HomeMy WebLinkAboutDCVR-HCI-10DESIGN CLARIFICATION/VERIFICATION REQUEST
CONTRACTOR: Hankal Construction, Inc.
PROJECT: Unalakleet Bulk Fuel
Upgrade
SPEC. NO.:
DESCRIPTION OF REQUEST:
DC/VR NO.: HCI 10
CONTRACT NO.: REG-06-088
C-15 detail 1
DRAWING NO.: M-6 detail 1
Sheet C-15 calls the pipe size to be 1/" sch 160. Sheet M-6 calls the
pipe size to be W . Contractor will field verify the size. The point
of question is the flex fitting called for on sheet M-6. It is
unlikely that a flanged flex fitting is available. Is a union end
flex fitting acceptable?
Please Advise.
ATTACHMENT: YES NOM CHANGE ORDER: YES NO®
IF YES PROVIDE RFP:
WRITTEN BY: DAVE SHELLENBERGER DATE: August 16, 2006
APPROVED BY: _d' , y _�. DATE :
DAVE SHELLENBERGER
RESPONSE: / i
�r-c9"J 1 � SA S LL ( c GL-- ,Ac Gam" C j U v�2e-� n
��+ 4e - : 114
�
V2 `
RFP REQUIRE YES NO
BY: DATE: T/D t,
A/E
This is NOT an authorization for additional reimbursement or time
extension. Authorization of such can be made only by the owner through a
change order in accordance with the contract documents.
DCVRFORM.