HomeMy WebLinkAboutE6118" =1'-0"
A. INSTALL ALL CONDUCTORS IN GALVANIZED RIGID CONDUIT. FIELD ROUTE AND SIZE CONDUIT TO
ACCOMMODATE ALL CONDUCTORS PLUS 25% SPARE CAPACITY. 1 /2- MINIMUM SIZE.
NOTES:
1. MOUNT ANTENNA TO POWER PLANT STRUCTURE ABOVE ROOF AS HIGH AS POSSIBLE. AIM TOWARD
BULK TANK FARM. SEE 2/E13_
2_ GROUND ROD, TYPICAL. SEE 2/E3 FOR GROUNDING DETAIL. CADWELD GROUNDING CONNECTOR TO
TANKS, FENCE, AND PIPING.
3. PROVIDE AND INSTALL 3/4-C, 3# 10, 1 # 10 CU GND, XHHW TO NEAREST 120/208V OR 120/240V
PANEL WITH CAPACITY. PROVIDE AND INSTALL NEW 2P/20A BREAKER, LISTED FOR USE IN THE PANEL.
LABEL BREAKER '"POWER PLANT INTERMEDIATE TANK CONTROL PANEL CP-2"_ FOR BIDDING PURPOSES,
ASSUME 100 FT FOR FEEDER LENGTH_
4. PROPOSED LOCATION FOR FUEL SYSTEM CONTROL PANEL CP-2. INSTALL PANEL TO MEET MINIMUM
NEC-110.26 CLEARANCE REQUIREMENTS. SEE SHEET E9_
EQUIPMENT SCHEDULE
CIRCUIT TAG
SOURCE
DESTINATION
HP
AMPS
VOLTS
PHASE
CONDUCTORS CU, XHHW
SCHEDULE NOTES
CP2-01
CP-2
RTU-1
4
120
1
8# 10, 1 # 10 G
1, 2
CP2-02
CP-2
CRITICAL HIGH LEVEL FLOAT SW. POWER PLANT INTERMEDIATE TANK
N/A
120
1
2# 12, 1 # 12 G
1
CP2-03
CP-2
HIGH LEVEL FLOAT SW. POWER PLANT INTERMEDIATE TANK
N/A
1 120
1
2# 12, 1 # 12 G
1
CP2-04
CP-2
EXTERIOR LIGHT
1.4
120
1
2# 12, 1 # 12 G
1
CP2-05
CP-2
HORN/STROBE HS-3
0.1
120
1
2# 12, 1 # 12 G
1
SCHEDULE NOTES:
1. SEE 1 /E9 FOR WIRING CONNECTIONS.
2. PROVIDE AN ADDITIONAL 2# 10 CONDUCTORS LABELED AS "SPARE-_
VERIFY SCAM
BAR IS ONE INCH ON
ORIGINAL DRAWING
0 1"
IF NOT ONE INCH ON
THIS SHEET, ADJUST
SCALES ACCORDINGLY.
r
�mm
V a�a
c W `9
ZN
n
(ry o
„Z0'
w to
0 u_
c Z N
m
■� J to
ZQ
O0
UO
a) z
V(;
J N
Ww
W
Z co
QO
Qca
Vca
-U
U) QU
r
Ulo�¢
LU 0
G N
c
04T-"
ao °00
-°CHAN ol(LI°LO°o
EE-10285
° rrr
:
l�t� ��ss�oNA�' �••.
DRAWN BY: CPL, NVL
CHECKED BY: CPL
DATE: 11 /18/05
JOB NUMBER: K4193
SCALE: AS SHOWN
DRAWING TITLE:
POWER PLANT
ELECTRICAL PLAN
SHEET: OF