HomeMy WebLinkAbout05-756 C-21C
P
C
L
SCALE: 1 " = 2'
r' rz /ir,neeesl
STIFFENER ON
OU TSIDE OF
GIRDER AT
CEN TERLINE
OF PIER 1
AND PIER 2
1-1
1 3/4 "0 BOLT WITH PL A TE 3/8 "X3 "X5
FLAT WASHERS,
LOCK WASHERS
AND CRIMP O
LOCK NUT \
(TYPICAL)
\ O
1/4"X2" \ \ b /
UHM WP \ / 0
SLIDE LT�T
\
3/4"O BOLT
WITH FL A T
WASHERS, LOCK
WASHERS AND
CRIMP LOCK NUT
(TYPICAL)
GRINNELL FIGURE 260
ADJUSTABLE
CLEVIS HANGER
(TYPICAL)—\
SCALE: 1" = l'
I
TYP. 1 4 #4 HORIZONTAL
\ 1 /4 V REBAR EACH FACE
\ / (TYPICAL)
\ 2.5 2„
VIZ IIVIVL LL rIVVIZL lJ/ IL W LVVJC rll IIIVV V-BOLT WITH
DOUBLE NUTS, FLAT WASHERS AND LOCK WASHERS (TYPICAL) \ —
TY C 99 99 PIPS U MTVE
El
SCALE: 1" = l' (T
SCALE: 1 " = 4'
I
4� 4"0 SCHEDULE 80 FUEL o�
LINES, CORE DRILL
CONCRETE ABUTMENT w
WALL AND INSTALL LINK z,
SEALS
L4x4x1/2
5/8"0 DOUBLE NUTS,
FLAT WASHERS
AND LOCK WASHERS
(TYPICAL)
5/8 " 0
ALL THREAD
4'-11 3/4 "
4"0 PIPE
(TYPICAL)
O
O
0
O
O
0
0
0
0
O
O
0
O
O
0
O
Q
37
O
14"
14"
14" 14"
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/ CAST IN PLACE
/ ABUTMENT WALL
V/
I
\ 1.0'
\ CONCRETE PILE/CAP
SCALE: 1" = 4'
\I
- PRECAST
ABUTMENT
WALL
L3x3x1/4x
5'-2 3/4"
c
1
2 1/4�
I
I
I
I
I
I
I
I
I /
I
I
I
I
I
I
I
I
I
I
I
I
�
I
SCALE: 1" = 4'
NOTES:
1, ALL PIPE SUPPORT HARDWARE TO BE HOT DIPPED GALVANIZED.
2, POWER TOOL CLEAN BRIDGE ATTACHMENTS AND COAT WITH
COLD GALVANIZING COMPOUND.
3. NO WELDING TO THE BRIDGE IS PERMITTED.
D� BEFORE CORE DRILLING HOLE IN CAST -IN -PLACE CONCRETE
ABUTMENT WALL, LOCATE AND MAP REBAR TO MINIMIZE
CUTTING OF REBAR. COAT ALL EXPOSED ENDS OF REBAR
INSIDE CORE DRILLED HOLE WITH COLD GALVANIZING COMPOUND.
5, FIELD VERIFY ALL DIMENSIONS PRIOR TO FABRIATION OF PIPE
SUPPOR TS.
ALL HOLES IN EXISTING BRIDGE MEMBERS MUST BE DRILLED,
FLAME CUTTING IS NOT PERMITTED,
RECORD DRAWING
THESE DRAWINGS HAVE BEEN PREPARED
FROM MARKED -UP DRAWINGS SUPPLIED BY
THE CONTRACTOR. AN AS -BUILT SURVEY
HAS NOT BEEN CONDUCTED. FIELD VERIFY
ANY INFORMATION CONTAINED HEREON
RFFnRF IICIN[:
f n cr In/ DI n t'I-
/
/
/
/
/
/
/
/
i
CAST IN PLACE
aLL
VCRE TE
E CAP
O
Z
a
W
Z
W
Q M
CO
ti
04
C6
0)
M
a
di
Em
0
U
Q
DRAWN BY: EE
CHECKED BY: GMO
DATE: 11 / 15/07
JOB NUMBER: 05-756
SCALE: AS SHOWN
DRAWING TITLE:
KOUWEGOK SLOUGH
BRIDGE DETAILS
SHEET: OF
C-21