HomeMy WebLinkAboutThayer Lake Hydropower Project Final Business Plan - Sep 2019 - REF Grants 7040038, 7050825TABLE 1
Thayer Creek Hydroelectric Project
Estimated Costs of Construction
TABLE 2
Thayer Creek Hydroelectric Project
Total Estimated Capital Costs of the Project and Sources of Funds
TABLE 3
Thayer Creek Hydroelectric Project
Estimated Annual Operating Costs of the Project
(2019 cost level)
TABLE 4
Thayer Creek Hydroelectric Project
Estimated Annual Net Benefits of the Project and
Net Present Value of Net Savings
TABLE 5
Inside Passage Electric Cooperative
Actual Costs of Operation (Revenue Requirement)
Fiscal Year 2018
TABLE 6
Inside Passage Electric Cooperative
Projected Annual Revenue Requirement with and
Without the Project
Projected Fiscal Year 2023