HomeMy WebLinkAboutAEA Susitna-Watana Report to the Legislature - 2013A �f
- 10
7 epp .0
■
SUSITNA',-.-WATANA HYDRO
Clean, reliable energy for V next I00 years.
Ora
0
*F B L E 0 F 0 0 N TH got*
Ex.. _It-, _ dIrector Is'�_�........... ......� r+.. c .y
a _ ante 9 ............,....e
A ram abl Year of progress .,.....,.3
K,ey accomplishments ........................4
- R�
[nwestin9 in rer4av;abie eneray-
Cc st of ipi . _ ....7
s.
r�3......................... ............ .,..7
s s...........8
•
;- eat � ............. ...............-14
fig.
L__ : ..............................16
fr _, . s 7ne .........................,....,
17
Ex�enoitures...................................
18
Projectteam ....................................
1'9
- ` —
LETTER FROM EXECUTIVE DIRECTOR
The past year marked positive momentum for Susitna-Watana Hydro. After more
than a year of planning and intensive stakeholder engagement, the Federal
Energy Regulatory Commission (FERC) approved 58 environmental studies.
Quality data was collected that will result in more being understood about the
Susitna Basin than ever before. The Alaska Energy Authority (AEA) collaborated
with the Alaska Department of Fish and Game to provide synergy between
Susitna-Watana Hydro fisheries studies and other work in the Matanuska-
Susitna region.
Perhaps most exciting is the partnership with the private sector. The scope of
work not only requires environmental and engineering contractors to be brought
on board, but the positive economic impacts expand to local restaurants,
hardware stores, boat operators, retailers and more.
As we look to 2014, Susitna-Watana Hydro enters another phase of the multi-
year FERC licensing effort. AEA will prioritize the critical items, including
environmental studies, that will continue to advance the project. The financial
advisory team is putting together financing proposals and has reaffirmed that
Susitna-Watana Hydro is a valuable and financially sound project.
Stakeholder engagement will continue to play a critical role in project success.
The project team is committed to engaging with Alaskans. A management -level
position was added to lead this important project component and to focus
on positive working relationships with the Alaska Native regional and village
corporations and tribes within and near the project area.
AEA has a full suite of programs designed to reduce the cost of energy in Alaska
by diversifying Alaska's energy portfolio, informing energy policy and planning,
developing energy infrastructure and providing technical training and assistance.
Susitna-Watana Hydro plays an important role in achieving our mission and in
moving the state toward our goal of 50 percent renewable power by 2025.
We will continue our work toward a process that engages stakeholders, resource
agencies, regulators and Alaskans to develop a safe, renewable energy resource
that has the potential to provide clean, reliable power for 100+ years. I am proud
of the small and dedicated project team and of all of our top-notch contractors
and the work we have accomplished.
Sincerely,
Sara Fisher -Goad, Executive Director
Alaska Energy Authority
sit a Hydro
T A GLANCE
PROJECT
& MAP
V-. 3.',> a1'+a'ti'"a;'fs'h"I mped�melli
Location::
r - r
Size:
Resetrroirr
Estimated Supply:
CF
Cost:
Nstaiied Capacity:
'.i
Annual Energy:
Licensing:
���-a: �r���y Rags'latary
s1 or:_RC
Project Life:
^ 1 -Ie s,a 'e rates
More than 60 years after Alaskans first considered building
a hydroelectric project on the Susitna River, 2013 will be
known as the year we made real progress towards turning
the river's power into electricity.
During the past 12 months, the Alaska Energy Authority commenced the
implementation of the Susitna-Watana Hydro study plan with two key
achievements: conducting elements of 58 Federal Energy Regulatory
Commission -approved studies in 11 critical categories and strengthening
a culture of safety.
An estimated 350 scientists, archeologists, biologists and other specialists
worked in the field, collecting water samples, radio -tagging fish, studying
cultural resources and much, much more. The Susitna-Watana Hydro
team stressed and fostered a culture of safety and this commitment was
recognized by other resource agencies and individuals in the field.
The project study area spans from the mouth of the Cook Inlet to the
glacial headwaters of the Alaska Range. With an area of this magnitude,
extensive coordination and project management are at the forefront.
2013 was a year of successes for Susitna-Watana Hydro and forward
momentum continues toward filing for a FERC license. We have moved
closer to clean, reliable, affordable energy for generations of Alaskans.
Alaska is one of the nation's most important energy producers and leads
the way in investments in renewable and alternative energy sources. We
have committed to a goal of 50 percent renewable power by 2025 and
Susitna-Watana Hydro can make this a reality.
r;?
A YEAR OF SUCCESSES
FERC approval and studies under way
Tlwerre<was a.sia pikant step toward filing for the
federal hydropower license. The Federal Energy
Regulatory Commission (FERC) approved the Susitna-
Watana Hydro environmental study plan, which
includes 58 studies in categories such as geology
and soi&, water, resourzces and fish. (Please read more
about the categories at Susitna-WatanaHydro.oro/
stud�olan.)
The FERC licensing process is extremely iterative,
with many public comment periods and opportunities
for stakeholder collaboration. The -development of
the environmental study plan included dozens of
full -day technical meetings with federal and state
resource agencies, Alaska Native regional and
village corporations, environmental organizations
and stakeholders. During the course of a year and
a half, several drafts were proposed and comments
Geology & Soils
Water Resources
Instream Flow Studies: Fish
Aquatics & Riparian
Fish & Aquatic Resources
Wildlife Resources
Botanical Resources
Recreation & Aesthetic
Resources
Cultural & Paleontological
Resources
Subsistence Resources
Socioeconomic & Transportation
Project Safety
war+-.�� � K-•�..-.�.�.
and suggestions from stakeholders and FERC were
incorporated into the final study plan. Perhaps most
significant, FERC endorsed the scientific approach
to the studies and moved the project toward
implementing the work.
After receiving FERC approval, an unprecedented
environmental study of the Susitna Basin was
underway. Biologists, engineers, hydrologists,
archeologists and scientists of many other disciplines
began collecting valuable data to build upon the
3,000 reports fielded as part of the 1980s effort and
the early studies initiated in 2012.
The project team was able to keep the studies on
schedule and budget while meeting critical licensing
milestones. Results from these studies will be
released throughout the coming months.
Culture of safety
The Alaska Energy Authority has worked hard to establish safe work
practices and guidelines for all personnel involved in the project.
This year, we brought an experienced team leader on board as
health, safety, environment and stakeholder manager and additional
HSE. contract support was provided.
A logistics management firm was hired to manage the field
operations and emphasize the culture of safety in the field. Not
only was it important to remain vigilant on Susitna-Watana Hydro's
efforts, but to be aware of surrounding projects and coordinate
to ensure safe operations. -AEA staff was on site weekly to attend
safety briefings, visit field camps and talk to crews in the field_ No
major safety incidents were reported this field season.
Financing
Work is underway to develop potential financing models for Susitna-
Watana Hydro. A leading, independent financial -advisory firm has
been hired and reconfirmed that Susitna-Watana Hydro remains a
viable and financially feasible project.
Engineering
The engineering feasibility report will be complete in spring 2014.
Work is underway with the internationally -experienced Board
of Consultants to determine the means to construct the safest
structure possible, designed to withstand significant seismic and
flooding events.
Stakeholder engagement
As one of the most significant state resource development projects
in recent years, Alaskans expect to be kept informed about Susitna
Watana Hydro and efforts to advance the federal licensing process.
A management -level position was added for the critical role of
engaging stakeholders, including Alaska Native regional and village
corporation land owners in the project area. More than 100 public
meetings and presentations about Susitna-Watana Hydro were held
during 2013, demonstrating the commitment of an open, accurate
and collaborative approach to managing stakeholder expectations.
Focus was placed on online resources to provide cost-effective
communications tools.
Hydroelectric power is one of the longest term, least
expensive ways to produce electricity and has the
added,bemei tssof being! relliablJe,. clean and local',
Susitna-Watana Hydro will stabilize energy costs for
nearly 80 of percent Alaskans, from Fairbanks through
M Siv,andAnchomge:to Nomer, inspiring confidence
in Alaska as a stable place to do business.
After two cost estimates and a third independent cost
estimate, project costs remain $5.19 billion. These costs
include current licensing activities; construction of the
project, roads and all related facilities; and transmission
of electricity from the project to the Railbelt Intertie.
AEA has hired an independent financial -advisory firm,
which will work with AEA throughout the next year
to define the range of'financing opportunities. It has
reaffirmed that SusitnaMatana Hydro remains a viable
and financeable project.. The State of Alaska has the
potential to recover its investment in Susitna-Watana
Hydro while providing long-term and affordable power.
Susitna-Watana Hydro vs. Natural Gas Power Costs
45 SUS1TU-t4ATF SA. IIIY :
COST OF POWER
AEA projects that the cost of power from Susitna-Watana Hydro will be competitive
with other sources at start-up, even with no direct State investment, then grow
more affordable over time until Susitna-Watana Hydro is one of the most economic
energy sources in the state. In addition, the project will help insulate Alaska's
energy costs from inflation, giving confidence to investors and stabilizing operating
costs for businesses.
The Alaska Energy Authority is currently working with a financial -advisory firm to
further define potential financing options that allow the State to recoup its initial
investment, including licensing costs.
One potential and successful model ESTIMATED POWER COSTS ($/kWh)
for a state-owned hydroelectric project
is Bradley Lake. Through power sales
agreements, the State will be repaid
for its initial investment in Bradley Lake,
beginning in 2021. For the purposes of
economic modeling, assumptions for
Year 1 Rate ($2024) $0.181
Year 1 Rate ($2013 Real)
$0.138
10-Year Avg Rate ($2013 Real)
$0.124
25-Year Avg Rate ($2013 Real)
$0.106
50-Year Avg Rate ($2013 Real)
$0.061
Susitna-Watana Hydro include no direct Real=Adjusted for Inflation
State investment, beyond licensing costs. • Assumes no direct state investment
Hyrdropower: Affordable, Stable Power Rates'
331t 33e
30 ? -
i
L5 i -
20 19¢
I
15! 13¢_
t lie 12�
1ol
1
I I
0 _
Winnipeg Seattle Vancouver Ottawa New York San Fransico
I CCAI ION * MWH, Americas
JOBS
Susitna-Watana Hydro will provide jobs during
construction and for many decades afterward during
normal operations.
The peak direct -workforce is anticipated to about 1,000
during construction. The permanent operation and
maintenance crew will be smaller, likely to work shifts at
the facility and travel by plane or helicopter.
Susitna-Watana Hydro will also provide jobs
tangentially by purchasing goods and services from
Alaska businesses. Local small businesses are already
receiving economic benefit in support of the field
activities. Local restaurants, lodges, tackle shops,
hardware stores, boat operators and more are providing
goods and services to field crews and the project team.
Construction of a large hydro project includes roads,
a powerhouse and related facilities, and the dam site
itself. Carpenters, welders, truck drivers, electricians,
pipefitters and laborers will be needed for the
estimated seven-year construction period. Alaskans are
poised to benefit from these opportunities.
41
- ;r
�!%�''; - •' dr. '.:• _ •' e .yam ►. ' ' ti ;•�•�" r �r . y'•. ' _ - r
.7ZU� ";'o • ; •'- t'• : r y ! r "to+:.ri •a..
j./r' - 'y. ��- ice. f'CA
„� ni - � jw V. � � L ti ►-t�,y' � .' _. • y,.. � � � •-�i_.� �j.,.. Y.. `� •�
r .S -+�����#T .��} �`,� - ��'},. 1-,r ��r�� ^ ��•_ .. t' -'fir ��•� � l 1 '�Y �• �...
-S L , ! F � Y'!��-� .-y. •Yd".�'t ,��i. y � ?' 'v �- � •ad[r � � i �r�r. ;•
-+ .r
41
This spring and early summer, the Alaska Energy Authority began implementing
the environmental study plan for Susitna-Watana Hydro. This effort includes 58
individual studies, approved by the Federal Energy Regulatory Commission earlier
in the year.
Current efforts build upon the 3,000 reports filed as part of the 1980s licensing
effort, the 18 early studies conducted in 2012. and, management data that the
Alaska Department of Fish and Game has continued to collect- Elements of all
58 studies were conducted this year and results will be released to the Alaska
Legislature and general public in the coming months. A complete list of the
58 studies included in the environmental study effort is available online at
Susitna-WatanaMydro orgjstudy plan.
An estimated 350 scientists, surveyors, archeologists, biologists and other
specialists traveled by helicopter to the project site and began studying the
surrounding environment, a total of nearly 186,000 acres. The studies will produce
data on virtually every facet of the region, everything from water, cultural and
botanical resources to land mammals, birds and fish.
When the studies are completed, Alaska will have the benefit of knowing more
about the Susitna Basin than ever before and will be one step closer to a valuable
hydropower license. This will enable us to design and enforce specific procedures
for engineering, construction and operation of the project to provide a balance
between the need for power and environmental concerns.
Fisheries and'aquatics, namely the five species of
salmon, continue to be a key focus of study for the
project. This effort spans from the mouth of the Cook
Inlet to the Upper Susitna River. The environmental
study team is building upon previous studies on salmon
migration and habitat in the Susitna River and its side
channels and tributaries.
This effort is also highly -coordinated with the Alaska
Department of Fish & Game, their management data
and Matanuska-Susitna study efforts -
More than 20D miles of the mainstem Susitna River and
25 tributaries were mapped during the summer of 2013
Biologists and scientists were in the field manning fish
wheels, electro-tagging fish, monitoring screw traps,
angling, dip netting snorkeling and trapping minnows,
all in the effort to better understand all life stages of
salmon, resident fish like grayling and trout, and their
respective habitats_
Research is indicating that Chinook salmon primarily
spawn in Susitna River tributaries, with limited
spawning in the mainstem of the Susitna River and
Susitna River side -channels. Hydroelectric projects can
provide benefit by maintaining flow levels in important
spawning habitat and reducing impacts from either
dangerously high or low water levels
The United States Geological Survey (USES) has been
tracking the flows of the Susitna River at Gold Creek for
more than 50 years AENs studies include year-round
information collection regarding Susitna River water
levels and extensive modeling.
The study efforts will aid in the development of future
project operations and to shape enhancement efforts.
Chinook Salmon and Devils Canyon
Only one species of salmon, Chinook, has been
documented within 30 miles of the project site, and
only in very, small numbers. It is important to note
that the project site is located 22 to 32 river miles
above Devils Canyon, a narrow and highly -turbulent
section of the river that acts as a natural impediment
to migrating fish.
Of the 58 studies in the Susitna-Watana Hydro study plan,
nearly half are dedicated to understanding the Susitna
River fish, water quality, flows and aquatic resources.
Chinook salmon and Devils Canyon
Only one salmon species has been documented within 30 miles of the project site.
�l 0
„rt_
41t a Devils
Above
Canyon
Project Site
Of the Chinook tagged at Curry, 94 percent headed up the tributaries; 6 percent stayed in the main stem.
10 susirna-WaUsr HYDRO
��pqE � yr r .d i • _�M1 _�.y. r _ f'
F +.�3 l�L• �4„leyf' �t af:i tip.•' ,,IL Tgy.
�`� -� •�.�,,.`.�►• ...ram .� :�,~ � � �C r. �� •- ..
rr-��
NIP
PRIORITIZING FOR SUCCESS
Few projects have been as important to Alaska's energy future
as Susitna-Watana Hydro If the trans -Alaska pipeline made it
possible for Alaska to develop into one of our nation's strongest
economies, Susitna-Watana Hydro will allow for continued
growth by providing affordable electricity rates and a reliable
source of power that will supply Alaska with clean energy for the
next 100 years.
A task this important requires the very best people at the helm
and in the field, and we have assembled a truly first-rate team.
The project area is remote and accessible only by helicopter.
A strategic approach to logistics is important to ensure a safe,
cost-effective and successful field season
The Susitna-Watana Hydro team approached the 2013 field
season with the following five priorities-
1 Field safety and an integrated culture focused on health,
safety and environment
2.Optimize efficiencies and maximize data collection
3 Control costs
4. Reduce risks and environmental impact
5. Minimize impacts on locals and recreational users
A small, core group of project team members is responsible
for managing a multitude of contractors with the goal of safely
and effectively conducting field work. It is the responsibility and
priority of the project team to ensure effective use of resources
This includes constant communication between contractors it
the field and project team members based in Anchorage.
This type of coordination isn't limited to team meetings,
but also includes a detailed scheduling mechanism to track
schedule and budget variances. Field audits were routinely
conducted by project team staff Asa result, Susitna-Watana
Hydro executed a safe field season that remained on schedule
and budget
.�+• 'i •�. �M�+- •^..r.• � �~ 5�T .-- � � i^awl. '� � r .�,.-�`7,'°.. � �� ��r'r 1 �-wr.
53y...-ti nice ' 'r.' �' ,�, •y, '+!—t . "- ` .�,!`'' .i'-.�' .a` a w.. rr. .+. �� �
., w i tIC. N. �.,C� � � _ 7 � y{', ` r-> >. , :.1• : � .- ►:- yak
�"�`1]�i�ry*j � Y� "T.1'r�.ln �• .F .1�.�,r }•`-r;• :''�#,.s �y�lk���'- I17T �'�r��`ia � M+1�
` _7 i � r'�,.-:� .x•�a. .� a •� .�J'��,�*,.1
Licensing and permitting
Licensing a project the scale of Susitna-Watana Hydro involves a complex series
of permitting issues and a diverse group of landowners, Including the State of Alaska,
federal government and private landowners that include Alaska Native regional
and village corporations
Extreme importance is placed on ensuring that the correct permits are in place and
compliance is maintained. All field crews are equipped with land -status maps and
tablets for real-time tracking of activity location
Ahtna inc owns lands adjacent to the Susitna-Watana Hydro project study area
and permits were secured for studies along the Denali Corridor, one of the three
potential project access routes
Cook Inlet Region Inc- owns the subsurface rights to lands within the project area
and six of the Cook Inlet village corporations - Chickaloon Moose Creek Native
Association, Knikatnu Inc, Salamatof Native Association, Tyonek Native Corporation,
Ninilchik Native Association and Seldovia Native Association - own surface nal ::C
selected and conveyed land
For more than a year, AEA and Susitna-Watana Hydro team members have met
with the Cook Inlet region working group, working toward a land -access permit In
recognition of this critical relationship, AEA has also engaged Commissioner Susan
Bell and members of the governor's executive team AEA opted not to pursue any
field activities on CIRI and Cook Inlet village corporation lands for the 2013 season but
continues to work towar,- future access_
A culture of safety
The Alaska Energy Authority manages energy projects across the state, from small
villages to Railbelt energy infrastructure As with all AEA projects, safety is the No 1
priority for Susitna-Watana Hydro field operations
Health and safety plans were required of all contractors, training - including swift -
water rescue and bear safety - was provided, regular site visits were conducted by
team members and a medic was stationed in the field Helicopters and boats were
equipped with Spyder tracking systems to provide real-time locations
Fngineering
The culture of safety does not just extend to field logistics An extensive project
safety program is underway
Project engineers work with the Board of Consultants, an independent body of
experts in the fields of dam safety and design This group brings international
experience to advise the Susitna-Watana Hydro team on dam design and
-�f '� -• - lit. �`'�`- �'�".- _�� - - -''>�'�`
ILI
construction In addition, the Board of Consultants works
with the Federal Energy Regulatory Commission division of
dam safety
Two critical areas of safety that directly feed into the project
design are flooding and seismicity The project will be
designed to withstand a flood event greater than any ever
recorded. Determining the maximum flooding event will
help inform the dam and spillway design, as well as water
release and storage capabilities_
Seismology is more than just a number on the Richter
scale It is also important in seismology to understand and
design for sources, distance and types of movement All of
these factors inform the design criteria for the project
Seven seismographs are collecting new information,
building on significant historical data The team is studyin
geological features for 60 miles around the project site
These features help identify ground movements that have
occurred for centuries prior and inform the desig i of the
safest project possible
I
a-M-NWI II
The Alaska Energy Authority is a public entity and has a responsibility to
keep Alaskans informed about Susitna-Watana Hydro and to share the
results of critical study areas AEA and the project team remain committed
to providing factual information and using as many online and electronic
resources as possible.
A critical component of Susitna-Watana Hydro's outreach has been the
project website, Susitna-WatanaHydro.oro. The site was retooled this
year to include more "Frequently Asked Questions" and opportunities
to provide factual answers that address misperceptions.The online
conversation was expanded to include social media sites like Facebook.
These online interactions provide a critical opportunity for Alaskans across
the state to ask questions of the project team and become involved in
project development.
We are particularly eager to share the results of the studies we conducted
in 2013, which will be released early in 2014. More than 60 project meetings
were held this year and AEA has provided Web and phone -based
connectivity to expand accessibility.
More than 50 presentations were given to community groups across Alaska.
Some discussions were with small groups and others to audiences of a
couple hundred people and more.
Engaging Stakeholders
Alaska is a patchwork of land ownership, including state and federal lands
and a mix of private lands that include Alaska Native regional and village
corporations. Understanding and respecting this complex land status is
critical to stakeholder outreach.
During the spring of 2013, historic land settlement agreements were
reached. More than 40 years after the passage of the Alaska Native
14 SUSITIMAIFTANA HYDRO
Claims Settlement Act, Cook Inlet Region Inc. (CIRI)
transferred more than 230,000 acres to the Cook Inlet
village corporations. Some of the lands conveyed are
within the proposed Susitna-Watana Hydro project
area. The Cook Inlet Region Working Group serves as
the point of contact for AEA on land access issues.
Stakeholder engagement, namely with the
landowners, remains a critical focus for Susitna-
Watana Hydro. A management -level staff member
was added to focus on these important relationships
while exploring potential opportunities for
economic development.
In addition to CIRI and the Cook Inlet village
corporations, AEA is working to keep open channels
of communications with tribes and regional
corporations near the project area. Ahtna Inc. has
lands adjacent to the project area and the Ahtna
people have historical and cultural ties to the region.
Ahtna representatives remain a valuable participant in
the licensing process.
E�rus#rr�-�nlaxaaa H�rrSra�
-s
;�%A,a 4G'ea&ncj the siaftm ou its commitment to retev4ahle
eraergV. As part cos the NZIP ease-rg} poky, the state l egiFlature
set the goal &' 50 pesce-O electrical merge from tenestable
saasz 6y 2025. http: +].tye�,. eawi l?n F
With a project of this scope, criticism and opposition from some groups can be expected. Alaska Energy Authority
is committed to listening to and considering all concerns. We believe that the importance of the project makes it
imperative for AEA to continue to communicate accurate information to keep Alaskans, particularly landowners near
the project area, informed as the project progresses.
An important aspect of our public outreach is maintaining a presence on social media, such as Facebook. These "new
media" platforms allow us to communicate information about the project to a worldwide audience on a frequent basis
for very little expense.
r .Y' JL
... +' k'• Y �i, 1 ` � . . _- cif .. - , - .` _
Awl
CONTINUING PROGRESS IN 2014 AND BEYOND
In the days prior to this report going to print,
behind funding levels. It is anticipated that agreements
adjustments were made to the Susitna-Watana Hydro
will be reached during the first quarter of 2014_
licensing schedule.
An important next step in the FERC application process
In an effort to prioritize licensing efforts and provide
is the Initial Study Report, which serves as a project
additional opportunity for stakeholder involvement, the
progress report, and was to be filed on February 3,
Alaska Energy Authority filed a letter with the Federal
2014, and include plans for second -year studies. AEA
Energy Regulatory Authority on Jan. 6, 2014, requesting
proposes filing the Initial Study Report as a draft on
a 120-day extension in the Susitna-Watana Hydro
February 3 and will continue workgroup meetings.
licensing process.
Under the requested time extension, the final Initial
Study Report would be filed on June 3, 2014, with the
$10 million was included in the proposed Capital
intent of filing the final license application in 2016.
Budget in December. Approximately $110 million is
needed to advance the project to license application.
As shown in this report, a tremendous amount of
information was gathered in 2013 as part of the Susitna-
At the time of print, AEA had not reached land -access
Watana Hydro environmental study plan. AEA sees
agreements with CIRI and the Cook Inlet village
value in taking the time to engage stakeholders in the
corporations for future. field work_ Both ,parties remain
process and to prioritize future efforts that will lead to a
committed to advancing land negotiations; however,
successful license application.
progress is needed. During the budget announcement,
Gov. Parnell indicated this lack of progress as a driver
16 SUSITKA.wATAHA HYDRO
Pt
A
Wk
PROJECT IMELIN
'ire -Application Phase
inspections
cortstruction
Construction Phase
4
FERC Review Phase
(2016 — 2017)
Operational Phase
(starting in 2025)
EXPENDITURES �
Activity
Site Determination &
Pre -Feasibility (Prior to
Pre -Application Document)
Personnel
Licensing Costs:
Engineering Feasibility Study
Board of Consultants
Detailed Engineering Design
Utility Corridor, Dept. of
Transportation Analysis
FERC Licensing Support
Office of Project Management
& Permitting
Resource & Feasibility Studies
Project Management Consult.
Technical Assistance
Permitting
Logistical Support
GIS
Website and Public Info Library
Communications
Legal
Travel
Project Office
Unallocated
Total Project Costs
Funding Sources
Railbelt Energy Fund
General Fund
Total Funding Sources
Susitna-Watana Hydroelectric Project
Status Report as of Dec. 31, 2013
Project Costs (in thousands)
FY2009-
FY2011 FY2012 FY2013 FY2014 Budgeted &
Committed
Actual Actual Actual To Date Total Encumbrance Funds Total
2,487.0 4,011.3 - 6,498.3 - - 6,498.3
625.7
1,432.4
1,287.1
3,345.2
10.9
2,120.6
5,476.7
1,244.3
7,304.0
2,108.0
10,656.2
3,531.1
3,740.5
- 17,927.9
-
418.6
56.8
475.4
383.0
450.0
1,308.5
-
-
-
-
200.0
200.0
450.8
94.8
7.9
553.5
227.2
80.6
861.3
510.0
1,032.6
213.8
1,756.4
582.8
365.0
2,704.3
165.7
1,519.0
340.8
2,025.5
1,203.3
2,041.9
5,270.7
-
4,915.7
25,008.0
18,800A
48,724.1
33,325.6
19,188.5
101,238.1
-
533.3
136.3
7.0
676.6
-
141.5
818.1
-
104.0
24.2
-
128.1
18.1
200.0
346.3
-
2.0
458.9
35.2
496.1
61.1
398.2
955.5
-
134.3
6,434.3
9,852.8
16,421.5
3,677.4
431.9
20,530.8
-
199.2
415.6
39.8
654.7
453.9
67.6
1,176.2
-
40.8
69.0
22.0
131.7
66.1
428.2
626.0
-
9.6
223.6
62.2
295.3
69.6
238.2
603.1
-
1,084.5
1,309.1
570.9
2,964.5
470.5
1,087.5
4,522.5
-
29.1
64.7
20.4
114.2
-
79.5
193.8
-
106.4
172.8
80.9
360.1
-
390.8
7%9
-
-
-
-
63.7
63.7
2,487.0
14,166.6
46,117.9
33,506.0
96,277.4
44,080.7
31,714.2
172,072.4
FY2009-
FY2011
FY2012
FY2013
FY2014
FY2014
1,528.1
65,700.0
-
-
67,228.1
9,644.3
-
95,200.0
104,844.3
11,172.4
65,700.0
-
95,200.0
172,072.4
18 SUSITNA-WATANA HYDRO
n. A ►�I
N
PROJECT TEAM
AEASKA ENERGY AUTHORITY 50ARD OF DIRECTORS
Russell Dick, chairman
Dana Pruhs, vice chair
Commissioner Susan Bell, member
Commissioner Angela Rodell, member
Wilson Hughes, public member
Crystal Nygard, public member
Gary R. Wilken, public member
STAFF
Sara Fisher -Goad
executive director, Alaska Energy Authority
Wayne Dyok
project manager
wdyok@aidea.org
Sandie Mayes
administrative assistant
shayes@aidea.org
Julie Anderson
health, safety, environment and
stakeholder manager
jnderson@aidea.org
Bryan Carey
engineering manager
bcarey@aidea.org
Betsy McGregor
environmental manager
bmcgregor@aidea.org
Emily Ford
public outreach liaison
eford@aidea.org
Andy Morton
procurement manager
amorton@aidea.org
Andrew Fraiser
licensing and permitting manager
afraiser@aidea.org
This publication was produced in Anchorage, Alaska. Asa fully electronic report, no printing cost were incurred.
ii
SUSITNA-WATANA HYDRO
Clean, reliable energy for the next 100 years.
susitna-watanahydro.org/