Volume 2 of this report, The Final Report of the 1981 and 1982 Cultural Resources Survey of the
Anchorage-Fairbanks Transmission Intertie, comprised of Appendices C and D, is identified as
APA no. 1855 in the Susitna Hydroelectric Project Document Index (1988), compiled by the
Alaska Power Authority.
Alaska Energy Authority has specified that this volume may not be posted online in its
entirety. Users wishing permission to access the document are advised to contact the Alaska
Office of History and Archaeology (OHA). If permission is granted, both electronic and paper
copies are available at ARLIS.
APPENDIXC
SITE DATA
AND
APPENDIXD
LAND OWNERSHIP SCHEDULE
This document contains confidential information concerning the location
of cultural resources discovered and identified during the cultural
resource survey of the Anchorage-Fairbanks Transmission Intertie.
Recipients of this document should restrict the dissemination of
locational information to only those personnel with a need-to-know.
This document is ·not to be submitted to the National Technical
Information Service.
ALASKA POWER AUTHORITY
334 WEST 5th AVENUE· ANCHORAGE, ALASKA 99501
April 19, 1984
Ms. Martha Shepard, Head Librarian
Federal Resources Library
Federal Building
701 C Street, Box 13
Anchorage, Alaska 99513
Subject: ANCHORAGE-FAIRBANKS TRANSMISSION INTERTIE
CULTURAL RESOURCES SURVEY REPORT
Dear Ms. Shepard:
Phone: (907) 277-7641
(907) 276-0001
Enclosed for your information is the final Cultural Resources
Survey Report for the Anchorage-Fairbanks Transmission Intertie.
In order to protect the integrity of identified sites, Appendices C
and D are provided for Your use only and are not intended for
general public distribution.
If we can be of further assistance, please feel free to contact us.
03~~
David R. Eberle
Project Manager
Enclosures:
DRE/lm
884/001
Cultural Resources Survey Report
Appendices C and D
I~ CD.
::::J\ ~.
)('i
( ,
o.\
APPENDIX C
SITE DATA
APPENDIX C
SITE DATA
TABLE OF CONTENTS
INTRODUCTION
DATA RECOVERY
CULTURAL RESOURCE PROPERTIES IN THE PROJECT AREA
SURVEY RESULTS
TRANSMISSION CORRIDOR
1981 Field Season
1982 Field Season
CAMP /STAGING AREAS
CAMP/STAGING AREA PLAN MAPS
SITE SURVEY FORMS
ARCHEOLOGICAL INVESTIGATION MAPS
LIST OF FIGURES
1
1
2
.5
5
5
20
39
FIGURE C1 SITE LOCATIONS MAP 7
FIGURE C2 ARTIFACTS RECOVERED DURING THE 1981 SURVEY 9
FIGURE C3 ARTIFACTS RECOVERED DURING THE 1981 SURVEY 13
FIGURE C4 GENERALIZED SOIL PROFILE: HEA-201 17
FIGURE C5 HEA-226: SITE PLAN 21
FIGURE C6 HEA-226 23
FIGURE C7 HEA-226: FEATURE #1 25
FIGURE C8 ARTIFACTS FROM HEA-226 AND HEA-225 27
FIGURE C9 HEA-225: SITE PLAN 31
FIGURE C10 HEA-225 AND TLM-011 33
FIGURE C11 TLM-011: SITE PLAN 35
FIGURE C12 HEA-188: SITE PLAN 37
LIST OF TABLES
TABLE C-1 IDENTIFICATION OF PROJECT IMPACT ZONES
TABLE C-2 CULTURAL RESOURCE ZONES
3
6
-:I
.< l> m ... ~(') ,... ::r
CCCI) .a o
i5' 0 :Icc
s: ~r m·-
"C.
Cll
APPENDJX D
LAND OWNERSmP SCHEDULE