Loading...
HomeMy WebLinkAboutDCVR-HCI-08ACONTRACTOR: PROJECT: SPEC. NO.: DESIGN CLARIFICATION/VERIFICATION REQUEST Hankal Construction, Inc. Unalakleet Bulk Fuel - Upgrade DC/VR NO.: HCI 8A CONTRACT NO.: REG-06-088 DRAWING NO.: C 12 DESCRIPTION OF REQUEST: Permission letter from UVEC & UNC to re -align pipeline at the UVEC power plant. Actual routing (A/G or U/G) will be finalized per direction of Engineers at a later date. ATTACHMENT: YES® NO❑ CHANGE ORDER: YES NO[j IF YES PROVIDE RFP: WRITTEN BY: DAVE SHELLENBERGER APPROVED BY: 3% DAVE SHELLENBgRGER DATE: September 6, 200.6 DATE: 6 rf. RESPONSE: Pej--)0- COL 4�eP-s I zov,,UVFC s UA)C aY-<f, ocr-e AC 4 LC1 Zou-4�� ` RFP REQUIRED: YES NO BY: DATE: 416106 A/E This is NOT an authorization for additional reimbursement or time extension. Authorization of such can be made only by the owner through a change order in accordance with the contract documents. i7yijia[i];7u1 Sep 05 06 04:450 Tim Holder 1-907-624-3278 p;1 Unalakleet Valley Electric Cooperative P.O_ Box 186 Telephone (907) 624-3474 Unalakleet, Alaska 99684 Fax (907) 624-3009 To Whom it May Concern: Field locates have indicated numerous existing aerial and underground utilities to the north and west of the Unalakleet Valley Electrical Coop Power Plant in Unalakleet, Alaska. UVEC personnel have indicated a desire to avoid any potential conflict NNrith other utilities and to reduce the risk of damage to the new fuel oil supply pipe line to the Power Plant. Permission is hereby granted to surface the pipeline near the northeast corner of the Power Plant and to affix the pipeline to the easterly and southeasterly exterior building wall. The pipeline will be supported by the building structure and will not penetrate the building. A grant of permission from the adjacent property owner ((inalakleet Native Corparation) to construct, operate and maintain the pipeline is attached. --- - -T 3 4'- 4'4# l o k.r 4- Name (Type or print Signature .�.� �-.✓Aa e� Title 0 9 C)s A Date 09/02/2006 SAT 01:57 FAX 0 002 "Where the East Wind Blows" Unalakleet Native Corporation September 2, 2006 To Whom It May Concern: Unalakleet Native Corporation (UNC) does not object to the establishment of a fuel oil pipeline attached to the easterly exterior wall of the Unalakleet Valley Electrical Coop (UVEC) Power Plant located in Unalakleet, Alaska. The pipeline will be in close proximity to the properly of UNC, but will not encroach upon the property: The pipeline will be above ground and exposed to view. No damage or disturbance to the properly is expected. UNC hereby grants permission for ingress and egress to UVEC, their assigns and Hankal Construction, Inc. for construction, operation and maintenance of the pipeline. Any incidental damage or disturbance to the property will be repaired to the original condition. &aaet Name Signature PO Box 100 Unalaklest, AK 99684-0100 Ph: 907.624.3411 Fax: 907.624.3833 Email: Unc@gd.nEt 09/02/2006 SAT 01:57 FAX Q 00 3 ff"v 'JM1xV1VNn W%Vdn mtu x1nu AV .kpUMB YMOVIV i r I I I Ila• T ' .7- � I ` �I �! ,` -_ �--��--_• ^�--������ -� __..____ -o'er f� \ `�, �` :\ I I ` z I 511 i III �1 I I Y ® .0 ' VI=E 113 C\ tt � pb `) la\• II -- - - M--_.� � II ICI � � � \ \ i ;lr,�—__�_�\—•-.� I , I . k 14,aI-Ahi W N0110081SN00 IMO WdLI�Z 90OZ '6 'any