HomeMy WebLinkAboutVillage End Use Energy Efficiency Program W Upper Kalskag Final Report 04-02-2009 Village End Use Energy Efficiency Measures Program
AEA Grant # 2195225 Administered by Alaska Building Science Network
Upper Kalskag Final Report
Community Summary
12 community buildings received energy efficiency upgrades as follows:
Upper City Hall, Town Hall/Tribal Office, Bulk Fuel Plant, Jail, Sanitation Office, Trailer I, Trailer II, Joseph &
Olinga Gregory Elementary School, George Morgan Sr. High School, Generator Shed, HS Bus Barn, HS Bus Barn
T5 Retrofit, George Morgan Sr. HS Gymnasium T-5 retrofit
Retrofits Completed: January 2008 - October 2008
Village-Wide Lighting Retrofit Summary:
• Retrofitted 134 light fixtures with electronic ballasts & T8 lamps
• Installed 17 compact fluorescent light bulbs
• Installed 24 T5 linear fluorescent fixtures
• Pre-retrofit energy use for all lighting: 19.244 Kilowatts
• Post-retrofit energy use for all lighting: 13.028 Kilowatts
• Energy savings projection: 6.216 Kilowatts
• Pre-retrofit to post retrofit energy reduction: 32%
• Estimated Annual Savings:
kWh Rate (as of 11/13/09): $0.64 Fuel Cost (FY 2007 Ave): $1.89
Comparative Comparative
Hours Per Day/ Electrical Avoided Diesel Avoided Diesel
250 Days Per Year Savings Use (gal) Costs
4 Hours/day $3,986.94 452.07 $854.42
7 Hours/day $6,977.15 791.13 $1,495.23
10 Hours/day $9,967.36 1130.18 $2,136.04
• Total project cost for all measures: $37,775
• Simple Payback (lighting measures only, using 7 hours/day lighting use run-time): 5.41 years
• Total village wide in-kind contribution: $6,243
Additional Energy Efficiency Measures:
Town Hall/Tribal Office attic insulation and air sealing.
2
Alaska Building Science Network – Village End Use Energy Efficiency Program – ’07-‘08
City of Upper Kalskag Owned Buildings
Field manager Harry Morgan helps out
with maintenance worker training.
Steven Gregory and Frank One work
on an energy efficient lighting retro-kit.
ABSN Field Manager Dan Lung and Steven
Gregory shake hands on a successful project.
6 buildings owned by the City of Upper Kalskag received energy efficient lighting upgr ades as follows:
Upper City Hall , Town Hall/Tribal Office, Bulk Fuel Plant, Jail, Sanitation Office, Trailer I and Trailer II,
• Lighting upgrades completed in January 2008
• Retrofitted 49 light fixtures with electronic ballasts & T8 lamps
• Installed 13 compact fluorescent light bulbs
• Pre-retrofit energy use for all lighting: 5.136 Kilowatts
• Post-retrofit energy use for all lighting: 2.967 Kilowatts
• Energy savings projection: 2.169 Kilowatts
• Pre-retrofit to post retrofit energy reduction: 42%
• Estimated Annual Savings:
Comparative Comparative
Hours Per Day / Electrical Avoided Diesel Avoided
250 Days Per Year Savings Use (gal) Diesel Costs
4 Hours/day $1,391.20 157.75 $298.14
7 Hours/day $2,434.59 276.05 $521.74
10 Hours/day $3,477.99 394.36 $745.35
3
Alaska Building Science Network – Village End Use Energy Efficiency Program – ’07-‘08
Upper City Hall
Materials Installed Quantity
2 ft fixture, 2-lamp electronic ballast, (2) 17 watt T8 9 2-lamp electronic ballast, (2) 25 watt T8 lamps 8
CFL-20 W 1
• Pre-retrofit energy use: 940 watts
• Post-retrofit energy use: 684 watts
• Energy savings projection: 256 watts
• Pre-retrofit to post retrofit energy reduction: 27%
• Estimated annual savings: Comparative Comparative Hours Per Day / Electrical Avoided Diesel Avoided Diesel
250 Days Per Year Savings Use (gal) Costs
4 Hours/day $164.20 18.62 $35.19
7 Hours/day $287.35 32.58 $61.58
10 Hours/day $410.50 46.55 $87.97
4
Alaska Building Science Network – Village End Use Energy Efficiency Program – ’07-‘08
Town Hall/Tribal Office
Five 4-lamp fixtures de-lamped for additional savings.
Materials Installed Quantity
2-lamp fixture (w/existing electronic ballast) re-lamped with (2) 25 watt T8 lamps 1 4 lamp fixture (w/existing electronic ballast) re-lamped with, (3) 25 watt T8 lamps 5 4-lamp fixture (w/existing electronic ballast) re-lamped with, (4) 25 watt T8 lamps 5
CFL-20 W 2 • Pre-retrofit energy use: 1320 watts
• Post-retrofit energy use: 912 watts
• Energy savings projection: 408 watts
• Pre-retrofit to post retrofit energy reduction: 31%
• Estimated annual savings: Comparative Comparative Hours Per Day / Electrical Avoided Diesel Avoided Diesel
250 Days Per Year Savings Use (gal) Costs
4 Hours/day $261.69 29.67 $56.08
7 Hours/day $457.96 51.93 $98.14
10 Hours/day $654.23 74.18 $140.20
Note: Fixtures contained existing electronic ballast and 32 watt T -8 lamps installed previously. All fixtures re-
lamped with 25 watt T-8 lamps.
Town Hall/Tribal Office attic insulation and air sealing
Town Hall attic: -55’ x 19’ (1045 sq. ft.). Existing insulation consists of R-13 fiberglass bats between ceiling joists
on 24” inch centers. This layer covers less than half of the ceiling attic floor space and the other half is exposed
wood (not insulated). Vapor barrier is present.
Materials provided: 17 bales of R-38 fiberglass insulation 24” x 52” x 72” bats (64 sq ft ea. bale), 4 bales of R13
fiberglass insulation 24”x 51” x72” , 12 tubes of clear paintable caulk, caulking gun, sheet rock screws, 2 gable end
vents and galvanized screws.
Work completed: Venting and Caulking-Installed two 12” x 18” gable end vents & caulked all seams and gaps in the
(interior) ceiling to reduce air leakage from interior of building into attic. Caulked all gaps at ceiling corners, around
light fixtures and seams between plywood sheets and other identified gaps.
Insulation-added new un-faced R13 insulation to front half of attic floor that was exposed wood then added 2nd
layer of un-faced R38 insulation (over entire 1st layer) in a direction going from front to rear of building bringing the
total attic insulating value to R-51.
5
Alaska Building Science Network – Village End Use Energy Efficiency Program – ’07-‘08
Bulk Fuel Plant
Fixtures re-lamped with 25 watt T-8
lamps for additional savings.
Materials Installed Quantity 2-lamp fixture (w/existing electronic ballast) re-lamped with (2) 25 watt T8 lamps 8
• Pre-retrofit energy use: 640 watts
• Post-retrofit energy use: 376 watts
• Energy savings projection: 264 watts
• Pre-retrofit to post retrofit energy reduction: 41%
• Estimated annual savings: Comparative Comparative Hours Per Day / Electrical Avoided Diesel Avoided Diesel
250 Days Per Year Savings Use (gal) Costs
4 Hours/day $169.33 19.20 $36.29
7 Hours/day $296.33 33.60 $63.50
10 Hours/day $423.32 48.00 $90.72
Note: Fixtures contained existing electronic ballast and 32 watt T -8 lamps installed previously. All fixtures re-
lamped with 25 watt T-8 lamps.
Jail
Materials Installed Quantity 2-lamp electronic ballast, (2) 25 watt T8 lamps 3 CFL-14 W 1 CFL-20 W 1
• Pre-retrofit energy use: 387 watts
• Post-retrofit energy use: 175 watts
• Energy savings projection: 212 watts
• Pre-retrofit to post retrofit energy reduction: 55%
• Estimated annual savings: Comparative Comparative
Hours Per Day / Electrical Avoided Diesel Avoided Diesel
250 Days Per Year Savings Use (gal) Costs
4 Hours/day $135.98 15.42 $29.14
7 Hours/day $237.96 26.98 $51.00
10 Hours/day $339.94 38.55 $72.85
Note: these lights were changed to maintain consistency with updating lighting in other trib al buildings. No
measurable savings is anticipated since lights are rarely on.
6
Alaska Building Science Network – Village End Use Energy Efficiency Program – ’07-‘08
Sanitation Office
Materials Installed Quantity 2-lamp electronic ballast, (2) 25 watt T8 lamps 6 • Pre-retrofit energy use: 504 watts
• Post-retrofit energy use: 282 watts
• Energy savings projection: 222 watts
• Pre-retrofit to post retrofit energy reduction: 44%
• Estimated annual savings: Comparative Comparative Hours Per Day / Electrical Avoided Diesel Avoided Diesel
250 Days Per Year Savings Use (gal) Costs
4 Hours/day $142.39 16.15 $30.51
7 Hours/day $249.18 28.25 $53.40
10 Hours/day $355.98 40.36 $76.29
Trailer I and II
Materials Installed Quantity 8 ft retro-kits, 4-Lamp electronic ballast, (4) 25 watt lamps 4
CFL-20 W 6 CFL-23 W 2
• Pre-retrofit energy use: 1345 watts
• Post-retrofit energy use: 538 watts
• Energy savings projection: 807 watts
• Pre-retrofit to post retrofit energy reduction: 60%
• Estimated annual savings: Comparative Comparative
Hours Per Day / Electrical Avoided Diesel Avoided Diesel
250 Days Per Year Savings Use (gal) Costs
4 Hours/day $517.61 58.69 $110.93
7 Hours/day $905.82 102.71 $194.12
10 Hours/day $1,294.02 146.73 $277.31
7
Alaska Building Science Network – Village End Use Energy Efficiency Program – ’07-‘08
Kuspuk School District Owned Buildings
Dennis Morris works on an energy
efficient lighting retro-kit Joe Nash retrofits a 4-lamp fixture. Joe Nash, Earl Morgan and Jeromy Hoeldt
pack up used fluorescent lamps for backhaul.
4 buildings owned by the Kuspuk School District received energy efficient lighting upgrades as follows:
Joseph & Olinga Gregory Elementary School, HS Bus Barn, HS Bus Barn T5 Retrofit, HS Generator Shed, George
Morgan Sr. HS Gymnasium T-5 retrofit.
• Lighting upgrades completed in October 2008
• Retrofitted 85 light fixtures with electronic ballasts & T8 lamps
• Installed 4 compact fluorescent light bulbs
• Installed 24 T5 linear fluorescent fixtures
• Pre-retrofit energy use for all lighting: 14.108 Kilowatts
• Post-retrofit energy use for all lighting: 10.061 Kilowatts
• Energy savings projection: 4.047 Kilowatts
• Pre-retrofit to post retrofit energy reduction: 29%
• Estimated Annual Savings:
Comparative Comparative
Hours Per Day / Electrical Avoided Diesel Avoided
250 Days Per Year Savings Use (gal) Diesel Costs
4 Hours/day $2,595.75 294.33 $556.28
7 Hours/day $4,542.56 515.07 $973.49
10 Hours/day $6,489.36 735.82 $1,390.70
8
Alaska Building Science Network – Village End Use Energy Efficiency Program – ’07-‘08
Joseph & Olinga Gregory Elementary
Joseph & Olinga School recognized as
one of the first buildings built in Upper
Kalskag.
School hallway and classrooms re-
lamped with 25 watt T-8 lamps.
Re-lamping with 25 watt T-8 lamps
saves energy while improving over-all
light levels in school classrooms for a
better learning environment.
Materials Installed Quantity
2-lamp fixture (w/existing electronic ballast) re-lamped with (2) 25 watt T8 lamps 55 4-lamp fixture (w/existing electronic ballast) re-lamped with, (4) 25 watt T8 lamps 3 8 ft retro-kit, 4-Lamp electronic ballast, (4) 25 watt 8
CFL-14 W 3 CFL-23 W 1 • Pre-retrofit energy use: 4552 watts
• Post-retrofit energy use: 3664 watts
• Energy savings projection: 888 watts
• Pre-retrofit to post retrofit energy reduction: 20%
• Estimated annual savings: Comparative Comparative Hours Per Day / Electrical Avoided Diesel Avoided Diesel
250 Days Per Year Savings Use (gal) Costs
4 Hours/day $569.56 64.58 $122.06
7 Hours/day $996.74 113.02 $213.60
10 Hours/day $1,423.91 161.45 $305.15
Notes: Fixtures contained existing electronic ballast and 32 watt T-8 lamps installed previously. All fixtures re-
lamped with 25-watt T-8 lamps
George Morgan Sr. High School Generator Shed
Materials Installed Quantity 4-lamp electronic ballast, (4) 32 watt T8 lamps 2
• Pre-retrofit energy use: 336 watts
• Post-retrofit energy use: 240 watts
• Energy savings projection: 96 watts
• Pre-retrofit to post retrofit energy reduction: 29%
• Estimated annual savings: Comparative Comparative
Hours Per Day / Electrical Avoided Diesel Avoided Diesel
250 Days Per Year Savings Use (gal) Costs
4 Hours/day $61.57 6.98 $13.20
7 Hours/day $107.76 12.22 $23.09
10 Hours/day $153.94 17.45 $32.99
Note: these lights were changed to maintain consistency with updating lighting in o ther school buildings. Very little
measurable savings is anticipated since lights are rarely on.
9
Alaska Building Science Network – Village End Use Energy Efficiency Program – ’07-‘08
George Morgan Sr. High School Bus Barn
Joe Nash takes apart a fixture for
retrofit.
Energy efficient T-8 and electronic
ballast lighting retro-kits used to update
fixtures in Bus Barn storage areas and
workbench.
Materials Installed Quantity 2-lamp electronic ballast retro-kits, (2) 25 watt T8 lamps 17 • Pre-retrofit energy use: 2380 watts
• Post-retrofit energy use: 799 watts
• Energy savings projection: 1581 watts
• Pre-retrofit to post retrofit energy reduction: 66%
• Estimated annual savings: Comparative Comparative Hours Per Day / Electrical Avoided Diesel Avoided Diesel
250 Days Per Year Savings Use (gal) Costs
4 Hours/day $1,014.05 114.98 $217.32
7 Hours/day $1,774.59 201.22 $380.30
10 Hours/day $2,535.13 287.45 $543.29
Bus Barn T5 Retrofit
T-5 fluorescent fixture installed in Bus
barn parking garage.
Materials Installed Quantity T5 fixture, electronic ballast, (2) 54 watt T5 HO 8 • Pre-retrofit energy use: 1120 watts
• Post-retrofit energy use: 912 watts
• Energy savings projection: 208 watts
• Pre-retrofit to post retrofit energy reduction: 19%
• Estimated annual savings: Comparative Comparative
Hours Per Day / Electrical Avoided Diesel Avoided Diesel
250 Days Per Year Savings Use (gal) Costs
4 Hours/day $133.41 15.13 $28.59
7 Hours/day $233.47 26.47 $50.03
10 Hours/day $333.53 37.82 $71.48
10
Alaska Building Science Network – Village End Use Energy Efficiency Program – ’07-‘08
George Morgan Sr. High School Gymnasium
T-5 fluorescent fixtures installed in
high school gymnasium. T-5 fixtures save energy while
improving light levels in large spaces.
Materials Installed Quantity
T5 fluorescent fixture, electronic ballast, (4) 54 watt T5 HO 9 T5 fluorescent fixture, electronic ballast, (6) 54 watt T5 HO 7 • Pre-retrofit energy use: 5720 watts
• Post-retrofit energy use: 4446 watts
• Energy savings projection: 1274 watts
• Pre-retrofit to post retrofit energy reduction: 22%
• Estimated annual savings: Comparative Comparative Hours Per Day / Electrical Avoided Diesel Avoided Diesel
250 Days Per Year Savings Use (gal) Costs
4 Hours/day $817.14 92.65 $175.12
7 Hours/day $1,430.00 162.15 $306.45
10 Hours/day $2,042.86 231.64 $437.79
Note: In Feb, 2009 George Morgan Sr. High School tragically burned down. The preceding village-wide and
school district energy savings summaries include the high school gymnasium T -5 retrofits. See page 11
below for the village wide and school district-wide energy savings summaries excluding the school gym.
11
Alaska Building Science Network – Village End Use Energy Efficiency Program – ’07-‘08
The Village-wide lighting retrofit summary below shows the expected savings excluding the long-term
savings that would have come from the George Morgan Senior High School gymnasium T -5 retrofits.
Village-Wide Lighting Retrofit Summary:
• Retrofitted 132 light fixtures with electronic ballasts & T8 lamps
• Installed 17 compact fluorescent light bulbs
• Installed 8 T5 linear fluorescent fixtures
• Pre-retrofit energy use for all lighting: 13.188 Kilowatts
• Post-retrofit energy use for all lighting: 8.342 Kilowatts
• Energy savings projection: 4.846 Kilowatts
• Pre-retrofit to post retrofit energy reduction: 37%
• Estimated Annual Savings:
kWh Rate (as of): $0.64 Fuel Cost (FY 2007 Ave): $1.89
Comparative Comparative Hours Per Day/ Electrical Avoided Diesel Avoided Diesel
250 Days Per Year Savings Use (gal) Costs
4 Hours/day $3,108.22 352.44 $666.10
7 Hours/day $5,439.39 616.76 $1,165.68
10 Hours/day $7,770.56 881.09 $1,665.26
• Total project cost for all measures: $37,775
• Simple Payback (lighting measures only, using 7 hours/day lighting use run-time): 6.9 years
The Kuspuk School District-wide lighting retrofit summary below shows the expected savings excluding
the long-term savings that would have come from the George Morgan Senior High School gymnasium T -5
retrofits.
Kuspuk School District Lighting Retrofit Summary:
• Retrofitted 83 light fixtures with electronic ballasts & T8 lamps
• Installed 4 compact fluorescent light bulbs
• Installed 8 T5 linear fluorescent fixtures
• Pre-retrofit energy use for all lighting: 8.052 Kilowatts
• Post-retrofit energy use for all lighting: 5.375 Kilowatts
• Energy savings projection: 2.677 Kilowatts
• Pre-retrofit to post retrofit energy reduction: 33%
• Estimated Annual Savings:
Comparative Comparative
Hours Per Day / Electrical Avoided Diesel Avoided
250 Days Per Year Savings Use (gal) Diesel Costs
4 Hours/day $1,717.03 194.69 $367.97
7 Hours/day $3,004.80 340.71 $643.94
10 Hours/day $4,292.57 486.73 $919.91
12
Alaska Building Science Network – Village End Use Energy Efficiency Program – ’07-‘08
Upper Kalskag Community Churches
Because the Fairbanks Catholic Diocese financially supports the Kalskag Catholic Church, ABSN did not do
upgrades in the church. However, ABSN worked closely with all three churches to do a lighting assessment and
made recommendations for what materials they should install and what their savings would be. The Catholic
Church recommendations are as follows, these calculations and savings estimates are not inclu ded in the village-
wide summary:
Catholic Church
Materials Installed Quantity
2-lamp electronic ballast, (2) 25 watt T8 lamps 3 4-lamp electronic ballast, (4) 32 watt T8 lamps 8 CFL-14 W 2 CFL-20 W 3 CFL-23 W 1
• Recommended 6 compact fluorescent light bulbs
• Recommended 11 light fixtures with electronic ballasts & T8 lamps
• Pre-retrofit energy use for all lighting: 2.001 Kilowatts
• Potential Post-retrofit energy use for all lighting: 1.212 Kilowatts
• Energy savings projection: 0.789 Kilowatts
• Pre-retrofit to post retrofit energy reduction: 39%
• Estimated Annual Savings:
Comparative Comparative
Hours Per Day / Electrical Avoided Diesel Avoided
250 Days Per Year Savings Use (gal) Diesel Costs
4 Hours/day $506.06 57.38 $108.45
7 Hours/day $885.61 100.42 $189.79
10 Hours/day $1,265.16 143.45 $271.13
Upper Kalskag - Alaska Building Science Network - T5 Lighting Upgrade Details
Upper
Kalskag Bus
Barn
Length
(feet)
Width
(feet)
Ceiling
Height
(feet)
Type of
Existing
Fixture
# of
Existing
Fixtures
Existing
Fixture
Wattage
Total
Existing
Wattage
Existing
Foot-
candles
New
Foot-
Candles
# of
New
Fixtures
New
fixtures
New
Fixture
Wattage
Total
New
Wattage
46.5 23 17
HPS
150
watt
160 0 twelve -
17 24 8
T-5
2
lamps
114 912
Color shade
of walls
HPS
250
watt
260 0
T-5
3
lamps
171 0
Color shade
of floor
Multi-
Vapor
400 watt
415 0
T-5
4
lamps
228 0
2-Lamp
Fixture
4ft High
Output
8 140 1,120
T-5
6
lamps
342 0
Total Existing
Watts 1,120 Total New Watts 912
Cost of Elect is $0.6414/kWh as of 11/13/08. Request rates from AVEC at avec.org
Percent Savings Pre to Post Retrofit: 18.57%
Savings & Payback Calculation for Gym: 1750 New watts / old watts
Assume 1750 hrs / year for 250 days/year of use neg 1 (New watts / Old watts x 100 - 100) / 100
Full cost of electricity: $0.64 /kWh
Watts of existing lighting: 1,120
New wattage for T5 fixtures: 912
Calculation: (Watts) x (hrs/year) / (1000w/kw) x (cost of electricity) = (cost / year)
Existing Cost: $1,257
Retrofitted Cost:
$1,024 T5 Materials costs $ 1,203
Annual Savings: $ 233 T5 shipping costs $ 300
Material & shipping cost of Gym retrofit: $ 1,500
Simple Payback: Materials cost / annual savings = 6.42 years (for retrofit to pay for itself in materials)
14
Alaska Building Science Network – Village End Use Energy Efficiency Program – ’07-‘08
Upper Kalskag - Alaska Building Science Network - T5 Lighting Upgrade Details
These retrofits were completed in October 2008.
Upper
Kalskag
High School
Gym
Length
(feet)
Width
(feet)
Ceiling
Height
(feet)
Type of
Existing
Fixture
# of
Existing
Fixtures
Existing
Fixture
Wattage
Total
Existing
Wattage
Existing
Foot-
candles
New
Foot-
Candles
# of
New
Fixtures
New
fixtures
New
Fixture
Wattage
Total
New
Wattage
George
Morgan Sr.
HS
100 64 27
HPS
150
watt
160 0 34
T-5
2
lamps
114 0
Color shade
of walls
HPS
175
watt
4 185 740
T-5
3
lamps
171 0
Color shade
of floor
Multi-
Vapor
400 watt
12 415 4,980 9
T-5
4
lamps
228 2052
Ceiling height averages 22' at walls to 32
feet at peak. Peak runs (widthwise?)
Other
School
Gym
(A)
0 7
T-5
6
lamps
342 2394
Total Existing
Watts 5,720 Total New Watts 4446
Cost of Elect is $0.6414/kWh as of 11/13/08. Request rates from AVEC at avec.org
Percent Savings Pre to Post Retrofit: 22.27%
Savings & Payback Calculation for Gym: 1750 New watts / old watts
Assume 1750 hrs / year for 250 days/year of use neg 1 (New watts / Old watts x
100 - 100) / 100
Full cost of electricity: $0.64 /kWh # Lamps Lumins/
lamp
Total
Lumins
Av. Foot-
candles
Watts of existing lighting: 5,720 72 5000 360000 34 fc
New wattage for T5 fixtures: 4,446 96 5000 480000 45.22
Calculation: (Watts) x (hrs/year) / (1000w/kw) x (cost of electricity) = (cost / year) 120000 122400
Existing Cost: $6,420 11.22
Retrofitted Cost:
$4,990 T5 Materials costs $ 2,610
Annual Savings: $1,430 T5 shipping costs $ 300
Material & shipping cost of G ym retrofit: $2,910
Simple Payback: Materials cost / annual savings = 2.03 years (for retrofit to pay for itself in materials)
Native Village of Kalskag
PO Box 50
Kalskag, Alaska 99607
(907) 471-2207
November 12, 2008
Alaska Building Science Network
PO Box 111097
Anchorage, Alaska 99511
(907) 562-3646
(907) 770-5412 fax
RE: Insulation Project
Dear Dan Lung,
The Native Village of Kalskag Traditional Council would like to thank ABSN on the Village Community Building
Energy Efficiency Project done in our historical community hall. This community hall, has been our Tribal Office
home since the beginning of time. The building is in need of repairs and energy lost is our concern in savings.
We are thankful, ABSN assisted us in the insulation of our Tribal Office roof. Before, the project was done the roof
had no insulation or proper ventilation. We were loosing heat, which caused us to have drastic problems in the
winter and high maintenance cost. The person hired for this project was reliable, dependable and show great
interest in working on this type of projects.
Through this project completion, we are working with the City of Kalskag to proceed forward in energy savings in
the building. Again, we thank ABSN in helping us out in our village in making our Town Hall energy efficient.
Sincerely,
Bonnie Persson
Tribal Administrator
kalskagtribal@yahoo.com
CC: Tribal Council
16
Alaska Building Science Network – Village End Use Energy Efficiency Program – ’07-‘08
17
Alaska Building Science Network – Village End Use Energy Efficiency Program – ’07-‘08
Upper Kalskag, In-Kind Contribution Tracking Record - ABSN Energy Efficiency Projects:
In-Kind Item Dates
Hours
Contri-
buted
Hourly
Wage
Value /
Amount Notes
Staff time for project contact,
introduction & review of intro
materials
4.00 $15.00 $60.00 list number of entities (Number of entities x
1 hour each)
Staff time for Attending
teleconference (TC/IRA) 1.00 $15.00 $15.00
list # of staff and wages if possible ($15/hr
is an average wage designated for village
entity staff).
Staff time for Attending
teleconference 1.00 $15.00 $15.00 (City)
Staff time for Attending
teleconference 1.00 $15.00 $15.00 (School)
Conservative village office
administrative percentage of total
project cost less ABSN Admin %.
Total project cost = $37,775/village -
(our admin percentage , (around
12%) Approx: $4,533) = $33,242 x
5.5% = $1,828 (this 5.5% village
admin cost estimate is spread across
all entities we work with for the
course of the grant for completing all
energy efficiency measures. These
are primarily for cumulative,
otherwise unaccounted time expense
for village- based project support.
Feb, '07
through $1,828.00
Each time we call, email, or fax a village entity,
someone has to receive the communication,
review and/or forward the information, follow-up
on requests, etc. Whether it is to set-up a
teleconference, verify maintenance staff
participation in lighting or boiler trainings, set-up
in-kind lodging and transportation, lighting
trainings, track a shipment, verify completion of
lighting in a given building, ship lamps and
ballasts out of the village, request a labor
reimbursement agreement, or invoice etc, etc.
Village expenses for phone charges, copying
and fax costs, office supplies, etc are part of
this amount.
Lodging for ABSN Field
Managers - 1st site visit 3 days $75.00 Lodging at school (KSD).
Transportation and fuel costs -
1st site-visit 2 days $100.00 2 days truck rental KSD
Lodging for ABSN Field
Managers - 2nd site visit 2 days $100.00 Lodging at City
Transportation and fuel costs
during 2nd Site-visit
12/18-
12/20
2007
$225.00
3 days 4-wheeler rental + 2 days truck
rental from Upper TC, (may get billed for
this). (9-11-08, never did)
Lodging for ABSN Field
Managers - 3rd site visit 3 days $75.00 Lodging at school (KSD).
Transportation and fuel costs
during 3rd Site-visit 2 days $100.00 2 days truck rental KSD
Lodging for ABSN Field
Managers - 4th site visit 3 days $75.00 Lodging at school (KSD).
Transportation and fuel costs
during 4th Site-visit 3 days $150.00 2 days truck rental KSD, 1 day Upper TC
truck rental
KSD-labor 58.00 $15.00 $ 870.00 School facility various T8 lighting upgrades
KSD-labor 35.00 $25.00 $ 875.00 Install 8, T-5 fixtures in Busbarn / bus barn
retro kits
KSD-labor 90.00 $25.00 $ 2,250.00 Install 16, T-5 fixtures in HS gym
KSD-labor support for T5 and T8
lighting upgrades - Earl Morgan, local
KSD Maint staff
40.00 $20.00 $ 800.00 Various lighting retrofit support
KSD notes: $ (1,385.00)
KSD is providing all labor In-Kind for their
full time maintenance staff however they
invoiced us for $1,385.00 (92.3 hrs) in
Nov '08 financial reporting for their on-call
maint staff they had to hire specifically for
the projects.
TOTAL $ 6,243.00