Loading...
HomeMy WebLinkAboutDCVR-HCI-03Apr.28 200E 7:55AM Hankal Construction 582-8499 p.l HANKAL CONSTRUCTION, INC. FACSIMILE TRANSMITTAL SHEET TO: FROM: Joe Daniels Dave Shellenberget COMPANY: DATE: LCMF LLC APRIL 28, 2006 FAX NUMBER: TOTAL NO. OF PAGES INCLUDING COVER: 273-1831 2 PHONE NUMBER: REFERENCE PROJECT: Unanddeet Bulk Fuel Upgrade RE: PROJECT NUMBER: DCVR HCI 3 2K6-100 CC: Bryan Casey — Alaska Enetgy Authority 269-3044 RECEWD APR 2 3 2006 550 WEST 54 AVENUE, ANCHORAGE, ALASKA 99518 (907) 563-5719 FAX (907) 562-6496 Apr 28 2006 7:55AM Hankal Construction 562-6496 p.2 DESIGN CLARIFICATION/VERIFICATION REQUEST CONTRACTOR: Hankal Construction, Inc. DC/VR NO.: HCI-3 PROJECT: Unalakleet Bulk Fuel CONTRACT NO.: REG-06-888 Upgrade SPEC. NO.: DRAWING NO.: DESCRIPTION OF REQUEST: Has any testing for Lead Based Paint been performed on the tanks to be modified? ATTACHMENT: YES[] NO® CHANGE ORDER: YES NOE] IF YES PROVIDE RFP: WRITTEN BY: DAVE SHELLENBERGER DATE: APPROVED BY: DATE: DAVE SHELLENB RGER RESPONSE: RFP REQUIR :'ES NO BY: DATE e `SDI_ (S,vtl� This is NOT an authorization for additional reimbursement or time extension 7 Authorization of such can be made only by the owner through a change order in accordance with the contract documents. DCVRFORM