HomeMy WebLinkAboutDCVR-HCI-31DESIGN CLARIFICATION/VERIFICATION REQUEST
CONTRACTOR: Hankal Construction, Inc.
PROJECT: Unalakleet Bulk Fuel
Upgrade
SPEC. NO.: 02082 Table 1
DC/VR NO.: HCI-31
CONTRACT NO.: REG-06-OBB
DRAWING NO..
DESCRIPTION OF REQUEST:
Reports indicate that the Owners have requested the following tanks to
be removed from the Decommission list and to retain use of the tanks:
WCAS #11
WCAS #12
WCAS #14
City #2
City #1 (previously deleted)
Please advise.
ATTACHMENT: YES NO® CHANGE ORDER: YESEI -NOF1
IF YES PROVIDE RFP:
WRITTEN BY: DAVE S ELLENBERGER DATE:
APPROVED BY: DATE: 28 /{�S Z06f
DAVE //S``HELLENBE GER L/�—
RESPO SE: / J��� C'`/��/y�T�/K'C/Oi+'II�KViSt'/an/i•��
r�.' 7"'Yesa 117�- C . T w-1�/ is o v a�/pow` rcl��r !/!�o(c ✓�
4GdYLI/�[�s%s/mas//it�Cdr 4, LccY/sC/ink �flO/��7GnK COviTi1%t C
A/� �cA'or2a�L✓sTe
7 h 7o GGCG/�2�y ei'U.zin( �` c
RFP REQUIR Y S NO r/
BY: DATE: r I
This is NOT an authorization for additional reimbursement or time
extension. Authorization of such can be made only by the owner through a
change order in accordance with the contract documents.
DCVRFORM