HomeMy WebLinkAboutDCVR-LCMF-05DESIGN CLARIFICATION/VERIFICATION REQUEST
CONTRACTOR: Hankal Construction, Inc.
PROJECT: Unalakleet Bulk Fuel
Upgrade
SPEC. NO.:
DESCRIPTION OF REQUEST:
DC/VR NO.: LCMF-05
CONTRACT NO.: REG-06-088
DRAWING NO.: See attached
The secondary power feeder from the new primary pole to the meter base
will now be installed (by others) below grade in conduit as per
attached sketch DCVR LCMF-05. Contractor is to coordinate with UVEC
for power service connection after meter base installation.
Remove 25' pressure treated wood pole for supporting power service.
Remove weatherhead and connecting conduit from top of meter base.
Note the new location of primary power pole per attached drawing DCVR
LCMF-05.
ATTACHMENT: YES® NO[-]
CHANGE ORDER: YES❑ NON
IF YES PROVIDE RFP:
WRITTEN BY: Egor E. DATE: 5/10/0
APPROVED BY: DATE : elf% D jo
Joe Daniels
RESPONSE:
RFP REQUIRED: YES❑ NO❑
BY: DATE:
Hankal Construction, Inc.
This is NOT an authorization for additional reimbursement or time
extension. Authorization of such can be made only by the owner through a
change order in accordance with the contract documents.
RE/lOVE
COORDINATE WITH UVEC
FOR POWER SERVICE. -
8"XB"X1O'-O" PRESSURE
TREATED WOOD POST.
TYP. OF (2)
5-GANG METERPACK. SEE 1/E2.
METER SHALL BE NO HIGHER
THAN 5'-6" A.F.G.
#4 B.C. STAPLED SECURELY
TO POST
(2 EA) 3/4"x10'-0"
CU CLAD GROUND RODS
SPACED MIN. 8'-0"
APART. BURY AFTER
INSPECTION. -�
GRADE
METER
NO SCALE
0'
4 L
t rt ri It r tt
1 tr I, 11 1 tl
I tt � tt t ►►
t tt �I tt t tt
I
7'-0' II
I I
SE MOUNTING DETAIL
TOP
25'
CANT TOP OF POST, TYP.
SECURE METER CENTERS TO
PLYWOOD. BACKING WITH
GALVANIZED UNISTRUT BRACKETS.
3/4- PRESSURE TREATED
MARINE GRADE PLYWOOD
BACKING SECURELY MOUNTED
TO POST WITH (4 EA.) 3/8"0,
3" LAG SCREWS AND FLAT
WASHERS.
PROVIDE UNISTRUT CONDUIT SUPPORT
PROVIDE LIQUIDTIGHT FLEXIBLE
CONDUIT FOR ABOVE GRADE
PORTION OF CONDUIT WITH
OFFSET BEND TO ALLOW FOR
GROUND MOVEMENT, TYP.
INSTALL CONDUIT SEALS WHERE REQUIRED.
THREADED BUSHING, TYP.
TRANSITION TO GRSC FOR BELOW -GRADE
PORTION OF CONDUIT. SEE 1/E13 FOR
CONDUIT TRENCHING DETAIL.
TO CONTROL PANELS. M
m♦ t R E I 1 OvL
SKCXH - DCVR LCMF -OS
NOTES
2871'
I. SEE SHEET G-2 FOR SURVEY CONTROL FOR TANK FARM LOCATION.
72. 0'
263. 1'
...........
2. SEE SHEET C-2 FOR GENERAL NOTES, ABBREVIATIONS AND LEGEND,,-
. .....
.. . ...... .....
3 PAD CONSTRUCTION TO ELEVATION 17 77' INCLUDING THERMOSYPHONS BY OTHERS,
EXCEPT FOR PAD EXTENSION FOR SPILL RESPONSE CONNEX9 SHEET C-2).
. . ..................
..... ..... - ....
..
......
0
(SEE
4. FOR DESCRIPTION OF WORK PROVIDED BY OTHERS �E'SHEET C-2.
SF
.
.. . . ..... ..... .... ... . -
5. SEE MECHANICAL DRAWINGS FOR TANKS AND PIPING
EXISTING PRIMARY
LINE POWER POLE
D
6. SEE ELECTRICAL DRAWINGS FOR ELECTRICAL WORK.
PROTECT CULVERT FROM EQUI
EQUIPMENT DAMAGE UNTIL PLACING FILL TO FINAL GRADE.
ADE.
... .... .
'A-,
$ HON
yp
TWBER
c
'N
TAINMEN
f77YP �Ai
I
-
ttl
I 0
m