Loading...
HomeMy WebLinkAboutDCVR-HCI-11CONTRACTOR: PROJECT; SPEC. NO.; DESIGN CLARIFICATION/VERIFICATION REQUEST Hankal Construction, Inc. Unalakleet Bulk Fuel Upgrade DC/V-R NO.: HCI 11 CONTRACT NO.: REG-06-088 DRAWING NO.. M-12 DESCRIPTION OF REQUEST: There is no mention of a weather strip fro the doors of the pump enclosures. Past projects have included a weather strip that requires a minor hinge offset on the doors to accommodate the weather strip. PEMKO S88 is suggested, having been used in the past. Please advise. ATTACHMENT: YESE] NOF-1 CHANGE ORDER: YES[E] NO[] IF YES PROVIDE RFPt WRITTEN BY: DAVE SHELLENBERGER DATE: August 21, 2006 APPROVED BY: DATEf. DAVE SHELLENBERGER RESPONSE: olfse+ pt.,- � eCA-C(05�Ltt-e-S J(o P-s. T c5D i r eel L*Y RFP REQUIRED: Y � 7 BY: (� 4y ;-eC DATE: A/E This is NOT an authorization for additional reimbursement or time extension. Authorization of such can be made only by the owner through a change order in accordance with the contract documents. DCVRFORM