Loading...
HomeMy WebLinkAboutDCVR-HCI-06DESIGN CLARIFICATIONNERIFICATION REQUEST CONTRACTOR: Hankal Construction, Inc. DC/VR NO.: HCI - 6 PROJECT: Unala,kleet Bulk Fuel CONTRACT NO.: REG-06-088 Upgrade 500 gal. & 1,000 Gal. tanks SPEC. NO.: SS 13201 DRAWING NO.: shop Drawings DESCRIPTION OF REQUEST Fabricator recommends modifying the end of the tang pipe supports to avoid conflict with the end mounted Ladder. The issue is clearance, where a person climbing the ladder could misstep in to the pipe supports. Please advise. ATTACHMENT: YESN NOO CHANGE ORDER: YESO NO0 IF YES PROVIDE RFP: WRITTEN BY: DAVE SHELLENBE GE ...... DATE: Tune 20, 2006 .._ APPROVED BY: �ma, DATE: A �w .._.. DAVE SHELLENBERGER RESPONSE; l�.c 1Z)rT05Rd wUoC�l/ec�i�sare-.� arcc�{c�(e. U RFP REQiIREDs YES N BY: DATE: 6120106 This is NOT an authorization for additional reimbursement or time extension. Authorization of such can be made only by the owner through a change order in accordance with the contract documents. DCVRF:ORM Gmail - Drawing Change http://mail.google.com/mail/?&ik=65b 116fe2f&view=pt&th= l 0bed5 d �:1 i i a,lAKNIC BETA Drawing Change 1 message Jill Davis <hankaIcon struction@gmail.com> Russ Gibbs <rgibbs@bmt-tank.com> Mon, Jun 19, 2006 at 9:19 AM To: Dave Shellenberger <hankalconstruction@gmail.com> Cc: Bob Barnhart <bbarnhart@bmt-tank.com> Dave, Please consider the attached details where we are proposing to change the unistrut supports in order to avoid the toe clear issues which could arise of piping passes behind the ladder. You will not we added additional brackets to allow piping to be run each side of the ladder to avoid any toe clearance issues. Let us know if we can proceed with this change at your earliest convenience. Thanks. Russ Gibbs MX-3501N 20060619 111816.pdf 28K — 1of1 LADDER NOT SHOWN FOR CLARITY 1 0 p UNSTRUT PIPE SUPPORT LAYOUT LADDER END ONLY 0 RIGHT END VIEW '11MI]�i 1218 Wesl RoyDrive K1 � / 1 --� � Olyrr &, RYA 98502 = V= � Phone 360 3,52-7575 Northwest, LLC Fox (36©) 357-9937 Hankal Construction - AIDEA 1000 Gallon U.L,-142 Double Nall on Slid Date: 6 3 OS BMT Job No. 21747 Drown By: J.LORENZ Scale: NTS Dwg. Sheet Rev. Project: UNALAKLEET BULK FUEL UPGRADES SAT 1K DW SK M—$ l of 1 LADDER NOT SHOWN FOR CLARITY 0 UNSTRUT PIPE SUPPORT LAYOUT FOR LADDER END nhil V RIGHT END VIE Bm'; r, Northwest, LLC 7218 Wes! Bay Drive Dlympio, WA 98502 Phone (360)352-7575 Fox (360)J57-9937 Hankal Construction - AIDEA 500 GALLON U,L,-142 DOUBLE NVALL ON SKIDS Date: 6/03/06 I ! BMT Job Number 21747 1 tl: J.LORENZ I SCOIG: NTS Dwq. Sheet IRIPV. UNALAKLEET BULK FUEL UPGRADES BMT 500 M-7 1 of 1