HomeMy WebLinkAboutDCVR-HCI-03Apr.28 200E 7:55AM Hankal Construction 582-8499 p.l
HANKAL CONSTRUCTION, INC.
FACSIMILE TRANSMITTAL SHEET
TO:
FROM:
Joe Daniels
Dave Shellenberget
COMPANY:
DATE:
LCMF LLC
APRIL 28, 2006
FAX NUMBER:
TOTAL NO. OF PAGES INCLUDING COVER:
273-1831
2
PHONE NUMBER:
REFERENCE PROJECT:
Unanddeet Bulk Fuel Upgrade
RE:
PROJECT NUMBER:
DCVR HCI 3
2K6-100
CC: Bryan Casey — Alaska Enetgy Authority 269-3044
RECEWD
APR 2 3 2006
550 WEST 54 AVENUE, ANCHORAGE, ALASKA 99518
(907) 563-5719 FAX (907) 562-6496
Apr 28 2006 7:55AM Hankal Construction 562-6496 p.2
DESIGN CLARIFICATION/VERIFICATION REQUEST
CONTRACTOR: Hankal Construction, Inc. DC/VR NO.: HCI-3
PROJECT: Unalakleet Bulk Fuel CONTRACT NO.: REG-06-888
Upgrade
SPEC. NO.: DRAWING NO.:
DESCRIPTION OF REQUEST:
Has any testing for Lead Based Paint been performed on the tanks to be
modified?
ATTACHMENT: YES[] NO® CHANGE ORDER: YES NOE]
IF YES PROVIDE RFP:
WRITTEN BY: DAVE SHELLENBERGER DATE:
APPROVED BY: DATE:
DAVE SHELLENB RGER
RESPONSE:
RFP REQUIR :'ES NO
BY: DATE e
`SDI_ (S,vtl�
This is NOT an authorization for additional reimbursement or time
extension 7 Authorization of such can be made only by the owner through a
change order in accordance with the contract documents.
DCVRFORM