Loading...
HomeMy WebLinkAboutCast-in Place Conc Field and Lab TestsAUG-01-2007 02:5a PM MARK HANSEN P.E. 907 746 4731 P.e2 MARK HANSEN P.E. COI TIN4 c"N41NEE0. TBLN6 WnB TP P.O. e 4 V Pdmar. M 98615-4,TY3 Pnme W) 7ar-4721 F. (007) 716 721 -mm: „npd:mlamm�„aa July 6, 2007 Work Order: 07063 Hankal Construction 550W. 54th Ave. Anchorage, AK 99518 Fax: 562-6496 Project:. Bulk Fuel Upgrade Subject: Concrete test summary Gentlemen: The results of field and laboratory tests of concrete on the above project are summarized below. TEST POUR LOCATION OF PLACEMENT SLUMP AIR TEMP. AGE LOAD DIAMETER PSI NO. DATE INCHES % F DAYS POUNDS INCHES 1 6/6/2007 Submitted Cylinder 07-04 4- 8 TO SZ 8 43,060 4.00 3430 07-05 14 52,920 4,00 4210 07-06 28 54,760 4.00 —4360 07-07 28 55,010 4.00 —4380 43�0 2 6Y27/2007 Submitted Cylinder- 07-08 2/Z r;.L SC 7 51,890 4.00 4130 07-09 14 55,050 4.00 4380 07-10 28 59,790 4.00 —4760 07-11 28 63,990 4.00 —5090 64�� 3 71W007 Submitted Cylinder 07-12 3.25 5.8 55. 7 46,050 4.00 3660 07-13 28 56,020 4.00 — 4460 07-14 28 57,590 4.00 —4580 4�eo 07-15 28 57,150 4.00 —4550 4 7/3/2004 Submitted Cylinder 07-16 zy1 4'0 $6 7 57,850 4.00 46DO 07-17 28 64,240 4.00 — 5110 07-18 28 65,160 4.00 — 519 0 5"o 07-19 28 60,560 4.00 — 4820 If you have any questions please do not hesitate to call. Sincerely, 10 J4Y 1 Mark Hansen 2 .J Page 1 of 1 /�- 1 Wic SAMPLE INFOR ATI?N:. e ,-�-r �:�:- 4 SaxP- Sample Number:®n-o o--c o-?� Date: o Slump: 2YR" %Air Entrainment —z7o Cement content (bags): G-9 Air Temperature: SZ" F Polyheed (Oz per 100 pounds cement) 2 o Z Type of Cement (circle one) 1� or 1,2 or 3 Other Information: l�gq e�a�e cones �ed< <¢ �jlVn i-S,% Cc,,y Se A bLUS Lv CAS Sl�h SAMPLE INFORMATION:. Sample Number. 09-o8a 2-as la-7- to Date: (o - a ?- 07 Cement content (bags): 6. 9 Air Temperature: so F Polyheed (Oz per 100 pounds ement) z oz Type of Cement (circle on or 1,2 or 3 Other Information: A.g�4& y v-ram CU ra; ed /o �s % Cmaesc iy �iv� SAMPLE INFORMATION•. s Sample Number: 6 iz Date: 9-2 - 0,7 slump: & r4 / % Air Entrainment 5-4 96 Cement content (bags): 64 9 Air Temperature: F Polyheed (Oz per 100 pounds cement) g oz Type of Cement (circle one) (f76r 1,2 or 3 Other Information: 44Q:A r&",- Z&/ Piv s ZSPe I&wA!st %v ' FYv c HANKAL CONST 9077576088 Ap proc" SAMPLE INFORMATION: Sample Number:a,)- I&. ,; ,w,, 6 a; Air S!a 65 G, `) Date: _9-3 - 0 7 Cement content (bags): k, = Air Temperature: J F Polyheed (Oz per.100 pounds ement) 0. 6,�--. Type of Cement (circle one) 1 or 1,2 or 3 Other Information:_ ,�c..c,,,rc . Y mow F k c �_J% /o 9 MATERIAL APPROVAL SUBMITTAL TO: (Conlracling Officer) Unalakieel Bulk Fuel Upgrade FROM: (Contractor) - Henkel Construction, Inc. 550 W. 54N Ave. Anch., AK 99518-1135 DATE: July 9, 2007 CONTRACT NUMBER REG-06-088 SUBMISSION NUMBER 60 SUBMITTAL []REVISION RNEW (DRESUBMITTAL PREVIOUS SUBMISSION NUMBER N/A HCI PROJECT NUMBER 2K6-100 TO BE COMPLETED BY CONTRACTOR ITEM N0. SPECIFICATION SECTION/ PARA. NO. 10R4W ING No. DESCRIPTION OF MATERWL IInCude Ty . MdN No, C Wloc No.. Mfg.. EIC.I AP- PROVED OISAP- PROVED SEE FEVE.E INRIA L 23 03300 CAST -IN -PLACE CONCRETE 1.06 C Field and Laboratory Tests to Date JUL 0 9 2007 BY COMPLETING THIS FORM. THE DNDERSIGNED OONTRACTOR OERTIFIES THAT THE MATERIAL COMPLIES WITH ALL SPECIFICATIONS OF SUBJECT CONTRACT DATE: ,n Y�V! � b7 NAME: DAVE SHELLENBERGER SIGNATURE TITLE: PROJECT MANAGER FOR ENGINEER/ARCHITECTOSE ONLY TO: Engineer/Architect For Evaluation and Action Approved El Disapproved as Indicated Above and Subject to Any Applicable comments on the Reverse Side. Request ResubmiHal Disap2mved Items Wilhin Da of Date Shown I Dale Type or Print Name and Titte Signature 'JUL-06-2e0T 01:41 PM MARK HANSEN P.E. 907 746 4721 P,02 MARK HANSEN P.E. CW9 TNG ENGINEERS TESnNG LaaO rp P.O. ea a]}3 Ptlmm, M 998A4-1323 ft— (9 7) 745-4721 Fa (907) 73 4721 e-mei:-m�eeOnloa9innnel July 6, 2007 Work Order: 07063 Hankal Construction 550W. 54th Ave. Anchorage, AK 99518 Fax: 562-6496 Project: Bulk Fuel Upgrade Subject: Concrete test summary Gentlemen: The results of field and laboratory tests of concrete on the above project are summarized below. TEST POUR LOCATION OF PLACEMENT SLUMP AIR TEMP. AGE LOAD DIAMETER PSI NO. DATE INCHES % F DAYS POUNDS INCHES 1 6/6/2007 Submitted Cylinder 07-04 07-05 8 2,0 4.00 0 592421 lI/JC Sj�y 07-06 14 0 4.00 0 28 54.764,760 4.00 436360 07-07 _ 28 55.010 4.00 4380 2 6/27/2007 Submitted Cylinder 7 51.890 4.00 4130 IJ CAS Sio-6 14 0 4.00 0 28 0 4.00 0 28 0 4.00 0 If you have any questions please do �nnoott, hesitate to call. Sincerely Mark Hansen Page 1 of 1 HAWWL CONST 9077576088 0.10 v CAS SIC. - SAMPLE INFORMATION:. o.7-1r Sample Number: �9-68 /n9-as h7 s® Date: [v - a 7- 07 Cement content (bags): 6. 9. AirTemperature: —o F Polyheed (Oz per 100 pounds ement) z oZ Type of Cement (circle on or 1,2 or 3 Other Information: ff4�-46,52 -TG C0yT-0,T aK /09 3& P1. R/U, SAMPLE INFDR ATIW.,q-0-7 4 a� Sample Number. on-o4+ o1-c �'+eu.� Date: Project: �6v k� -BF:u Slump: 2Yr," % Air Entrainment -77e Cement content (bags): E_9 Air Temperature: S2" F Polyheed (Oz per 100 pounds cement) 2 az Type of Cement (circle one)I or 1,2 or 3 Other Information: Ago.ega4e cnw,-taLned< lc%g Dios JAN-10-2007 04:08 PM MARK HANSEN P.E. 907 74E 4721 P.02 MARK HANSEN P.E. CWWNI ENOMEAI IES7NG Lc90FaTORY P.O 9ov 4323 Pdmv. M 996e5-U23 Phom (907) 74S-021 Fa (907) 76-4721 - o—meu: - mnPecmmwme.ml West Coast Construction Box 248 Unalakleet, Alaska 99684 1 /10/06 06028 Fax: 907-624-3098 Subject: Mix Design — 4500 psi Gentlemen: Attached are the results of a trial batch prepared in the laboratory. The aggregate properties are shown on the attached sheet. Also attachedarethe results of the trial batch. The aggregates used for the trial batch included a mixed sand and gravel supplemented with a small amount of crushed aggregate. The ACI and International building codes require 1200-psi strength overdesign for this specified strength for a plant without an extensive strength test record. The average target strength is 5700 psi. The 4500-psi specification is required by the building codes primarily for durability of outdoor placements. The strength will be sensitive to air content, with higher air content exhibiting lower strength. Strength will be most reliably achieved with the greatest strength overdesign when the air content is maintained near the specified minimum: however, durability will be best near the maximum specified air content. The specific gravity and absorption of the aggregate is as follows: Aggregate SSD Specific Gravity Absorption Coarse Portion - 2.641 1.55% Fine Portion - 2.589 2.20 % Weighted Average, Mixed.Agg. 2.607 1.98% Weighted Average, Crushed Agg. 2.634 1.63% The water and aggregate quantities shown on the mix design are for saturated surface dry (SSD) aggregates. The actual aggregates will be wetter than SSD. The catching quantities for water and aggregate need to be adjusted to account for the free moisture in the aggregates.- The attached batching table will aid in making the adjustment. - Sincerely, �p r 55 CJ33cc-' C r Mark Hansen, P.E. JAH-10-2007 04:08 PM MARK HANSEN P.E. 907 746 4721 ,03 (t m O m N O OOi m n0 N N P W N O O Percent Finer J5 V'7 3c0 /.04 OF JAH-10-2007 04:09 PM MARK HRNSEN P.E. 907 746 i721 P.04 (v G N d LL O O O 1p m O n W N O N ('1 O m r (O {7 O N W W G E n N (r'J N m N Oi V N O O O O d N V N i0 m O O O O a a i I I I I � 0.075 .150 {0 100 E I 0. 00 E L m o i i i i 2.36 .75 t i - 12. 1 i 5 37so C 75 .. .. e 0 o a o 0 0 0 0 0 0 0 5 Percent Finer r C .SS C33CC 1,c4 B,l -AM —10-2007 04:09 PM MARK HRNSEN P.E. 907 746 4721 P.05 0 MARK HANSEN P.E. CIX ULTIN6-NGWEER5 IESiING Le90Pemm P.O. Be, 43 ] Ptlmv. AN 9064-43U Phonc (907) 745-4721 fm: (907) 76-4731 West Coast Construction PROJECT: Unalakleel Mix Design BATCH NUMBER Test Date PROPORTIONS - PER CUBIC YARD Cement - Type I - II Pounds Water - - Pounds Water Gallons Crushed Aggregate, SSD Pounds Mixed Aggregate, SSD - Pounds Admixture, Polyheed 997 Fl.oz./cwt. Admixture, MB AE 90 Fl.oz./cwl. PROPERTIES OF FRESH CONCRETE ...... ...................... Slump Inches Air - Pressure Method Percent Air- Gravametric Method Percent Unit Weight_ - Pounds/Cu. Ft. Water - Cement Ratio By Weight Temperature F Workability - COMPRESSIVE STRENGTHS 4" cylinders, ASTM C 39, psi 3 Days 3 Days; Average 7 Days 7 Days, Average 28 Days 28 Days, Average 1 11 Sep-06 660 300 35.9 401 2475 6.0 1.30 4.00 4.7 4.5 142.1 0,45 63 Oversanded 3650 2850 3250 4710 4510 4270 4497 5140 5720 5900 5810 JSc33cc 1,c4 $:J JAM-10-2007 04:10 P. MARK HRNSEN P.E. 907 746 4721 P.06 MARK HANSEN P.E. CWWLTIM9 ENCINEEC9 TUTI1.L.o. ram P.e. eev 43" PWMW' M 99" 439 Pbme: (907) 745-4721 FCC (207) 7+ -4721 Prepared for: West Coast Construction 1/10/07 ONE CUBIC YARD BATCH MIXTURE CRCRITERIAUnalakleel DESIGN STRENGTH, 28 days (f,) PROJECTED AVERAGE STRENGTH, 7days PROJECTED AVERAGE STRENGTH, 28 days CEMENT ADMIXTURE, Air Envaining ADMIXTURE, Water Reducing COARSE AGGREGATE MIXED AGGREGATE - SLUMP AIR CONTENT WATER -CEMENT RATIO UNIT WEIGHT BATCHING QUANTITIES - PER CUBIC YARD BATCHING ITEM - QUANTITY Cement 658 Ib. Water -34.7 gal. 290 lb. 3/4" Mixed Aggregate SSD 2383 lb. 1' Crushed Agg 450 lb. Admixture: 7 bag mix An Entrained 4500 psi 4500 psi 5700 psi Type I ME AE 90 Polyheed 997 Crushed 1', (SSD) 3/4" Minus, (SSD) 4" 6% 0.44 140.0 pcf DISPLACED VOLUME, c.f. 3.35 4.65 14.65 2.74 Polyheed 997 39.5 oz. MB AE.90 8.0 oz.1.62 , - '? i h TOTAL 3787 27.00, y Quantity of air entraining admixture to be field adjusted to produce Specified i` ',4'. �.:..® I p air content Hln.. ...... CE-4753 �•r 5 S 0330C !. C' 4- F. 1 JAN-10-2007 04:1e PM NARK HRNSEN P.E. 90i 746 S721 P_0i MARK HANSEN P.E. Ca SPTING CVGINEEM rBIMC LdeGp410pY P.O. am 4323 PWmv. AK 69645—L23 Phone (907) 745-4721 -Poe: (907) 74-411 —moil:- mM1poWnlaanllnunel MOISTURE CORRECTION TABLE West COast Construction 1 C.Y. Batch 7.0 Bag Mix Cement 658 lb. 1"Aggregate Me AE 90 - As required for 6% air PolyHeed 997 - 39.5 fl. oz per cubic yard Aggregate Moistures Batch Weights 1' Crushed 314" Mixed 1" Crushed 3/4" Mixed Water Water Cement % % Pound, Pounds Pounds Gallons Pounds Ah5,xians 1 y d n50 - M83 290 343 658 1-63 1.98 - 1.0 yard. -450 2383 290 34.7 658 MdsNres - 2 -2 1.0 yard. 452 - 2383 288 34.5 658 2 3 452 2407 265 31.7 658 2 4 452 2430 241 28.9 658 2 5 452 2454 218 26.1 658 2 6 452 2477 194 23,3 658 2 7 452 2500 171 20.5 658 3 3 1.0 yards 456- 2407 260 31.1 658 3 4 456 2430 237 28.4 658 3 5 456 2454 - 213 25.6 658 3 6 456 2477 190 22-8 658 3 7 456 2500 167 20.0 658 3 a 456 2524 143 17.2 656 I Prepared by Mark Hansen 1/10/2007 SS c_33cc- i, Cc� 3,! CAST -IN -PLACE CONCRETE Pour Plan Hardest Construction, hie. proposes a three (3) pour procedure for construction of the truck till containment areas. Each containment area will require the same 3 step approach, hoever in some cases the work may occur concurrently ie: the sump bottom of the next work area may be poured as the approach slabs of a finished area is completed. The following sequence is expected to be reasonable procedure to satisfy the intended design for the containment slabs. l" Pour Bottom of the 2' x 2' sump up to the bottom elevation of the 8" slab. Elev. = 18.65 Prior to the 2"a pour a hydrophilic waterstop will be installed in this cold joint. 2ntl Pour The entire containment portion will be constructed without cold joints as a monolithic pour. Concrete will be placed in the raised curb formwork first to allow a set to begin. Concrete will then be placed and graded throughout the containment. The curb formwork pins will be removed while the slab concrete is still plastic enough to fill the impression of the removed pins.. A broom finish will be applied, the entire exposed surface will be wetted and an impervious sheet will be placed to maintain minimum moisture loss. The moisture cure will be interrupted long enough to saw cut the crack control joints and then re -wetted and covered. The crack control joints will be cleaned and filled with Sikaflex 2c SL after a full cure of the concrete is achieved. 3" Pour The roll -up approach slabs will be constructed, broom finish, wetted and covered to maintain minimum moisture loss. All concrete pours will be scheduled during a favorable weather outlook. No exposed concrete pours will be attempted during inclement or unfavorable weather conditions. eo' \ - i-`--- : I ttWGl_ I - i I I zxs'n'Qi j xvm9:.xxr 'IpICGL) 9 N^-I V MUCK CONTL�,16 MENT PLAM -. 2�d o '-hlo::-.i �l'•c µ-11 MUCK -5 6'31.iFAG fOMF 6 SMFAL� CMRSEI ^YV V9A N1 FlLL m AC= M �B.]R' � 95.. MAPNLLV pEN9r1 �5£CLN6JtYYE/I&PANE uxc3 IY1 S ncl�ur5 C�a o> ST49VOAP." YQ(6W V!£ NNER� IALFI9r FN. flllPac RD ro WLtlNWI oemr. r acm .wsvunuw� .uvwaw sAe nrrx .J q N