HomeMy WebLinkAboutDCVR-HCI-08CONTRACTOR:
PROJECT:
SPEC. NO.:
DESIGN CLARIFICATION/VERIFICATION REQUEST
Hankal Construction, Inc.
Unalakleet Sulk Fuel
Upgrade
DC/VR NO.: HCI-6
CONTRACT NO.: REG-06-088
DRAWING NO.: C-12
DESCRIPTION OF REQUEST:
Physical locates of utilities North and West of the UVEC Power Plant
indicate that there are several more N/G services that indicated on
the plans. It is also apparent that the true configuration of the
services extend well into Beach Road East rendering the planned
pipeline location impractical to construct with out relocation of some
existing services. Contractor proposes to surface the pipeline near
the NE corner of the Power Plant and run the line exterior to the
building to the new fuel tank location. The new tank could he
configured to have the supply nozzle on the east side.
ATTACHMENT.- YES® NOF� CHANGE ORDER: YES NOF]
IF YES PROVIDE RFP:
WRITTEN BY: DAVE SHELLENBERGER DATE:
APPROVED BY: %-- > DATE:-
DAVE SHELLENBEER
RESPONSE: ,ZJ (.
rcGC �/ / 1��,.� �cnaT•-+�cT.�i►w� 9�yt�•n/{na`�c� access).
u pp �� �� f (emu ��-- 1
�/�! ✓/ o((. GLQ- ✓� d� Ci �` ��/I! C OY�+ e-%-A -it/>
a// rvV4/ ,
RFP REQUIR ES NO
BY. DATE:
E
This is NOT an authorization for additional reimbursement or time
extension. Authorization of such can be made only by the owner through a
change order in accordance with the contract documents.
DCVRFORM