Loading...
HomeMy WebLinkAboutThayer Lake Hydropower Project Final Business Plan - Sep 2019 - REF Grants 7040038, 7050825TABLE 1 Thayer Creek Hydroelectric Project Estimated Costs of Construction TABLE 2 Thayer Creek Hydroelectric Project Total Estimated Capital Costs of the Project and Sources of Funds TABLE 3 Thayer Creek Hydroelectric Project Estimated Annual Operating Costs of the Project (2019 cost level) TABLE 4 Thayer Creek Hydroelectric Project Estimated Annual Net Benefits of the Project and Net Present Value of Net Savings TABLE 5 Inside Passage Electric Cooperative Actual Costs of Operation (Revenue Requirement) Fiscal Year 2018 TABLE 6 Inside Passage Electric Cooperative Projected Annual Revenue Requirement with and Without the Project Projected Fiscal Year 2023