Loading...
HomeMy WebLinkAboutDCVR-HCI-10DESIGN CLARIFICATION/VERIFICATION REQUEST CONTRACTOR: Hankal Construction, Inc. PROJECT: Unalakleet Bulk Fuel Upgrade SPEC. NO.: DESCRIPTION OF REQUEST: DC/VR NO.: HCI 10 CONTRACT NO.: REG-06-088 C-15 detail 1 DRAWING NO.: M-6 detail 1 Sheet C-15 calls the pipe size to be 1/" sch 160. Sheet M-6 calls the pipe size to be W . Contractor will field verify the size. The point of question is the flex fitting called for on sheet M-6. It is unlikely that a flanged flex fitting is available. Is a union end flex fitting acceptable? Please Advise. ATTACHMENT: YES NOM CHANGE ORDER: YES NO® IF YES PROVIDE RFP: WRITTEN BY: DAVE SHELLENBERGER DATE: August 16, 2006 APPROVED BY: _d' , y _�. DATE : DAVE SHELLENBERGER RESPONSE: / i �r-c9"J 1 � SA S LL ( c GL-- ,Ac Gam" C j U v�2e-� n ��+ 4e - : 114 � V2 ` RFP REQUIRE YES NO BY: DATE: T/D t, A/E This is NOT an authorization for additional reimbursement or time extension. Authorization of such can be made only by the owner through a change order in accordance with the contract documents. DCVRFORM.