Loading...
HomeMy WebLinkAboutDCVR-HCI-04DESIGN CLARIFICATION/VERIFICATION REQUEST CONTRACTOR: Hankal Construction, Inc. DC/VR NO.: PROJECT: Unalakleet Hulk Fuel CONTRACT NO.: Upgrade SPEC, NO.: 16950 DRAFTING NO.: HCI-4 REG-06-088 DESCRIPTION OF REQUEST: Supplier offers a savings potential for alternative Telemetry System. See attached letter. Actual savings would be the result of agreement on a Value Engineering Proposal. ATTACHMENT: YES® NOQ CHANGE ORDER: YES❑ NO❑ IF YES PROVIDE RFP: WRITTEN BY: DAVE SHELLENBERGER APPROVED BY: _ • f' O DAVE SHELL ERGER /- / RESPONSE: %2 SC441,/ / Q Vci a-t- DATE: fay DATE: � zooc 1 "✓Z� K�r�m2�el�- RFP REQUI s ES ✓ NO BY: DATE: J 1 �� A E !!l This is NOT an authorization for additional reimbursement or time extension. Authorization of such can be made only by the owner through a change order in accordance with the contract documents. 05/08/2006 13:16 907-344-1856 DYNAMIC SYSTEMS INC PAGE 01 YNAMTC SYSTEMS TNC.I FAX COVER SHEET To: Dave Shellenberger Fax: -6496 Company: Hwl al Construction Inc. Pages: 9M From: Andy Buck Date: May 8. 2006 Subject: Unalaklect Bulk Fuel Dave we have been asked to pass the following substitution and cost saving onto Hankal Construction so that you may review and pass it onto the owner. Our supplier has offered to supply a pair of point to point SRTU units in lieu of the specified EZ-MTU and the SRTU. This would represent a savings of S 1,302.00 to the owners. We do not have any further information on this item but if desired we can request some supporting documents and product specifications. Page I of I q 625 - — 1120 F. Fluffinan Rd. Ste. 23 Anchorage, AK 99515-3561 Phonc: 907.344.1946 Fax:907,344.1856 E-mail: abudcMA.net