Loading...
HomeMy WebLinkAboutDCVR-HCI-31DESIGN CLARIFICATION/VERIFICATION REQUEST CONTRACTOR: Hankal Construction, Inc. PROJECT: Unalakleet Bulk Fuel Upgrade SPEC. NO.: 02082 Table 1 DC/VR NO.: HCI-31 CONTRACT NO.: REG-06-OBB DRAWING NO.. DESCRIPTION OF REQUEST: Reports indicate that the Owners have requested the following tanks to be removed from the Decommission list and to retain use of the tanks: WCAS #11 WCAS #12 WCAS #14 City #2 City #1 (previously deleted) Please advise. ATTACHMENT: YES NO® CHANGE ORDER: YESEI -NOF1 IF YES PROVIDE RFP: WRITTEN BY: DAVE S ELLENBERGER DATE: APPROVED BY: DATE: 28 /{�S Z06f DAVE //S``HELLENBE GER L/�— RESPO SE: / J��� C'`/��/y�T�/K'C/Oi+'II�KViSt'/an/i•�� r�.' 7"'Yesa 117�- C . T w-1�/ is o v a�/pow` rcl��r !/!�o(c ✓� 4GdYLI/�[�s%s/mas//it�Cdr 4, LccY/sC/ink �flO/��7GnK COviTi1%t C A/� �cA'or2a�L✓sTe 7 h 7o GGCG/�2�y ei'U.zin( �` c RFP REQUIR Y S NO r/ BY: DATE: r I This is NOT an authorization for additional reimbursement or time extension. Authorization of such can be made only by the owner through a change order in accordance with the contract documents. DCVRFORM