HomeMy WebLinkAboutDCVR-HCI-08CONTRACTOR: PROJECT: SPEC. NO.: DESIGN CLARIFICATION/VERIFICATION REQUEST Hankal Construction, Inc. Unalakleet Sulk Fuel Upgrade DC/VR NO.: HCI-6 CONTRACT NO.: REG-06-088 DRAWING NO.: C-12 DESCRIPTION OF REQUEST: Physical locates of utilities North and West of the UVEC Power Plant indicate that there are several more N/G services that indicated on the plans. It is also apparent that the true configuration of the services extend well into Beach Road East rendering the planned pipeline location impractical to construct with out relocation of some existing services. Contractor proposes to surface the pipeline near the NE corner of the Power Plant and run the line exterior to the building to the new fuel tank location. The new tank could he configured to have the supply nozzle on the east side. ATTACHMENT.- YES® NOF� CHANGE ORDER: YES NOF] IF YES PROVIDE RFP: WRITTEN BY: DAVE SHELLENBERGER DATE: APPROVED BY: %-- > DATE:- DAVE SHELLENBEER RESPONSE: ,ZJ (. rcGC �/ / 1��,.� �cnaT•-+�cT.�i►w� 9�yt�•n/{na`�c� access). u pp �� �� f (emu ��-- 1 �/�! ✓/ o((. GLQ- ✓� d� Ci �` ��/I! C OY�+ e-%-A -it/> a// rvV4/ , RFP REQUIR ES NO BY. DATE: E This is NOT an authorization for additional reimbursement or time extension. Authorization of such can be made only by the owner through a change order in accordance with the contract documents. DCVRFORM