HomeMy WebLinkAboutChange Order #5May 03 2007 4:57AM Hankal Construction 562-6496 P.1
HANKAL CONSTRUCTION, INC.
550 W. 54TH AVENUE
ANCHORAGE, AK 99518
PH:
9 0 7 - 5 6 3 - 5 7 1 9 FX: 907-562-6496
FACSIMILE TRANSMITTAL SHEET
TO:
FROM:
Joe Daniels
Dave Shellenberger
COMPANY:
DATE: -
LCMF, Inc.
AUGUST 2, 2007
FAX NUMBER:
TOTAL NO. OF PAGES INCLUDING COVER:
273-1831
10
PHONE NUMBER: REFERENCE PROJECT:
Unalakleet Bulk Fuel Upgrade
RE: PROJECT NUMBER:
Change Order No. 3 2K6-100
May 03 2007 4:58AM Hankal Construction 562-6496
v �
Hankal Construction, Inc.
550 W. 54thAvenue
Anchorage, Alaska 99518
(907) 563-5719
General FAX: (907) 562-6496 Industrial
August 2, 2007 Fax: 273-1830
LCMF, Inc. REG46-088
615 E. 82°d Ave. Ste 200
Anchorage, AK 99518
REFERENCE: UNALAKLEET BULK FUEL UPGRADE
ATTENTION: JOE DANIELS
SUBJECT: CHANGE REQUEST 5 —FUEL SUPPLY AND DAY TANK FOR SCHOOL BOILER
ROOM
Gentlemen
The following is a cost breakdown for Change Request No. 5
I. LABOR
Superintendent
15 MH @ $107
Operator
10 MH @ $94
Welder/Fitter,
64 MH @ $91
Laborer
10 MH @ $82
Expediter
5 MH @ $45
II. EQUIPMENT
Backhoe 1 day @ $400
Bobcat 1 day @ $250
Compactor 1 day @ $225
Welding Truck 2 days @ $300
Crew Transport Pickup 2 days @ $75
$
1,605.00
$
940.00
$
5,824.00
$
820.00
$ ' 225.00
Subtotal I: $
9,414.00
$ .
.400.00
$
250.00
$
225.00
$
600.00
$
150.00
Subtotal It: S
1,625 ,00
2
1
May 03 2007 4:58AM Hankal Construction 562-6496 p.3
�J
III. MATERIALS
ILI
Pipe, Valves, Fittings
LS .
Shipping for above _
635 ltis @ 1.00
Day Tank and Specials .,.
LS
Shipping to Anchorage
200 lbs @ 0.75
Shipping to Unalakleet
200 lbs @ 1.00
Sand Bedding
3 by @ $45
Pipe Wrap
LS
17# Anode
1 @ $125
Shipping to Anchorage.
LS
Shipping to Unalakleet
20 lbs @ 1.00
Subtotal Item HE
TRANSPORTATION / LODGING
Airfare
Lodging
V. SUBCONTRACT
Electrical
Contractor Markup
2 @ $420
4MD@$150
Quotation Attached
@ 10%
Subtotal Item IV:
Subtotal Item V:
Total Items I, II, III and IV:
Overhead & Profit @ 17%:
Subtotal:
Total Item V:
Subtotal:
Bond @ 1.5%:
Subtotal:
Insurance @ 2%:
Total:
$ .
730.00
$
635.00
$
5,919.00
$
150:00
$.
200.00
$
135.00
$
50.00
$
125.00
$
39.00
S
20.00
$ 8,003.00
$ 840.00
$ 600.00
$ 1,440.00
$ 2,924.00
$ 292.00
$ 3,216.00
$ 20,482.00
$ 3,482.00
S 23,964.00
$ 3,216.00
$ 27,180.00
$ 408.00
$ 27,588.00
$ 552.00
$ M140.00
GRAND TOTAL: $ z9;99f:08•
25 iq"c
Due to the excessive lead time for components, a sixty (60) day extension of Contract Time is requested -
If you have any questions or require additional information, please contact the undersigned at your earliest
convenience. ,
Sincerely,
Dave Shellenberger
Project Manager
May 03
2007
4:58AM
Hankal Construction
0'7126I07
04:41
PH CDT
puge• soundpipe via YSI-FAX
562-G49G
p.4
Page 2 of 3 #114299 0K
Pu et Sound Pipe & S I Co. #3
gly
200CHORAGE AK99 1
907-277-7473 faX 907-277-0656
QUOrE TO: . .
H.ANKAL CONSTRUCTION 3
550 W 54TH AVE
ANCHORAGE, AK 99518
Quotation
07/26/07
IS1148363
ORDER TO:
I ... d Yip. a Uml, C.
SHIP TO:
HANKAL CONSTRUCTION 3
550 W 54TH AVE
ANCHORAGE, AK 99518
4:
1755
1;=IN K;PNNEMY
..... ................
KE= KENNEDY
OT OUR=TRUCX
NET DUE.-.30 DAYS 107/26/07
No
UNALA=T BULK FUEL UPGRADE
lea
1" 150# C5410-31-2236FT-XL-I P13V
110.35ea
110.35
VALVE, RF, FLANGED, FLOATING BALL,
REG PORT, UNIBODY WCB BODY, 316SS
TRIM, PACKED STEM, VIRGIN TFM SEAT,
VIRGIN PTFE SEALS, LEVER OPERATOR
-20F RATED, NACE, ISO-5211 MOUNTING
PAD
lea
1" 250# TED BALL VALVE, PBV#
26.50ea
26.50
C5312-38-2236-TL-YC
168ft
10 S80 A53A BLACK ERW PLAIN END SR
138.00cf
231.84
IMPORT PIPE
21ft
1/211 S40 A53A BLACK ERW THRD a CPL
57.00cf
11.97
IMPORT PIPE
42ft
211 S40 A53A BLACK ERW THRD & CPLD
239.00af
100.38
IMPORT PIPE
2ea
1" 150# AIDS RF'WELDNECK FLANGE
11.87ea
23.74
STD BORE
125 TO 250 AARH
3ea
1" 250# SPIRAL WOUND 304 SS
1.46ea
4.38
RW GRAFOIL GASKET
3ea
1/211- 1,- 150# BOLT & NUT KIT
2.00ea
6.00
WITH A307B BOLTS AND RRAVY.HEX NUTS
10ea
I" 3M A105 90 ELL, SOCKETWELD
3..43ea
34.91
10eal2-1
150# 90 ELL: MALLEABLE IRON:
4. 90ea
49.01
LACK
1
DOMESTIC
4ea
2" 150# 45 ELL: MALLEABLE IRON:
5.24ea
20.96
Continued on Next Page
34,6 At
5 1�
Mab 03 2007 4:.58AM Henkel Construction
07126167 04.- 41 PH COT Puget, Sound Pips via V-51-FAX
ANCSound Pipe & Sugly Co: #3
ICHORAGE AK 99 1
907-277-7473 Fax 90.7-277-9656.
QUOTE TO:
11ANKAL CONSTRUCT I 101\7 3
550 W 54TH AVE
ANCHORAGE, AK 99518
562-6496 P.5
Page 3 of 3 $114299 0-=
Quotation
07/26/07 S114636
.ORDER TO:
. . . . . . . . . .
2
SHIP TD:
HANKA-L CONSTRUCTION'3
550 W 54TH AVIR
ANCHORAGE, AR 99518
........... .
1755
KENN KENNEDY
nX:
KENN KENNEDY
OT OUR -TRUCK NET DUE 30 DAYS
07/26/07
No
BLACK
DOMESTIC
lea
211 150# TEE: MALLEABLE IRON BLACK
7-02ea
7.02
IRON: BLACK
DOMESTIC
lea
111 3M A105 TEE, SOCKETWELD
5.44ea
5.44
lea
211 125# PLUG, SQUARE HEAD, CORED
1.45ea
1.45
CAST IRON, BLACK
lea
I" 3M AIDS CAP, THREADED
2.68ea
2.68
AVAIL - 7-10 DAYS COMPLETE, ARO
FOB ANCHORAGE
TAXES NOT INCLUDED
This is a quotation
Subtotal
636.93
All PO's for random length pipe must allow
S&H CHQS
.0.00
quantities plus or minus 10?6 or one length
Prices are firm for 30 days and subject to
change without notice after 30 days.
Amount Due
636.63
Applicable taxes extra! V��nl
/� 11 C0171"T
-730
May 03 2007 4:58AM Hankal Construction 562-6496
.6
Seattle Office
67D3 East Marginal Way S.
Seattle, WA 93108
Phone: (206) 281-5000
Toff Free: (800) 426-2880
Fax: (888) 475-1418
663-5719 ( (90715e2-849e
Dave Schellenberger
Hankal Construction
550 West 54th Ave
Anchorage, AN 99518
Day tank and other misc. Items.
2)
3)
4)
5)
6)
TERMS AND CONDITIONS
70744
Portland d Office
17721 NE Riverside Drive
Suite C
Portland, OR 9T230
Phone:- (800) 452.7437
Fax: (goo) 279-Tllw
Unalakleet
Misc. Fuel Items
27. 2007
STARTUP AND TRAINING:
FREIGHT FOB: Ace Tank
SALES TAX (If applicable): ola
1. Priceexciudestank affloading;e ;Or:piptrp'1 t1alWtfdn;u'nlett 6liPiwl5a8peetfluly noted'kerelt, -
2. Orders will be Invokgd upon" shipmentorattllGty. (30)'days after the daft OfCompletion of product, whtchevereomas ill Tank will hold
andior stom material dot have been lirvolcedfo¢a-shorttom4 for a:standeiq�etoraga fee,
3 AO prking IS FOB: AceTanlcWaretfo'uu.unl utli§red5gnd6ad;below Ftelght qu6YtdlRe tnna0e"only. Actuaf fmightto he charged:
4. BeymontAtrms.are35X'down»n orders-mien.:S25,0�..9C,lialanpgls lletL3o.+.fskaed.bn approJed:c641Y .
S: Subml"swd03ttF!Orj?ed utonrecelpbnfordtrr ar{4t0er"ofiifpt;C ltlloWbnfC7)xEkkYojAallge y';
& UnWa,6Vdherwl3e.spgciBed fP tfpsggar?'plh quota Nrlll ibt va'tf�iYpttryhty{�ap�+aay,,frChr:'(g@d8p�;y-this 'gUoia.,ouetMrVtG abpcsd:bome metal.
mericets, pHolrg361' elect:fairke artgifSL:dgylpmen b)aot t0`arRe9na+fasesleh?:9rgtven;itBIG
.
7. Arurtock fae.of459: wlltbe.ctieygld.pnanY,noo-sloyk Iwitwrthinletl: Sypclat`cgstom orpruj2CtspeoHlciaci rut may nat:bs,retuinable and
will be charged atthe quoted price,.althoogh� AAoetank"mlyusylyt;¢podalb e;.lrttlre resalaoi'wyit HeirlS: -
8. An NSF ehatgeOf $2&OHIMAll.be applied [oniaeh:rdWmed eheyk .
9. Acetank Standard Terms and Condltore.to apply; Seat laetpage..of'gllotatorr4ordetalls. -
Quoted By.
SIGNED
Steve Latimer
July 27, 2007
PRINTED NAME
DATE QUOTED
August 26, 2007
DATE QUOTE P]aP1 S
(206) 790-3680
slatimerCacetank.com
OIFSCrP NE
EMAIL
Accepted By:
SIGNATURE DATE
Dave Schellenberger - -
PMNTEDNAME
Nankai Construction
COMPANY
Page 1 of 3 www.AceTank.com 3:37 PM
7272007
May 03 2007 4:59RM Hankal Construction
562-6496
7
. utub Ace Tank &:Fueling Equipment � ,
Prolect Soec Seellonwa
a Ouote N ilawr
Undlakleet - . Misc. Fuel Ttems - _ July27, 2007 707-04
I warmry inanureCNry leladel$ I 'Stye �DBscrip5pn PdkxaE eh Exre n"x
n•ra•s•�n.. --- --Me
-
1
Am Tank PYSOUL -50 Callon Day Tank with RtOft a Basin and Options as specified
Opt 405 lASOB Control Panel
$5.6w.00
$i,635.00
Opt 205 Critical Low Alarm w/ErK*m Shutdown
Opt 210'High / Low Combination Fuel level Alan
-
Opt 211 Tennin rls; Socket, Relay & Widng for Opt 210 (remote
annuncletim)
Opt 213A CdOd 1-0911 Rerm w/ Pump & Motor Shutdown (121
NPT)
Opt 223 Alarm Horn; Compac
.Opt 240."Alarm Test Switch
_ Opt 242 Alamt Silence Switch
. Opl. 244 Pump Run Dry Contacts
Opt 301 Manual Fuel FlII w/ Loddng Cap Or NPT)
Opt 312A Priming Tee (14 NPT)
OPL315SGLFuel.Ffltar (VNPT)
Opt 322A Vent lilt Package (Includes (1) working vent &(1)UL
- pressure relief cap)
Opt 38N720A Solenoid Valve; AC System 1,V
Opt 374 Fusible Valve (I- NPT)
Opt 385W 150% Rupture Basin
Opt 395 Rupture Basin Leak DetaCtor
PM 295. Extra Heavy Duty Float Switches (brass) (clty 6)
1
M tsonBrc 178-0100AC Z" AuxlffaryThreaded FBI Cap (Lkluid Tight)
521.6a
$21.68
9taer � .. - ..
el- Wamkr
OLD to Ih6pmPud volao)ityof the. steel Industry,-. steel tank prices Will 'b6ANkoied'fare PeledeF21:ddyalfrom:date.of
quotation. After 21 days; we reservedheflght to revise the tank price; eccadhrgly at tlmakif Mier. If you have any
ltuesaons mgarding1Ns:pplicy, please dl-to discuss. -
-
7 HARDWARE ACCESROP
1
1
F'; Aa
AloTE Brc
DSO-105-01
334-0100AV
.1/Y
314'
. Foot Valve, Single Poppelt Brass
Foot Valve, Slagle PoppeR Brass
NOTE: PrlminD
Tee by others
1
Morrison Bn
1114-22001B
4'• x 1 x 1
Double Tapped Bushing
2
RUB, Irk.
S95-1
1 •
Ball Vahre, Full Porl, Brass'
7$3.81
1
HoseMaster
FSMM-12-1
V x 12"
Stainless Steel Flex Connector, Male x Mate
1
A® Tank
PB1X12B .
- 1"x V2-
Black Pipe Bushing
1
Ace Tank
PB34X12B
3/4'x 12'.
Black Pipe Bushing
2
McMaster
4838K83
1•
Dielecbic Unlon, FxF.
x$n•n
$37
wwwAceTank.com
Page 2 at 3 - 3:37 PM
7/272007
May 03 2007 4:58AM Hankal Construction 582-8498
� u
P.
Ace Tank & Fueling Equipment dial
PLAY gee sxtion ocatiorr :- - - Q eta Dafe' Qunt® Nr�.
Urtalakleet - Misc. Fuel Items July 27, 2007 707d4
OuanflN Man,M.-,..�
-� Pdca Each Extended
1. TERMS AND SONORIONS OF SALE Sellei oRers to Sell goods to Buyer 6hased.on the terms -and c w4filom setfodh bereln,
togetherwith-any sPedal auadlments hereby InCUIX)ratad by !aferance and Constituting the Online eg:eerrera between parties. Said
terms and condillons may not be varied, and no modltfmtien or adbklon to them shall be of any force areffecL uNess made by or
dfiely sPeby the Seller.In wdtkV.
Unless otherwise staled, Prices offerad are firm for a Period of 30 days bonrdale of the quotation, and will be Invoked at the prices
staled In the quotation, and are subsequently sublectto'Itmmase in prices of any of these goods by sellers suppliers.
Buyers acmplance for all quotations or the sale of products.on Buyer's ptuChase'order form, acknowledgement, orofher form, that
Includes Printed terms and condBons used to oNergoods from Seller ahalrh for cote for ,
uncmdlitonal agreement to the Seller'&'tenre and:oonditiona, and shall hall be for
bindiupon the ce Sand stwiless see evdenee of Buyers
writing by Seller. If any, conflict eldsQz Ioelween the Sellers terms and awtdipgrsand B rely agreed to in
uyars:form, the Sellers farms and conditlone at
If Buyera;aedithas 'not been establisl the commatctal mfprenoes and ale ban* reference shall accompany the first order.
2 bELl1[F_RY. Time far delivery sbag nd'ba.the essence dttie agreement Bdlfe[61
for d1 - br=:afegodsto Wrest-sadyilprren. irllMery dates. Sebershall nofify w tgrperofa;delay.-itapcotr,gmerAtihthe UCC.. -
Sdier shall:not be liable to Buyer oranythird Pwty:iorahy loso..damaft pr a>Persafrom�3iryrd'elay pff2lluiG Ar pprfomgnoa due to .
a .beyoshort d s, i conpotor SerWallon,,Power.ohg- tiul no-UnIteoID; fVe, strike, accldenf;wartznf7dPo.ns, government regulation a
Ihonages it Irenspodatlon, Power,.labor or, matarial,:fraghtemdarpo. not, or dvil mr1frnlion, default of the suppller, or
prohlbPoone or events which.rendar.parfom7ance:dtltiwgor lmpossill .
3. PAYMENT Buyeregress mmak�payment-within Sellers terms d
to and reepgnsl6le for charges oft-t/2%a 18%� ohllteface heredf, orBuyer vnll.be srAjed
become Warmum oo
on-Past:Dire'acunts_ Inthe aventlegal 'salon'or any prooeedings necessary to erdorce the ten aset loth herein or toodled the-smourts set forth,•lhe:Buyer shall ralmtwrse the Seller tar all
such Costs Ond-experusm% Indudurg.but not Unitedlogeasortable atibnley!s fees
e. TITLE AND DELIVERY Undeas stated'io the".00rdrary on th&face hereofi all.goatsfurnlstied'hereunder.vM'beshipped F:09.
palntofshlpme'nL sndiitieand risk in the goods s ialt peas-tstile;euyeruponSUef'srlaliPary 6(.:the caYdarek the•
Anytrel9htallowanewhleh Seller maygrant.baeed uponddlar:.vaius M a.3W print ifl:shiprrrern:
construed' del asa pmerhb or upon type' of goods involved; shall.be.
s y pffce torment defiverylipfm
8 ERRbR.¢_. T . . ypographicatarM/or madterrellcalenors.nhade:py8eller..Ih'quotatloh; aGeidvleQg""ern :-orinvdcas ahesubjecfto
correction. Buyer shall notify Soler in wdbrlg'at any dalm of elrofln gwntty shi ApedwhfiF 10 days after receipt olthe goods
6 RETURNS. No goods may be returned witifohil fits Sellers pendsston; and If authorized for return. traMPatatlon dWOOs'musl be Prepaid try Buyer urdess otherwise noted by Seller In the authorization to return goods Ag goods audfodzed for return are su4> ed to Salers.lnspsctlah and accepFance, and mdnlmum handling charge equal to 15%.of the. Purchase'prloe.oflhe goods, er $20.00. whkcftt* r is greater, wit -be assessed, Un" otherwise;rloted In Sellers outhorizaticnto return said goods.
7:CHANGES:OR CANCELLA77DNa. .Cancellation; edspansfon, orvanation dthe crdersh'all tievelld.cniy witht she ow iint'and
uPOP tells agreed to,bylhe Seller In wolfing. In (he event orsuU Wnbertwsl-Buyer•shall pay Iq $glererry:cahheetiatipn; or other
chargesor exPsrtsesr:lndudy�.lOss of'proNk es:ppmpeusadon for alFl?ss kieprredas:a:resrdtof'cdnCellagon,
6. WAltRf n an AS -IS ' WIM n- .The goBtls EasCdbad Herein ale vrartanteO ld;ie fiee.lrohtdsfaLts brwotgranship and mahadat:
uNesseddon an'AS•IS tiasis.
THERE ARE No WARRANTIES WHICH EXTEND BEYOND THOSE'OF'THE MANUPACTURER OR THE DESCRIPTION ON THE
FACE HEREOF, AND THE SELLER SPECIFICALLY EXCLUDES ANY OTHER EXPRESS OR IMPLIED WARRANTY OF
MERCHANTABILITY OR FITNESS. THE WARRANTY CONTAINED IN THI&PARAGRAPH'ASkIMFTED IN IT, IS THE ONLY
WARRANTY EICTENED BY THE BE I ER IN CONNECTIONWITH ANY SALE BY IT AND IS MUENDED TO THE IMMEDIATE.
BUYER ONLY AND NOT TO ANY SUCCESSIVEBtiYERS, USERS, THIRD'PAWRES, OR'EMPLOYEE.
www.AceTank.com
Page 3 of 3 3:37 PM
7272007
May 03 2007 4:59RM Hankal Construction 562-6496 p.9
FAX COVER SHEET
To:
Dave Shellenberger
Company:
Hankal
From:
Andy
Subject:
Unalakleet Bulk Fuel
Fax: 562-6496
Pages: Two
Date: July 31, 2007
Dave please see the attached pricing for the day tank electrical installatio $ 2,924.00
Another item has just come to our attention; the equipment schedule on drawing B-5
hcVR shows for circuit tag CP 1-01 3#6 and one 98 in a conduit to the distribution pump.
�y We believe that six number six conductors will be required in a larger conduit for the wye
l�� delta start.
Please check this last item and get back to us_
PAr
Page 1 of 1
625-1120 E. Huffinan Rd. Phone: 907.34-4.1846
Aochorage; AK Fait: 907.344.1856
99515 E-mail: abuck6da-.net
May 03 2007 4:59RM Hankal Construction
•
�Desuiptlon--- -- --'
.t
--- Price:'U r
__
EMT --_-.--_-
1
_ 70.52LCy.
_1 _''-3/4"
2
314" EMT INS STL COMP CCNN
4a
156.39!C ;
3
3/4" EMT STL COMP CPW-_ - _-
14"
163.08'C i
'-4
314" EMT STRUT CLAMP -
-182
--78�
153.37C
_
5
-172' LT FLEX
1,267.00LM
_ fi
_--_--_--
r 1/2" LT STRAIGHT CONN---- --Bi2
--_--
210.70'C_
! 7
; #10 XHHW__-
140'..
M i
_445.60
263:00iMr
-� 6 '#12THW SOLID GREEN
9
_-----.--..1401
i 12-1-10 NYL INSUL FORK RC10-6F I
_ 31.
48.54 C
10
:YEL SCO_TC_HLOCK(#18.12) _ !
6ii
6.95;C 1
--f
_
75_00)�EJ
12
20A 1P BREAKER BOLT -ON
2" 16331E
i 13
.# 12-2C& GIRD 208V MOTOR TERM i--
- 3'y. 0.00'E 1
! 14
;sloenoid--------- , _
- 1 s----0_OD:E `
r rr
K rr
0.00
562-6496
P.10
Net Price 1.
"o(�U_ ;.
Total Mat($){Total Hours' °1z
"-_
70.52;
iC
98.73.4.93
156.391
_',--62
10.00'C 1
6261 0.40{,
n 1
163-081
O.O�C
22.83! 0.00 41 911 j
153.37,
5.101C j
_-
27.611 0.92` '
1,2fi7.001
39.00
22.81; O70 ,!-
210.70.
.• 15.D0 'C 'C
--- 12. 44f 0.901.
'-
-- 1445.00
5.-67�M
62.301
0.79'n91
263.0
5.40
M
48.54�IC�
1.461
0.12
'1
-
6.95;
6.00IC
' 0.421
0.36}7'I
�� I
75.0, 15 .0.65.E
75.001-
0.65
16.33!
0.151E
1 32.66,
0.30
{{
! Labor Type Crew !
Hours
Rate $ - SubTo�fal Brdn % I Frng $ Brdn Tat: ,1 Frng Tot. !
Total Full Rate
__'_ _
2 IdOURt4 mY N 1.001
4.101
-J--
. 138.05: 24.000 17.O7L 33.131 69- 99�
241.17i 58.8:
3 OVERTIME----_--{--2.00T---8.19+
_33.67i
50.50 413�60 24.0001. 17.07E 99261 139.601
662. I 79.6'
J---,Totals
12.29)-,-
55L65j 23.999:.-.,,17.071 _132_3y 209.79
893.83 72.7
--_-_-,__ __--_ ,-3_001_
-44.89�_
__rdn% i Fmg3dnTot mgTotTotlIncleLebor Hours ! Rate uFull Rate 4
4 TRAVELTIME - -_--:--6.00: 33.67' 202.D2� 23.999! 17.071 48�_102.4-352,921_
-1----
_7 =MATERIAL PUR/SHIP - � 2.00j_�33.67 _-67.34E .23.993 _ t7.D7 r-16.16i 34.14' 117.641 58.82�
Totals .-_ _- -I 8:00!- 33.67' 269.361 23.998j -17.D7 64.641 136561 470.56j 58.82�j
--- -------_..-..----'-'---..._ .-- --------'- -T---Ty�y�
_ General Expenses ' _Alarm_' Quantity 1 Cost/Unit Overhead %Markup °A' Tolat i
_ -f - -
'j-2 ;PERMIT _.' Alarm 1.001 l 4.0001 _ 3_000 _.,_ . II .
S TRAVEL EXPENSES (per Mile) Off -- 1.001 423.00 j 423.001
' 6 :ROOM & BOARD (per Day) Off _ 1.00 140.00; i _ _^ 140.001
10 ;CONSUMABLES Alarm . ! 4.0003.0001.
r 11 zSMALL TOOLS_ _ r Alart_n --- I -- T - 4000E 3.000; _ 1:
! 13 iTRANSPORTATION Off 1.001 90.001
T - 653.00 'I <
-- --- -- -- - ----FN9 (
a1Pricin ...._ ._.._... _.. -----Value S) -T--•- Pc! °k) ---T --Alarm Code i
--------ci ----- ( -1-'--
_Database Material ((Extension)324.52,
- __ - - --_-- �-- ---�
Quoted Material (Extension) 75.00'
Quoted Material ---, -----1---- On ---- -- -----
i Material Total 398.52
! I Direct Labor 893.83{ °--'--_---=
-- - -------- ._... .-- ----r-----�.-.._..-_
Ineldental
Labor 470.56' !
-- - -- -- ---- _-j-.-.-.-
iLaborTatal 1,354.39'
- Subcontractors ----`--'-.- -- -- _ i ..---------
On Q1
General Expenses : ,
On
Total Cost
Database Material Overhead
Quoted Material Overlie<d
Labor Overhead
Adjustment Overhead 24169i 10.000�-
, ;Total Ovethead----__10.00y----__�,--_
Database Material Markup_- ----- - - ! i_--.
Quoted Material Markup
Labor Markup -.i
_....__.;-Adjustrnent MadcuP.___,-___ -. 265.86j--_-..- 10_DDO!
Total Markup 265A6, 10.0001 !
....Selling Price ._ - .. - 2,92446.
-
-Final Price
II