HomeMy WebLinkAboutHoly Cross Final Audit Report 04-29-2011-VEEPAlaskan Village Audit Final Report Energy Audit of City Buildings
Ameresco VEEP Audit- City of Holy Cross
Page i Holy Cross, AK
EENNEERRGGYY AAUUDDIITT FFIINNAALL RREEPPOORRTT
Results and Recommendations from
Energy Audit of Holy Cross
For VEEP Grants
City of Holy Cross, Alaska
April 29, 2011
Prepared By: Prepared For:
Ameresco, Inc.
6643 Brayton Drive
Anchorage, AK 99507
Alaska Energy Authority
City of Holy Cross
Alaskan Village Audit Final Report Energy Audit of City Buildings
Ameresco VEEP Audit- City of Holy Cross
Page ii Holy Cross, AK
TTAABBLLEE OOFF CCOONNTTEENNTTSS
EXECUTIVE SUMMARY AND PREFACE .................................................................................. 1
1.0 BUILDING DESCRIPTIONS ............................................................................................ 2
1.1 HOLY CROSS CITY OFFICE ..................................................................................... 2
1.2 HOLY CROSS COMMUNITY HALL ............................................................................. 5
1.3 HOLY CROSS SCHOOL ........................................................................................... 7
1.4 HOLY CROSS W ASHETERIA .................................................................................. 10
1.5 HOLY CROSS W ATER TREATMENT PLANT ............................................................. 12
2.0 UTILITIES ..................................................................................................................... 15
2.1 Electricity ................................................................................................15
2.1.1 Electricity Usage Profiles ........................................................................16
2.2 Fuel ........................................................................................................18
2.2.1 Fuel Usage Profiles ................................................................................18
3.0 OPERATIONS/MAINTENANCE PRACTICES .............................................................. 20
4.0 ENERGY CONSERVATION OPPORTUNITIES ............................................................ 21
4.1 ECO DESCRIPTIONS ............................................................................................ 21
4.1.1 Controls Opportunities ............................................................................21
4.1.2 Electrical Opportunities ...........................................................................22
4.1.3 Mechanical Opportunities .......................................................................22
4.2 ECO DESCRIPTIONS – ECOS NOT FUNDED .......................................................... 23
4.2.1 Building Envelope Opportunities .............................................................23
4.2.2 Electrical Opportunities ...........................................................................23
AAPPPPEENNDDIICCEESS
APPENDIX A – VEEP ECO CALCULATION RESULTS ......................................................... A-1
APPENDIX B – ECOS NOT FUNDED .................................................................................... B-1
APPENDIX C – ECO CALCULATIONS .................................................................................. C-1
Alaskan Village Audit Final Report Energy Audit of City Buildings
Ameresco VEEP Audit - City of Holy Cross
Page 1 Holy Cross, AK
EEXXEECCUUTTIIVVEE SSUUMMMMAARRYY AANNDD PPRREEFFAACCEE
This Final Report summarizes the results of an Ameresco Energy Audit of the City of Holy Cross. The
intent of this Final Report is to evaluate energy consumption and costs, and to identify city and
community projects that could utilize grant money provided by the Alaska Energy Authority (AEA). The
City of Holy Cross is a recipient of an AEA Village Energy Efficiency Program (VEEP) grant of
$150,000.
Ameresco engineers conducted an energy audit of the City of Holy Cross on November 29-30, 2010. The
table below shows the buildings audited and their respective square footages.
City of Holy Cross - Building Summary
Building Category Square Footage
City Office Public Building 770
Community Hall Public Building 2,640
School School 17,537
Water Treatment Plant Public Facility 860
Washeteria Public Facility 330
The audit identified existing types, conditions, operating modes, and energy consumption profiles for a
variety of buildings, facilities and systems. The audit also identified all cost-effective system and facility
modifications, adjustments, alterations, additions, and retrofits. Systems investigated during the audit
included heating, ventilation, interior and exterior lighting, process exhaust, domestic hot water, mot ors,
building envelopes, utility metering systems, and energy management control systems (EMCS).
The table below shows the results of Ameresco’s audit and potential calculation savings, allocated by
grant. See Appendix A for more detailed calculation results. It is important to note that the simple
paybacks (SPBs) have been determined according to ECO type. For example, the SPB for an electrical
ECO is calculated using only the annual kWh savings, even though the equivalent annual fuel gallon
monetary savings is reported.
VEEP
ECO Cost Savings SPB
C01 - THERMOSTAT UPGRADE $ 2,000.00 $ 7,937.11 0.25
E01 - T8 LIGHTING UPGRADE $ 60,200.00 $ 10,830.24 5.56
E02 - INSTALL OCCUPANCY SENSORS $ 13,000.00 $ 5,511.37 2.36
E03 - PREMIUM EFFICIENCY MOTORS UPGRADE $ 20,000.00 $ 1,102.31 18.14
M01 - BOILER TUNE-UP $ 8,400.00 $ 17,642.00 0.48
M02 - BOILER UPGRADE $ 41,000.00 $ 6,164.56 6.65
DESIGN/AUDIT $ 2,500.00
AVAILABLE FUNDING $ 2,900.00
* Available funding allocated for travel expenses, shipping, additional labor, etc
TOTAL $ 150,000.00 $ 49,187.60 3.05
Alaskan Village Audit Final Report Energy Audit of City Buildings
Ameresco VEEP Audit - City of Holy Cross
Page 2 Holy Cross, AK
11..00 BBUUIILLDDIINNGG DDEESSCCRRIIPPTTIIOONNSS
11..11 HHOOLLYY CCRROOSSSS CCIITTYY OOFFFFIICCEE
Description: The Holy Cross City Office handles the day to day operations and maintenance
issues of the village. The upstairs of the building is used mostly as a storage area. Typical
operating hours are from 0900 to 1700 hours, Monday through Friday.
General Conditions: The building is in fair condition overall, with several damaged areas found
during the course of the audit, in particular the leaky roof. Much room exists for repair and
improvement in energy savings.
Pictures of general conditions found during the field audit immediately follow this building
description.
Building Envelope: The building overall is in fair condition and could use many improvements.
The roof is in poor condition and is leaking water into the building. The building exterior is
showing many signs of weathering and age but it still holding up. The windows are in fair
condition. Weather-stripping, when present, is in poor condition and needs to be replaced; the
front entrance door has no weather-stripping at all. There is a potential safety hazard on the
second floor of the building; an exterior door exists where there is no staircase or balcony for
unknowing occupants to step out on.
Heating: Building heating is provided by a Toyostove Laser 73 oil burning unit heater. A
Lennox oil furnace that is no longer used remains in the building. This furnace is kept as a
backup in case the Toyostove heater breaks. The Toyostove heater, however, cannot heat the
building to the setpoint of 68°F in cold weather.
Controls: The old mechanical thermostats for the furnace remain in the building but are not used
at this time.
Alaskan Village Audit Final Report Energy Audit of City Buildings
Ameresco VEEP Audit - City of Holy Cross
Page 3 Holy Cross, AK
Lighting: Interior lighting consists primarily of T12 fluorescent lamps with magnetic ballasts as
well as several 60-90 watt incandescent fixtures.
Domestic Water: The building does not have a domestic hot water system in place.
Alaskan Village Audit Final Report Energy Audit of City Buildings
Ameresco VEEP Audit - City of Holy Cross
Page 4 Holy Cross, AK
Building Photos: Holy Cross City Office
Exterior Door to Nowhere Melting Snow – Poor Insulation
Run-Down Exterior Window No Weather-stripping on Front Door
Toyostove Laser 73 Heater Ceiling Water Damage From Leaky Roof
Old Lennox Furnace More Water Damage
Alaskan Village Audit Final Report Energy Audit of City Buildings
Ameresco VEEP Audit - City of Holy Cross
Page 5 Holy Cross, AK
11..22 HHOOLLYY CCRROOSSSS CCOOMMMMUUNNIITTYY HHAALLLL
Description: The Holy Cross Community Hall is connected to the City Office building by a
shared foyer area. This section of the building is used for special occasions and various
community gatherings.
General Conditions: This building is in the same condition as the City Office, but the roof of the
Community Hall section of the building is in fair condition with no water leakage issues.
Pictures of general conditions found during the field audit immediately follow this building
description.
Building Envelope: The building envelope of the Community Hall is the same as the City
Office, except there is no water leakage, so the roof and dropped-ceiling tiles are in good
condition.
Heating: This section of the building has the same setup as the City Office. A new Toyostove
Laser 73 supplies the building with space heating, while an old Lennox furnace remains in place
as a backup heating system.
Controls: The Toyostove has a building in thermostat, but the old furnace mechanical
thermostats remain in place in the facility.
Lighting: Interior lighting fixtures are mostly T12 fluorescent with magnetic ballasts , and there
are several 60-90 watt incandescent fixtures as well.
Domestic Water: The building has a men’s and women’s toilet, but no showers or domestic
water heater.
Alaskan Village Audit Final Report Energy Audit of City Buildings
Ameresco VEEP Audit - City of Holy Cross
Page 6 Holy Cross, AK
Building Photos: Holy Cross Community Hall
Interior Lighting System Women’s Restroom – No Longer Functional
Unused Furnace Community Hall Interior
Insulated Exhaust Opening Toyostove Laser 73 Heater
Alaskan Village Audit Final Report Energy Audit of City Buildings
Ameresco VEEP Audit - City of Holy Cross
Page 7 Holy Cross, AK
11..33 HHOOLLYY CCRROOSSSS SSCCHHOOOOLL
Description: The Holy Cross school houses elementary through high school students from the
village. School hours are from 0730 to 1700, but there are several after school activities that keep
the facility open longer some nights.
General Conditions: Although the building was constructed in 1986, it is in good condition with
no major faults or defects found during the course of the audit. Although there is some water
damage, it is not certain at this time weather the water damage is due to an issue with the roof or
mechanical equipment. The primary concern at this time is the overheating that is currently
happening in the facility. Updating the controls system to maintain building temperatures as well
as introduce night setbacks will provide ample opportunity for energy savings.
Pictures of general conditions found during the field audit immediately follow this building
description.
Building Envelope: The building is in good condition overall and is well-maintained. The roof
appears to be in good condition. In the library, there is evidence of some water damage on the
dropped ceiling, but the source of the damage is uncertain. Windows are in fair condition, and
some have been recently replaced; many have handles that have been broken off. Weather-
stripping is in fair condition, but could be upgraded. Doors are in good condition.
Air Distribution: A Trane Climate Changer air handling unit (AHU) provides the school with its
air distribution needs. There is also a second smaller AHU that servers as a boiler room vent fan.
At the time of the audit, both of these AHUs were shut down. According to the operator, thes e
pieces of equipment are only used in the fall and spring as backup heat for somewhat milder but
cold days, while the boilers operate independently in the winter months.
Alaskan Village Audit Final Report Energy Audit of City Buildings
Ameresco VEEP Audit - City of Holy Cross
Page 8 Holy Cross, AK
Heating: Two Burnham PF 504 boilers rated at 80.5% thermal efficiency and 620 MBH each
provide the building with space heating. A combustion analysis at the time of the audit showed
these boilers to be operating at 78.6 and 82.2% combustion efficiency. The Holy Cross school,
however, was clearly overheated at the time of the audit. Although the thermostat was set to
70°F, temperature measurements taken ranged from 75-80°F.
Controls: Building heating is controlled by a series of mechanical thermostats throughout the
building. The functionality of these thermostats is uncertain due to the overheating concerns of
this building.
Lighting: Interior lighting is primarily T12 fluorescent with magnetic ballasts. There are several
90 watt incandescent fixtures scattered throughout the building as well as several 150 and 175
watt metal halide, high pressure sodium, and mercury vapor fixtures. The gym has T-8 high bay
fixtures with motion sensors.
Domestic Water: A Triangle Tube Smart series indirect-fired water heater provides the building
with domestic hot water.
Alaskan Village Audit Final Report Energy Audit of City Buildings
Ameresco VEEP Audit - City of Holy Cross
Page 9 Holy Cross, AK
Building Photos: Holy Cross School
Burnham Boilers Circulating Pumps and Smart Indirect Water Heater
Air Handling Unit (AHU-1) Boiler Room Vent Fan (VF-1)
Gym High Bay Lighting Water Damage in Library
Alaskan Village Audit Final Report Energy Audit of City Buildings
Ameresco VEEP Audit - City of Holy Cross
Page 10 Holy Cross, AK
11..44 HHOOLLYY CCRROOSSSS WWAASSHHEETTEERRIIAA
Description: The Holy Cross Washeteria is used by most of the villages to meet their laundering
needs. The Washeteria operates from 0900 to 1900 hours, seven days a week.
General Conditions: The building is in fair condition overall due to age and weathering; the
facility was originally constructed in 1986.
Pictures of general conditions found during the field audit immediately follow this building
description.
Building Envelope: The building is showing many signs of weathering and age and is in fair
condition overall. The roof is in fair condition, but is showing no signs of leakage. There is not
enough insulation, however, to prevent building heat from escaping, and this is causing snow on
the roof to melt. Additional attic insulation is needed to retain building heat. The exterior walls
are in fair condition, but do not have any major structure faults or defects. Weather-stripping is in
poor condition and is due to be replaced. Doors are in poor condition and need replacements.
Heating: Building heating is provided by a Toyostove Laser 73 fuel oil forced air heater.
Controls: There are no separate building controls.
Lighting: Interior lighting is primarily T12 fluorescent with magnetic ballasts.
Domestic Water: The water heater for the Washeteria is located in the Water Treatment Plant’s
office. It is a tankless kerosene-fired Toyotomi model BS-36UFF.
Laundry Equipment: The Washeteria has 3 washers and 2 dryers. The washers run on
electricity, while the dryers consume liquid propane for heat and use electricity for the motors.
At the time of the audit, one of the dryers was out of order, and two of the washers were out of
order. This leaves only one functional washer and dryer for the village Washeteria.
Alaskan Village Audit Final Report Energy Audit of City Buildings
Ameresco VEEP Audit - City of Holy Cross
Page 11 Holy Cross, AK
Building Photos: Holy Cross Washeteria
Windows Roof – Melting Snow Evidence of Poor Insulation
Toyostove Laser 73 Heater Dryers
Washers Interior Lighting
Alaskan Village Audit Final Report Energy Audit of City Buildings
Ameresco VEEP Audit - City of Holy Cross
Page 12 Holy Cross, AK
11..55 HHOOLLYY CCRROOSSSS WWAATTEERR TTRREEAATTMMEENNTT PPLLAANNTT
Description: The Holy Cross Water Treatment Plant provides clean water to the entire city. The
plant has a single operator, but receives extra maintenance help when needed. The plant is open 3
hours a day, Monday through Friday, but constantly has an operator on call.
General Conditions: The water treatment plant is in fair condition overall. Having been
constructed in 1986, the building is showing many signs of age and weathering. There are several
concerns with the heating equipment that should be corrected as soon as possible.
Pictures of general conditions found during the field audit immediately follow this building
description.
Building Envelope: The building’s exterior is in fair condition, due to its age and the weathering
seen over the years. The metal roof is in fair condition and has been patched. The walls are 2x4
posts with no side insulation according to the operator. Windows appear to be in good condition.
Weather-stripping is in poor condition and is due to be replaced. Doors are in poor condition.
Roof insulation is in fair condition, but additional insulation could be added.
Heating: Two Burnham V903 fuel oil boilers provide the building with heating; these boilers are
rated 80.0% thermally efficient with a combustion efficiency of 85.2%. Combustion analyses of
these two boilers showed them to be functioning at combustion efficiencies of 78% and 79.2%.
At least one, if not both, of the boilers seems to have a crack in the combustion chamber or
diffuser, and the inspection had to be completed with the main entrance doors open to abate the
overwhelming fumes in the mechanical room. There are also several hydronic unit heaters and
fuel oil forced air heaters in the facility as well.
Controls: Building heating is controlled by mechanical thermostats.
Alaskan Village Audit Final Report Energy Audit of City Buildings
Ameresco VEEP Audit - City of Holy Cross
Page 13 Holy Cross, AK
Lighting: The building is primarily lit by T12 fluorescent fixtures with magnetic ballasts as well
as several 90 watt incandescent fixtures.
Domestic Water: A tankless kerosene-fired Toyotomi model BS-36UFF water heater provides
domestic hot water to the Water Treatment Plant as well as the Washeteria.
Vacuum System: Vacuum sewage systems are installed in bush Alaska due to permafrost and
lack of available pitch. The system originates at the treatment facility and is in good operational
condition. The vacuum pump motor runs 24/7 to meet village requirements. A higher efficiency
motor will result in measurable savings for this system.
Heat Trace System: To prevent system freeze ups, hot water heat trace pumps that run
throughout the water distribution system originate from this facility. The system is manually
controlled and runs at all times or at operators’ discretion. Limiting the operation of the heat
trace based on outside air or ground temperatures will provide significant savings to the village.
Alaskan Village Audit Final Report Energy Audit of City Buildings
Ameresco VEEP Audit - City of Holy Cross
Page 14 Holy Cross, AK
Building Photos: Holy Cross Water Treatment Plant
Burnham Boilers Toyotomi Fuel Oil Heater
Water Tank Doors in Need of New Weather-stripping
Unused Insulation – Not Enough to Cover Attic Corroded Heat Exchanger
Alaskan Village Audit Final Report Energy Audit of City Buildings
Ameresco VEEP Audit - City of Holy Cross
Page 15 Holy Cross, AK
22..00 UUTTIILLIITTIIEESS
22..11 EElleeccttrriicciittyy
The City of Holy Cross purchases its electricity from the Alaskan Village Electric Cooperative (AVEC).
Village facilities are billed on an electric use and fuel use to provide the electricity. Some facilities may
also qualify for a Power Cost Equalization (PCE) incentive. The AVEC rates for the City of Holy Cross
are listed below.
Current Rates as of January 2011
AVEC Cost of Fuel (Added to Customer Electric Bill) $ 0.2271
Rate Per kWh, Fuel Cost Included (1-700 kWh) $ 0.5271
Rate Per kWh, Fuel Cost Included (Over 700 kWh) $ 0.4271
PCE Rate (1-700 kWh) $ 0.3119
PCE Rate (700+ kWh) $ 0.2839
Rates August 2010 - December 2010
AVEC Cost of Fuel (Added to Customer Electric Bill) $ 0.2405
Rate Per kWh, Fuel Cost Included (1-700 kWh) $ 0.5405
Rate Per kWh, Fuel Cost Included (Over 700 kWh) $ 0.4405
PCE Rate (1-700 kWh) $ 0.3246
PCE Rate (700+ kWh) $ 0.2966
Rates for Calculations, Including Fuel Cost and PCE Incentive
Rate for Calculations (1-700 kWh) $ 0.2152
Rate for Calculations (700+ kWh) $ 0.1432
All buildings audited except for the Holy Cross School currently receive PCE funding. The School has its
own agreement with AVEC, but bills were not readily available at the time of the audit or reporting
process. The school is therefore assumed to pay the same amount per kilowatt -hour as the rest of the
village. Most schools that have a contract with AVEC also pay a demand fee of $45/kW, s o this has been
assumed as well in savings calculations.
The street light bills show identical usage month to month and, therefore, are most likely billed on a flat
rate.
Alaskan Village Audit Final Report Energy Audit of City Buildings
Ameresco VEEP Audit - City of Holy Cross
Page 16 Holy Cross, AK
22..11..11 EElleeccttrriicciittyy UUssaaggee PPrrooffiilleess
Holy Cross City Office Electric Usage
0
100
200
300
400
500
600
Oct-
09
Nov-
09
Dec-
09
Jan-
10
Feb-
10
Mar-
10
Apr-
10
May-
10
Jun-
10
Jul-
10
Aug-
10
Sep-
10
Oct-
10
Nov-
10kWh
Holy Cross Community Hall Electric Usage
0
100
200
300
400
500
600
700
800
Oct-
09
Nov-
09
Dec-
09
Jan-
10
Feb-
10
Mar-
10
Apr-
10
May-
10
Jun-
10
Jul-
10
Aug-
10
Sep-
10
Oct-
10
Nov-
10kWh
Holy Cross Washeteria Hall Electric Usage
0
50
100
150
200
250
300
Oct-
09
Nov-
09
Dec-
09
Jan-
10
Feb-
10
Mar-
10
Apr-
10
May-
10
Jun-
10
Jul-10 Aug-
10
Sep-
10
Oct-
10kWh
Alaskan Village Audit Final Report Energy Audit of City Buildings
Ameresco VEEP Audit - City of Holy Cross
Page 17 Holy Cross, AK
Holy Cross Water Treatment Plant Electric Usage
0
1000
2000
3000
4000
5000
6000
7000
Oct-
09
Nov-
09
Dec-
09
Jan-
10
Feb-
10
Mar-
10
Apr-
10
May-
10
Jun-
10
Jul-
10
Aug-
10
Sep-
10
Oct-
10
Nov-
10kWh
Holy Cross Street Lights Electric Usage
0
100
200
300
400
500
600
Jan-10 Feb-10 Mar-10 Apr-10 May-10 Jun-10 Jul-10 Aug-10 Sep-10 Oct-10 Nov-10kWh
Alaskan Village Audit Final Report Energy Audit of City Buildings
Ameresco VEEP Audit - City of Holy Cross
Page 18 Holy Cross, AK
22..22 FFuueell
The City of Holy Cross purchases its fuel from Ruby Marine at a rate of $3.12/gallon.
The Holy Cross Washeteria purchases 14 bottles of 100-pound liquid propane from Fairbanks each year
at a rate of $223.30/bottle.
The Holy Cross School has its own fuel contract with Crowley Petroleum Distribution, Inc. Bills were
not readily available at the time of the audit, and therefore, the school has been assumed to pay the same
fuel rates as the rest of the village in savings calculations.
22..22..11 FFuueell UUssaaggee PPrrooffiilleess
Holy Cross City Hall Fuel Purchases
0.0
100.0
200.0
300.0
400.0
500.0
Jan-
10
Feb-
10
Mar-
10
Apr-
10
May-
10
Jun-
10
Jul-10 Aug-
10
Sep-
10
Oct-
10
Nov-
10
Dec-
10Gallons
Holy Cross City Office Fuel Purchases
0.0
50.0
100.0
150.0
200.0
250.0
300.0
Jan-
10
Feb-
10
Mar-
10
Apr-
10
May-
10
Jun-
10
Jul-10 Aug-
10
Sep-
10
Oct-
10
Nov-
10
Dec-
10Gallons
Alaskan Village Audit Final Report Energy Audit of City Buildings
Ameresco VEEP Audit - City of Holy Cross
Page 19 Holy Cross, AK
Holy Cross Washeteria Fuel Purchases
0
100
200
300
400
Jan-
10
Feb-
10
Mar-
10
Apr-
10
May-
10
Jun-
10
Jul-10 Aug-
10
Sep-
10
Oct-
10
Nov-
10
Dec-
10Gallons
Holy Cross Water Treatment Plant Fuel Purchases
0.0
200.0
400.0
600.0
800.0
1000.0
Jan-
10
Feb-
10
Mar-
10
Apr-
10
May-
10
Jun-
10
Jul-10 Aug-
10
Sep-
10
Oct-
10
Nov-
10
Dec-
10Gallons
Alaskan Village Audit Final Report Energy Audit of City Buildings
Ameresco VEEP Audit - City of Holy Cross
Page 20 Holy Cross, AK
33..00 OOPPEERRAATTIIOONNSS//MMAAIINNTTEENNAANNCCEE PPRRAACCTTIICCEESS
The village has a number of designated maintenance personnel that seem to possess the basic skills
required to clean and maintain selected equipment. From Ameresco’s observations, if the equipment
should fall into disrepair, the staff does not have the training or experience to repair the equipment per the
manufacturer’s requirements and tends to piece together the equipment to maintain operation. Over time,
the systems no longer function as required, which currently appears to be the case of most equipment and
systems with in the village.
Operations and maintenance is one area in energy services where improvement and training costs are
lower than equipment replacement costs, and the energy efficiency return is high. During the site audit,
Ameresco found that outside of general cleaning, most of the equipment is not maintained to meet
standard manufacturers’ recommendations. Dirty filters, boilers in disrepair, systems altered, and control
systems disconnected are a result of limited funding and lack of system training. This results in excessive
energy use, premature equipment failure, and employee and resident discomfort. An annual system check
by a qualified burner service technician to perform services such as boiler cleaning, boiler tune ups,
system check out, and control system reviews will not only extend the overall life of the equipment , but
improve occupant comfort as well as increase and maintain long term energy efficiency.
Alaskan Village Audit Final Report Energy Audit of City Buildings
Ameresco VEEP Audit - City of Holy Cross
Page 21 Holy Cross, AK
44..00 EENNEERRGGYY CCOONNSSEERRVVAATTIIOONN OOPPPPOORRTTUUNNIITTIIEESS
The ECO matrix below summarizes the funded energy conservation opportunities identified during the
site survey and baseline analysis. A description of each energy conse rvation opportunity follows the
matrix.
ECO No.
ECO Description ECO MATRIX
B=Building Envelope; C=Controls;
E=Electrical; M=Mechanical;
W=Water/Wastewater;
R=Renewable
HOLY CROSS School City Hall Washeteria City Office Water Treatment Controls
C01 Thermostat Upgrade X X
Electrical
E01 T-8 Lighting Upgrade X
E02 Occupancy Sensors X X X X X
E03 Premium Efficiency Motors X
Mechanical
M01 Boiler Tune-Up X X
M02 Boiler Upgrade X
44..11 EECCOO DDEESSCCRRIIPPTTIIOONNSS
Below are the descriptions of the Energy Conservation Opportunities (ECOs) that Ameresco analyzed for
the Village of Holy Cross. For the results of the calculations, refer to Appendix A.
44..11..11 CCoonnttrroollss OOppppoorrttuunniittiieess
C01 – Thermostat Upgrade
This ECO proposes replacing the outdated mechanical thermostats with 7-day programmable thermostats.
The programmable thermostats would allow a building’s HVAC system to be scheduled to operate in
comfortable conditions while occupied and allow for night set-backs.
Alaskan Village Audit Final Report Energy Audit of City Buildings
Ameresco VEEP Audit - City of Holy Cross
Page 22 Holy Cross, AK
44..11..22 EElleeccttrriiccaall OOppppoorrttuunniittiieess
E01 – T8 Lighting Upgrade
This ECO proposes replacing current T-12 fluorescent lighting and magnetic ballast with T-8 lamps and
electronic ballasts. Post-light levels will be nearly equal or better to that of the existing lighting systems.
E02 – Occupancy Sensors
Lighting systems are often left energized in unoccupied areas. This ECO proposes to install sensors to
shut off lighting in unoccupied spaces. Common sensing technologies include infrared, ultrasonic, and
audible sound, often combining multiple types of sensing in one unit to avoid shutting off lights in an
occupied area.
E03 – Premium Efficiency Motors
This ECO proposes installing National Electrical Manufacturers Association (NEMA) premium
efficiency motors to replace standard and high efficiency motors. There are various mechanical systems
operating with inefficient motors throughout the base. Premium efficiency motors typically increase
energy efficiency by 2-3%.
44..11..33 MMeecchhaanniiccaall OOppppoorrttuunniittiieess
M01 – Boiler Tune-Up
This ECO proposes a comprehensive re-commissioning of the boilers in each building to optimize system
operations. Such efforts include:
Replace, repair, calibrate or install sensors or switches
Repair air linkages
Conduct combustion efficiency test services
Clean combustion chambers and stacks
M02 – Boiler Upgrade
This ECO proposes replacing existing hot-water heating boilers with more energy efficient units. Many
of the existing units in the village are original to the buildings they serve and have reached the end of their
useful service life. Boilers employing modern technology can be installed to reduce energy consumption,
improve system operations, and reduce maintenance costs.
Alaskan Village Audit Final Report Energy Audit of City Buildings
Ameresco VEEP Audit - City of Holy Cross
Page 23 Holy Cross, AK
44..22 EECCOO DDEESSCCRRIIPPTTIIOONNSS –– EECCOOSS NNOOTT FFUUNNDDEEDD
Below are the descriptions of the Energy Conservation Opportunities (ECOs) that Ameresco analyzed for
the Village of Holy Cross, but there was not enough grant funding to cover construction. For the results of
the calculations, refer to Appendix B.
44..22..11 BBuuiillddiinngg EEnnvveellooppee OOppppoorrttuunniittiieess
B01 – Door Weather-stripping Upgrade
This ECO proposes applying weather stripping to exterior door perimeters to reduce air infiltration into
the buildings. Many building doors have existing weather stripping material which is worn or missing.
B02 – Thermal Insulation Upgrade
This ECO proposes installing blown-in roof insulation on existing building envelopes to reduce energy
consumption. Insulation can be added to roofs to increase or renew their insulating ratings (R-value).
B03 – Energy Efficient Doors
This ECO proposes installing new insulated doors. The installation would improve U-values of the
current hollow metal doors, single pane glass doors, and un-insulated bay doors connected to conditioned
spaces.
44..22..22 EElleeccttrriiccaall OOppppoorrttuunniittiieess
E01 – T8 Lighting Upgrade
This ECO proposes replacing current T-12 fluorescent lighting and magnetic ballast with T-8 lamps and
electronic ballasts. Post-light levels will be nearly equal or better to that of the existing lighting systems.