs¾More towards sustainable rural communities polarconsult alaska, inc. Engineering Consulting engineers surveyors energy consultantsCivil, Environmental, EnergyThe HVDC Transmission Project: Objectives¾Develop an affordable HVDC technology optimized for rural Alaskan applications¾Sized for rural AK needs ¾Designed for rural AK conditions¾Optimized for rural AK infrastructure¾Priced to make interties a viable solution¾HVDC promises lower costs than AC polarconsult alaska, inc. Engineering Consulting engineers surveyors energy consultantsCivil, Environmental, EnergyThe HVDC Transmission Project: Project Overview¾Organized into 3 Phases¾Phase I – Feasibility and Prelim. Engineering. (underway, complete by end of 2008)Funded by DC, Partnered with AVEC¾Phase II – Design, construction, and testing of prototypes (complete by end of 2009)¾Phase III – Demonstration Project (2010/11) polarconsult alaska, inc. Engineering Consulting engineers surveyors energy consultantsCivil, Environmental, EnergyThe HVDC Transmission Project: Phase I Task Status¾Design, build, and test a bi-directional 12 kV DC/480VAC 250 kW Demonstrator to prove the concept¾Develop conceptual designs for affordable transmission ¾Cost and economic models of HVDC polarconsult alaska, inc. Engineering Consulting engineers surveyors energy consultantsCivil, Environmental, EnergyWhat can HVDC do for Rural Alaska? -- Naknek Regional Grid•Naknek •Connect 25 communities•Geothermal power•450 miles of transmission•$140 million cost for AC transmission systems•HVDC can lower costs to make interconnections feasible polarconsult alaska, inc. Engineering Consulting engineers surveyors energy consultantsCivil, Environmental, Energy polarconsult alaska, inc. Engineering Consulting engineers surveyors energy consultantsCivil, Environmental, EnergyWhat can HVDC do for Rural Alaska? - - Galena Nuclear PlantKALTAGKOYUKUKNULATORUBYGALENATO UNALAKEET25 MILES polarconsult alaska, inc. Engineering Consulting engineers surveyors energy consultantsCivil, Environmental, EnergySt. Mary’s – Mountain VillageMARSHALL25 MILESPILOT STATIONST. MARY’SMOUNTAIN VILLAGE polarconsult alaska, inc. Engineering Consulting engineers surveyors energy consultantsCivil, Environmental, EnergyHVDC in Southeast Alaska polarconsult alaska, inc. Engineering Consulting engineers surveyors energy consultantsCivil, Environmental, EnergyQuestions & Comments