Loading...
HomeMy WebLinkAboutKalskag Wind Feasibility and Conceptual Design Scope and Milestone Schedule 2023 - REF Grant 7015016Scope and Milestone Schedule Scope of Work Summary AVEC proposes to install and operate a ZX300 wind LIDAR profiler to collect and analyze wind data, complete a reconnaissance-level geotechnical effort, and work with the community to determine the feasibility, location, turbine type, and conceptual design of a wind project in Kalskag. AVEC proposes to use the feasibility study to examine the potential for wind energy production in Kalskag. The effort would culminate in a Concept Design Report (CDR), including an alternatives evaluation and conceptual design that could be used to seek future wind turbine construction funding. Milestone Schedule Milestones Tasks Start End Deliverables MS 1: Project Scoping and contractor solicitation 1. Select contractor(s) for wind feasibility, geotechnical analysis, and CDR 8/1/23 9/1/23 1. Signed Contracts and/or Task Orders MS 2: Resource identification and detailed resource analysis 1. Procure, mobilize, and install a ZX 300 Wind LIDAR station 2. Operate and monitor LIDAR station for 1 year 3. Draft resource report 4. Perform preliminary geotechnical survey 9/15/23 10/31/24 1. Wind Resource Analysis Report 2. Preliminary Geotechnical Report MS 3: Identification of land and regulatory uses 1. Obtain letter of non- objection for LIDAR and geotechnical work as applicable 2. Identify potential site for wind infrastructure based on analyses 3. Initiate negotiations for site control 9/1/23 6/1/24 1. Site Control Agreement for LIDAR station MS 4: Permitting and environmental analysis 1. Perform research and conduct consultations with appropriate agencies to determine required environmental permitting 9/15/24 12/15/24 1. Section in the CDR MS 5: Detailed analysis of current cost of energy and future market 1. Analyze existing and future energy costs in Kalskag 2. Hold community meeting(s) 3. Incorporate results in the CDR 2/1/24 3/30/24 1. Section in the CDR MS 6: Assessment of alternatives 1. Review turbine types and locations 2. Determine the best location and system 5/1/23 9/30/24 1. Section in the CDR MS 7: Conceptual design report and costs estimate 1. Examine various turbine types and locations to determine the best-suited system for Kalskag 2. Develop conceptual design and cost estimate 9/1/24 11/1/24 1. Section in the CDR 2. Cost Estimate MS 8: Detailed economic and financial analyses 1. Conduct economic and financial analysis 6/1/24 8/30/24 1. Section in the CDR MS 9: Conceptual business and operations plan 1. Update operating and business plans to include wind energy 8/1/24 12/15/24 1. Section in the CDR MS 10: Final report and recommendations 1. Finalize CDR including all of the previously mentioned information 9/15/24 12/31/24 1. Final Conceptual Design Report MS 11: CDR Review & Grant Closeout 1. AEA will review final CDR and perform grant closeout 1/1/25 3/31/25 1. Project Closeout