Loading...
HomeMy WebLinkAboutDCVR-HCI-28DESIGN CLARIFICATION/VERIFICATION REQUEST CONTRACTOR: Hankal Construction, Inc. PROJECT: Unalakleet Bulk Fuel Upgrade SPEC. NO.- DC/VR NO.: HCI:-2,8 CONTRACT NO.: REG-06-088 DRAWING NO.: M-7, M-8 DESCRIPTION OF REQUEST`: Field Crew report9 the`3 facilities being served by these tanks have •Niger Loops-, installed at the boilers. F.O.R.lines 'are 'not needed or desired by the User. Also, the User requests only the F.O.;S.'line be installed into the RSSD Maintenance Storage Building. A "Tiger Loop" is to be installed on that boiler when the 'piping is changed out. ATTACHMENT: YES7 NOZ CHANGE ORDER: YES7 NOZ IF YES PROVIDE RFP: WRITTEN BY: DAVE ZHIELLENBERGER DATE: APPROVED BY: DATE: DAVE SHELLENBERGER RESPONSE: ©(-may'/='C"As 6 REP REQUIRED: YES 0 BY: DATE: A/E This is NOT an authorization for additional reimbursement or time extension. Authorization of such can be made only by the owner through a change order in accordance with the contract documents. DCVR:FORM