HomeMy WebLinkAboutDCVR-HCI-15DESIGN CLARIFICATION/VERIFICATION.REQUEST
CONTRACTOR: kIank. aX ConstruCt.o4, Inc DC/VR NO•. HCI 15
PROJECT: Unalakleet.Bulk Fuel CONTRACT NO:.: REG-0.6w088
Upgrade
SPEC. NO.:
Detail 2
DRAWING NO.- M-2 M-3.
DESCRIPTION OF REQUEST:
The 4" dia. Gasoline supply is to run atop the 6" timber dike. wall
(see sheet M-13_), There is not enough clearance to mouth the pig
catchier low paint piping and drain valve (see -detail 2/M-2). Contractor
suggests offsetting the pig catcher in board of the dike wall as
indicated on the sketch provided. Please advise.
ATTACHMENT: YESZ NO[] CHANGE ORDER: YESM NO❑
IF YES PROVIDE RFP:
WRITTEN BY: DAVE SHELLENBERGER
APPROVED BY: - r�
RAVE 9HELLENBERGER
DATE: October 3, 2006
DATE: 3 0446,.r r-l)C
RESPONSE: % liI/PV aCt-�tcip 1 - o cy
fr�./5� ��t� � �-fa /• �r�rCr�r� --c,�� hr 78'.' i-'h�
D � GI L P fps � i T � % (/l� /S e'i ,o -r
^f-/i1 O� r /�� G:ad l� CSt�@ /O�/�f-/�/ CCf✓1 ex S (1 ot<
� f�av�cvtcE' l�te`o(e«Q..� .TZi� afl��� �Gi�fc� 1s rL
RFP REQUIRED: YES N0)
-t-u�o •�h a /.� o� �u cf ci««P�,crf
d DATE : O ;r 9. /' 7F7,- L. oc.c., P i t4+-
A/E �, 1I��
f> r-a fvt.
This is NOT an authoritiation for additional reimbursement or time
extension. Authorization of such can be made only by the owner through a
change order in accordance with the contract documents.