HomeMy WebLinkAboutHughes Final Report 2011-VEEP
Village End Use Energy Efficiency Measures Program
AEA Grant # 2195294 Administered by Alaska Building Science Network
Hughes Final Report
Community Summary
8 community buildings received energy efficiency upgrades as follows:
Tribal/City Office, Washeteria/Water Plant, Clinic/Computer Lab, Safe House, Community Hall, Co-Op Store,
Johnny Oldman School, Johnny Oldman School Gymnasium, Hughes Community Church
Retrofits Completed: January 2009 – December 2009
Village-Wide Lighting Retrofit Summary:
• Retrofitted 134 light fixtures with electronic ballasts & T8 lamps
• Retrofitted 15 light fixtures with HO electronic ballasts & HO T8 lamps
• Installed 38 compact fluorescent light bulbs
• Pre-retrofit energy use for all lighting: 20.144 Kilowatts
• Post-retrofit energy use for all lighting: 10.971 Kilowatts
• Energy savings projection: 9.173 Kilowatts
• Pre-retrofit to post retrofit energy reduction: 46%
• Estimated Annual Savings:
kWh Rate (FY 2009 AVE): $0.71 Fuel Cost (FY 2009 Ave): $5.25
Comparative Comparative
Hours Per Day/ Electrical Avoided Diesel Avoided Diesel
250 Days Per Year Savings Use (gal) Costs
Locally Estimated Use $11,516.57 1207.78 $6,340.86
4 Hours/day $6,512.83 683.02 $3,585.87
7 Hours/day $11,397.45 1195.29 $6,275.27
10 Hours/day $16,282.08 1707.56 $8,964.68
• Total project cost for all measures: $20,000
• Simple Payback (lighting measures only, using 7 hours/day lighting use run-time): 1.75
• Total village wide in-kind contribution: $1,703.00
Additional Energy Efficiency Measures: Two programmable thermostats installed in the C linic/Computer
lab bldg. and one in the Washeteria lobby.
2
Alaska Building Science Network – Village End Use Energy Efficiency Program – ’08-’10 Final Report Interior Region - Hughes
City Of Hughes Owned Buildings
Hughes City and Tribal office. Programmable thermostat installed in
computer lab.
3 buildings owned by the City of Hughes received energy efficient lighting upgrades as follows:
Tribal/City Office, Clinic/Computer Lab, Washeteria/Water Plant
• Lighting upgrades completed in: January 2009
• Retrofitted 64 light fixtures with electronic ballasts & T8 lamps
• Installed 16 compact fluorescent light bulbs
• Pre-retrofit energy use for all lighting: 8.565 Kilowatts
• Post-retrofit energy use for all lighting: 4.478 Kilowatts
• Energy savings projection: 4.087 Kilowatts
• Pre-retrofit to post retrofit energy reduction: 48%
• Estimated Annual Savings:
Comparative Comparative
Hours Per Day / Electrical Avoided Diesel Avoided
250 Days Per Year Savings Use (gal) Diesel Costs
Locally Estimated $5,192.84 544.59 $2,859.10
4 Hours/day $2,901.77 304.32 $1,597.67
7 Hours/day $5,078.10 532.56 $2,795.93
10 Hours/day $7,254.43 760.80 $3,994.18
3
Alaska Building Science Network – Village End Use Energy Efficiency Program – ’08-’10 Final Report Interior Region - Hughes
Tribal/City Office Building
Materials Installed Quantity 2-lamp electronic ballast, (2) 25 watt T8 lamps 9 4-lamp electronic ballast, (3) 25 watt T8 lamps 9 4-lamp electronic ballast, (4) 25 watt T8 lamps 8
CFL-14 W 3 CFL-20 W 2 • Pre-retrofit energy use: 3699 watts
• Post-retrofit energy use: 1891 watts
• Energy savings projection: 1808 watts
• Pre-retrofit to post retrofit energy reduction: 49%
• Estimated annual savings: Comparative Comparative Hours Per Day / Electrical Avoided Diesel Avoided Diesel
250 Days Per Year Savings Use (gal) Costs
4 Hours/day $1,283.68 134.62 $706.78
7 Hours/day $2,246.44 235.59 $1,236.86
10 Hours/day $3,209.20 336.56 $1,766.94
1920 Hours/year (Est.) $2,464.67 258.48 $1,357.01
Note: De-lamped nine 4-lamp fixtures to operate three lamps each for additional savings.
Clinic/Computer Lab
Materials Installed Quantity 2-lamp electronic ballast, (2) 25 watt T8 lamps 8 3-lamp electronic ballast, (3) 25 watt T8 lamps 4 4-lamp electronic ballast, (3) 25 watt T8 lamps 3 CFL-14 W 1 CFL-20 W 2 • Pre-retrofit energy use: 1779 watts
• Post-retrofit energy use: 943 watts
• Energy savings projection: 836 watts
• Pre-retrofit to post retrofit energy reduction: 47%
• Estimated annual savings: Comparative Comparative
Hours Per Day / Electrical Avoided Diesel Avoided Diesel
250 Days Per Year Savings Use (gal) Costs
4 Hours/day $593.56 62.25 $326.81
7 Hours/day $1,038.73 108.94 $571.91
10 Hours/day $1,483.90 155.62 $817.01
288 Hours/year (Est.) $170.95 17.93 $94.12
Note: Reduced four 4-lamp fixtures to 3-lamp fixtures, while de-lamping 3 additional 4-lamp fixtures to
operate three lamps each for additional savings. Additional Energy Efficiency Measures: Two
programmable thermostats installed in the Clinic/Computer lab.
4
Alaska Building Science Network – Village End Use Energy Efficiency Program – ’08-’10 Final Report Interior Region - Hughes
Washeteria/Water Plant
Materials Installed Quantity 2-lamp electronic ballast, (2) 25 watt T8 lamps 10 3-lamp electronic ballast, (3) 25 watt T8 lamps 5 4-lamp electronic ballast, (4) 25 watt T8 lamps 8
CFL-11 W 6 CFL-14 W 2 • Pre-retrofit energy use: 3087 watts
• Post-retrofit energy use: 1644 watts
• Energy savings projection: 1443 watts
• Pre-retrofit to post retrofit energy reduction: 47%
• Estimated annual savings: Comparative Comparative Hours Per Day / Electrical Avoided Diesel Avoided Diesel
250 Days Per Year Savings Use (gal) Costs
4 Hours/day $1,024.53 107.45 $564.09
7 Hours/day $1,792.93 188.03 $987.16
10 Hours/day $2,561.33 268.62 $1,410.23
2496 Hours/year (Est.) $2,557.23 268.19 $1,407.97
Note: Reduced five 4-lamp fixtures to 3-lamp fixtures for additional savings.
Additional Energy Efficiency Measures: One programmable thermostat installed in the Washeteria lobby.
5
Alaska Building Science Network – Village End Use Energy Efficiency Program – ’08-’10 Final Report Interior Region - Hughes
IRA/TC Owned Buildings
ABSN Project Coordinator Anna Hilbruner
gives training on how to recycle old lamps
and ballasts.
Maintenance workers practice changing
out ballasts.
3 buildings owned by the IRA/TC received energy efficient lighting upgrades as follows:
Community Hall, Safe House, Co-Op Store
• Lighting upgrades completed in: January 2009
• Retrofitted 10 light fixtures with electronic ballasts & T8 lamps
• Installed 21 compact fluorescent light bulbs
• Pre-retrofit energy use for all lighting: 3.347 Kilowatts
• Post-retrofit energy use for all lighting: 1.232 Kilowatts
• Energy savings projection: 2.115 Kilowatts
• Pre-retrofit to post retrofit energy reduction: 63%
• Estimated Annual Savings:
Comparative Comparative
Hours Per Day / Electrical Avoided Diesel Avoided
250 Days Per Year Savings Use (gal) Diesel Costs
Locally Estimated $2,490.58 261.20 $1,371.28
4 Hours/day $1,501.65 157.48 $826.79
7 Hours/day $2,627.89 275.60 $1,446.88
10 Hours/day $3,754.13 393.71 $2,066.97
6
Alaska Building Science Network – Village End Use Energy Efficiency Program – ’08-’10 Final Report Interior Region - Hughes
Community Hall
Materials Installed Quantity 4-lamp electronic ballast, (4) 25 watt T8 lamps 8 CFL-20 W 1 • Pre-retrofit energy use: 1419 watts
• Post-retrofit energy use: 740 watts
• Energy savings projection: 679 watts
• Pre-retrofit to post retrofit energy reduction: 48%
• Estimated annual savings: Comparative Comparative Hours Per Day / Electrical Avoided Diesel Avoided Diesel
250 Days Per Year Savings Use (gal) Costs
4 Hours/day $482.09 50.56 $265.43
7 Hours/day $843.66 88.48 $464.51
10 Hours/day $1,205.23 126.40 $663.58
880 Hours/year (Est.) $424.24 44.49 $233.58
Safe House
Materials Installed Quantity CFL-20 W 11
• Pre-retrofit energy use: 1100 watts
• Post-retrofit energy use: 220 watts
• Energy savings projection: 880 watts
• Pre-retrofit to post retrofit energy reduction: 80%
• Estimated annual savings: Comparative Comparative Hours Per Day / Electrical Avoided Diesel Avoided Diesel
250 Days Per Year Savings Use (gal) Costs
4 Hours/day $624.80 65.52 $344.01
7 Hours/day $1,093.40 114.67 $602.01
10 Hours/day $1,562.00 163.81 $860.01
2640 Hours/year (Est.) $1,649.47 172.99 $908.18
7
Alaska Building Science Network – Village End Use Energy Efficiency Program – ’08-’10 Final Report Interior Region - Hughes
Co-Op Store
Materials Installed Quantity
2-lamp electronic ballast, (2) 25 watt T8 lamps 2 CFL-20 W 9
• Pre-retrofit energy use: 828 watts
• Post-retrofit energy use: 272 watts
• Energy savings projection: 556 watts
• Pre-retrofit to post retrofit energy reduction: 67%
• Estimated annual savings:
Comparative Comparative Hours Per Day / Electrical Avoided Diesel Avoided Diesel
250 Days Per Year Savings Use (gal) Costs
4 Hours/day $394.76 41.40 $217.35
7 Hours/day $690.83 72.45 $380.36
10 Hours/day $986.90 103.50 $543.37
1056 Hours/year (Est.) $416.87 43.72 $229.52
8
Alaska Building Science Network – Village End Use Energy Efficiency Program – ’08-’10 Final Report Interior Region - Hughes
Yukon-Koyukuk School District Owned Buildings
All classrooms and hallway lighting
updated with energy efficient electronic
ballast and T-8 lamps while improving
light levels in those spaces.
1 building owned by Yukon-Koyukuk School District received energy efficient lighting upgrades as follows:
Johnny Oldman School & Gym
• Lighting upgrades completed in December 2009
• Retrofitted 56 light fixtures with electronic ballasts & T8 lamps
• Retrofitted 15 light fixtures with HO electronic ballasts & T8 lamps
• Installed 1 compact fluorescent light bulb
• Pre-retrofit energy use for all lighting: 7.896 Kilowatts
• Post-retrofit energy use for all lighting: 5.077 Kilowatts
• Energy savings projection: 2.819 Kilowatts
• Pre-retrofit to post retrofit energy reduction: 36%
• Estimated Annual Savings:
Comparative Comparative
Hours Per Day / Electrical Avoided Diesel Avoided
250 Days Per Year Savings Use (gal) Diesel Costs
Locally Estimated $3,821.93 400.82 $2,104.30
4 Hours/day $2,001.49 209.90 $1,101.99
7 Hours/day $3,502.61 367.33 $1,928.49
10 Hours/day $5,003.73 524.76 $2,754.98
Note: Eight 2-lamp fixtures taken offline in the boys and girls restrooms due to over-lighting in those
spaces for additional savings.
9
Alaska Building Science Network – Village End Use Energy Efficiency Program – ’08-’10 Final Report Interior Region - Hughes
Johnny Oldman School
Materials Installed Quantity 2-lamp electronic ballast, (2) 25 watt T8 lamps 23 3-lamp electronic ballast, (2) 25 watt T8 lamps 33
CFL-23 W 1
• Pre-retrofit energy use: 4596 watts
• Post-retrofit energy use: 2797 watts
• Energy savings projection: 1799 watts
• Pre-retrofit to post retrofit energy reduction: 39%
• Estimated annual savings: Comparative Comparative
Hours Per Day / Electrical Avoided Diesel Avoided Diesel
250 Days Per Year Savings Use (gal) Costs
4 Hours/day $1,277.29 133.95 $703.26
7 Hours/day $2,235.26 234.42 $1,230.70
10 Hours/day $3,193.23 334.88 $1,758.14
2000 Hours/year (Est.) $2,554.58 267.91 $1,406.52
Johnny Oldman School Gym
Gym lights updated with energy efficient electronic ballast and T-8 lamps save energy while improving light quality.
Materials Installed Quantity 8 FT, 2 lamp HO electronic ballast, T8 (152w fixtures) 15 • Pre-retrofit energy use: 3300 watts
• Post-retrofit energy use: 2280 watts
• Energy savings projection: 1020 watts
• Pre-retrofit to post retrofit energy reduction: 31%
• Estimated annual savings: Comparative Comparative
Hours Per Day / Electrical Avoided Diesel Avoided Diesel
250 Days Per Year Savings Use (gal) Costs
4 Hours/day $724.20 75.95 $398.73
7 Hours/day $1,267.35 132.91 $697.78
10 Hours/day $1,810.50 189.87 $996.84
1750 Hours/year (Est.) $1,267.35 132.91 $697.78
Note: Fifteen original T-12 HO fixtures operating at approx. 220 watts each, were retrofitted with energy
efficient electronic ballast and T -8 HO lamps operating at 152 watts each.
10
Alaska Building Science Network – Village End Use Energy Efficiency Program – ’08-’10 Final Report Interior Region - Hughes
Hughes - Alaska Building Science Network - T5 Lighting Upgrade Details, Yukon - Koyukuk SD,
These retrofits were completed in (December, 2009).
Hughes
Gym
Length
(feet)
Width
(feet)
Ceiling
Height
(feet)
Type of
Existing
Fixture
# of
Existing
Fixtures
Existing
Fixture
Wattage
Total
Existing
Wattage
Existing
Foot-
candles
New
Foot-
Candles
# of
New
Fixtures
New
fixtures
New
Fixture
Wattage
Total
New
Wattage
Hughes 59 39 20
HPS
150
watt
160 0 37-43 40-47
T-5
2
lamps
114 0
Color shade
of walls white
HPS
250
watt
260 0
T-5
3
lamps
171 0
Color shade
of floor dark
Multi-
Vapor
400 watt
415 0
T-5
4
lamps
228 0
8FT
HO 15 220 3,300 15 T-8-HO 152 2280
Total Existing Watts 3,300 Total New Watts 2280
Percent Savings Pre to Post Retrofit: 30.91%
neg 1 (New watts /
Old watts x 100 -
100) / 100
Savings & Payback Calculation for Gym: 1750 New watts / old watts
Assume 1750 hrs / year for 250 days/year of use
Full cost of electricity: $ 0.71 /kWh
Watts of existing lighting: 3,300
New wattage for T5 fixtures: 2,280
Calculation: (Watts) x (hrs/year) / (1000w/kw) x (cost of electricity) = (cost / year)
Existing Cost: $ 4,100
Retrofitted Cost: $ 2,833 T5 Materials costs $ 964.65
Annual Savings: $ $ 1,267 T5 shipping costs $ 86.80
Material & shipping cost of Gym retrofit: $1,051.45
Simple Payback: Materials cost / annual savings = 0.83 years (for retrofit to pay for itself in materials)
11
Alaska Building Science Network – Village End Use Energy Efficiency Program – ’08-’10 Final Report Interior Region - Hughes
Hughes Community Church Owned Buildings
The Hughes Community Church received energy efficient lighting upgrades as follows:
Church
Materials Installed Quantity
2-lamp electronic ballast, (2) 25 watt T8 lamps 4
• Lighting upgrades completed in: January 2009
• Retrofitted 4 light fixtures with electronic ballasts & T8 lamps
• Pre-retrofit energy use for all lighting: 0.336 Kilowatts
• Post-retrofit energy use for all lighting: 0.184 Kilowatts
• Energy savings projection: 0.152 Kilowatts
• Pre-retrofit to post retrofit energy reduction: 45%
• Estimated annual savings:
Comparative Comparative
Hours Per Day / Electrical Avoided Diesel Avoided Diesel
250 Days Per Year Savings Use (gal) Costs
4 Hours/day $107.92 11.32 $59.42
7 Hours/day $188.86 19.81 $103.98
10 Hours/day $269.80 28.29 $148.55
104 Hours/year (Est.) $11.22 1.18 $6.18
12
Alaska Building Science Network – Village End Use Energy Efficiency Program – ’08-’10 Final Report Interior Region - Hughes
Hughes In-Kind Contribution Tracking Record - ABSN Energy Efficiency
Projects:
In-Kind Item Dates
Hours
Contri-
buted
Hourly
Wage
Value /
Amount Notes
Staff time for project contact,
introduction, and review of
intro materials 4 $ 20.00 $ 80.00 (# of entities x 1 hour each)
Staff time for Attending
telecon Village Council 1 $ 20.00 $ 20.00 Janet Bifelt
Staff time for Attending
teleconference (City) 1 $ 20.00 $ 20.00 Wilmer Beetus
Staff time for Attending
teleconference (School) 1 $ 20.00 $ 20.00 John Christian
Maint. Staff time to
accompany Field Manager
on building assessments -
1st site visit
$ 120.00 Wilbur Koyukuk 8 hours over
2 days $15hr
Conservative village office
administrative percentage of total
project cost less ABSN Admin %.
Total project cost = $20,000/village
- (our admin percentage , (around
12%) Approx: $2,400) = $17,600
x 5.5% = $968 (this 5.5% village
admin cost estimate is spread
across all entities we work with for
the course of the grant for
completing all energy efficiency
measures. These are primarily for
cumulative, otherwise unaccounted
time expense for village- based
project support.
Feb, '07
through $ 968.00
Each time we call, email, or fax a
village entity, someone has to
receive the communication, review
and/or foward the information, follow-
up on requests, etc. Whether it is to
set-up a teleconference, verify
maintenance staff participation in
lighting or boiler trainings, set-up in-
kind lodging and transportation,
lighting trainings, track a shipment,
verify completion of lighting in a given
building, ship lamps and ballasts out
of the village, request a labor
reimbursement agreement, or invoice
etc. Village expenses for phone
charges, copying and fax costs,
office supplies, etc. are part of this
amount.
Lodging for ABSN Field
Managers - 1st site visit 7/22-24/08 $75 Dan 3 nights stay at school
($25/night)
Transportation and fuel
costs - 1st site-visit 7/22-23/08 2 $ 25.00 $ 50.00 4-wheeler rental 1.5 days
(Wilbur Koyukuk).
Lodging for ABSN Field
Managers - 2nd site visit 1/12-16/09 7 $50 $ 350.00 Lodging for Dan 4 nights &
Anna 3 Nights
TOTAL $1,703.00
The capacity of ABSN’s scope of work was increased by the response of local communities to work in partnership with ABSN
and provide in-kind services of project coordination, paid labor for lighting retrofits, transportation and lodging for ABSN field
staff, and other valuable contributions. This allowed ABSN and the community of Hughes to deliver 9% more energy savings
measures beyond the original grant funding.