HomeMy WebLinkAboutVillage End Use Energy Efficiency Program W Stony River Final Report 03-03-2009 Village End Use Energy Efficiency Measures Program AEA Grant # 2195234 Administered by Alaska Building Science Network Stony River Final Report Community Summary 6 community buildings received energy efficiency upgrades as follows: Village Office, Stony River Inn – Summer Rental, Church, Main School Bldg, Generator Room, School Gym Retrofits Completed: October 2007 – December 2008 Village-Wide Lighting Retrofit Summary: • Retrofitted 105 light fixtures with electronic ballasts & T8 lamps • Installed 49 compact fluorescent light bulbs • Installed 21 T5 linear fluorescent fixtures in the School Gym • Pre-retrofit energy use for all lighting: 19.142 Kilowatts • Post-retrofit energy use for all lighting: 10.119 Kilowatts • Energy savings projection: 9.023 Kilowatts • Pre-retrofit to post retrofit energy reduction: 47% • Estimated Annual Savings: kWh Rate (as of 11/19/08): $0.85 Fuel Cost (FY 2007 Ave): $3.15 Comparative Comparative Hours Per Day/ Electrical Avoided Diesel Avoided Diesel 250 Days Per Year Savings Use (gal) Costs Locally Estimated $12,487.94 1829.91 $5,764.23 4 Hours/day $7,660.53 1122.53 $3,535.97 7 Hours/day $13,405.90 1964.43 $6,187.95 10 Hours/day $19,151.30 2806.33 $8,839.93 • Total project cost for all measures: $ 37,775 • Simple Payback (lighting measures only, using 7 hours/day lighting use run-time): 2.82 years • Total village wide in-kind contribution: $7,873.00 (extended grant capacity by 20.8%) 2 Alaska Building Science Network – Village End Use Energy Efficiency Program – ’07-’08 Final Report West Region – Stony River Stony River Traditional Council Owned Buildings 2 buildings owned by the Stony River Traditional Council received energy efficient lighting upgrades as follows: Village Office, Stony River Inn – Summer Rental • Lighting upgrades completed in Oct 2007 • Retrofitted 11 light fixtures with electronic ballasts & T8 lamps • Installed 44 compact fluorescent light bulbs • Pre-retrofit energy use for all lighting: 3.994 Kilowatts • Post-retrofit energy use for all lighting: 1.349 Kilowatts • Energy savings projection: 2.645 Kilowatts • Pre-retrofit to post retrofit energy reduction: 66% • Estimated Annual Savings: Comparative Comparative Hours Per Day / Electrical Avoided Diesel Avoided 250 Days Per Year Savings Use (gal) Diesel Costs Locally Estimated $3,069.81 449.83 $1,416.98 4 Hours/day $2,245.61 329.06 $1,036.53 7 Hours/day $3,929.81 575.85 $1,813.93 10 Hours/day $5,614.01 822.65 $2,591.33 3 Alaska Building Science Network – Village End Use Energy Efficiency Program – ’07-’08 Final Report West Region – Stony River Village Office Materials Installed Quantity 2-lamp electronic ballast, (2) 25 watt T8 lamps 1 CFL-14 W 19 CFL-20 W 6 CFL-23 W 8 • Pre-retrofit energy use: 2154 watts • Post-retrofit energy use: 617 watts • Energy savings projection: 1537 watts • Pre-retrofit to post retrofit energy reduction: 71% • Estimated annual savings: Comparative Comparative Hours Per Day / Electrical Avoided Diesel Avoided Diesel 250 Days Per Year Savings Use (gal) Costs 1800 Hours/year (Est.) $2,348.84 344.19 $1,084.19 4 Hours/day $1,304.91 191.21 $602.33 7 Hours/day $2,283.60 334.63 $1,054.07 10 Hours/day $3,262.28 478.04 $1,505.82 Stony River Inn - Summer Rental Materials Installed Quantity 2-lamp electronic ballast, (2) 25 watt T8 lamps 10 CFL-20 W 4 CFL-27 W 2 • Pre-retrofit energy use: 1340 watts • Post-retrofit energy use: 604 watts • Energy savings projection: 736 watts • Pre-retrofit to post retrofit energy reduction: 55% • Estimated annual savings: Comparative Comparative Hours Per Day / Electrical Avoided Diesel Avoided Diesel 250 Days Per Year Savings Use (gal) Costs 800 Hours/year (Est.) $499.89 73.25 $230.74 4 Hours/day $624.86 91.56 $288.43 7 Hours/day $1,093.51 160.24 $504.75 10 Hours/day $1,562.16 228.91 $721.07 4 Alaska Building Science Network – Village End Use Energy Efficiency Program – ’07-’08 Final Report West Region – Stony River Church Materials Installed Quantity CFL-20 W 1 CFL-27 W 4 • Pre-retrofit energy use: 500 watts • Post-retrofit energy use: 128 watts • Energy savings projection: 372 watts • Pre-retrofit to post retrofit energy reduction: 74% • Estimated annual savings: Comparative Comparative Hours Per Day / Electrical Avoided Diesel Avoided Diesel 250 Days Per Year Savings Use (gal) Costs 700 Hours/year (Est.) $221.08 32.40 $102.05 4 Hours/day $315.83 46.28 $145.78 7 Hours/day $552.70 80.99 $255.12 10 Hours/day $789.57 115.70 $364.45 5 Alaska Building Science Network – Village End Use Energy Efficiency Program – ’07-’08 Final Report West Region – Stony River Kuspuk School District Owned Buildings 3 buildings owned by the Kuspuk School District received energy efficient lighting upgrades as follows: Main School Bldg, Generator Room, School Gym • Lighting upgrades completed in October 2007 & December 2008 • Retrofitted 94 light fixtures with electronic ballasts & T8 lamps • Installed 5 compact fluorescent light bulbs • Installed 21 T5 linear fluorescent fixtures • Pre-retrofit energy use for all lighting: 15.148 Kilowatts • Post-retrofit energy use for all lighting: 8.77 Kilowatts • Energy savings projection: 6.378 Kilowatts • Pre-retrofit to post retrofit energy reduction: 42% • Estimated Annual Savings: Comparative Comparative Hours Per Day / Electrical Avoided Diesel Avoided 250 Days Per Year Savings Use (gal) Diesel Costs Locally Estimated $9,418.13 1,380.08 $4,347.25 4 Hours/day $5,414.92 793.47 $2,499.44 7 Hours/day $9,476.11 1,388.58 $4,374.02 10 Hours/day $13,537.3 1,983.68 $6,248.59 6 Alaska Building Science Network – Village End Use Energy Efficiency Program – ’07-’08 Final Report West Region – Stony River Main School Bldg School maintenance worker retrofits a fixture. Electronic ballast and T-8, 25 watt lighting retrofits save energy while improving light levels in school classrooms and hallways for a better learning environment. Materials Installed Quantity 2-lamp electronic ballast, (2) 25 watt T8 lamps 29 2-lamp electronic ballast, (2) 32 watt T8 lamps 10 3-lamp fixture, (2) 2-lamp electronic ballasts (3) 25 53 CFL-27 W 1 • Pre-retrofit energy use: 9540 watts • Post-retrofit energy use: 5806 watts • Energy savings projection: 3734 watts • Pre-retrofit to post retrofit energy reduction: 39% • Estimated annual savings: Comparative Comparative Hours Per Day / Electrical Avoided Diesel Avoided Diesel 250 Days Per Year Savings Use (gal) Costs 1800 Hours/year (Est.) $5,706.30 836.17 $2,633.93 4 Hours/day $3,170.17 464.54 $1,463.30 7 Hours/day $5,547.79 812.94 $2,560.77 10 Hours/day $7,925.42 1161.35 $3,658.24 Generator Room Materials Installed Quantity 2-lamp electronic ballast, (2) 32 watt T8 lamps 2 CFL-27 W 4 • Pre-retrofit energy use: 568 watts • Post-retrofit energy use: 228 watts • Energy savings projection: 340 watts • Pre-retrofit to post retrofit energy reduction: 60% • Estimated annual savings: Comparative Comparative Hours Per Day / Electrical Avoided Diesel Avoided Diesel 250 Days Per Year Savings Use (gal) Costs 1000 Hours/year (Est.) $288.66 42.30 $133.24 4 Hours/day $288.66 42.30 $133.24 7 Hours/day $505.16 74.02 $233.17 10 Hours/day $721.65 105.75 $333.10 7 Alaska Building Science Network – Village End Use Energy Efficiency Program – ’07-’08 Final Report West Region – Stony River School Gym T-5 fixtures save energy while improving light levels in large spaces. Materials Installed Quantity T5 fixture, electronic ballast, (2) 54 watt T5 HO 15 T5 fixture, electronic ballast, (3) 54 watt T5 HO 6 • Pre-retrofit energ y use: 5040 watts • Post-retrofit energy use: 2736 watts • Energy savings projection: 2304 watts • Pre-retrofit to post retrofit energy reduction: 46% • Estimated annual savings: Comparative Comparative Hours Per Day / Electrical Avoided Diesel Avoided Diesel 250 Days Per Year Savings Use (gal) Costs 1750 Hours/year (Est.) $3,423.17 501.61 $1,580.08 4 Hours/day $1,956.10 286.64 $902.90 7 Hours/day $3,423.17 501.61 $1,580.08 10 Hours/day $4,890.24 716.59 $2,257.25 Stony River - Alaska Building Science Network - T5 Lighting Upgrade Details These retrofits were completed in Dec, 2008. School Gym Length (feet) Width (feet) Ceiling Height (feet) Type of Existing Fixture # of Existing Fixtures Existing Fixture Wattage Total Existing Wattage Existing Foot- candles New Foot- Candles # of New Fixtures New fixtures New Fixture Wattage Total New Wattage 56 39 low 16' high 24' HPS 150 watt 160 0 15 T-5 2 lamps 114 1710 HPS 250 watt 260 0 6 T-5 3 lamps 171 1026 Other School Gym (A) 40 126 5,040 T-5 6 lamps 342 0 Other School Gym (B) 0 Other fixtures (A) 0 Total Existing Watts 5,040 Total New Watts 2,736 Percent Savings Pre to Post Retrofit: 45.71% Savings & Payback Calculation for Gym: 1750 New watts / old watts Assume 1750 hrs / year for 250 days/year of use Full cost of electricity: $0.85 /kWh Watts of existing lighting: 5,040 New wattage for T5 fixtures: 2,736 Calculation: (Watts) x (hrs/year) / (1000w/kw) x (cost of electricity) = (cost / year) Existing Cost: $7,488 Retrofitted Cost: $4,065 T5 Materials costs $ 3,585 Annual Savings: $3,423 T5 shipping costs $ 540 Material & shipping cost of Gym retrofit: $4,125 Simple Payback: Materials cost / annual savings 1.21 years (for retrofit to pay for itself in materials) Stony River, In-Kind Contribution Tracking Record - ABSN Energy Efficiency Projects: In-Kind Item Dates Hours Contri- buted Hourly Wage Value / Amount Notes Staff time for project contact, introduction, and review of intro materials (Number of entities x 1 hour each) 3 $15.00 $45.00 list number of entities Staff time for Attending teleconference (TC/IRA) 1 $15.00 $15.00 list # of staff and wages if possible ($15/hr is an average wage designated for village entity staff). Staff time for Attending teleconference (School) 1 $15.00 $15.00 " Conservative village office administrative percentage of total project cost less ABSN Admin %. Total project cost = $37,775/village - (our admin percentage , (around 12%) Approx: $4,533) = $33,242 x 5.5% = $1,828 (this 5.5% village admin cost estimate is spread across all entities we work with for the course of the grant for completing all energy efficiency measures. These are primarily for cumulative, otherwise unaccounted time expense for village- based project support. Feb, '07 through $1,828.00 Each time we call, email, or fax a village entity, someone has to receive the communication, review and/or forward the information, follow-up on requests, etc. Whether it is to set-up a teleconference, verify maintenance staff participation in lighting or boiler trainings, set-up in-kind lodging and transportation, lighting trainings, track a shipment, verify completion of lighting in a given building, ship lamps and ballasts out of the village, request a labor reimbursement agreement, or invoice etc, etc. Village expenses for phone charges, copying and fax costs, office supplies, etc are part of this amount. Lodging for ABSN Field Managers - 1st assessment site visit 3-29 through 3-30- 07 $120.00 Transportation and fuel costs - 1st assessment site-visit 3-29 through 3-30- 08 Lodging for ABSN Field Managers - 2nd site visit 10-8 through 10-10- 07 $180.00 Transportation and fuel costs during 2nd Site-visit 10-8 through 10-10- 07 $135.00 KSD cert. electrician maint labor for T5 retrofits $4,500.00 Comparable estimate - In-kind labor, provided by school district - includes airfare & per diem and lodging. Kuspuk SD maint labor for T8 and cfl retrofits in school facilities Oct '07 69 $15.00 $1,035.00 Our tally sheet labor estimate for retrofitting 94 linear fluorescent and 5 cfl light fixtures is 69 hours @ $15/hr TOTAL $7,873.00