HomeMy WebLinkAboutDCVR-HCI-11CONTRACTOR:
PROJECT;
SPEC. NO.;
DESIGN CLARIFICATION/VERIFICATION REQUEST
Hankal Construction, Inc.
Unalakleet Bulk Fuel
Upgrade
DC/V-R NO.: HCI 11
CONTRACT NO.: REG-06-088
DRAWING NO.. M-12
DESCRIPTION OF REQUEST:
There is no mention of a weather strip fro the doors of the pump
enclosures. Past projects have included a weather strip that requires
a minor hinge offset on the doors to accommodate the weather strip.
PEMKO S88 is suggested, having been used in the past. Please advise.
ATTACHMENT: YESE] NOF-1 CHANGE ORDER: YES[E] NO[]
IF YES PROVIDE RFPt
WRITTEN BY: DAVE SHELLENBERGER DATE: August 21, 2006
APPROVED BY: DATEf.
DAVE SHELLENBERGER
RESPONSE:
olfse+ pt.,- � eCA-C(05�Ltt-e-S J(o P-s. T c5D i r eel
L*Y
RFP REQUIRED: Y
� 7
BY: (� 4y ;-eC DATE:
A/E
This is NOT an authorization for additional reimbursement or time
extension. Authorization of such can be made only by the owner through a
change order in accordance with the contract documents.
DCVRFORM