HomeMy WebLinkAboutDCVR-LCMF-05DESIGN CLARIFICATION/VERIFICATION REQUEST CONTRACTOR: Hankal Construction, Inc. PROJECT: Unalakleet Bulk Fuel Upgrade SPEC. NO.: DESCRIPTION OF REQUEST: DC/VR NO.: LCMF-05 CONTRACT NO.: REG-06-088 DRAWING NO.: See attached The secondary power feeder from the new primary pole to the meter base will now be installed (by others) below grade in conduit as per attached sketch DCVR LCMF-05. Contractor is to coordinate with UVEC for power service connection after meter base installation. Remove 25' pressure treated wood pole for supporting power service. Remove weatherhead and connecting conduit from top of meter base. Note the new location of primary power pole per attached drawing DCVR LCMF-05. ATTACHMENT: YES® NO[-] CHANGE ORDER: YES❑ NON IF YES PROVIDE RFP: WRITTEN BY: Egor E. DATE: 5/10/0 APPROVED BY: DATE : elf% D jo Joe Daniels RESPONSE: RFP REQUIRED: YES❑ NO❑ BY: DATE: Hankal Construction, Inc. This is NOT an authorization for additional reimbursement or time extension. Authorization of such can be made only by the owner through a change order in accordance with the contract documents. RE/lOVE COORDINATE WITH UVEC FOR POWER SERVICE. - 8"XB"X1O'-O" PRESSURE TREATED WOOD POST. TYP. OF (2) 5-GANG METERPACK. SEE 1/E2. METER SHALL BE NO HIGHER THAN 5'-6" A.F.G. #4 B.C. STAPLED SECURELY TO POST (2 EA) 3/4"x10'-0" CU CLAD GROUND RODS SPACED MIN. 8'-0" APART. BURY AFTER INSPECTION. -� GRADE METER NO SCALE 0' 4 L t rt ri It r tt 1 tr I, 11 1 tl I tt � tt t ►► t tt �I tt t tt I 7'-0' II I I SE MOUNTING DETAIL TOP 25' CANT TOP OF POST, TYP. SECURE METER CENTERS TO PLYWOOD. BACKING WITH GALVANIZED UNISTRUT BRACKETS. 3/4- PRESSURE TREATED MARINE GRADE PLYWOOD BACKING SECURELY MOUNTED TO POST WITH (4 EA.) 3/8"0, 3" LAG SCREWS AND FLAT WASHERS. PROVIDE UNISTRUT CONDUIT SUPPORT PROVIDE LIQUIDTIGHT FLEXIBLE CONDUIT FOR ABOVE GRADE PORTION OF CONDUIT WITH OFFSET BEND TO ALLOW FOR GROUND MOVEMENT, TYP. INSTALL CONDUIT SEALS WHERE REQUIRED. THREADED BUSHING, TYP. TRANSITION TO GRSC FOR BELOW -GRADE PORTION OF CONDUIT. SEE 1/E13 FOR CONDUIT TRENCHING DETAIL. TO CONTROL PANELS. M m♦ t R E I 1 OvL SKCXH - DCVR LCMF -OS NOTES 2871' I. SEE SHEET G-2 FOR SURVEY CONTROL FOR TANK FARM LOCATION. 72. 0' 263. 1' ........... 2. SEE SHEET C-2 FOR GENERAL NOTES, ABBREVIATIONS AND LEGEND,,- . ..... .. . ...... ..... 3 PAD CONSTRUCTION TO ELEVATION 17 77' INCLUDING THERMOSYPHONS BY OTHERS, EXCEPT FOR PAD EXTENSION FOR SPILL RESPONSE CONNEX9 SHEET C-2). . . .................. ..... ..... - .... .. ...... 0 (SEE 4. FOR DESCRIPTION OF WORK PROVIDED BY OTHERS �E'SHEET C-2. SF . .. . . ..... ..... .... ... . - 5. SEE MECHANICAL DRAWINGS FOR TANKS AND PIPING EXISTING PRIMARY LINE POWER POLE D 6. SEE ELECTRICAL DRAWINGS FOR ELECTRICAL WORK. PROTECT CULVERT FROM EQUI EQUIPMENT DAMAGE UNTIL PLACING FILL TO FINAL GRADE. ADE. ... .... . 'A-, $ HON yp TWBER c 'N TAINMEN f77YP �Ai I - ttl I 0 m