HomeMy WebLinkAboutDCVR-HCI-04DESIGN CLARIFICATION/VERIFICATION REQUEST
CONTRACTOR: Hankal Construction, Inc. DC/VR NO.:
PROJECT: Unalakleet Hulk Fuel CONTRACT NO.:
Upgrade
SPEC, NO.: 16950 DRAFTING NO.:
HCI-4
REG-06-088
DESCRIPTION OF REQUEST:
Supplier offers a savings potential for alternative Telemetry System.
See attached letter. Actual savings would be the result of agreement
on a Value Engineering Proposal.
ATTACHMENT: YES® NOQ
CHANGE ORDER: YES❑ NO❑
IF YES PROVIDE RFP:
WRITTEN BY: DAVE SHELLENBERGER
APPROVED BY: _ • f' O
DAVE SHELL ERGER /- /
RESPONSE: %2 SC441,/ / Q Vci a-t-
DATE: fay
DATE: � zooc
1 "✓Z� K�r�m2�el�-
RFP REQUI s ES ✓ NO BY: DATE: J 1 ��
A E !!l
This is NOT an authorization for additional reimbursement or time
extension. Authorization of such can be made only by the owner through a
change order in accordance with the contract documents.
05/08/2006 13:16 907-344-1856 DYNAMIC SYSTEMS INC
PAGE 01
YNAMTC SYSTEMS TNC.I
FAX COVER SHEET
To: Dave Shellenberger Fax: -6496
Company: Hwl al Construction Inc. Pages: 9M
From: Andy Buck Date: May 8. 2006
Subject: Unalaklect Bulk Fuel
Dave we have been asked to pass the following substitution and cost saving onto Hankal
Construction so that you may review and pass it onto the owner.
Our supplier has offered to supply a pair of point to point SRTU units in lieu of the
specified EZ-MTU and the SRTU.
This would represent a savings of S 1,302.00 to the owners.
We do not have any further information on this item but if desired we can request some
supporting documents and product specifications.
Page I of I
q 625 - —
1120 F. Fluffinan Rd. Ste. 23
Anchorage, AK 99515-3561
Phonc: 907.344.1946
Fax:907,344.1856
E-mail: abudcMA.net