Loading...
HomeMy WebLinkAboutCordova Heat Recovery Project Photos - May 2012 - REF Grant 2195407CORDOVA ELECTRIC COOPERATIVE, INC ORC PROJECT PHOTOS 05/21/2012 View of Exterior of Organic Rankine Cycle Building – Fig 1. 05/21/2012 View of Exterior of Organic Rankine Cycle Building and Evaporative Cooling Tower – Fig 2. 05/21/2012 View of 480/12470 VAC Step-Up Transformer – Fig. 3 05/21/2012 View of Evaporative Cooling Tower and Piping Insulation – Fig. 4 05/21/2012 View of ORC Building Station Service Metering and Disconnects – Fig. 5 05/21/2012 View of Evaporative Cooling Tower Piping with Insulation and Heat Trace – Fig. 6 05/21/2012 View of PureCycle 280 Turbine and Evaporator/post installation of RF 247 Refrigerant – Fig. 7 05/21/2012 View of Condenser and Evaporator Control Valves and Piping – Fig. 8 05/21/2012 View of Condenser and Evaporator Control Valves and Piping – Fig. 9 05/21/2012 View of Electrical Control Panels and Associated Conduit Raceways – Fig. 10 05/21/2012 View of Electrical Distribution & Control Panels and Associated Conduit Raceways – Fig.11 05/21/2012 View of Hazardous Gas / Refrigerant Gas Detector with Newly Installed H2O Trap – Fig. 12