Loading...
HomeMy WebLinkAboutChange Order #4Hankal Cons ruction, Inc. 550 W. 54th Avenue Anchorage, Alaska 99519 (907)563-5719 General FAX: (907) 562-6496 Industrial May 22, 2007 Fax: 273-1830 REG-06-088 LCMF, Inc. 615 E. 82nd Ave. Ste 200 Anchorage, AK 99518 REFERENCE: UNALAKLEET SULK FUEL UPGRADE ATTENTION: .FOE DANIELS SUBJECT: CHANGE REQUEST 4 — UPSIZE CONTAINMENT DIKE AT UVEC POWER PLANT Gentlemen The following is a cost breakdown for Change Request No. 4 I. LABOR Superintendent 12 MH @ $107 $ 1,284.00 Operator 16 MH @ $94 $ 1,504.00 Welder 3 MH @ $91 $ 312.00 Laborer 65 MH @ $82 $ 5,330.00 Laborer (fence) 40 MH @ $82 $ 3,280.00 Expediter 5 MH @ $45 $ 225.00 Subtotal 1: 11,935.00 11, EQUIPMENT Excavator '/x day @ $900 $ 450.00 L-70 Loader 1 %a day @ $500 $ 750.00 Compactor 1 day @ $225 $ 225.00 Welding Truck '/Z day @ $300 $ 150.00 Flat Bed '/2 day @ $150 $ 75.00 Crew Transport Pickup 1 week @ $400 $ 400.00 Subtotal II: $ 2,050.00 III. MATERIALS Cooley L1023 2000 sf @ 1.95 $ 3,900.00 Non -woven Geotextile 500 SY @ 0.914 $ 457.00 Freight for above 630 lbs @ $1.00 $ 630.00 Bedding Sand 24 cy @ $43.50 $ 1,044.00 Select Fill 50 cy @ $42.00 $ 2,100.00 Fuels 50 gal @ $5.00 $ 250.00 Subtotal Ill: $ 8,381.00 IV. OUTSIDE SERVICE Seaming Technician 2 days @ $750 RT Airfare 1 @ $420 Other Expenses 2 days @ $150 Subtotal Item IV: Total Items I,11,111 and IV: Overhead & Profit @ 17%: Subtotal: Bond @ 1.5%: Subtotal: Insurance @ 2%: Total: GRAND TOTAL: We request a one (.1) week extension of contract time for completion of this work. $ 1,500.00 $ 420.00 $ 300.00 $ 2,220.00 $ 24,586.00 $ 4,180.00 $ 28,766.00 $ 431.00 $ 29,197.00 $ 584.00 $ 29,781.00 $ 29,781.00 If you have any questions or require additional information, please contact the undersigned at your earliest convenience. Sincerely, Dave Shellenberger Project Manager 2 05I1812007 09:113 907-562-7002 PQLAR SUPPLY CO PAGE 01/02 r Polar Supply Co. a dlvlafon of E-Malk sgordner@polarsupply.coen Spenard guilders Supply Web Slle: www.polarsupply.corn 300 E. 54th Ave, Dale: 5/16/2007 Anchorage, AK 99510 To: Henkel Consl Main Phone: (907) 563.5000 Attn. Dave Shellenbur9or Main Fax; (907) 581.1050 Rona: 561.5719 Alternate Fax: (907) 5152.7003 ['By: 562-8496 "Quality Products for Quality Projects" U nalaklee# Change Order MATERIAL ESTIMATE We are pleased to quote the following materials for the referenced Project: Bid Item Material Deserlptlon Approx. QuantityUnit Unit Lbs. Per Unit Price Extended Price F.0,13, Point Apprux. Availability Cooley L1023 Black Urethane Membrane 58' x 34.5' 2000 5F 0.19 $1.950 $3 900.00 Polar Yard 2.3 weeks P rop 9x 801 Mon -Woven Gealax tile 15' x 300' rolls 0 SY 0.50 $0.914 Polar Yard 5locked Item Please Nore. /V, 10o, , — -Zr'o �6$ COO r�� _ TaD r�5 � 630 16; The altached "Standard Terms and Condiiigns" are a part of Ns quotalion "'XX Sieve Gardner Geotechnlcal I Environmental division Polar Supply Co. I! you have any technical queslions please call Steve Gardner a1 907.646.4715 The Geolechnical 1 Environmental Division fax number is 907.562.7003 Accepted Page t of 2 r ',ryj i o rl sS 1 a d ni a d �9 i MEMO I me .. BMW !own I I 4 W ❑ ti x x �a z N �Q � i V a uj S i yy t ` u U n ZZ fi uIt