Loading...
HomeMy WebLinkAboutDCVR-HCI-27DESIGN CLARIFICATION/VERIFICATION REQUEST CONTRACTOR: Henkel Construction, Inc. DC/VR NO PROJECT: Unalakleet Bulk Fuel CONTRACT NO Upgrade SPEC. NO.: HCI-27 REG-06-088 DRAWING NO.: M-2 DESCRIPTION OF REQUEST: Cleaning of the buried pipe lines has revealed that pigs WILL NOT PASS the check valves at the Marine Header. The checkvalvesmust be removed for pigging operations. Exercise caution when removing the check valves after the pipeline is flooded. A backflow condition may exist resulting in a spill at the Marine Header. Recommend mounting the Check Valve on the ocean side of the ball valves. ATTACHMENT: YES NO® CHANGE ORDER: YES NOF-1 IF YES PROVIDE RFP: WRITTEN BY: DAVE HELLENBERGER DATE: APPROVED BY: i DATE: DAVE SHELLENBERGER RESPONSE: /