Loading...
HomeMy WebLinkAboutDCVR-LCMF-14DESIGN CLARIFICATION/VERIFICATION REQUEST CONTRACTOR: Hankal Construction, Inc. DC/VR NO.: PROJECT: Unalakleet Bulk Fuel CONTRACT NO.: Upgrade SPEC. NO.: DESCRIPTION OF REQUEST: LCMF-14 REG-06-088 DRAWING NO.: C-12 Attached revisions to Sheet C-12 show revised piping layout at the UVEC Power Plant as a result of Contractors request to route pipeline above ground on the northeast side of the Power Plant instead of below ground on the northwest side of the Power Plant. This change was requested due to congestion with existing utilities in areas of the original pipeline alignment. The Contractor has received permission from adjacent property owner, the Unalakleet Native Corporation, to access their Lot on the northeast side of the Power Plant for installation of the pipeline. The attached sheet also includes the following revisions: 1. Changing Power Plant issue line (Arctic Pipe) and tank shell valve from 3-inch to 2-inch. The tank shell valve shall be a 2-inch Nutron ball valve, Model No. T3-R20R01LZ-05, with a ASTM A350 Grade LF2 body so it can accept the standard AEA motor operator in the future. 2. The location of Tank #PP1 has been changed slightly to accommodate piping coming out of the east side of the tank instead of the west side. 3. The location of the Control Panel and fire extinguisher has been moved 65 feet to the east, closer to the RTU antenna and near the bottom of the dike access stairs. 4. Existing power plant doors and remote radiator have been shown. 5. The two existing 88,600 gallon Power Plant tanks that will now be abandoned in place have been shown. 6. The new location of UVEC's existing spill response tank has been changed. ATTACHMENT: YES® NO❑ WRITTEN BY: G APPROVED BY: / Joe Mniffils RESPONSE: RFP REQUIRED: YES NO CHANGE ORDER: YES❑ NO[] IF YES PROVIDE RFP: BY: DATE: Hankal Construction, Inc. DATE: 1-09-07 DATE: 1-10-07 This is NOT an authorization for additional reimbursement or time extension. Authorization of such can be made only by the owner through a change order in accordance with the contract documents. DCVRFORM PLOTTING DATE: 1/8/07 (18:57) BY: goen riper I I I 1 1 I m --------------- /1 / I I \I W W / I AZ / I Ocmi�� nxao° mm0 WNW 1 tim Rz n A A m U coO �ym� O I A oT2 tinter U RZ W Z o � z a - N aza I 's? C) / �"7x xox 1 wiz \ WIN C) Z \ Z 1 \In—N,I 1. 5 (51.0' MINIMUM) ll II �A ()D \\ Om Vim \ x \ � \ A W W W / - N 1155. 6' W- r 155. 76' tiA / OH/E- y A �m A 1,z ~ � X O� AO o A o c� (15. 0' O •MIN) a 0 5.0' 0 MIN • Z � �= A o a 0 000�o II A Z � W —S II h II x I I m z m / m A I I\ im II I/ u Ocn Aa xxm�m i.� I x Ij I coA o as ''gym Nz o I 1 2+12.0 C ' N C—xmi myW C)v1I �a O OZm Ia c'�a2= Im 100 W �y06mo I21 nz � nm o Z I I z om �o oa ~ m � do names N cQLo z �a zo m O I zo -a :z O -a :z O �A I I I m ozo o� I o z oA I I m o �ti V I I �I ZZ tiA Zm , I W �a \ - - - - - - - - - - \ \ I - - - - - - - - - \\ A I I �oA \ 1 - —\ - o R- - - - _ - - - N 15'5T20" W 752.2T - - - - - - 1--- \ c _ _ o I I I c C. O zi ZD 11 \ \ \ II II I N I I Ix Q I \� �mZ 2 z \ \ o \ \ \ \ // / \\\\\\ ____ ///// ------------------- _________o ���� / II j ���� / / -------------- _ ---N--------------------- ------------ 1 \\ m n / EE /C-12I m-- 2 q NORTR - - - --- - - _ _ _ - / / / / O a o n EE /C-22* ,� CHLINE m m IT Z m > > m _ > CONSTRUCTION £ m Z m F DOCUMENTS N D Z N G. /J/ F y N m K {' A = s a c A REVISIONS: i O Ao N ; 01/09/07 -PIPELINE w+ s Z I O 1 ROUTING (DCVR-LCMF-14) _ F. 1 V z A 815 EffiiM WE STE 20O Antl -p,A 99818 (907)273-1830 0 I 1 I 1 I / I I / I / / I 1 I 1 I 1 1 v v I 1 A now a� ( a cznAn ZO cn Ogg o n oza m oOx c o0 � mzOZ AA 0 z Ao zz rc o� m m oA m of ay am zvmi {nA v,a m� �A � mn om � A2 O 00 RZ ZZ A� An 2m m� p� za Ao � o� m �m ~ �A ALASKA ENERGY AUTHORITY BULK FUEL UPGRADE UNALAKLEET, ALASKA Z O m N