Loading...
HomeMy WebLinkAboutCity of Nunam Iqua Heat Recovery Project Feasibility Analysis - Sep 2013 - REF Grant 7071052ANTHC DEHE Alaska Native Tribal Health Consortium Project Name: Nunam Iqua Heat Recovery Project Project Number: TBD Engineer: WLF Revision Date: 09-Sep-13 Print: 10-Sep-13 Checked: Find: Feasibility of Heat Recovery from Nunam Iqua Generator Facility to existing Utility Buildings Given: Assumptions: Calculations: Monthly KWH produced by existing Nunam Iqua generator plant in 2012 Heating Degree Days for Emmonak 3300 BTU to radiators KW Power Generated (From Kris Noonan @AIDEA) Energy Audits of Water Plant, Clinic and Tribal Office Estimated peak heat loss for Tribal Office Estimated Peak heat loss for Clinic Bldg Estimated Peak heat loss for Trading Post Design Air Temperature: Design Water Temperature Design Glycol Heat Trace Temperature Occupied Building Space temperature Cllnlc Building Heat Loss: Building design heating loss: Heat loss/ degree of OSA temp !Tribal Office Building Heat Loss: Building design heating loss: Heat loss/ degree of OSA temp !Trading Post Heat Loss: Building design heating loss: Heat loss/ degree of OSA temp Above Ground Heat Recovery Pipe Heat Loss: Design Heat Recovery loop Temperature Design Air Temperature: Insulation: Pipe: 51,000 BTU/Hr 40,000 BTU/Hr 80,000 BTU/Hr 180 Degrees F -40 Degrees F -40 Deg F 40 Deg F 75 Deg F 72 Deg F 4.5 Inch foam ins. 3.25 Pipe OD (Inches) 40,000 BTU/H 357.1 BTH/H* Deg F 51,000 BTU/H 455.4 BTH�F 80,000 BTU/H 714.3 BTH/H* Deg F Insulation K value R value= 0.16 BTU x in/ (ft'2 x hr x Deg F) 15.839 Ft'2 x hr x Deg F Length of Above ground Pipe Design Heat Loss: Heat Loss/ Degree OSA temp 2500 Ft 29,545 BTU/hr 11.82 BTU H/ft 134.3 Division of Environmental Health Engineering 1901 Bragaw Street, Suite 200 ANCHORAGE, AK 99503 (907) 729-3609 FAX (907) 729-3729 e-mail: william.fraser@anthc.org Estimated energy use for washeteria based on ANTHC-DEHE Energy Audit (2012) Estimated energy use for Tribal office and Clinic building based on ANTHC-DEHE Energy Audit (2012) Estimated Burner AFU E: 82% Clinic & Store Estimated Fuel Price: $4.38 per gal Utility Heat Sales Agreement: 0% Avoided fuel cost Frozen Soil Conductivity 0.12 (Between 0.05 & 0.15 BTU H/Ft) Above Ground Heat Recovery System in Arctic Pipe Generator Module Heat Loads design conditions was assumed based on small footprint buildings with poor insulation and high infiltration. Design conditions were based on OSA temp of -50F Living quarters design heat loss Control module Heat Loss Storage modules Heat Loss Generator Modules Heat Loss Heat loss/ degree of OSA temp: Parasitic Generator Cooling System Losses Design Air Temperature: AMOT valve leak Rate (average) Hot CoolantTemperature Design Heat Loss: Heat loss/ Degree of OSA temp: Total 0 BTU/Hr 10000 BTU/Hr 0 BTU/Hr 0 BTU/Hr 10000 BTU/Hr 91 BTU/Hr* deg F -40 Deg F 0.5 GPM 180 Deg F 49500 BTU/Hr 225.0 050100150200250300350400450500January February March April May June July Aug Sept Oct Nov DecMBTU/HRMONTHNunam Iqua Recovered Heat UtilizationWasheteria Heating DemandTrading Post Htg Demand (MBH)Tribal Office Bldg Htg Demand (MBH)Clinic Bldg Heating Demand (MBH)Available Recovered Heat