HomeMy WebLinkAboutDCVR-LCMF-10DESIGN CLARIFICATION/VERIFICATION REQUEST
CONTRACTOR: Hankal Construction, Inc. DC/VR NO.: LCMF-10
PROJECT: Unalakleet Bulk Fuel CONTRACT NO.: REG-06-088
Upgrade
SPEC. NO.:
DESCRIPTION OF REQUEST:
DRAWING NO.: C-12
At the UVEC Power Plant change height of the gate at access stairs
only and adjacent fence section to 5' (see attached).
ATTACHMENT: YES® NO❑
WRITTEN BY:
APPROVED BY:
Joe
RES
RFP REQUIRED: YES NO
CHANGE ORDER: YES❑ NO®
IF YES PROVIDE RFP:
BY: DATE:
Hankal Construction, Inc.
DATE: 6-23-06
DATE: 6-23-06
This is NOT an authorization for additional reimbursement or time
extension. Authorization of such can be made only by the owner through a
change order in accordance with the contract documents.
DCVRFORM