Loading...
HomeMy WebLinkAboutE6118" =1'-0" A. INSTALL ALL CONDUCTORS IN GALVANIZED RIGID CONDUIT. FIELD ROUTE AND SIZE CONDUIT TO ACCOMMODATE ALL CONDUCTORS PLUS 25% SPARE CAPACITY. 1 /2- MINIMUM SIZE. NOTES: 1. MOUNT ANTENNA TO POWER PLANT STRUCTURE ABOVE ROOF AS HIGH AS POSSIBLE. AIM TOWARD BULK TANK FARM. SEE 2/E13_ 2_ GROUND ROD, TYPICAL. SEE 2/E3 FOR GROUNDING DETAIL. CADWELD GROUNDING CONNECTOR TO TANKS, FENCE, AND PIPING. 3. PROVIDE AND INSTALL 3/4-C, 3# 10, 1 # 10 CU GND, XHHW TO NEAREST 120/208V OR 120/240V PANEL WITH CAPACITY. PROVIDE AND INSTALL NEW 2P/20A BREAKER, LISTED FOR USE IN THE PANEL. LABEL BREAKER '"POWER PLANT INTERMEDIATE TANK CONTROL PANEL CP-2"_ FOR BIDDING PURPOSES, ASSUME 100 FT FOR FEEDER LENGTH_ 4. PROPOSED LOCATION FOR FUEL SYSTEM CONTROL PANEL CP-2. INSTALL PANEL TO MEET MINIMUM NEC-110.26 CLEARANCE REQUIREMENTS. SEE SHEET E9_ EQUIPMENT SCHEDULE CIRCUIT TAG SOURCE DESTINATION HP AMPS VOLTS PHASE CONDUCTORS CU, XHHW SCHEDULE NOTES CP2-01 CP-2 RTU-1 4 120 1 8# 10, 1 # 10 G 1, 2 CP2-02 CP-2 CRITICAL HIGH LEVEL FLOAT SW. POWER PLANT INTERMEDIATE TANK N/A 120 1 2# 12, 1 # 12 G 1 CP2-03 CP-2 HIGH LEVEL FLOAT SW. POWER PLANT INTERMEDIATE TANK N/A 1 120 1 2# 12, 1 # 12 G 1 CP2-04 CP-2 EXTERIOR LIGHT 1.4 120 1 2# 12, 1 # 12 G 1 CP2-05 CP-2 HORN/STROBE HS-3 0.1 120 1 2# 12, 1 # 12 G 1 SCHEDULE NOTES: 1. SEE 1 /E9 FOR WIRING CONNECTIONS. 2. PROVIDE AN ADDITIONAL 2# 10 CONDUCTORS LABELED AS "SPARE-_ VERIFY SCAM BAR IS ONE INCH ON ORIGINAL DRAWING 0 1" IF NOT ONE INCH ON THIS SHEET, ADJUST SCALES ACCORDINGLY. r �mm V a�a c W `9 ZN n (ry o „Z0' w to 0 u_ c Z N m ■� J to ZQ O0 UO a) z V(; J N Ww W Z co QO Qca Vca -U U) QU r Ulo�¢ LU 0 G N c 04T-" ao °00 -°CHAN ol(LI°LO°o EE-10285 ° rrr : l�t� ��ss�oNA�' �••. DRAWN BY: CPL, NVL CHECKED BY: CPL DATE: 11 /18/05 JOB NUMBER: K4193 SCALE: AS SHOWN DRAWING TITLE: POWER PLANT ELECTRICAL PLAN SHEET: OF