Loading...
HomeMy WebLinkAboutDCVR-LCMF-08DESIGN CLARIFICATION/VERIFICATION REQUEST CONTRACTOR: Hankal Construction, Inc. PROJECT: Unalakleet Bulk Fuel Upgrade SPEC. NO.: DC/VR NO.: LCMF - 08 CONTRACT NO.: REG-06-088 DRAWING NO.: C-18, Detail 2 DESCRIPTION OF REQUEST: On the Marine Header, switch placement of 4" ball valve with 4" check valve for both fuel oil and gasoline pipelines. ATTACHMENT: YES❑ NO® CHANGE ORDER: YES❑ NO❑ IF YES PROVIDE RFP: WRITTEN BY: Egor E DATE: June 20 2006 APPROVED BY: DATE: 64 Joe D niels RESPONSE: RFP REQUIRED: YES❑ NO❑ BY: Hankal Construction, Inc. DATE: This is NOT an authorization for additional reimbursement or time extension. Authorization of such can be made only by the owner through a change order in accordance with the contract documents. DCVRFORM