HomeMy WebLinkAbout05-756 C-2GENERAL NOTES, ABBREVIATIONS, AND LEGEND L a� c 0 E m 3 ui u c a) c a V) a� 0 z a Q) c Q) i J GENERAL NOTES EXISTING TANK REPAIRS LEGEND ABBREVIATIONS 1. FLOOD DATA IS BASED ON THE 100 YEAR FLOOD ELEVATION AS ESTABLISHED BY 1. FOUR EXISTING VERTICAL ABOVE GROUND TANKS CONSTRUCTED IN ACCORDANCE WITH - - EXISTING PROPERTY LINE ACI AMERICAN CONCRETE INSTITUTE THE USDA - NATURAL RESOURCES CONSERVATION SERVICE REPORT REQUESTED BY API-650 ARE TO BE RELOCATED, REFURBISHED AND REUSED FOR THIS PROJECT. ALL ADEC ALASKA DEPARTMENT OF ENVIRONMENTAL CONSERVATION THE CITY AND NATIVE VILLAGE OF UNALAKLEET ON JUNE 28, 1999. BASED ON THE TANKS SHALL BE DRAINED, CLEANED, AND VAPOR FREED SAFE FOR ENTRY. THE PROPOSED FENCE ANSI AMERICAN NATIONAL STANDARDS INSTITUTE USDA - NRCS REPORT THE 100 YEAR FLOOD ELEVATION IS 13.2 FEET ABOVE MSL, TANK OWNER WILL REMOVE THE MAJORITY OF THE FUEL FROM THE TANKS. ASSUME API AMERICAN PETROLEUM INSTITUTE BASED ON THE BASIS OF VERTICAL CONTROL STATED ON SHEET G-2. 100 GALLONS OF FUEL AND SLUDGE MUST BE REMOVED FROM EACH TANK AND CENTER LINE ASTM AMERICAN SOCIETY FOR TESTING & MATERIALS DISPOSED OF BY THE CONTRACTOR IN ACCORDANCE WITH ALL ENVIRONMENTAL AWPA AMERICAN WOOD PRESERVERS ASSOCIATION 2. FOUNDATION DESIGN IS BASED ON THE RECOMMENDATIONS PROVIDED IN THE REGULATIONS PRIOR TO CLEANING THE TANKS. EXISTING VEGETATION AWS AMERICAN WELDING SOCIETY GEOTECHNICAL REPORT BY DUANE MILLER & ASSOCIATES, DATED JUNE 30, 2004. BSSD BERING STRAITS SCHOOL DISTRICT 2. FOLLOWING TANK CLEANING PERFORM INTERNAL AND EXTERNAL INSPECTIONS ON ALL _ - EXISTING SHORELINE BTM BOTTOM 3. PERFORM ALL WORK IN ACCORDANCE WITH THE LATEST STATE OF ALASKA ADOPTED TANKS IN ACCORDANCE WITH API-653. SUBMIT INSPECTION REPORT TO THE BTU BRITISH THERMAL UNITS EDITION OF THE INTERNATIONAL FIRE CODE, THE INTERNATIONAL MECHANICAL CODE, ENGINEER UPON COMPLETION AND BEFORE MOVING TANK OR BEGINNING TANK - - - - 2 - - - - EXISTING CONTOUR q CENTER LINE THE INTERNATIONAL BUILDING CODE, AND THE NATIONAL ELECTRICAL CODE MODIFICATIONS. C COMMUNICATIONS INCLUDING STATE OF ALASKA AMENDMENTS. COMPLY WITH ALL APPLICABLE STATE T T PROPOSED FILL CLR CLEAR AND FEDERAL REGULATIONS. 3. ALL TANKS ARE ASSUMED TO HAVE 3/16 INCH THICK ROOFS, 1/4 INCH THICK CMP CORRUGATED METAL PIPE SHELLS, 5/16 INCH THICK BOTTOMS AND CENTER COLUMN SUPPORTS. y EXISTING FILL DFT DRY FILM THICKNESS 4. THE DRAWINGS ARE DIAGRAMMATIC AND DO NOT NECESSARILY SHOW ALL FEATURES DIA DIAMETER OF THE REQUIRED WORK. PROVIDE ALL LABOR, EQUIPMENT AND MATERIALS 4. SUBMIT SHOP DRAWINGS FOR ALL TANK REPAIRS AND MODIFICATIONS SHOWING WORK •. . . . . . . . . . . . . . . . . . GRADE BREAK EG EXISTING GRADE REQUIRED FOR A COMPLETE SYSTEM. VERIFY EXISTING FIELD CONDITIONS PRIOR TO CONFORMING TO API-650 AND API-653. SHOP DRAWINGS SHALL BE SIGNED BY A ELEV ELEVATION STARTING CONSTRUCTION, IMMEDIATELY CONTACT THE ENGINEER FOR CLARIFICATION LICENSED ENGINEER WITH A MINIMUM OF 5-YEARS EXPERIENCE IN THE DESIGN AND OH/E OVERHEAD ELECTRIC EPA ENVIRONMENTAL PROTECTION AGENCY OF QUESTIONABLE ITEMS OR APPARENT CONFLICTS, MODIFICATION OF API-650 WELDED STEEL OIL STORAGE TANKS. PROVIDE API F FAHRENHEIT 6501653 SUITABLE FOR SERVICE CERTIFICATE AFTER COMPLETING THIS WORK. � DRAINAGE ARROW FG FINISH GRADE 5. ALL ITEMS SHOWN ARE NEW UNLESS SPECIFICALLY INDICATED AS EXISTING, INSTALL FM FORCED MAIN ALL MATERIAL AND EQUIPMENT IN ACCORDANCE WITH MANUFACTURER'S 5. EXISTING TANKS TO BE REUSED ARE LISTED BELOW WITH A BRIEF DESCRIPTION OF EXISTING POWER POLE W/GUY WIRE FO FUEL OIL RECOMMENDATIONS, INSTRUCTIONS, AND INSTALLATION DRAWINGS UNLESS INDICATED THE REPAIRS AND UPGRADES REQUIRED ON EACH TANK: FOR FUEL OIL RETURN OTHERWISE. f EXISTING POWER POLE FOS FUEL OIL SUPPLY A. 0 (2) 25.25'0 x 23.67 FT HIGH 88,600 GALLON TANKS BELONGING TO UVEC FPT FEMALE PIPE THREAD 6. PERFORM WORK WITH SKILLED CRAFTSMEN SPECIALIZING IN THE REQUIRED WORK. BO H TANKS ARE CURRENTLY AND WILL CONTINUE TO BE USED FOR THE ST AGE * PROPOSED LIGHT POLE FT FEET INSTALL ALL MATERIALS IN A NEAT, ORDERLY, AND SECURE FASHION, AS REQUIRED OF ESEL #2. BOTH TANKS HAVE DOUBLE BOTTOMS WITH 2-INCHES OF SA D GA GAUGE BY THESE SPECIFICATIONS AND COMMONLY RECOGNIZED STANDARDS OF GOOD BETW N BOTTOMS AND ARE INSTALLED ON CONCRETE RING WALLS WITHO T ANCHON 100.4 EXISTING GRADE SPOT ELEVATION GALV GALVANIZED WORKMANSHIP. CHAIRS. SEE SHEET C-11 FOR CURRENT TANK LOCATIONS, AND SHEETS C-3 AND GPM GALLONS PER MINUTE C-12 FO FINAL TANK LOCATIONS. SEE SHEET M-5 FOR DETAILS ON ANK 101.0 FINISH GRADE ELEVATION HRS HEAT RECOVERY SUPPLY 7. MARK UP DESIGN DRAWINGS TO REFLECT FIELD CHANGES THROUGHOUT MODIFICAT NS. THE FOLLOWING MODIFICATIONS AND IMPROVEMENTS A E REQUIRED: HRR HEAT RECOVERY RETURN CONSTRUCTION, TURN OVER "RED LINE" CONSTRUCTION DRAWINGS TO ENGINEER AT p SIGN HR HOUR COMPLETION OF THE PROJECT. TANK #PP1: IAW IN ACCORDANCE WITH * PROVIDING N W 5/16 INCH THICK TANK BOTTOM ❑u.T. UNDERGROUND TELEPHONE LB A0GOD IRON 8. NOT ALL UTILITIES MAY BE SHOWN ON THE PLANS. FIELD LOCATE ALL EXISTING * PROVIDING HE T TRACE COILS SUPPORTED FROM TANK BOTTO LF LINEAR FEET UTILITIES BEFORE BEGINNING CONSTRUCTION. PROTECT UTILITIES AT ALL TIMES * PROVIDING ANC R CHAIRS ❑U.C. UNDERGROUND CABLE MAX MAXIMUM DURING CONSTRUCTION, REPAIR ANY DAMAGE IN ACCORDANCE WITH THE RESPECTIVE * PROVIDING 2-1/ "0 NOZZLE ON TANK ROOF FOR HIGH LE V L/CRITICAL HIGH MECH MECHANICAL UTILITY COMPANIES REQUIREMENTS. LEVEL ALARM LE V SWITCH O TH-13 TEST HOLE MIL 0.001 INCH * PROVIDING 2" 0 PRE URE RELIEF VALVE MIN MINIMUM 9. PROVIDE AND MAINTAIN ALL SIGNS, BARRICADES AND WARNING LIGHTS AND OTHER * SAND BLASTING AND OATING APPLICATION TO THE E TIRE TANK EXTERIOR MONITORING WELL M0. MODEL PROTECTIVE DEVICES NECESSARY FOR SAFETY. ROADS MUST REMAIN ACCESSIBLE FOR MPT MALE PIPE THREAD NORMAL DAY TO DAY ACTIVITIES IN THE COMMUNITY, ANY ROAD CLOSURES SHALL TANK #3: CATHODIC PROTECTION N. C. NORMALLY CLOSED BE COORDINATED WITH THE CITY OF UNALAKLEET A MINIMUM OF 14-DAYS IN * PROVIDING NEW 5/16 INC THICK TANK BOTTOM SYSTEM ANODE NFS NON -FROST SUSCEPTIBLE ADVANCE. IN GENERAL ROAD CLOSURES SHALL BE LIMITED TO 1 TO 2 HOURS. * PROVIDING ANCHOR CHAIRS N. 0, NORMALLY OPEN PROVISIONS FOR ROUTING OR DIRECTING TRAFFIC SHALL BE PROVIDED AS * PROVIDING 4-INCH FILL/ISSU NOZZLE SURVEY MONUMENT NO. NUMBER NECESSARY DURING CONSTRUCTION. * PROVIDING 2" 0 PRESSURE RELI VALVE OR POINT OF REFERENCE NPS NOMINAL PIPE SIZE * SAND BLASTING AND COATING A PLICATION 0 THE ENTIRE TANK EXTERIOR NPT NATIONAL PIPE THREAD 10. ALL WORK SHALL BE PERFORMED IN ACCORDANCE WITH U.S. ENVIRONMENTAL NTS NOT TO SCALE PROTECTION AGENCY, ALASKA DEPARTMENT OF ENVIRONMENTAL CONSERVATION, AND B. ONE (1) 25'0 x 24.25' HIGH 89,000 LLO TANK BELONGING TO WCAS. TANK IS OC ON CENTER STATE & FEDERAL OCCUPATIONAL HEALTH AND SAFETY REGULATIONS. INSTALLED ON A TIMBER FOUNDATION IT OUT ANCHOR CHAIRS. TANK HAS SPIRAL OD OUTSIDE DIAMETER ROOF ACCESS STAIRS WITH HAND RAIL D TOE BOARD AROUND ENTIRE OH/E OVERHEAD ELECTRIC 11. COORDINATE WORK REQUIRED BY THIS PROJECT WITH OTHER CONTRACTORS IN THE CIRCUMFERENCE OF THE ROOF. TANK RRENTLY USED TO STORE AVIATION OSHA OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION AREA, HIS SUBCONTRACTORS, THE OWNER, STATE AND FEDERAL AUTHORITIES. GASOLINE AND WILL BE USED TO ST RE JE A AFTER PROJECT COMPLETION. SEE OZ OUNCE SHEET C-1 FOR CURRENT TANK L ATION, D SHEETS C-3 AND M-3 FOR FINAL PL STEEL PLATE 12. SCHEDULE AND COORDINATE DEMOLITION AND NEW CONSTRUCTION/RENOVATION TANK LOCATION. THE FOLLOWING ODIFICATION AND IMPROVEMENTS ARE REQUIRED: PSF POUND PER SQUARE FOOT ACTIVITIES SUCH THAT COMPLETE AND OPERABLE BULK FUEL STORAGE, DISPENSING EXISTING TANKS WERE DECOMMISSIONED AND PSI POUND PER SQUARE INCH AND TRANSFER SYSTEMS ARE MAINTAINED AT ALL TIMES. ALL OUTAGES SHALL BE TANK #18: REPLACED WITH NEW BY CHANGE ORDER. PSIG POUND PER SQUARE INCH GAUGE COORDINATED A MINIMUM OF 14 DAYS IN ADVANCE WITH THE RESPECTIVE ENTITY. * PROVIDING NEW 5/16 INCH HICK TANK BOTTOM PT PRESSURE TREATED THE FOLLOWING OUTAGES ARE ALLOWED: * PROVIDING ANCHOR CHAT ATTACHED TO TANK S ELL SIMILAR TO DETAIL 8 ON S SEWER SHEET M- 4 SCH SCHEDULE * WCAS TANK #14: COORDINATE TAKING EXISTING WCAS AV GAS TANK OUT OF * PROVIDING NEW LIQUID LEVEL MECHANICAL TAPE GA S. SIM SIMILAR SERVICE SUCH THAT THEY HAVE SUFFICIENT STORAGE, OR NO REDUCTION IN THEIR * PROVIDING 2"0 PRES RE RELIEF VALVES SIMILAR TO TAIL 1 ON SHEET M-4. SS STAINLESS STEEL CURRENT STORAGE CAPACITY AS RESULT OF THE CONTRACTORS OPERATIONS, AND * SAND BLASTING AN COATING APPLICATION TO THE ENT E TANK EXTERIOR SSPC STEEL STRUCTURES PAINTING COUNCIL WCAS HAS SUFFICIENT ACCESS TO THEIR FUEL. STA STATION C. ONE (1) 89,000 G LLON TANK BELONGING TO UNC. TANK IS URRENTLY SITTING ON STD STANDARD * UVEC SUPPLY TANKS: COORDINATE WORK AT UVEC SUCH THAT THE POWER WOODEN TIMBERS AND IS NOT IN SERVICE. TANK HAS SPIRAL OF ACCESS STAIRS STL STEEL PLANT RECEIVES A CONTINUOUS SUPPLY OF FUEL, AND SUFFICIENT STORAGE FOR WITH HAND RAI AND TOE BOARD AROUND ENTIRE CIRCUMFEREN OF THE ROOF. SY SQUARE YARD NORMAL OPERATION IS AVAILABLE AT ALL TIMES. THE LAST PR UCT STORED IN THE TANK IS UNKNOWN. TANK DO NOT HAVE T TELEPHONE ANCHOR CH RS. SEE SHEET C-1 FOR CURRENT TANK LOCATION, A D SHEETS C-3 TBM TEMPORARY BENCH MARK * CITY DISPENSING SYSTEM: ONE SEVEN DAY OUTAGE WILL BE ALLOWED. AND M-3 OR FINAL TANK LOCATION. THE FOLLOWING MODIFICATION AND T.O.P. TOP OF PIPE IMPROVE NTS ARE REQUIRED: TS TUBE STEEL * CITY WATER TREATMENT PLANT. • COORDINATE WORK AT THE WATER TREATMENT T YP TYPICAL PLANT SUCH THAT A CONTINUOUS SUPPLY OF FUEL IS AVAILABLE. TANK 22: U UTILIDOR * PR VIDING NEW 5/16 INCH THICK TANK BOTTOM UHMWP ULTRA HIGH MOLECULAR WEIGHT PLASTIC * BSSD SCHOOL INTERMEDIATE AND SUPPLY TANKS: COORDINATE WORK SUCH THAT * P OVIDING ANCHOR CHAIRS ATTACHED TO TANK SHELL SIMILAR TO DETAIL ON UL UNDERWRITERS LABORATORY A CONTINUOUS SUPPLY OF FUEL IS AVAILABLE. HEET M-4 UNC UNALAKLEET NATIVE CORPORATION PROVIDING NEW LIQUID LEVEL MECHANICAL TAPE GAUGES. LION UNLESS OTHERWISE NOTED * UNC MOTOR VEHICLE DISPENSING SYSTEM: A SINGLE ONE DAY OUTAGE WILL BE * PROVIDING 2"0 PRESSURE RELIEF VALVES SIMILAR TO DETAIL 1 ON SHEET M-4. UVEC UNALAKLEET VALLEY ELECTRIC CORPORATION ALLOWED. * SAND BLASTING AND COATING APPLICATION TO THE ENTIRE TANK EXTERIOR W WATER W/ WI TH 13. PROVIDE TANK FARM SIGNAGE PER THE INTERNATIONAL FIRE CODE AND AS SHOWN WORK BY OTHERS WCAS WEST COAST AVIATION SERVICE ON THE DRAWINGS, WP WORKING PRESSURE 1. ALL WORK SHOWN AND SPECIFIED ON THE CONSTRUCTION DOCUMENTS FOR THE 0 DIAMETER 14. PROVIDE SPILL RESPONSE MATERIALS AS INDICATED IN THE SPECIFICATION SECTION- 11951 "SPILL RESPONSE EQUIPMENT". 15. NO WELDING WILL BE ALLOWED ON FUEL TANK OR OTHER COATED STEEL FABRICATIONS AFTER APPLICATION OF FIELD OR SHOP APPLIED COATINGS. UNALAKLEET BULK FUEL UPGRADE PROJECT SHALL BE PROVIDED BY THE SUCCESSFUL BIDDER FOR THE PROJECT UNLESS SPECIFICALLY INDICATED TO BE PROVIDED BY OTHERS. THE WORK PROVIDED BY OTHERS IS DESCRIBED BELOW, WITH FURTHER CLARIFICATION OF WORK BY OTHERS IS SHOWN ON THE DRAWINGS (SEE SHEETS C-3, C-9 AND DETAIL 4 ON C-19). 2. ELECTRICAL SERVICE WILL BE PROVIDED BY THE LOCAL UTILITY COMPANY. 3. BULK TANK FARM PAD CONSTRUCTION, TO THE EXTENTS INDICATED, WILL BE PROVIDED BY OTHERS AND CAN GENERALLY DESCRIBED AS FOLLOWS: A. GEOTEXTILE, PLACEMENT OF FILL MATERIAL, AND COMPACTION REQUIRED TO BRING THE PAD UP TO THE ELEVATION OF THE BOTTOM OF THE RIGID INSULATION BOARD (ELEV. = 17.17). THE BID CONTRACTOR SHALL COMPLETE FINAL GRADING AND COMPACTION OF THE SITE BEFORE PLACING RIGID INSULATION OF FILL MATERIAL. B. FLAT -LOOP THERMOSYPHONS INCLUDING; EVAPORATORS, CONDENSERS, CHARGING, COMMISSIONING, AND VERIFICATION OF PROPER THERMOSYPHON OPERATION APPROXIMATELY ONE YEAR FOLLOWING INSTALLATION. INSTALLATION OF CONDENSERS, CHARGING, AND COMMISSIONING OF THE THERMOSYPHONS SHALL BE COMPLETED NO LATER THAN SEPTEMBER 30, 2006. THIS WILL REQUIRE 3 WEEKS TO COMPLETE, AND WRITTEN NOTIFICATION 1 WEEK IN ADVANCE. C. SURVEYING AND MARKING WITH WOODED SURVEY STAKES THE LOCATIONS FOR ALL PRESSURE TREATED POSTS REQUIRED FOR BULK TANK FARM DIKE WALLS. THIS INCLUDES APPROXIMATELY 154 PRESSURE TREATED TIMBER POST LOCATIONS. THE BID CONTRACTOR WILL BE RESPONSIBLE FOR CONFIRMING LOCATIONS OF THERMOSYPHON LOOPS PRIOR TO INSTALLING TIMBER POSTS, OR OTHER BELOW GRADE STRUCTURES, AND FOR REPAIRING DAMAGE TO THERMOSYPHON LOOPS AS A RESULT OF THE CONTRACTORS OPERATIONS. RECORD DRAWING THESE DRAWINGS HAVE BEEN PREPARED FROM MARKED -UP DRAWINGS SUPPLIED BY THE CONTRACTOR. AN AS -BUILT SURVEY HAS NOT BEEN CONDUCTED. FIELD VERIFY ANY INFORMATION CONTAINED HEREON BEFORE USING. W Z W Q M ��GG CO a) 0 03: 044 o W> =o W DRAWN BY: EE CHECKED BY: GMO DATE: 11 / 15/07 JOB NUMBER: 05-756 SCALE: AS SHOWN DRAWING TITLE: GENERAL NOTES, ABBREVIATIONS, AND LEGENDS SHEET: OF C-2