Loading...
HomeMy WebLinkAboutDCVR-HCI-05DESIGN CLARIFICATION/VERIFICATION REQUEST CONTRACTOR: Hankal Construction, Inc. PROJECT: Unalaklest Bulk Fuel Upgrade SPEC. NO.: OS15484 2.08B DC/VR NO.s HCI-5 CONTRACT NO.: REG-06-088 DRAWING NO.: DESCRIPTION OF REQUEST: Please clarify the intent for configuration of the Dike Drainage Punps. Specification language is confusing, a sketch of what is intended would be helpful. ATTAMOSUT: YES[] KOO CHANGE ORDER, YESO NOM IF YES PROVIDE RFPs WRITTEN BY s DAVE §E1aM8RG XR DATE: Way 15, 2006 "PROVED BY s DAVS `' DAIS: IS Ir" � C RBSPONSE: See- Qg4,1—L1- lz'-, . i�,C/V R No. HH- S esp®� Se . RFP REQUIRED: S 00 - BY = DATE s A/S This is NOT an authorization for additional reimbursement or time extension. Authorisation of such can be made only by the owner through a change order in accordance with the contract dociments. DCVRFORM Wa4eR pis�,gr�� DCNR No. HCI-5 Response: The configuration of the dike drainage pump is as following: The 30 feet of 3/4" suction hose with female camlocks on each end connects to 3/4" sch. 40 galvanized steel pipe with male camlock fitting at the dike wall at one end and to the dike drainage pump at the other end. The 5' of 3/4" hose is connected to the pump for water discharge (see sketch below). �W1\S&, 140 30� I.