1. Name of City or Borough:
_''_-- _.
wk:omnpletedapp. (4pages)
Alaska Small Cities
iciency and Conservation Block Grant (EECBG)
Grant Application, Option 1
(For option 2 applicants only)
Opt -in Technical Assistance
City of Galena
2. To what extent is the community committed to coordinating, planning and working with the
contractor? Please describe.
The City nfGalena iscommitted Vumaking whatever staff ianecessary to work with the selected
service provider massist with project planning, access, design, and/or construction for this energy
efficiency project for critical infrastructure. The City will also make necessary vehicles available
sawell aofuel. Our idea ioonce the assessment has been completed, oouse any additional
funding for necessary materials, supplies, orequipment. Our Public Works Department would Un
onsite ooassist inthis endeavor.
3.Will in -kind support beprovided tuthe project by the community? Ifso, please describe the types
ofin-kind support that are available (labor, storage, lodging, other), and the extent to which it is
|naddition mthe commitment stated above, the City will supply whatever space isneeded inen
unheated but dry, secured, storage area, for equipment. The City will load/unload and transport
all equipment necessary from the airport vrbarge dock upon arrival. The City will also supply
office space, a computer, phone and Internet service for the duration of the project for the service
provider.
4. ifknown, what buildings urfacilities would the city like the contractor tofocus onduring the audit
portion ofthe work? if specific known opportunites exist in any of these buildings, please list them
in "additional comments" section below.
#_ Name of BuildinR or-Faci-litv - Street Address So. Ft. Sector
1.
2�
l
4a
City Hall 87AnmokiRd.
Larson Community Hall 14STiger Freeway
Galena Pool 149 Antoski Rd.
15,728 Public Building
4.600 Public Building
13.500 Public Building
Select from Arrow
Select from Arrow
I
/fadditional space isneeded, please list other buildings /nthe "Additional comments' box below.
Page 2ofQ
5. Summary ofProject
GAL A10-179Kesend
w/comMpkstedapp. <4pages)
The City of Galena wishes to take advantage of the opt -in technical assistance program. We will
have towait for the appointed service provider's technical assistance tudetermine the full scope
of work. The City is committed to providing in -kind services/equipment/personnel contributions in
addition tovehicles and storage ofequipment toassist inthis project. VVahave opodfiauthree
buildings to receive and energy audit and assessment by the service provider:
1} City Hall - Daily operations and weekly public meetings with the public health clinic
operations in part of the building. Currently using older boiler system, but trying to adjust
management cfwaste heat provided bypower plant.
2) Larson Community Hall - Weekly attendance by Village Elders for bingo and social
meetings. Funerals are also held here for all residents. Very tall, older, building with limited
insulation and 2boilers with forced -air fans. Whole building must boheated tzuse any portion of
it.
3) Galena Pool - Only constructive entertainment for 170 children at GILA and residents who
are land -locked inthe Interior. Current costs for heat are over $1U0.QQO. Trying ouget best use
of waste heat from power plant, but losing pressure in system.
6.Additional Comments
The City ofGalena was devastated Uythe closing ufit's USAir Force base. After October /f
2O08.the City lost over 7O%ofit's revenue stream from utilities. The City was also left with a
generating system designed k,handle anadditional 1000inhabitants. TUo58O residents and the
students of the Galena Interior Learning Academy now must bear the brunt of that impact. The
City must reduce it's power consumption for each individual building to keep each of these vital
services functioning. Estimates for the buildings cited would beinthe $1OO.O0Oplus category for
utilities without energy efficiency savings. The Qr/smeager general fund would not allow for
their continued operation.
Barges run generally from late May to early Septernber. All other shipments must be sent via air.
Local labor is readily available.
Page 3of8
,JbK E �A 10-179 re send
wi:onlpletedapp. (4pages)
Alaska Small Cities
Ener Efficiency and Conservation Block Grants
Name of City or Borough:
BudgetForm
City of Galena
Table Ak Full Project Budget
Line Funding Source Budgeted Amount |
1. EE[BG funds requested $33'400
Z. City/borough matching orin-kind contributions $5.000
3. Funding from other sources* $5.000
4. Estimated total project cost $43,400
~ identify other sources from line 3' and whether sources are confirmed or pending:
$5000 in -kind services/equipment/personnel contributions from the Galena Interior Learning Academy.
Tabhe@: EECBGFunding Breakdown
Please budget how the EEC8Gfunding (Table A,line labove) breaks down between the following
categories. Please note that the energy audit cost column may not be more than 50 percent of the total.
Expense Categories Energy Audit Costs EEM/ECIM Costs" Total
�
Personnel
Travel
Materials &Supplies
Equipment
ment
Contractual
�
�
� �
- `
Total $O $V $O |
**EEM: Energy Efficiency Measure, ECM: Energy Conservation Measure; defined in EECBG Funding
Announcement and Instructions document.
$Q
$0
$O
$O
Budget Narrative
Please briefly describe the use of EECBG funds and any matching funds, as categorized above:
The City of Galena and the Galena Interior Learning Academy have committed to $10,000 of in -kind
aarvicoo/equipmenVponmnne|contributions mthe EEBCGproject. The funds will beoverseen by'he
selected service provider. The City Manager will provide updates and documentation ofthe spending for
each quarterly report.
After the assessment iscomplete, remaining funds would boutilized for necessary materials and/or
supplies.
The City is not looking for funding for it's part in the management of this critical infrastructure project.
Page 4uf8
HUGHES 10-164(&pages)
Alaska Small Cities
Ener Efficiency and Conservation Block Grant (EECBG)
1. Name of City or Borough:
Grant Application, Option 1
(For option 2 applicantsunkJ
Opt -in Technical Assistance
City of Hughes
2. To what extent is the community committed to coordinating, planning and working with the
contractor? Please describe.
The City of Hughes commits tomaking appropriate staff available tocoordinate with the selected
service provider to assist with project planning, coordination and implementation. Access will be
made available omall public buildings and facilities inatimely manner. Local transportation and
lodging will beprovided Uythe City ofHughes. The City maintenance department and wenhetaha
will provide up to 1100 hours of employee time to conduct a thorough and complete energy audit.
lWill in -kind support beprovided tothe project bythe community? ifso, please describe the types
ufin'kindsupportthataneavai|ab|p(|abor,stomge'|odgin8,nther)'andtheextenttowhichitis
Upm1OOhours uflabor by the maintenance and waahetehaemployees.
Approximately 200 hours of city staff and community volunteer time in planning, coordinating,
moving materials, helping with transportation, and helping implement weatherization and
alternative energy pnojeut(o). The city will pick upmaterials from the airport upon arrival and store
them in a heated or unheated building depending upon storage requirements. The city will ensure
adequate lodging for the service provider, either in the city -owned apartment above the clinic or
city office. the approximate value of these in -kind contributions is specified on the budget form.
4. If known, what buildings or facilities would the city like the contractor to focus on during the audit
portion ofthe work? If specific known opportunites exist in any of these buildings, please list 'them
in "additional comments" section below.
# Name of BuildinR or Facilitv Street Address Sa. Ft. Sector
1. VVasUetehu OnMain Street from Airport Public Building
Q�O�eB��ng OnM�nG�ef�m��� Public Building
_
Old Clinic OnMain Street fromAirport Other Public Facility
_
Select from Arrow
4.
5. Select from Arrow
If additional space is needed, please list other buildings in the "Additional comments" box below.
Page 2of8
The City of Hughes has selected Option 1, opt -in technical assistance program. Therefore, we
will await the service provider's technical assistance prior to determining the full scope of work.
We have committed to providing in -kind services, labor, storage, and lodging to the service
provider for this project atonestimated value of$0.0Q0. Threepublic buildings have been
specified toreceive enenergy audit o,assessment Uythe service provider. |tiothe intent to
reduce heating fuel consumption by improving the building(s) thermal envelope and/or HVAC
6.Additional Comments
The City of Hughes is planning to add a biomass system to the washeteria for economic
xustoinabiWY. The expenditures for the operation of this building far exceeds its revenue from the
sale ofits tokens for washers, dryers and showers. Currently, there are four boilers inthe building
for heating purposes and the present cost of diesel is $8.55 per gallon. Any technical assistance
for this endeavor would begreatly appreciated.
The waoketeho.city office and old clinic buildings are within ablock ofthe airport and are located
inone general area. Anew clinic opened in2O09. The approximate size nfthe buildings are:
1.VVaoheteria:1.872square feet.
Z. Old Clinic: 1.536 square feet.
1 City Office: 2,304 square feet,
Page 3of8
�_ IsNEmGY AUTHORITY
Alaska Small Cities
Ener Efficiency and Conservation Block Grants
Name ofCity nrBorough:
BudgetForm
City of Hughes
Table A:Full Project Budget
Line Funding Source Budgeted Amount
l. EECBGfunds requested $18.300
2. City/borough matching orin-kind contributions $1.600
Funding from other sources* $0
| I
' 4. Estimated total project cost $14,900
* identify other sources from line 3, and whether sources are confirmed or pending:
Table8: EECBQFunding Breakdown
Please budget how the EECBG funding (Table A, line I above) breaks down between the following
categories. Please note that the energy audit cost column may not be more than 50 percent of the total.
Expense Categories Energy Audit Costs EExN/EC&8Costs** Total �
Personnel $ $ so
Travel $ $ so
Materials &Supplies $ $ so
Equipment $ $ so
| Contractual $ $ so
| |
Total so / �O �O /
**EEM: Energy Efficiency Measure, ECM: Energy Conservation Measure; defined in EECBG Funding
Announcement and Instructions document.
Budget Narrative
Please briefly describe the use of EECBG funds and any matching funds, as categorized above:
The City has committed up to $1,600 of cash and in -kind contributions to extend the energy saving through
thiopno�ect. The City of Hughes will provide the service provider timely updates of cash and in -kind
spending for quarterly reports.
Page 4uf8
��lrY� ��-��� ��K �������
~..... .~ .,~~�.� pages)
Alaska Small Cities
Energy Efficiency and Conservation Block Grant (EECBG)
1. Name of City or Borough:
Grant Application, Option 1
(For option 2applicants only)
Opt -in Technical Assistance
City of McGrath
ITowhat extent isthe community committed tocoordinating, planning and working with the
contractor? Please describe.
The city'sPublic Works Foreman and City Administrator will work closely with the service
provider/contractor toassess the energy saving choice for the city and it's residents that we have
identified; to replace an initial number of aging and failing streetlights with energy efficient LED
fixtures/bulbs. By selecting Option 1, we hope to be able to take advantage of the best possible
pricing on LED light fixtures and bulbs through bum pricing being negotiated by the contractor.
3.Will in -kind support beprovided tothe project bythe community? If so, please describe the types
ofin'kindsupportthatareavaiiab|e(|abor,stumge,|udAin@,other),andtheextenttowhichhis
The Public Works Foreman and his staff aswell as the City Administrator will contribute in -kind
labor during the development and implementation of this project. The city staff isprepared oo
receive materials as they arrive and to provide dry storage until installation and to assist with local
transportation ifthe contractor makes esite visit mMcGrath,
It will also banecessary tufund the installation ofthe new streetlight fixtures through this grant,
including the removal of the old fixtures which isonly allowed bythe owner ufthe poles, McGrath
Light and Power (ML&P). The city owns the fixtures and pays the monthly electric charges and
ML&P maintains the fixtures (replaces bulbs supplied by the city and repairs fixtures tothe extent
4. If known, what buildings or facilities would the city like the contractor to focus on during the audit
portion of the work? if specific known opportunites exist in any of these buildings, please list them
in"additional comments" section below.
# Name ofBuilding u, Faci|kv Street Address
Streetlights located invarious
l� |000ionothmuqhout town
2.
l
4.
l
Sq. Ft. Sector
Other Public Facility
Select from Arrow
Select from Arrow
Select from Arrow
Select from Arrow
If additional space is needed, please list other buildings in the "Additional comments" box below.
Page 2ofO
5. Summary of Project
RATH "
�
10-156 `�4 "�*���
�
Old streetlight fixtures exist throughout town and some have failed beyond repair. Nehave not
yet replaced them aothe city would like totake advantage ofmore energy efficient LED fixtures
due mhigh costs associated with the price offuel (i.o.high electric rates that are additionally
being reviewed for a tariff increase). This proJect will provide the first phase of transition to LED
streetlights for McGrath.
The Opt -in option will provide needed technical assistance todoanenergy efficiency and
conservation assessment /four community's streetlights, The City ofMcGrath wants to
eventually replace all of the aging, considerably less efficient fixtures with highly energy efficient,
bright LED streetlights. Good visibility iaanimportant safety factor for all who walk urride onour
roads. If the selected service provider will be able to assist us in laying out a scope of work and
through bulk purchasing/collaboration with other communities, get the lowest cost per unit for the
replacement o(eninitial number o(our streetlights.
6.Additional Comments
Page 3of@
Alaska Small Cities
Ener Efficiency and Conservation Block Grants
Name of City or Borough:
BudgetForm
City of McGrath
Table AcFull Project Budget
Line Funding Source Budgeted Amount
l. EE[8Gfunds requested $22.800
� -
| �
| Z City/borough matching urin-kind contributions $2.500
3. Funding from other sources* $O
4. Estimated total project cost ~$25.800
identify other sources from line 3, and whether sources are confirmed or pending:
Line 2: City staff labor (Public Works and Administrative services), local transportation, receiving and
hauling freight from airport and dry, secure storage ofproject materials.
TableB: EECBGFunding Breakdown
Please budget how the EEC8Gfunding (Table A,line labove) breaks down between the following
categories. Please note that the energy audit cost column may not be more than 50 percent of the total.
ExpenseCategnhes Energy Audit Csts EEA8/ECIV1Costs*Total '
�
Personnel $ � $0
. Travel $ � $C��
Materials &Supplies $ $O
Equipment $ $0
Contractual $ $O
~
Total $0 $U $8
**EEM: Energy Efficiency Measure, ECM: Energy Conservation Measure; defined in EECBG Funding
Announcement and Instructions document.
Budget Narrative
Please briefly describe the use of EECBG funds and any matching funds, as categorized above:
At the time of this initial application, we do not know how the contracted technical assistance provider will
allocate funds within table B.
The city will be contributing $2/500 of in -kind labor and other services as stated inthe explanation box for
Table A, above.
We anticipate that the assessment will take a minimal amount of the overall funds available.
Page 4uf8
DENERGY A
THonnr NORTH POLE 10_103 (^*pages)
Alaska Small Cities
Energy Efficiency and Conservation Block Grant (EECBG)
1. Name of City or Borough:
Grant Application, Option 1
(For option 2 applicantsonly)
Opt -in Technical Assistance
City of North Pole
2. To what extent is the community committed to coordinating, planning and working with the
contractor? Please describe.
The City has 13city buildings that could benefit from energy efficiency upgrades. North Pole is
small city of 2000 so it does not have the technical expertise to assess and implement energy
efficiency upgrades. The EECIBG Option 1 will provide the City with a "turnkey" alternative to
achieve greater energy efficiency in its buildings --access to vetted technical expertise to
determine the deficiencies in current energy utilization: identification of energy efficiency
improvements; recommendations of reputable suppliers and contractors; and assistance with
satisfying grant reporting requirements. Energy audits of City facilities will support budget planning
to implement additional energy -saving actions beyond those funded with the grant award.
3.Will in -kind support beprovided tothe project bythe community? If so, please describe the types
ofin-kind support that are available (|ahor, storage, lodging, other),and the extent tuwhich itis
North Pole'sPublic Works Department has only two full time employees; however, these staff
members do have skills that can be used for basic construction activities. The North Pole Fire
Department has employees with construction skills that could be used for construction -related
activities ouFire Department facilities. The Director ofCity Services will provide administrative
support for the project. Depending upon the results of energy audits, recommended
improvements and estimated pay -back times, the City Council will actively consider funding
energy improvements beyond those funded with grant dollars.
4. If known, what buildings or facilities would the city like the contractor to focus on during the audit
portion nfthe work? If specific known opportunities exist in any of these buildings, please list them
in "additional comments" section below.
# Name ofBuilding cvFacKitvStreet Address
North Pole City Hall 125Snowman Lane
1.
3.
3.
4.
S.
North Pole Police Station 125Snowman Lane
�
North Pole Fire Station 1O2Lewis Street
North Pole Fire Annex 2431 stAvenue
North Pole Public Works 1O3Lewis Street
If additional space is needed, please list other buildings in the "Additional comments"' box below.
So`Ft. Sector
3.900 Public Building
�
5,500 Public Building
12.240 Public Building
3.000 Public Building
4.800 Public Building
Page 2ofD
5. Summary ofProject NORTH POLE 10-103 (4 pages)
The majority ofthe ChyofNorth Pole public facilities are between 2Uand 4Qyears old. When
these buildings were constructed, energy was relatively inexpensive, attitudes toward energy
saving were different, and energy saving technologies were less effective than those available
today. With competing demands for scarce public resources, it is challenging for a small
municipality to overcome the financial hurdle for initiating upgrades in the energy efficiency of its
facilities. The funding from the EECBG will provide the City with start-up funding to initiate efforts
to improve energy efficiency of its facilities. The critical first step in improving the energy
efficiency of the City's facilities is an assessment of the the current state of energy usage and the
facilities' conditions; recommendations for improving energy efficiency; and cost -benefit data
including estimated payback for investments in energy efficiency improvements. With this
information, the City can use the remainder of the grant funds to make energy efficiency
improvements that will generate immediate results and cost savings. Energy efficiency
improvement recommendations that cost more than the balance of grant funds will be the
foundation for an energy efficiency improvement plan to be funded with City funds and possible
grant and loan awards.
6.Additional Comments
The City ofNorth Pole recognizes the need mimprove energy efficiency auits facilities and inits
operations and has made energy efficiency a priority component of capital projects. The City has
received funding from USDA -Rural Development, Environmental Protection Agency, Alaska
Department of Environmental Conservation, and Alaska Department of Transportation and Public
Facilities matched with City cash for a series of capital projects. Below is a summary of capital
projects scheduled for 2010-2011 that have significant energy -saving components.
1.Water Treatment Plant Pump Replacement Project for Energy Efficiency: $OUO.OUVofARRA
funding u,replace old single -speed water pumps with high efficiency variable frequency drive
pumps.
2. Water Meter Replacement Project: $100,000 to replace residential water meters and to provide
every water utility customer with an in -home water meter monitor so they ran make informed
water conservation decisions.
3.Waste Water Treatment Plant Engineering and Design Project: $5OO.O0Otodesign upgrades to
the City's waste water treatment plant. A directive to the engineering firm will be to incorporate
energy saving technologies inthe project design.
4.Water Treatment Plant Engineering and Design Project: $5OO.8OOvodesign upgrades mthe
Qt/owater treatment plant. Adirective mthe engineering firm will b000incorporate energy
saving technologies inthe project design.
5. Sewer Lift Station Rehabilitation Project Phases 1 &2: $4.800.800oo upgrade sewer lift
stations that includes energy efficient variable frequency drive pumps and supervisory control and
data acquisition (SCADA) controls that will provide operational data that will support energy
efficiency.
0. Utility Garage Construction Project: $U5O.00Umbuild a utility maintenance shop and garage
that will incorporate energy efficient construction, heating, and lighting.
7�LED Street Light and Load Center Replacement Project: $2UD.00Ufor the replacement nf
streetlights with energy -saving LED lights and the upgrade of all street light load centers.
Page 3nf8
NORTH POLE 10-103 �����
ENERGY AUTHORITY ` ' — �
Alaska Small Cities
Energy Efficiency and Conservation Block Grants
Name of City or Borough:
BudgetForm
City of North Pole
Table A: Full Project Budget
Line Funding Source Budgeted Amount
| l. EE[BGfunds requested $100.000
2. City/borough matching orin-kind contributions $10.000
� 3. Funding from other sources* $
4. Estimated total project cost $1101000
* Identify other sources from line 3, and whether sources are confirmed or pending:
TatdeB: EEC8GFunding Breakdown
Please budget how the EE[BGfunding (Table A,line 1above) breaks down between the following
categories. Please note that the energy audit cost column may not be more than 50 percent of the total.
Expense Categories Energy Audit Costs EEM/ECM[uuts**
Personnel $ $ $O
Travel $ $ $O
Materials &3upp|ieo $ $ $O
Equipment $ $ $O
Total
Total $O $O $O
� �
**EEM: Energy Efficiency Measure, ECM: Energy Conservation Measure; defined in EEC G Funding
Announcement and Instructions document,
Budget Narrative
Please briefly describe the use of EECBG funds and any matching funds, as categorized above:
Asaparticipant inEEC8GOption 1.the City will rely heavily upon the technical expertise of
project- p rovid ed consultants. The City has identified the need to conduct energy assessments of its
h*ci|ities, but lacks the resources to make the initial investment. Aprofessional energy assessments that
provide sound recommendations about needed upgrades, costs, and energy savings -payback data will
provide the City with the ability to make sound policy and funding decisions. With an energy saving plan,
the City can allocate resources for those activities that ran be funded internally and that use intemal labor
and can budget for more expensive project. A professionally conducted energy assessment of City facilities
will also provide the City with technically sound data to support grant and loan applications.
Matching contributions will be in -kind labor from the Public Works, Fire Department, and Administration
staff. Depending upon the recommendations of the energy assessment, particularly ones that provide
documentable rapid payback and future budget savings, the North Pole City Council may be willing to
commit significant financial resources ooenergy upgrades.
Page 4of8
U Y 10-161 (4 pages)
Alaska Small Cities
Energy Efficiency and Conservation
1. Name of City or Borough:
ck Grant (E
Grant Application, Option 1
(For option 1 applicants only)
Opt -In Technical Assistance
fct-(1)
2. To what extent is the community committed to coordinating; planning and working with the
contractor? Please describe.
. / 0
d (jet bc
IL)S5/K tL
r'jj2. /476cfra
-
3. Will in -kind support be provided to the project by the community? if so, please describe the types
of in -kind support that are available (labor, storage, lodging, other), and the extent to which it is
Thejli )(1 Stoi7-1-
7re-ic7e (uyt Z6-0'c '64&a
4. if known, what buildings or facilities would the city like the contractor to focus on during the audit
portion of the work? if specific known opportunites exist in any of these buildings, please list them
in "additional comment? section below.
# Name of Building or Facility Street Address
7
c ;kit C
2.
3,
4,
So, Ft, Sector
LI t,
k_Oact Select from Arrow
Select from Arrow
Select from AfrOVV
Select from Arrow
Select from Arrow
if additional space is needed, please list other buildings in the "Addition& comments" box below.
Pace. 2 of 8
6-0
ApueN
dLC'CO OL 60 JdV
5, Summary of Project
6. Additional ents
Y 0-164 pages)
Pane 3 of e
LG
9t7L0
tioN 40ueN
Ot 60 AV
Ene
Name of City or Borough:
E
0-161 (4 pa es)
Alaska Small Cities
iciency and Conservation Block Grants
Budget Form
Table A: Full Project Budget
Line Funding Source 1 Budgeted Amount
1. EECBG funds requested 6, 5co
2. City/borough matching or in -kind contributions
3. Funding from other sources*
Estimated total project cost $ tt, 5i2_O()
Identify other sources from line 3, and whether sources are confirmed or pending:
Table B: EECBG Funding Breakdown
Please budget how the EECBG funding (Table A, line 1 above) breaks down between the following
categories. Please note that the energy audit cost column may not be more than 50 percent of the total
Expense Categories I Energy Audit Costs EEM/ECM Costs** i Total I
Personnel $ $ S I
Travel $ $ $0 5ZCO6
I Materials & supplies $ SO
Equipment $ SO
Contractual $0 .
Total 0 I $0
**EEM: Energy Efficiency Measure, ECM: Energy Conservation Measure; defined in EECBG Funding
Announcement and instructions document.
Budget Narrative
Please briefly describe the use of EECBG funds arid any matching funds, as categorized above: