HomeMy WebLinkAboutDCVR-LCMF-11DESIGN CLARIFICATION/VERIFICATION REQUEST
CONTRACTOR: Hankal Construction, Inc
PROJECT: Unalakleet Bulk Fuel
Upgrade
SPEC. NO.:
DC/VR NO.: LCMF-11
CONTRACT NO.: REG-06-088
DRAWING NO.: C-23
DESCRIPTION OF REQUEST:
Relocate low point drain per attached drawing. Adjust pipeline depths
to move low point to proposed low point drain. Field verify final
location w/onsite engineer.
ATTACHMENT: YES® NO❑
WRITTEN BY:
APPROVED BY:
e
RFP REQUIRED: YES❑ NO❑
CHANGE ORDER: YES❑ NO®
IF YES PROVIDE RFP:
DATE: 6/30/06
® DATE: 6/30/06
BY: DATE:
Hankal Construction, Inc.
This is NOT an authorization for additional reimbursement or time
extension. Authorization of such can be made only by the owner through a
change order in accordance with the contract documents.
DCVRFORM
PLOTTING DATE: 6/19/06 (08:23) BY: eesipov
AUTOCAD DRAWING NAME: Lowpoint drain #2option2.dwg
D
>0
n
D
m�
aZ
z
x l�\
o • �� EDGE OF ROAD
(MINIMUM)
MAIC LyrrE IIIII I
\� � IIIIIIII � IIIIII
%' ® IIIIIIIIIII IIII I
A % � IIIIIIIII II IIII
m \� IIIIIIII IJ.a � N
Z % 'IIIIIIIII � II.
� IIIIIIIII m o I III
�� � IIIIIIIII m IIIIIII
F.IIIIIIIII A IIIIII
\• I I I I I I I I I I I I I I � o m
1 IIIIIIIIIII o IIIII 4E
�_ g IIIIIIII In IIIII o 0
(IIIIIIIII I� IIIII �A
\� olllllllll-o
olll`fllllil I � �•IIIIN
'� IIIIIIIII I � IIIIIII
,�� AIIIIIIIII I � IIIIIII
%� IIIIIIIIIII I � IIIIIII
IIIIIIIII I � IIIIIII
'% IIIIIIIII � I I IIIIIII
EDGE OF ROAD IIIIIIIII I I IIIIII I
.IIIIIIIII III N IIIIIII
.�'' IIIIIIIII I IIIIIII
IIIIIIIIIII I IIIIIII
��/' IIIIIIIII Y I IIIIII I
%, o IIIIIIIII I IIIIIII
\\\ �� o a z IIIIIIII I� o ,IIIIII I
%`\ m m � � IIIIIIII - IIIIII I
<' p
0
`�� mop IIIIIIIII � IIIIIII
0 0
m
m 2.0•t
0
w
a
nA
I=i O D D W ti m D
_ " z ALASKA ENERGY AUTHORITY
DLn
y w REVISIONS:
Z o o
r LCMFLLc BULK FUEL UPGRADE
4k Z V 139E 51 st Ave. •Anchorage, Alaska 99503 • (907)273-1830
0) UNALAKLEET, ALASKA