HomeMy WebLinkAbout05-756 C-12NOTES
RECORD DRAWING
THESE DRAWINGS HAVE BEEN PREPARED
FROM MARKED -UP DRAWINGS SUPPLIED BY
THE CONTRACTOR. AN AS -BUILT SURVEY
-CIA&-I4OT-BEEN_ CONDUCTED. FIELD VERIFY
ANY INFORMATION CONTAINE6-HEREOW----- -
BEFORE USING.
UNALAKLEET
TO WNSI TE
PLAT 87-11
,� ARCTIC PIPE
12
PRC�1C
2'
1
HRR- -
/E_FO -
F�
UNALAKLEET
TO WNSI TE
PLAT 87-11
-------
EDGE OF ROAD -------
BEACH ROAD EAST
1. LOCATIONS OF UNDERGROUND UTILITIES ARE BASED ON LIMITED AS -BUILT
DRAWINGS. FIELD VERIFY ALL LOCATIONS BEFORE CONSTRUCTION.
INSTALL EXISTING TANK ON NEW CONCRETE RING WALL. INSTALL NEW DIKE LINER 2�
UNDER TANK AND CONCRETE RING WALLS. EXTEND PRIMARY LINER TO TOP OF
RECONSTRUCTED DIKE WALL.
FOR LARGE SCALE PIPING PLAN SEE 1
-15
- - _ _ _ - CENTERLINE OF RIGHT- OF- WA Y
HRR &HRS HRR &HRS
—HRR / TO SCHOOL NEW 4"0 UVEC PIPELINE FROM BULK
TO BALER FUEL TANK FARM, ADJUST EXACT
- HRR - - HRR - - HRR - _ BUILDING T.O.P. ELEV-9.21 w
HRR HRR LOCATION OF PIPELINE AS NECESSARY z
EDGE OF ROAD - - -- -- - - __ N 73 53'S4" E HRR TO AVOID EXISTING BELOW GRADE UTILITIES =
- HRS HRS 147. 18' - -- -- - - - - - - HRR_
HRS HRS i \ HRS - - - - - - - - -
_ is--
OH/E \ \%j OH E HRS HRS o T.O.P. ELEV-9.23' — — _ _ _ 4+00� ___
__ _ _ _
T // ---- - ASEM —OH E - - - - I I �� / _--� �� ,---� ,� � a a
`/ T T - E- - -ENT - - - - I OH./E OH�E / - �T�O. -LE-C/ 00� \ F
/ FO FO FO - - - T I I ATI-40DI)CFO �� PROTECTION \ w
.SYSTE 0 \ \ :� .FO
I
�I
N
rn�
zl
WA TER
MAIN
I
FROM
WA TER
PLANT
I
I
I
I
UNALAKLEET
TO WNSI TE
PLAT 87-11
6 BOLLARD
C-18 (TYPICAL OF 3)
TO FIRE
f SPRINKLER EXISTING EXISTING REMOTE
RISER 12" ARCTIC PIPE RADIATOR
WAS TE
HEAT
UTILIDOR EXISTING I
DOOR P.P. o z
5.0' J • •
MINIMUM -�
53.0'
(51.0' MINIMUM)
SUMPC-19
(SIMILAR)
13.7
TANK ,DPP 1
89,000 GALLON
DIESEL No. 2
(25'-2"0 x 24'-0" HIGH)
72.0'
13.4 2
C-19
LINE POST
(TYP.)
CONSTRUCT NEW 40' X 40'
STEEL CONTAINMENT DIKE WALL
AND FENCE TO MATCH EXISTING
1
C-19
15 I I I I
I I I I
I
I II I I
I I
I I PROPERTY CORNER
I II I E 352683.35
S 72:33'18" W
I I I I 137.63'
I EWER PLANT TANK SITE PL
SCALE: 1 " = 10'
s I
0
/ I
3.0'
CHAIN LINK
FE
CE MAN GA TE
(Ty
ICAL OF 2)
I
2
CORNER POST
(TYP.)
�
/
I
I
I
I
POWER PLANT
FINISH FLOOR
ELEVATION = 13.3'
CONNECT NEW 3"0 SCHEDULE 80 PIPING TO
EXISTING 3"0 PIPING INSIDE POWER PLANT.
CONNECT EXISTING 314"0 COPPER HRS
AND HRR JACKET WATER TO NEW INSULATED
AND HEAT TRACED FUEL SUPPLY PIPING.
EXISTING
INSULATE AND HEAT TRACE 2' 0 1 DOOR P.P.
POWER PLANT FUEL SUPPLY PIPING M - 5
FIRE
EXTINGUISHER
PIPE SUPPORT 2
(TYPICAL) _14 CONTROL
PANEL
1 T0
PROVIDE 12"X8"
PRESSURE TREA TED
TIMBERS A T EACH END
AND AT ALL SUPPORT POINTS
dPREMANUFACTURED
4 DIKE ACCESS STAIRS
C-9
63.0'
o (51.0' MINIMUM)
7. O'.f Ai
+ CENTERLINE OF TEE
N�
4 "0 SCHEDULE 80 ABOVE
GROUND PIPING
(SIMILAR)
13.7 FUEL TANK
180,000 GALLON
80
(TYP.) (36'0 x 24'-0" HIGH)
o �
Nl.N
N N
;SIN
Lr)L
z
\ AT 700' O.L.
UNALAKLEET \ \ \ \ IIII
TRANSITION FROM TO WNSI TE \ \ \ \ I II I I I
PLAT 87-11
BELOW GROUND \ 1 I I I I I
TO ABOVE GROUND I I I I I I I
I I I I IIII
I I I I III I
I II III
PROVIDE PIPE SUPPORTS A I I I II I I I
MAXIMUM OF 10.0' ON CENTER I I I I I
SUPPORT FROM BUILDING AND 214 II I I I I I I
FROM GROUND ON TIMBERS
UNALAKLEET
TO WNSI TE
3+00 I I I I / PLAT 87-11
IIII //
10' 1 15'
5 / I \ (\
I I I \\ \ \ \ GCI
I I I I \ \ \ \
I I I I \ \\ \\ I
I I I I I \\\ \ I
I I I I \ \ \ \
ATT
I \I
III \
/ IIII I
3'- 0"
\I I I I I lam/ I I I
I I \
SA TELLI TE DISH I I\ \ \ - _ I I
\ SHED
,10-- ---- / /
I
/ o
0 10' 20'
SCALE IN FEET
DRAWN BY: EE
CHECKED BY: GMO
DATE: 11 / 15/07
JOB NUMBER: 05-756
SCALE: AS SHOWN
DRAWING TITLE:
UVEC POWER PLANT
TANK SITE PLAN
SHEET: OF
C-12