HomeMy WebLinkAboutDCVR-HCI-24FAX TRANSMITTAL
AAia7cAL CONSTRUCTION, INC.
550 West 54th Avenue
Anchorage, AK 99518
Telephone: (907) 563-5719
Facsimile: (907) 562-6496
Email Address: hankalcon@worldnet.att.nd
TO: LCi�IF
ATTENTION: �dQ Da„ F-e,([
FAX NUMBER: z 7
PHONE NUMBER: Z 7 3
SUBJECT: CV Yc-x—Z
DATE: 2-9 Zooy
TOTAL PAGES: (Z)
IF any pages are missing, or you wish this message resent, please call 563-5719.
MESSAGE:
0
a
I ' d Sara' ON
ONI N0110AMN00 1VMH NV00:11 LOR '6a'AeN
CONTRACTOR;
PROJECT:
SPEC. NO.:
DESIGN CLARIFICATION/VERIFICATION REQUEST
Hankal Construction, Inc.
❑nalakleet Bulk Fuel
Upgrade
DC M NO.: HCI-24
CONTRACT NO.S REG-05-088
DRAWING NO.: C-11 Note S
DESCRIPTION OF REQUEST;
Local labor force reports that the existing dike liner at the VVEC
Power Plant was laid down OVER soils contaminated with used oil.
Please provide direction on how to proceed. Can the new liner be
placed on top of the existing liner to avoid exposure of the reported
condition' Can the amount of ballast (see detail. 4 sheet C-9) be
adjusted to coordinate with this elevation work point? RAPID RESPONSE
REQUESTED - WORK IS IN PROGRESS.
ATTACMUM : YRS[I NO® CHANGE ORDER: YES NOFJ
IF YES PROVIDE RFPz
WRITTEN SY: DAVE SHELLLNBERGER DATE: May 29, 2007
APPROVED BY: -/, DATE: Z y y�oc-y
DAVE SHELLENBERGER
RESPONSE%
RFP REQUYRED: YES NO
BY; DATES
A/E
This is NOT an authorization for additional reimbursement or time
extension. Authorization of such can be made only by the owner through a
change order in accordance with the contract documents.
.01