Loading...
HomeMy WebLinkAboutDCVR IndexUnalakleet Bulk Fuel Upgrade Phase IIILCMF WO# 05-756Index to DC/VRsLCMFDateDC/VRIssued1 Relocate spill response connexes New Tank Farm 4/28/062 Relocate electrical items and dike access stairs New Tank Farm 4/28/062.1 Additional: Proposed light pole locations. New Tank Farm 5/4/062.2 Control Panel Mounting Detail New Tank Farm 5/10/073 Culvert relocation by Force Account Contractor New Tank Farm 4/28/064 Vertical Tanks appurtenances arrangement and piping hook-up New Tank Farm 5/4/065 Electrical Service to Tank Farm New Tank Farm 5/10/066 Containment Sump Elevation Clarification New Tank Farm 5/25/067 Low Point Drain Relocation Station 38+00 6/15/068 Marine Header Valve Rearrangement Marine Header 6/20/069 Dike walls elevation clarification Tank Farm, UVEC 6/23/0610 Access stair gate height change UVEC 6/23/0611 Low Point Drain#2 Relocation Station 18+00 6/30/0612 Fence Fabric placement UVEC/Tank Farm 7/13/0613 Decomissioning of 37,600 Gal Tank Water Plant 8/1/0714 Pipeline RoutingUVEC 1/10/0715 Enlarge UVEC Dike (06/01/07) UVEC 6/8/0716 Fuel Supply and Day Tank for School Boiler School 7/17/0717 Addition of "AC" tank to Decommissioning List 9/11/07DescriptionLocation Unalakleet Bulk Fuel Upgrade Phase IIIHCI WO# 05-756Index to DC/VRsHCIDateDateDC/VRIssuedResponeded1 Cathodic protection anodes allocation Pipeline 4/19/06 4/26/062 Pre-cast concrete tank foundation orientation New Tank Farm 4/27/06 5/1/063 Testing for Lead Base Paint New Tank Farm 4/28/06 4/28/064 Alternative for Telemetry System New Tank Farm 5/8/06 5/9/065 Dike Drainage Pumps New Tank Farm 5/15/06 5/15/066 500 & 1,000 Gal Tanks pipe supports modification School/ Housing 6/20/06 6/20/067 Dike Wall Elevation Discrepancy New Tank Farm 7/6/06 N/A8 Pipeline reroute around UVEC UVEC 7/28/06 8/2/068A Permission letter for reroute around UVEC UVEC 8/6/06 8/6/069 High Level Alarms on Jet "A" Tanks New Tank Farm 8/9/06 8/9/0610 Size connection descripency BSSD 8/16/06 8/17/0611 Hinge offset on the pump eclosures doors New Tank Farm 8/21/06 8/28/0612 Testing and Inspection of Welds Entire Project 9/19/06 9/20/0613 Cast in place Concrete New Tank Farm 9/20/06 9/21/0614 Piping Revision10/3/06 10/12/0615 Offset Pig CatcherNew Tank Farm 10/3/06 10/12/0616 Enclosure skid legs modifications New Tank Farm 10/11/06 10/12/0617 Set Point Height Installation for 1,500 Gal Tank BSSD 10/27/06 10/30/0618 Signage New Tank Farm 11/2/06 11/2/0619 Demo and Electrical Work Clarification UNC Station 11/2/06 11/2/0620 EPA ID # for all Owners of Tanks or piping to be decommissioned. 12/14/0621 Products Clarification New Tank Farm 2/26/0722 Hydro U/G portion at Power Plant Power Plant 5/10/07 5/11/0723 Tank RelocationUVEC 5/25/07 N/A24 Contaminated SoilsUVEC 5/29/07 N/A25 Supply Tank to SchoolK-12 6/4/0726 High Point Vent in 4" Supply Line UVEC 6/26/07 6/27/0727 Pigging OperationsPipeline 7/9/07 7/10/0728 Boiler PippingBSSD 7/30/07 7/30/0729 Conduit and Conductor Size Clarification New Tank Farm 8/2/07 8/7/0730 DP-1 Motor Replacement New Tank Farm 8/14/07 8/22/0731 Tanks to be removed from Decommission List 8/28/07 8/29/0732 5K Gallon Store Tank to be re-dedicated 7/11/07 9/11/0733DescriptionLocation