Loading...
HomeMy WebLinkAboutDCVR-HCI-09DESIGN CLARIFICATION/VERIFICATION REQUEST CONTRACTOR: Hankal Construction, Inc.,-- PROJECT: Unalakleet Bulk Fuel — Upgrade SPEC. NO.: 13200 2.05 A DC/VR NO.: HCI-9 CONTRACT NO.: R.EG-06-088 Detail 1 DRAWING NO.: sheet M-4 DESCRIPTION OF REQUEST: Detail indicates the High Level (95%) Alarms are to be installed on the gasoline tanks only. We believe this is to include the AVGAS tanks. It is unclear if the JET -A tanks are considered to be more related to the gasoline product classification or to the diesel product classification. Please clarify if the JET -A tanks require the High Level Alarms ATTACHMENT: YES NOE] CHANGE ORDER: YES NO[] IF YES PROVIDE RFP; WRITTEN BY: DAVE SHELLENBERGER DATE: August 9, 2006 APPROVED BY: i� _ DATE: DAVE SHELLENBERGER / F _ RESPONSE: rLeA off , J�� CLIc� I s CU7) UID4 Lctve Sew 1 4 ,C1O f s J � f RFP REQUIRED; S O / P BY: < /" DATE: � 9 A/E This is NOT an authorization for additional reimbursement or time extension. Authorization of such can be made only by the owner through a change order in accordance with the contract documents. DCVRFORM