Loading...
HomeMy WebLinkAboutDCVR-HCI-23DESIGN CLARIFICATION/VERIFICATION REQUEST CONTRACTOR: Hankal Construction, Inc. PROJECT; Unalakleet Bulk Fuel Upgrade SPEC. NO.: DC/VR NO.: HCI-23 CONTRACT NO.: REG-06-088 DRAWING NO.: C-11 / C-12 DESCRIPTION OF REQUEST: UVEC plant personal report that the UVEC spill response contingency storage tank indicated on the drawings is suspect of having a bad bottom. Extreme rust and scabbing conditions are apparent. It is also reported that the tank contains and amount of sludge presumably removed from the UVEC tanks at the last cleaning. The tank is approximately 8'-10" CD x 121h. There is 21" of sludge in the tank (±80Q gal) HCI does not think the tank should be relocated outside a containment area in this condition. Please advise. ATTACHMENT: YES[] NO® CHANGE ORDER: YES® NO[:] IF YES PROVIDE RFP: WRITTEN BY: DAVE SHELLENBERGER 4.9 APPROVED BY:° DAVE SHELLENBERGER RESPONSE: RFP REQUIRED: YES NO BY: A/E DATE: DATE: May 25, 2007 DATE: -Z5 14 _00 This is NOT an authorization for additional reimbursement or time extension. Authorization of such can be made only by the owner through a change order in accordance with the contract documents. DCVRFORM