July 6, 2007
Work Order: 07063
Hankal Construction
550W. 54th Ave.
Anchorage, AK 99518
Fax: 562-6496
Project:. Bulk Fuel Upgrade
Subject: Concrete test summary
Gentlemen:
The results of field and laboratory tests of concrete on the above project are summarized below.
TEST POUR LOCATION OF PLACEMENT SLUMP AIR TEMP. AGE LOAD DIAMETER PSI
NO. DATE INCHES % F DAYS POUNDS INCHES
1 6/6/2007 Submitted Cylinder 07-04 4- 8 TO SZ 8 43,060 4.00 3430
07-05 14 52,920 4,00 4210
07-06 28 54,760 4.00 —4360
07-07 28 55,010 4.00 —4380 43�0
2 6Y27/2007 Submitted Cylinder- 07-08 2/Z r;.L SC 7 51,890 4.00 4130
07-09 14 55,050 4.00 4380
07-10 28 59,790 4.00 —4760
07-11 28 63,990 4.00 —5090 64��
3 71W007 Submitted Cylinder 07-12 3.25 5.8 55. 7 46,050 4.00 3660
07-13 28 56,020 4.00 — 4460
07-14 28 57,590 4.00 —4580 4�eo
07-15 28 57,150 4.00 —4550
4 7/3/2004 Submitted Cylinder 07-16 zy1 4'0 $6 7 57,850 4.00 46DO
07-17 28 64,240 4.00 — 5110
07-18 28 65,160 4.00 — 519 0 5"o
07-19 28 60,560 4.00 — 4820
If you have any questions please do not hesitate to call.
Sincerely,
10
J4Y
1 Mark Hansen 2 .J
Page 1 of 1 /�-
1
Wic
SAMPLE INFOR ATI?N:. e ,-�-r �:�:- 4 SaxP-
Sample Number:®n-o o--c o-?� Date: o
Slump: 2YR" %Air Entrainment —z7o
Cement content (bags): G-9 Air Temperature: SZ" F
Polyheed (Oz per 100 pounds cement) 2 o Z
Type of Cement (circle one) 1� or 1,2 or 3
Other
Information: l�gq e�a�e cones �ed< <¢ �jlVn
i-S,% Cc,,y Se A bLUS
Lv CAS Sl�h
SAMPLE INFORMATION:.
Sample Number. 09-o8a 2-as la-7- to Date: (o - a ?- 07
Cement content (bags): 6. 9 Air Temperature: so F
Polyheed (Oz per 100 pounds ement) z oz
Type of Cement (circle on or 1,2 or 3
Other
Information: A.g�4& y v-ram CU ra; ed /o
�s % Cmaesc iy �iv�
SAMPLE INFORMATION•. s
Sample Number: 6 iz Date: 9-2 - 0,7
slump: & r4 / % Air Entrainment 5-4 96
Cement content (bags): 64 9 Air Temperature: F
Polyheed (Oz per 100 pounds cement) g oz
Type of Cement (circle one) (f76r 1,2 or 3
Other
Information: 44Q:A r&",- Z&/ Piv s
ZSPe I&wA!st %v ' FYv c
HANKAL CONST
9077576088
Ap proc"
SAMPLE INFORMATION:
Sample Number:a,)- I&. ,; ,w,, 6 a;
Air
S!a 65 G, `)
Date: _9-3 - 0 7
Cement content (bags): k, = Air Temperature: J F
Polyheed (Oz per.100 pounds ement) 0. 6,�--.
Type of Cement (circle one) 1 or 1,2 or 3
Other Information:_ ,�c..c,,,rc . Y mow F k c �_J% /o 9
MATERIAL APPROVAL SUBMITTAL
TO: (Conlracling Officer)
Unalakieel Bulk Fuel Upgrade
FROM: (Contractor) -
Henkel Construction, Inc.
550 W. 54N Ave. Anch., AK 99518-1135
DATE:
July 9, 2007
CONTRACT NUMBER
REG-06-088
SUBMISSION NUMBER
60
SUBMITTAL []REVISION
RNEW (DRESUBMITTAL
PREVIOUS SUBMISSION NUMBER
N/A
HCI PROJECT NUMBER
2K6-100
TO
BE COMPLETED BY CONTRACTOR
ITEM
N0.
SPECIFICATION SECTION/
PARA. NO. 10R4W ING No.
DESCRIPTION OF MATERWL
IInCude Ty . MdN No, C Wloc No.. Mfg.. EIC.I
AP-
PROVED
OISAP-
PROVED
SEE
FEVE.E
INRIA
L
23
03300
CAST -IN -PLACE CONCRETE
1.06
C
Field and Laboratory Tests to Date
JUL 0 9 2007
BY COMPLETING THIS FORM. THE DNDERSIGNED OONTRACTOR OERTIFIES THAT
THE MATERIAL COMPLIES WITH ALL SPECIFICATIONS OF SUBJECT CONTRACT
DATE: ,n
Y�V! � b7
NAME: DAVE SHELLENBERGER SIGNATURE
TITLE: PROJECT MANAGER
FOR ENGINEER/ARCHITECTOSE ONLY
TO: Engineer/Architect
For Evaluation and Action
Approved
El
Disapproved as Indicated Above and Subject to Any Applicable comments on the Reverse Side. Request ResubmiHal
Disap2mved Items Wilhin Da of Date Shown
I
Dale
Type or Print Name and Titte
Signature
'JUL-06-2e0T 01:41 PM MARK HANSEN P.E.
907 746 4721 P,02
MARK HANSEN P.E.
CW9 TNG ENGINEERS TESnNG LaaO rp
P.O. ea a]}3 Ptlmm, M 998A4-1323 ft— (9 7) 745-4721 Fa (907) 73 4721
e-mei:-m�eeOnloa9innnel
July 6, 2007
Work Order: 07063
Hankal Construction
550W. 54th Ave.
Anchorage, AK 99518
Fax: 562-6496
Project: Bulk Fuel Upgrade
Subject: Concrete test summary
Gentlemen:
The results of field and laboratory tests of concrete on the above project are summarized below.
TEST POUR LOCATION OF PLACEMENT SLUMP AIR TEMP. AGE LOAD DIAMETER PSI
NO. DATE INCHES % F DAYS POUNDS INCHES
1 6/6/2007 Submitted Cylinder 07-04
07-05 8 2,0 4.00 0
592421
lI/JC Sj�y 07-06 14 0 4.00 0
28 54.764,760 4.00 436360
07-07 _ 28 55.010 4.00 4380
2 6/27/2007 Submitted Cylinder 7 51.890 4.00 4130
IJ CAS Sio-6 14 0 4.00 0
28 0 4.00 0
28 0 4.00 0
If you have any questions please do �nnoott, hesitate to call.
Sincerely
Mark Hansen
Page 1 of 1
HAWWL CONST 9077576088 0.10
v CAS SIC. -
SAMPLE INFORMATION:. o.7-1r
Sample Number: �9-68 /n9-as h7 s® Date: [v - a 7- 07
Cement content (bags): 6. 9. AirTemperature: —o F
Polyheed (Oz per 100 pounds ement) z oZ
Type of Cement (circle on or 1,2 or 3
Other
Information: ff4�-46,52 -TG C0yT-0,T aK /09 3& P1.
R/U,
SAMPLE INFDR ATIW.,q-0-7 4 a�
Sample Number. on-o4+ o1-c �'+eu.� Date:
Project: �6v k� -BF:u
Slump: 2Yr," % Air Entrainment -77e
Cement content (bags): E_9 Air Temperature: S2" F
Polyheed (Oz per 100 pounds cement) 2 az
Type of Cement (circle one)I or 1,2 or 3
Other
Information: Ago.ega4e cnw,-taLned< lc%g Dios
JAN-10-2007 04:08 PM MARK HANSEN P.E. 907 74E 4721
P.02
MARK HANSEN P.E.
CWWNI ENOMEAI IES7NG Lc90FaTORY
P.O 9ov 4323 Pdmv. M 996e5-U23 Phom (907) 74S-021 Fa (907) 76-4721
- o—meu: - mnPecmmwme.ml
West Coast Construction
Box 248
Unalakleet, Alaska 99684
1 /10/06
06028
Fax: 907-624-3098
Subject: Mix Design — 4500 psi
Gentlemen:
Attached are the results of a trial batch prepared in the laboratory. The aggregate
properties are shown on the attached sheet.
Also attachedarethe results of the trial batch. The aggregates used for the trial
batch included a mixed sand and gravel supplemented with a small amount of
crushed aggregate.
The ACI and International building codes require 1200-psi strength overdesign for
this specified strength for a plant without an extensive strength test record. The
average target strength is 5700 psi. The 4500-psi specification is required by the
building codes primarily for durability of outdoor placements. The strength will be
sensitive to air content, with higher air content exhibiting lower strength. Strength will
be most reliably achieved with the greatest strength overdesign when the air content
is maintained near the specified minimum: however, durability will be best near the
maximum specified air content.
The specific gravity and absorption of the aggregate is as follows:
Aggregate SSD Specific Gravity
Absorption
Coarse Portion -
2.641
1.55%
Fine Portion -
2.589
2.20 %
Weighted Average, Mixed.Agg.
2.607
1.98%
Weighted Average, Crushed Agg.
2.634
1.63%
The water and aggregate quantities shown on the mix design are for saturated
surface dry (SSD) aggregates. The actual aggregates will be wetter than SSD. The
catching quantities for water and aggregate need to be adjusted to account for the
free moisture in the aggregates.- The attached batching table will aid in making the
adjustment. -
Sincerely,
�p r 55 CJ33cc-'
C r
Mark Hansen, P.E.
JAH-10-2007 04:08 PM MARK HANSEN P.E. 907 746 4721
,03
(t
m
O
m
N
O OOi m n0 N N P W N O O
Percent Finer
J5 V'7 3c0 /.04 OF
JAH-10-2007 04:09 PM MARK HRNSEN P.E. 907 746 i721 P.04
(v
G
N
d
LL
O
O
O
1p
m
O
n
W
N
O
N
('1
O
m
r
(O
{7
O
N
W
W
G
E
n
N
(r'J
N
m
N
Oi
V
N
O
O
O
O
d
N
V
N
i0
m
O
O
O
O
a
a
i
I
I
I
I
�
0.075
.150
{0
100
E
I
0.
00
E
L
m
o
i i
i
i
2.36
.75
t
i
-
12.
1
i
5
37so
C
75
.. ..
e
0 o a o 0 0 0 0 0 0 0
5
Percent Finer
r
C
.SS C33CC 1,c4 B,l
-AM
—10-2007 04:09 PM MARK HRNSEN P.E. 907 746 4721
P.05
0
MARK HANSEN P.E.
CIX ULTIN6-NGWEER5 IESiING Le90Pemm
P.O. Be, 43 ] Ptlmv. AN 9064-43U Phonc (907) 745-4721 fm: (907) 76-4731
West Coast Construction
PROJECT: Unalakleel Mix Design
BATCH NUMBER
Test Date
PROPORTIONS - PER CUBIC YARD
Cement - Type I - II
Pounds
Water
- - Pounds
Water
Gallons
Crushed Aggregate, SSD
Pounds
Mixed Aggregate, SSD -
Pounds
Admixture, Polyheed 997
Fl.oz./cwt.
Admixture, MB AE 90
Fl.oz./cwl.
PROPERTIES OF FRESH CONCRETE
...... ......................
Slump
Inches
Air - Pressure Method
Percent
Air- Gravametric Method
Percent
Unit Weight_
- Pounds/Cu. Ft.
Water - Cement Ratio
By Weight
Temperature
F
Workability -
COMPRESSIVE STRENGTHS 4"
cylinders, ASTM C 39, psi
3 Days
3 Days; Average
7 Days
7 Days, Average
28 Days
28 Days, Average
1
11 Sep-06
660
300
35.9
401
2475
6.0
1.30
4.00
4.7
4.5
142.1
0,45
63
Oversanded
3650
2850
3250
4710
4510
4270
4497
5140
5720
5900
5810
JSc33cc 1,c4 $:J
JAM-10-2007 04:10 P. MARK HRNSEN P.E. 907 746 4721 P.06
MARK HANSEN P.E.
CWWLTIM9 ENCINEEC9 TUTI1.L.o. ram
P.e. eev 43" PWMW' M 99" 439 Pbme: (907) 745-4721 FCC (207) 7+ -4721
Prepared for:
West Coast Construction
1/10/07
ONE CUBIC YARD BATCH
MIXTURE CRCRITERIAUnalakleel
DESIGN STRENGTH, 28 days (f,)
PROJECTED AVERAGE STRENGTH, 7days
PROJECTED AVERAGE STRENGTH, 28 days
CEMENT
ADMIXTURE, Air Envaining
ADMIXTURE, Water Reducing
COARSE AGGREGATE
MIXED AGGREGATE -
SLUMP
AIR CONTENT
WATER -CEMENT RATIO
UNIT WEIGHT
BATCHING QUANTITIES - PER CUBIC YARD
BATCHING
ITEM - QUANTITY
Cement 658 Ib.
Water -34.7 gal. 290 lb.
3/4" Mixed Aggregate SSD 2383 lb.
1' Crushed Agg 450 lb.
Admixture:
7 bag mix
An Entrained
4500 psi
4500 psi
5700 psi
Type I
ME AE 90
Polyheed 997
Crushed 1', (SSD)
3/4" Minus, (SSD)
4"
6%
0.44
140.0 pcf
DISPLACED
VOLUME, c.f.
3.35
4.65
14.65
2.74
Polyheed 997 39.5 oz.
MB AE.90 8.0 oz.1.62 ,
- '?
i h
TOTAL 3787 27.00, y
Quantity of air entraining admixture to be field adjusted to produce Specified i` ',4'. �.:..®
I p air content Hln.. ......
CE-4753 �•r
5 S 0330C !. C' 4- F. 1
JAN-10-2007 04:1e PM NARK HRNSEN P.E. 90i 746 S721 P_0i
MARK HANSEN P.E.
Ca SPTING CVGINEEM rBIMC LdeGp410pY
P.O. am 4323 PWmv. AK 69645—L23 Phone (907) 745-4721 -Poe: (907) 74-411
—moil:- mM1poWnlaanllnunel
MOISTURE CORRECTION TABLE West COast Construction
1 C.Y. Batch 7.0 Bag Mix
Cement 658 lb.
1"Aggregate
Me AE 90 - As required for 6% air
PolyHeed 997 - 39.5 fl. oz per cubic yard
Aggregate Moistures Batch Weights
1' Crushed 314" Mixed 1" Crushed 3/4" Mixed Water Water Cement
% % Pound, Pounds Pounds Gallons Pounds
Ah5,xians 1 y d n50 - M83 290 343 658
1-63 1.98 - 1.0 yard. -450 2383 290 34.7 658
MdsNres -
2 -2 1.0 yard. 452 - 2383 288 34.5 658
2 3 452 2407 265 31.7 658
2 4 452 2430 241 28.9 658
2 5 452 2454 218 26.1 658
2 6 452 2477 194 23,3 658
2 7 452 2500 171 20.5 658
3 3 1.0 yards 456- 2407 260 31.1 658
3 4 456 2430 237 28.4 658
3 5 456 2454 - 213 25.6 658
3 6 456 2477 190 22-8 658
3 7 456 2500 167 20.0 658
3 a 456 2524 143 17.2 656
I
Prepared by Mark Hansen 1/10/2007
SS c_33cc- i, Cc� 3,!
CAST -IN -PLACE CONCRETE
Pour Plan
Hardest Construction, hie. proposes a three (3) pour procedure for construction of the truck till
containment areas. Each containment area will require the same 3 step approach, hoever in some
cases the work may occur concurrently ie: the sump bottom of the next work area may be poured
as the approach slabs of a finished area is completed.
The following sequence is expected to be reasonable procedure to satisfy the intended design for
the containment slabs.
l" Pour Bottom of the 2' x 2' sump up to the bottom elevation of the 8" slab.
Elev. = 18.65 Prior to the 2"a pour a hydrophilic waterstop will be
installed in this cold joint.
2ntl Pour The entire containment portion will be constructed without cold joints as
a monolithic pour.
Concrete will be placed in the raised curb formwork first to allow a set to
begin. Concrete will then be placed and graded throughout the
containment. The curb formwork pins will be removed while the slab
concrete is still plastic enough to fill the impression of the removed pins..
A broom finish will be applied, the entire exposed surface will be wetted
and an impervious sheet will be placed to maintain minimum moisture
loss.
The moisture cure will be interrupted long enough to saw cut the crack
control joints and then re -wetted and covered. The crack control joints
will be cleaned and filled with Sikaflex 2c SL after a full cure of the
concrete is achieved.
3" Pour The roll -up approach slabs will be constructed, broom finish, wetted and
covered to maintain minimum moisture loss.
All concrete pours will be scheduled during a favorable weather outlook. No exposed
concrete pours will be attempted during inclement or unfavorable weather conditions.
eo'
\
- i-`---
:
I
ttWGl_
I
-
i
I I
zxs'n'Qi j
xvm9:.xxr
'IpICGL)
9
N^-I
V
MUCK CONTL�,16 MENT PLAM -. 2�d o '-hlo::-.i �l'•c
µ-11 MUCK
-5
6'31.iFAG fOMF
6 SMFAL� CMRSEI ^YV V9A N1 FlLL m AC= M
�B.]R' � 95.. MAPNLLV pEN9r1
�5£CLN6JtYYE/I&PANE uxc3
IY1
S ncl�ur5 C�a o>
ST49VOAP." YQ(6W V!£ NNER� IALFI9r FN. flllPac RD
ro WLtlNWI oemr.
r acm .wsvunuw�
.uvwaw sAe nrrx
.J q
N