Loading...
HomeMy WebLinkAboutDCVR-LCMF-11DESIGN CLARIFICATION/VERIFICATION REQUEST CONTRACTOR: Hankal Construction, Inc PROJECT: Unalakleet Bulk Fuel Upgrade SPEC. NO.: DC/VR NO.: LCMF-11 CONTRACT NO.: REG-06-088 DRAWING NO.: C-23 DESCRIPTION OF REQUEST: Relocate low point drain per attached drawing. Adjust pipeline depths to move low point to proposed low point drain. Field verify final location w/onsite engineer. ATTACHMENT: YES® NO❑ WRITTEN BY: APPROVED BY: e RFP REQUIRED: YES❑ NO❑ CHANGE ORDER: YES❑ NO® IF YES PROVIDE RFP: DATE: 6/30/06 ® DATE: 6/30/06 BY: DATE: Hankal Construction, Inc. This is NOT an authorization for additional reimbursement or time extension. Authorization of such can be made only by the owner through a change order in accordance with the contract documents. DCVRFORM PLOTTING DATE: 6/19/06 (08:23) BY: eesipov AUTOCAD DRAWING NAME: Lowpoint drain #2option2.dwg D >0 n D m� aZ z x l�\ o • �� EDGE OF ROAD (MINIMUM) MAIC LyrrE IIIII I \� � IIIIIIII � IIIIII %' ® IIIIIIIIIII IIII I A % � IIIIIIIII II IIII m \� IIIIIIII IJ.a � N Z % 'IIIIIIIII � II. � IIIIIIIII m o I III �� � IIIIIIIII m IIIIIII F.IIIIIIIII A IIIIII \• I I I I I I I I I I I I I I � o m 1 IIIIIIIIIII o IIIII 4E �_ g IIIIIIII In IIIII o 0 (IIIIIIIII I� IIIII �A \� olllllllll-o olll`fllllil I � �•IIIIN '� IIIIIIIII I � IIIIIII ,�� AIIIIIIIII I � IIIIIII %� IIIIIIIIIII I � IIIIIII IIIIIIIII I � IIIIIII '% IIIIIIIII � I I IIIIIII EDGE OF ROAD IIIIIIIII I I IIIIII I .IIIIIIIII III N IIIIIII .�'' IIIIIIIII I IIIIIII IIIIIIIIIII I IIIIIII ��/' IIIIIIIII Y I IIIIII I %, o IIIIIIIII I IIIIIII \\\ �� o a z IIIIIIII I� o ,IIIIII I %`\ m m � � IIIIIIII - IIIIII I <' p 0 `�� mop IIIIIIIII � IIIIIII 0 0 m m 2.0•t 0 w a nA I=i O D D W ti m D _ " z ALASKA ENERGY AUTHORITY DLn y w REVISIONS: Z o o r LCMFLLc BULK FUEL UPGRADE 4k Z V 139E 51 st Ave. •Anchorage, Alaska 99503 • (907)273-1830 0) UNALAKLEET, ALASKA