HomeMy WebLinkAboutDCVR-LCMF-10DESIGN CLARIFICATION/VERIFICATION REQUEST CONTRACTOR: Hankal Construction, Inc. DC/VR NO.: LCMF-10 PROJECT: Unalakleet Bulk Fuel CONTRACT NO.: REG-06-088 Upgrade SPEC. NO.: DESCRIPTION OF REQUEST: DRAWING NO.: C-12 At the UVEC Power Plant change height of the gate at access stairs only and adjacent fence section to 5' (see attached). ATTACHMENT: YES® NO❑ WRITTEN BY: APPROVED BY: Joe RES RFP REQUIRED: YES NO CHANGE ORDER: YES❑ NO® IF YES PROVIDE RFP: BY: DATE: Hankal Construction, Inc. DATE: 6-23-06 DATE: 6-23-06 This is NOT an authorization for additional reimbursement or time extension. Authorization of such can be made only by the owner through a change order in accordance with the contract documents. DCVRFORM