Loading...
HomeMy WebLinkAboutDCVR-HCI-24FAX TRANSMITTAL AAia7cAL CONSTRUCTION, INC. 550 West 54th Avenue Anchorage, AK 99518 Telephone: (907) 563-5719 Facsimile: (907) 562-6496 Email Address: hankalcon@worldnet.att.nd TO: LCi�IF ATTENTION: �dQ Da„ F-e,([ FAX NUMBER: z 7 PHONE NUMBER: Z 7 3 SUBJECT: CV Yc-x—Z DATE: 2-9 Zooy TOTAL PAGES: (Z) IF any pages are missing, or you wish this message resent, please call 563-5719. MESSAGE: 0 a I ' d Sara' ON ONI N0110AMN00 1VMH NV00:11 LOR '6a'AeN CONTRACTOR; PROJECT: SPEC. NO.: DESIGN CLARIFICATION/VERIFICATION REQUEST Hankal Construction, Inc. ❑nalakleet Bulk Fuel Upgrade DC M NO.: HCI-24 CONTRACT NO.S REG-05-088 DRAWING NO.: C-11 Note S DESCRIPTION OF REQUEST; Local labor force reports that the existing dike liner at the VVEC Power Plant was laid down OVER soils contaminated with used oil. Please provide direction on how to proceed. Can the new liner be placed on top of the existing liner to avoid exposure of the reported condition' Can the amount of ballast (see detail. 4 sheet C-9) be adjusted to coordinate with this elevation work point? RAPID RESPONSE REQUESTED - WORK IS IN PROGRESS. ATTACMUM : YRS[I NO® CHANGE ORDER: YES NOFJ IF YES PROVIDE RFPz WRITTEN SY: DAVE SHELLLNBERGER DATE: May 29, 2007 APPROVED BY: -/, DATE: Z y y�oc-y DAVE SHELLENBERGER RESPONSE% RFP REQUYRED: YES NO BY; DATES A/E This is NOT an authorization for additional reimbursement or time extension. Authorization of such can be made only by the owner through a change order in accordance with the contract documents. .01 Z 'd EM'ON ON] N0110H1SN00 MM NV00:11 L00Z IZ'M