HomeMy WebLinkAboutDCVR-HCI-05DESIGN CLARIFICATION/VERIFICATION REQUEST
CONTRACTOR: Hankal Construction, Inc.
PROJECT: Unalaklest Bulk Fuel
Upgrade
SPEC. NO.: OS15484 2.08B
DC/VR NO.s HCI-5
CONTRACT NO.: REG-06-088
DRAWING NO.:
DESCRIPTION OF REQUEST:
Please clarify the intent for configuration of the Dike Drainage
Punps. Specification language is confusing, a sketch of what is
intended would be helpful.
ATTAMOSUT: YES[] KOO CHANGE ORDER, YESO NOM
IF YES PROVIDE RFPs
WRITTEN BY s DAVE §E1aM8RG XR DATE: Way 15, 2006
"PROVED BY s DAVS `' DAIS: IS Ir" � C
RBSPONSE:
See- Qg4,1—L1- lz'-, . i�,C/V R No. HH- S
esp®� Se .
RFP REQUIRED: S 00
-
BY = DATE s
A/S
This is NOT an authorization for additional reimbursement or time
extension. Authorisation of such can be made only by the owner through a
change order in accordance with the contract dociments.
DCVRFORM
Wa4eR
pis�,gr��
DCNR No. HCI-5 Response:
The configuration of the dike drainage pump is as following:
The 30 feet of 3/4" suction hose with female camlocks on each end connects to 3/4" sch. 40
galvanized steel pipe with male camlock fitting at the dike wall at one end and to the dike
drainage pump at the other end. The 5' of 3/4" hose is connected to the pump for water
discharge (see sketch below).
�W1\S&, 140
30� I.