HomeMy WebLinkAboutCity of Unalaska Wind Reconnaissance Assessment Report Aug 2009Westward Seafood’s/Ounalashka Corporation
Wind Data Assessment Report
Final Report
August 1, 2009-Unalaska, Alaska
Tower 1 SW Ridge Site-erected September 13, 2006 (data base changed September 16 and
September 21, 2006)*. Tower 1 was lowered and rewired in July 2008.
Site Description South West Corner –Pyramid Valley Ridge
Latitude/Longitude 53 50.0 North 166 31.0 West
Site Elevation 250 Feet
Load Logger and Tower Second Wind Load logger- 100 Foot NRG Tower
2
DATA SYN0PIS
There are two NRG 30 meter metrological towers installed. One tower is on Westward
property (T1) and one on the adjoining property of the Ounalashka Corporation (T2). At each
site there is installed a 100’ (30 meters) guyed tower with three wind anemometers, wind
vane and temperature devices collecting data 24 hours. The wind speed anemometer at 100’
C1 has backup recording equipment at 100’ C2 and there is a third anemometer installed at
66’ (20 meters) to evaluate wind speed and potential wind shear. The wind vane is installed
at the elevation of 80’. The data is being collected into a data base logger provided by
Second Wind Software. The data is being collected on an average interval of ten minutes.
The temperature gauge on Tower 1 was destroyed in a wind storm last winter (February
2008) and not replaced. The daily temperature data is available on Tower 2.
Each site has solar panel charger connected to a 12 volt battery and a backup 9.3 volt
alkaline battery. The wind information is recorded every 10 minutes and stored into flash
memory on site and is being down loaded weekly to a laptop computer. The flash memory
has data capacity of three plus years.
The Second Wind Software provides wind speed and direction for any period or time. The
time being used is Greenwich Mean Time GMT (-9 hrs) or Alaska Standard Time. The data
is being collected and reported in increments of 10 minute average time. For the purpose of
this report data will be collected and reported on a monthly basis and added monthly to the
year-to-date data base. The contract provides for a data collection period of 33 months for
Tower 1---Tower 2 was relocated to the ridge South-East of Tower 1. Tower 2 will have two
different data bases from the different locations.
The Second Wind Software also provides general information on power production capability
at each site, average speed, daily hourly wind availability (Diurnal Information) and wind
direction, temperature, daily, weekly and YTD energy information on a sample generator or
on specific generating equipment. Please note any wind turbine manufactures power curve
information can be added to the software for any generator type or size. The present energy
report is utilizing the TMA 250 generator (250 Kw) power curve information provided by the
manufacturer and a comparative 250 Kw propeller type (NED) generator. This generator
comparison utilizes only data from Tower 1 located on Westward property erected in
September 2006. Wind availability is also being collected and analyzed from Tower 2 and
compared to wind availability from Tower 1 reinstalled in July 2008.
The 30 meter met towers and data loggers have been furnished by the Alaska Energy
Authority under their wind energy assessment program. Information from the assessment
report is public information and can be obtained from the consultant or the Alaska Energy
Authority.
3
Ounalashka Corporation Tower 2 Site
Tower 2 Pyramid Lake Site-Erected July 2008
Site Description Old military lake reservoir Pyramid Valley
Latitude/Longitude 53 59’9 North 166 33’44 West
Site Elevation 350 Feet
Load Logger and Tower Second Wind Load logger- 100 Foot NRG Tower
A partnership between Ounalashka Corporation and Westward Seafood’s was developed to
share wind information on adjoining land. The current location of Tower 2 is near the old
military lake reservoir on the ridge above OSI and Westward. The site has ready access
from an old military road to the lake and is located on land owned by the Ounalashka
Corporation.
4
Wind Classes
Please note the following definition of wind classes attached to this report by the American
Wind Association. The article by the American Wind Association on the “Basic Principles of
Wind” outlines the different classes of wind for power production.
Basic Principles of
Wind Resource Evaluation
:LQGUHVRXUFHHYDOXDWLRQLVDFULWLFDOHOHPHQWLQSURMHFWLQJWXUELQHSHUIRUPDQFHDWD
JLYHQVLWH7KHHQHUJ\DYDLODEOHLQDZLQGVWUHDPLVSURSRUWLRQDOWRWKHFXEHRILWV
VSHHGZKLFKPHDQVWKDWGRXEOLQJWKHZLQGVSHHGLQFUHDVHVWKHDYDLODEOHHQHUJ\E\D
IDFWRURIHLJKW)XUWKHUPRUHWKHZLQGUHVRXUFHLWVHOILVVHOGRPDVWHDG\FRQVLVWHQW
IORZ,WYDULHVZLWKWKHWLPHRIGD\VHDVRQKHLJKWDERYHJURXQGDQGW\SHRIWHUUDLQ
3URSHUVLWLQJLQZLQG\ORFDWLRQVDZD\IURPODUJHREVWUXFWLRQVHQKDQFHVDZLQG
WXUELQH
VSHUIRUPDQFH
,QJHQHUDODQQXDODYHUDJHZLQGVSHHGVRIPHWHUVSHUVHFRQGPLOHVSHUKRXUDUH
UHTXLUHGIRUJULGFRQQHFWHGDSSOLFDWLRQV$QQXDODYHUDJHZLQGVSHHGVRIWRPV
PSKPD\EHDGHTXDWHIRUQRQFRQQHFWHGHOHFWULFDODQGPHFKDQLFDODSSOLFDWLRQVVXFK
DVEDWWHU\FKDUJLQJDQGZDWHUSXPSLQJ:LQGUHVRXUFHVH[FHHGLQJWKLVVSHHGDUH
DYDLODEOHLQPDQ\SDUWVRIWKHZRUOG
:LQG3RZHU'HQVLW\LVDXVHIXOZD\WRHYDOXDWHWKHZLQGUHVRXUFHDYDLODEOHDWD
SRWHQWLDOVLWH7KHZLQGSRZHUGHQVLW\PHDVXUHGLQZDWWVSHUVTXDUHPHWHULQGLFDWHV
KRZPXFKHQHUJ\LVDYDLODEOHDWWKHVLWHIRUFRQYHUVLRQE\DZLQGWXUELQH&ODVVHVRI
ZLQGSRZHUGHQVLW\IRUWZRVWDQGDUGZLQGPHDVXUHPHQWKHLJKWVDUHOLVWHGLQWKH
WDEOHEHORZ:LQGVSHHGJHQHUDOO\LQFUHDVHVZLWKKHLJKWDERYHJURXQG
Classes of Wind Power Density at 10 m and 50 m(a)
.10 m (33 ft)50 m (164 ft)
Wind
Power
Class
Wind
Power
Density
(W/m2)
Speed(b)
m/s (mph)
Wind
Power
Density
(W/m2)
Speed(b)
m/s (mph)
1 <100 <4.4 (9.8) <200 <5.6 (12.5)
2 100 - 150 4.4 (9.8)/5.1 (11.5) 200 - 300 5.6 (12.5)/6.4 (14.3)
3 150 - 200 5.1 (11.5)/5.6 (12.5) 300 - 400 6.4 (14.3)/7.0 (15.7)
4 200 - 250 5.6 (12.5)/6.0 (13.4) 400 - 500 7.0 (15.7)/7.5 (16.8)
5 250 - 300 6.0 (13.4)/6.4 (14.3) 500 - 600 7.5 (16.8)/8.0 (17.9)
6 300 - 400 6.4 (14.3)/7.0 (15.7) 600 - 800 8.0 (17.9)/8.8 (19.7)
7 >400 >7.0 (15.7) >800 >8.8 (19.7)
5
(a) Vertical extrapolation of wind speed based on the 1/7 power law
(b) Mean wind speed is based on the Rayleigh speed distribution of equivalent wind power density. Wind
speed is for standard sea-level conditions. To maintain the same power density, speed increases
3%/1000 m (5%/5000 ft) of elevation.
(from the Battelle Wind Energy Resource Atlas)
,QJHQHUDOVLWHVZLWKD:LQG3RZHU&ODVVUDWLQJRIRUKLJKHUDUHQRZSUHIHUUHGIRU
ODUJHVFDOHZLQGSODQWV5HVHDUFKFRQGXFWHGE\LQGXVWU\DQGWKH86JRYHUQPHQWLV
H[SDQGLQJWKHDSSOLFDWLRQVRIJULGFRQQHFWHGZLQGWHFKQRORJ\WRDUHDVZLWKPRUH
PRGHUDWHZLQGVSHHGV
Wind data for the NRG Towers is being collected at 20 meters (66’) and 30 meters (100’).
E\WKH$PHULFDQ:LQG(QHUJ\$VVRFLDWLRQ
0D\EHIUHHO\GLVWULEXWHGSURYLGHGWKLVQRWLFHLVLQFOXGHG
$OORWKHUULJKWVUHVHUYHG
June 2009 Assessment Report
In July 2008 Tower 1 was lowered and the wind anemometers and weather vane were
rewired. The data logger was not operating and was returned to Second Wind for
evaluation. It was determined that the wet cell battery had failed. The data logger was
reinstalled at the end of July with a new battery. In September the data logger on T1
encountered additional voltage issues and the battery was exchanged with the T2 battery.
The issue seems to be resolved but will require constant monitoring. On June 24, 2009 the
T1 system shut down with a continuing voltage issue. No attempt is being made to repair the
system with the termination of the study by Westward Seafood on May 31, 2009.
The June, July and August 2007 monthly wind was at the lowest velocity when compared to
the previous months of the study. Given the historical wind data, June and July are the
normal months with the lowest wind velocity and average wind strength. Information from
Tower 2 in July 2008 and from Tower 1 and Tower 2 in August supports the lower summer
wind velocities. It is interesting to note on the August 2008 “Diurnal Graphs” that during the
peak evening hours of 6:00PM to 9:00PM there still was economic wind speeds (12 MPH) for
energy production.
In September 2008 the lower wind velocities continued when compared to the prior years.
The wind capacity factor was 16% for September 2008 and 30% for September 2007. In
mid-October the data logger failed on Tower 2 and was returned to Second Wind for repairs.
The data logger for Tower 2 was reinstalled at the end of November 2008.
Vertical Axis Generation comparison to Horizontal Axis Generation
Westward Seafood’s has elected to consider a vertical axis generator developed by TMA in
Wyoming as an option. The consultant received the power curve information from TMA on
their 250Kw vertical axis generator during the month of July 2007. The consultant has
incorporated the TMA power curve information into each of the monthly study periods. The
6
consultant has selected a NED 250 Kw propeller (horizontal axis) type generator for
comparative analysis. The NED wind turbine power curve was included with the Second
Wind Software. Any manufactures wind turbine power curve data can be added to the
software for calculating the energy production from the respective generating unit.
In an e-mail received from TMA the following comments have been received.
The following information is from Scott Taylor of TMA, Inc on July 27, 2007:
“My thoughts regarding the differences in the capacity factors of the TMA turbine and a similarly rated prop
turbine are as follows:
The referenced prop turbine has a rotor swept area = 710 m2, while the referenced TMA turbine has a rotor
swept area = 285 m2. The prop has a 2.5X larger rotor swept area, therefore having the ability to capture more
energy from the wind. Above 20 mph, the TMA wind turbine is more efficient and is converting more kW per unit
of rotor swept area, but has trouble overcoming the large difference in rotor swept area. The formula for energy
conversion of a turbine is:
Power = ½ x air density x rotor swept area x wind speed3 x turbine efficiency
The rotor swept area has a linear affect on the power conversion. Based on the cube effect of the wind speed,
the TMA turbine can make up production in the higher wind speeds where the prop efficiency drops and shuts
down.
The referenced prop power curve shows a cut-out wind speed of 55 mph. In my experience, I haven’t seen a
prop turbine in the 250 kW rated size, or larger for that matter, operate above 45 mph in the type of terrain that
we are evaluating.
Although wind speed data is a good indicator of the power production available at a site, there are other factors
that really should be considered in the evaluation.
Turbulence Intensity (TI): In general, it is a quantity that characterizes the intensity of gusts in the airflow. The
CPP engineers have indicated that most prop manufacturers won’t even consider placing their turbines in
locations with turbulence intensities greater than 15%. Higher TI’s adversely affect the performance of the
turbine and can cause excessive loads on the blades which require shutting down the turbine at wind speeds
below the cut-out speed to prevent damage. This should not be a problem for the TMA design.
Wind Shear: The local variation of the wind vector in a given direction, i.e. change in wind speed with change in
height. Excessive wind shear can also cause highly fluctuating blade load conditions on props that may cause
them to be shut down prematurely to prevent damage. It may also affect the aerodynamic performance of the
rotor. This should not be a problem for the TMA design.
Turbine Availability: Dick’s numbers are based wind availability and on the turbines being available to operate
100% of the time that the wind is sufficient for production. I would argue that the TMA turbine would have a
higher turbine availability than a prop based on the robust design of the TMA turbine. The TMA turbine would
require less downtime for maintenance and would continue to operate in conditions that would require a prop to
be shut down to prevent possible damage.
With the generator technology that we may incorporate into the turbine, the TMA power curve may not have to
be “flattened out” above rated wind speeds and may continue up the available curve until the cut-out wind speed
is reached. This ability will greatly increase the amount of kWh produced by the TMA turbine”.
7
The following comparison is the (Tower 1) monthly and Period to Date wind capacity
information for power production from both types of generating units:
NED 250Kw Wind Turbine (Propeller)
TMA 250Kw Vertical Axis Turbine
Month Capacity* Capacity* Capacity*
1st Year (2006) 2nd Year (2007) 3rd Year (2008)
October 43% 29% 28%
November 49% 39% 33%
December 40% 30% 36%
January 40% 39% 25%
February 34% 30% 41%
March 40% 33% 45%
April 27% N/A 36%
May 27% N/A 14%
June 23% N/A 18%
July 6% N/A -
August 17% 9% -
September 44% 16% -
Period-To-Date
Kwh
31%
667,354
28%
399,588
31%
422,110
Month Capacity* Capacity* Capacity*
1st Year (2006) 2nd Year (2007) 3rd Year (2008)
October 27% 9% 16%
November 29% 22% 21%
December 15% 17% 21%
January 25% 21% 13%
February 19% 16% 25%
March 21% 20% 25%
April 13% N/A 20%
May 12% N/A 6%
June 10% N/A 7%
July 3% N/A -
August 8% 4% -
September 26% 7% -
Period-To-Date
Kwh
17%
362,743
15%
215,918
17%
222,418
8
Wind Capacity*
*The wind capacity information is calculated based on the amount of actual Kwh produced for
the period noted (based on the manufactures power curves) and compared to the maximum
Kwh that could be produced for each period. The wind capacity formula is hours of the
period times the generator’s output capacity (8,760 hrs X 250 Kw) equals (2,190,000 Kwh)
maximum YTD energy. The amount of Kwh actually produced (based on the manufactures
power curves) during the YTD period is then divided by the maximum Kwh that could be
generated to determine wind capacity. I; E, 667,354/2,190,000Kwh =s 31% wind capacity
for the first 12 months of the study period. These Kilowatt-hours produced are based on the
wind capacity during the initial twelve month study period. The above Tower 1 data covers
33 months of the study period.
Average monthly wind capacity for the NED generator at the T1 location is 31% (winds above
7 MPH and below 55 MPH) during the initial 12 months study period (Oct 2006-Sept 2007).
During the 2008-09 study period wind capacity has averaged 27% for the Ned Generator.
This average wind capacity information is based on the NED 250Kw turbine power curves as
utilized by the Second Wind Software.
Average monthly wind capacity for the TMA generator at the T1 location is 17% (winds above
10 MPH and below 60 MPH) during the first 12 months study period (Oct 2006-Sept 2007)
and 15% for the TMA unit during the second year of the study period. This wind capacity
information is based on the TMA 250Kw generator power curve as added to the Second
Wind Software. The second year of the study period utilized only eight months of actual data.
In the present study period (July 2008-June 2009) wind capacity is averaging 17% for the
TMA 250Kw VAT.
I would note there is some wind shear recorded at Tower 1 for the past monitoring periods.
Wind shear or wind differential is noted between C1 at 30 meters and wind velocities at 15
meters for C3. It is interesting to note that Tower 1 and Tower 2 have experienced class 5 to
7 winds during the winter study period.
Attached is the period-to-date summary of wind direction for the Tower 1 site since October
2006. During the first 12 month study period (Oct 2006-Sept 2007) Tower 1 wind was from
the North in general 48% of the time. The most prevalent wind direction was from the due
North at 17% of the period hours. During the current 12 month study the wind was
predominately from the South, with South West wind as the most prevalent direction at 16%
of the hours.
9
Available Wind Capacity Comparison between Towers (based on a NED 250 Kw wind
Turbine) propeller type
Month Tower 1
Capacity*
Energy Tower 2
Capacity*
Energy
July 2008 (17%) (29,202 Kwh) 17% 29,202 Kwh
August 9% 15,008 Kwh 9% 15,008 Kwh
September 16% 28,074 Kwh 16% 28,942 Kwh
October 28% 49,749 Kwh (28%) (49,749 Kwh)
November 33% 57,980 Kwh (33%) (57,980 Kwh)
December 36% 63,539 Kwh (36)% (63,539 Kwh)
January 25% 45,505 Kwh 26% 47,455 Kwh
February 41% 68,672 Kwh 40% 67,534 Kwh
March 45% 84,440 Kwh 45% 83,692 Kwh
April 36% 64,047 Kwh 38% 68,549 Kwh
May 14% 24,432 Kwh 12% 22,049 Kwh
June (18%) 32,478 Kwh 18% 32,478 Kwh
Average Wind
Capacity for
study period
27%
27%
Average Energy
For study
period
563,126 Kwh
566,177 Kwh
*Percentage of the monthly hours that wind is available for power production. July data from
Tower 2 was incorporated into the Tower 1 data set and utilized for reporting purposes
(Tower 1 data is mirroring Tower 2). In October, November and December 2008 data from
Tower 1 is inserted into Tower 2 data set for reporting purposes. There is very little
difference in the actual wind velocity data between towers. Note the actual data from
January, February, March, April, May and June 2009.
Attached are the copies of the wind direction summaries and average speed for the study
period. The study to date has indicated economic wind values from September 2006 through
June 2009 in excess of 12 MPH (Class 4) from Tower 1. The new Tower 2 location is mostly
a mirror image of data being collected from Tower 1. Please note the data from Tower 1 and
Tower 2 in the above graph
The consultant would like to note the two 30 Meter towers and all equipment for the wind
assessment study has been supplied by the Alaska Energy Authority under their wind
program. The consultant is very appreciative of the support and recommendations of the
AEA staff during the wind assessment study period.
Data can be exported in a raw format in an “Excel” spreadsheet from the data base collected
over the study periods.
The consultant Richard G. Peck can be reached by e-mail: rgpeck@hotmail.com or phone at
907.581.4832 or cell phone 907.359.2215. The information from the thirty-three month
assessment study can be obtained from the consultant or the Alaska Energy Authority.
10
Final Wind Assessment Report
Westward Seafood’s—Ounalashka Corporation
August 1, 2009
The (Westward Seafood’s-Ounalashka Corporation) wind assessment study for Pyramid Valley was
concluded on June 30, 2009. The joint (Westward-OC) wind assessment was for a period of one year
and consisted of two NRG 30 meter metrological towers erected on their adjoining Pyramid Valley
lands. The study area in Pyramid Valley had excellent access on a ridge that ran in a North-
Northwest to an East-Southeast direction. Tower 1 was located at an elevation of 250’ at the Latitude
53 50.0 North and Longitude 166 3.0 West. Tower 2 was re-located at elevation of 350’ at the
Latitude 53 59’9 North and Longitude 66 33’44 West on “OC” land. The towers and the associated
equipment were provided by the Alaska Energy Authority under their wind tower loan program. The
data loggers were manufactured by Second Wind, Inc. The data was collated and analyzed utilizing
Second Winds’ “Nomad Software”. The thirty-three month data from Tower 1 and twelve month data
from Tower 2 has been collected in its raw format and is available in “Excel” spreadsheets.
The Westward wind assessment study started on October 2006. Tower 2 was initially installed at a
lower elevation on Westward land and then relocated to Ounalashka Corporation land in July 2008.
Tower 2 at its initial location had winds approximate 30% less capacity when compared to Tower 1
during the first two years of the study. The Tower 2 wind speed at lower Westward elevation location
has limited economic value.
The three year long Westward wind assessment study indicates that the monthly wind capacity has
varied form a high of 49% in the winter and a low of 9% during the summer months. The average
yearly wind capacity during the study period was 30% at the Westward Tower 1 site. The average
30% wind capacity data at the Tower 1 location is based on wind speeds that are above 7 MPH and
below 55 MPH. Tower 1 and Tower 2 wind speeds and direction are a virtual mirror imagine of each
other during the past year’s joint study.
The wind power class has averaged about Class 4 (5.6 to 6.0 M/S) or 12 MPH for the entire thirty-
three month study period according to the “American Wind Energy Association” classification system.
June, July and August are the months with the lowest average wind capacity of about 18% during the
33 month study period. The nine months of October through May often experience Class 5-7 winds,
wind speeds that average in excess of 14 mph or 6.2 M/S. Note Chart 1-average wind speed for
the past thirty –three months for Westwards Tower 1 location.
Winds in Pyramid Valley have been strongly directional from the North-23% in Year one, 15% in Year
two and 14% in the third year. The Pyramid Valley wind flow was not always laminar and wind shear
was experienced on several occasions. In depth wind shear information can be obtained by analyzing
wind data form the C1-C2 anemometer (30 meters) and comparing it to the wind speeds recorded
from the C-3 anemometer located at (15 meters). There were minimal icing conditions experienced
during the study periods due to the low elevations of the Towers at an approximate height of about
300’ MSL. Note Chart 2-wind rose major wind directions for the Tower 1-Averaged North 16.5%
of the time for the thirty-three month study period.
The maximum wind gust speed recorded during the study period was 98 MPH. In contacting the local
weather bureau at the Dutch Harbor Airport (PADU) their records indicate a maximum recorded wind
gust of 98 Knots or 126 MPH recorded in 1995.