HomeMy WebLinkAboutCordova Heat Recovery Project Photos - May 2012 - REF Grant 2195407CORDOVA ELECTRIC COOPERATIVE, INC ORC PROJECT PHOTOS
05/21/2012 View of Exterior of Organic Rankine Cycle Building – Fig 1.
05/21/2012 View of Exterior of Organic Rankine Cycle Building and Evaporative Cooling Tower – Fig 2.
05/21/2012 View of 480/12470 VAC Step-Up Transformer – Fig. 3
05/21/2012 View of Evaporative Cooling Tower and Piping Insulation – Fig. 4
05/21/2012 View of ORC Building Station Service Metering and Disconnects – Fig. 5
05/21/2012 View of Evaporative Cooling Tower Piping with Insulation and Heat Trace – Fig. 6
05/21/2012 View of PureCycle 280 Turbine and Evaporator/post installation of RF 247 Refrigerant – Fig. 7
05/21/2012 View of Condenser and Evaporator Control Valves and Piping – Fig. 8
05/21/2012 View of Condenser and Evaporator Control Valves and Piping – Fig. 9
05/21/2012 View of Electrical Control Panels and Associated Conduit Raceways – Fig. 10
05/21/2012 View of Electrical Distribution & Control Panels and Associated Conduit Raceways – Fig.11
05/21/2012 View of Hazardous Gas / Refrigerant Gas Detector with Newly Installed H2O Trap – Fig. 12