HomeMy WebLinkAboutBPMC Sept 21, 2018BRADLEY LAKE PROJECT MANAGEMENT COMMITTEE MEETING
REGULAR MEETING
Alaska Energy Authority,Anchorage,Alaska
September 21,2018
1.CALL TO ORDER
Chair Borgeson called the regular meeting of the Bradley Lake Hydroelectric Project
Management Committee to order at 10:02 a.m.A quorum was established.
2.ROLL CALL FOR COMMITTEE MEMBERS
Cory Borgeson (Golden Valley Electric Association [GVEA]);Janet Reiser (Alaska Energy
Authority [AEA]);Lee Thibert (Chugach Electric Association [CEA]);Tony Izzo (Matanuska
Electric Association [MEA]);Mark Johnston (Anchorage Municipal Light &Power [ML&P]);John
Foutz (City of Seward);and Bob Day (Homer Electric Association [HEA)]).
3.PUBLIC ROLL CALL
Tom Erickson,Jocelyn Garner,Kirk Warren,Teri Webster,Brandi White (AEA);Brian Hickey,
Russell Thornton (CEA);Stefan Saldanha (Department of Law);Ron Rebenitsch (Energy
Engineering);Leo Quiachon,Pete Sarauer (GVEA);Rick Baldwin,Bob Day,Emily Hutchinson,
Larry Jorgenson (HEA);Jocelyn Peese,Kirk Gibson (McDowell Rackner Gibson,PC);David
Pease,Tony Zellers (MEA);Ryan Garner,Molly Morrison (ML&P);Bernie Smith (Public);Sunny
Morrison,Deborah Mack (Accu-Type Depositions).
4,PUBLIC COMMENTS
None.
5.AGENDA APPROVAL
MOTION:Mr.Johnston made a motion to move the Executive Session agenda item to
after Committee Assignments on the agenda.Motion seconded by Mr.Thibert.Motion
passed unanimously.
6.PRIOR MINUTES -August 17,2018
MOTION:Mr.Foutz made a motion to approve the Minutes of August 17,2018.Mr.Thibert
seconded the motion.
Mr.Thibert requested the Minutes of August 17,2108 be corrected to reflect Chair Borgeson as
Chair calling the meeting to order.
The motion to approve the Minutes of August 17,2018 with the correction of Chair
Borgeson calling the meeting to order passed unanimously.
7.NEW BUSINESS
A.Bradley O&M Agreement Update
MOTION:Mr.Day made a motion to approve the existing negotiated contract.Motion
seconded by Mr.Foutz.
BPMC Minutes 9/21/18 Page |of 6
Mr.Day distributed copies to members of the existing negotiated contract.He noted the
negotiated contract has been reviewed and concurred by subcommittees and legal.Mr.Day
requested areas of discord be identified and communicated if the negotiated contract is not
approved.
Chair Borgeson requested Mr.Gibson comment regarding the contract negotiations.Mr.Gibson
noted Chair Borgeson asked for a contract negotiation taskforce in August.Mr.Gibson
convened a task force and reviewed the contract in two phases;a compensation phase,and atermsandconditionsphase.Mr.Gibson worked with HEA,Mr.Baldwin,Mr.Saldanha,AEA,
and the Finance Committee.Final comments were received on September 7".Mr.Gibson
distributed the final draft version of the negotiated contract on September 11"and requested
comment and agreement.The document before the BPMC today is the final draft version of
September 11th.Mr.Gibson informed he received verbal indication there are issues with
respect to indemnification and performance standards language.Mr.Gibson expects to receive
those specific comments in written form this week.
Ms.Reiser indicated AEA will abstain regarding terms and deliberations because AEA is party
to the agreement.
Chair Borgeson informed Mr.Gibson was requested to prepare a resolution to authorize an
extension to the September 11"draft negotiated contract.Chair Borgeson understands HEA
has not necessarily agreed to the extension.If an extension is not agreed to,AEA will have to
give notice to HEA regarding the current O&M agreement.Chair Borgeson explained GVEA
supports HEA being the O&M operator,but GVEA is not ready to vote for the agreement today.
GVEA believes additional changes to the terms and conditions,including,but not limited to,a
rolling two-year notice and performance guarantees and metrics are necessary in the contract.
Additionally,GVEA requests to see the proposed budget amendment that would support the
September 11"draft negotiated contract.He noted the additional annual cost could range from
$500,000 to $1,000,000,with the contract rates going into effect January 1.A budget
adjustment would be required and no budget information has been provided.GVEA counsel has
been working on these negotiations in conjunction with counsel of MEA and CEA.GVEA
counsel is expected to provide a revision and response to the September 11"draft negotiated
agreement to AEA and HEA by the middle of next week.
Mr.Thibert informed !egal counsel of CEA has reviewed the September 11"draft negotiated
contract.CEA legal counsel has prepared questions of the draft,a red-lined version on some of
the provisions,and is in the process of coordinating with the other utilities.CEA is unprepared to
approve the September 11"draft negotiated agreement today.Mr.Thibert assumed a 60-day
contract extension would be brought before the members at today's meeting.
Mr.Izzo commented if the motion is tabled,he requests a commitment be made for all issues to
be resolved before the next BPMC meeting on October 19"and a vote be taken then.
Ms.Reiser requests any issues be resolved before October 18",because of notification
provisions.
Chair Borgeson encouraged all counsel provide their additional comments by next Wednesday,
after which negotiation can occur with HEA.A special BPMC meeting to vote can then be
called.
Mr.Gibson recommended the Committee take a 60-day extension to provide the time to
complete negotiations and make the necessary budget amendments.Mr.Gibson noted HEA
has a commitment that BPMC wants HEA to be the operator.
BPMC Minutes 9/21/18 Page 2 of 6
Mr.Thibert agreed with Mr.Gibson.
Mr.Johnston asked if HEA will consent to a 60-day extension.Mr.Day stated he is not
empowered to comment on the acceptability of a 60-day extension.
MOTION:Mr.Thibert made a motion to table the approval of the existing negotiatedcontractuntilOctober19".Motion seconded by Mr.Izzo.
A roll call vote was taken,and the motion to table passed,with HEA voting no and AEA
abstaining.
MOTION:Mr.Johnston made a motion to approve Resolution 2018-02.Motion seconded
by Mr.Thibert.
Mr.Thibert expressed support for HEA to continue to be the operator,and the motion to extend
the current HEA operator agreement for two months provides time for legal to answer all of the
questions within the negotiations.
A roll call vote was taken,with HEA and AEA abstaining.
Mr.Gibson advised the motion requires an affirmative vote from AEA to pass because it
concerns budget issues and operations.Mr.Gibson requested AEA reconsider the vote.Ms.
Reiser explained a different procedural understanding and requested advice from counsel,Mr.
Saldanha.
The Committee took a 5-minute at-ease.
Ms.Reiser informed AEA reconsidered its vote as yes on the procedural motion.
The motion to approve Resolution 2018-02 passed,with HEA abstaining.
B.Battle Creek Construction Update
Ms.Reiser requested Mr.Rebenitsch provide the Battle Creek construction update.Mr.
Rebenitsch informed he will give a greater detailed presentation during executive session.The
BPMC was provided progress notes and pictures entitled West Fork Upper Battle Creek Update
dated September 21,2018.Mr.Rebenitsch highlighted the Lower Access Road is substantially
complete.He believes the contractor has done a quality job.The struggle with pay applications
include problems with obtaining accurate survey data.Issues have been resolved and the cost
of the Lower Access Road is close to equal to the original budgeted amount.
Mr.Rebenitsch informed the road pioneering is out to the Upper Access Road above Wall #2
and has stopped.Materials for the wall have not yet been received.An alignment change is
being proposed which would increase the cost by approximately $1.2 million.Mr.Rebenitsch
believes the change will ultimately provide a better end product.The general excavation and
rock excavation is within the +/-25%of the specified contract quantities.Mr.Rebenitsch does
not believe the contractor will be able to complete the road to the diversion this year.The 2019
work year is expected to be very busy.Mr.Rebenitsch described the road pictures provided.
The road contains steep grades.There is no intent and no reason to use the road during the
wintertime.The system will be drained in the late fall.
C.Generator Report
BPMC Minutes 9/21/18 Page 3 of 6
Mr.Day reminded members of the high partial discharge readings reviewed at last month's
meeting.The O&D approved a $32,000 inspection which was coordinated with the tie outage
that began on Monday September 17th.The generator inspection was completed yesterday
September 20th.Reassembly of the unit has progressed and will hopefully be online by Monday
September 23.Mr.Day described the photos of the inspection,including corona testing,
semiconductor degradation,and archive photos of stator installation and brazing of the
windings.The generator is 27 years old.The full report is not yet complete.Mr.Day highlighted
the inspection and the Generator expert suggested the generator should be in good working
condition for the next year of operation.After that time there is increased risk of major failure,
the repairs need to be completed within the next year to 18 months.Mr.Day anticipates the
rotor will be pulled and the material degradation will be repaired at a cost range of $500,000 to
$1.5 million during a three to four-week timeframe.A scope of work and budget for the repair is
being developed.Mr.Day noted there is a scheduled 60-day tie line outage in February that
could provide an opportunity for the repair to be completed while Bradley is unavailable to the
northern utilities.Mr.Day stated that in his opinion if the unit is run to failure,the repair costs
could be in range of $5 million to $7 million.
8.REPORTS
A.O&D Report
Mr.Sarauer stated he is the Vice-Chair of the Bradley O&D Committee and the Chair,Jeff
Warner,is out of town.A written report will be provided to the Committee by Mr.Warner upon
his return.Mr.Sarauer concurred the O&D Committee approved the recent outage and
inspection Mr.Day discussed.
B.Operators Report
Mr.Day directed members to the Operator's Report provided in the packet.Mr.Day commented
the work seems to have slowed for the contractor at Battle Creek and the number of workers
has decreased.The equipment storage building material has arrived onsite and work has
begun.The fish water control automation system was unstable at certain flows which resulted in
variation.Staff is working with Emerson to resolve the issues.The public dock is closed.FERC
personnel visited the site to conduct the annual inspection.The comments were positive
concerning the state of the plant and the cleanliness.Brush was cleared from the side of the
spillway and at the dam sidewalls.An additional round of weed control is scheduled for
September 28".
Mr.Day informed the operations were normal.Unit 2 was 100%available.Unit 1 was 99.89%,
because it was shut down by the dispatcher due to system disturbances for .8 hours.The gate
testing on the diversion tunnel is complete and the broken switch has been repaired.
Cc,Budget Subcommittee Report
Ms.Garner reviewed the provided 4"Quarter Report for FY 2018.She noted the unaudited
refund for operations and maintenance is at $1 million as of June 30.The audit is tentatively
scheduled for the beginning of November,and will be presented and approved at the December
meeting.The O&M refunds will be received after that process.The refund for the R&C Fund
was about $400,000 and is shown on the balance sheet side.Ms.Garner showed the capital
purchases for Bradley Lake,as a whole,and informed the budget was $1.3 million and actual
spent was $950,000.The operation and maintenance budget was $4.5 million and actual spent
was $3.9 million.The only project completed within the R&C Fund was the SVC replacement.
The spillway raise did not occur and the fire alarm system replacement is now in FY19.
BPMC Minutes 9/21/18 Page 4 of 6
Ms.Garner showed the Battle Creek capital purchases and reviewed the administrative costs
budgeted at $43,000 and actual spent was $137,000.The majority of the overage Is due to the
approved owners'representative.
9.COMMITTEE ASIGNMENTS
Chair Borgeson assigned the Finance Committee to review the costs and proposed rates that
will be incurred with the execution of a new HEA O&M agreement,and coordinate a meeting
with the BPMC members in a timely manner.
10.MEMBERS COMMENTS
A.Member Comments
Mr.Day expressed appreciation for joining the meeting today and looks forward to a successful
completion of the contract negotiations.
Chair Borgeson expressed appreciation to staff for their efforts and thanked Mr.Day for the
work at Bradley.
A brief at-ease was taken.
MOTION:Mr.Johnston made a motion to go into Executive Session to discuss
confidential financial conditions with respect to Battle Creek construction clalms and
federal land fees.The motion was seconded.
Motion passed without objection.
7.D.Executive Session:11:20 a.m.
¢Battie Creek Construction Clalms
*Federal Land Fees
The Committee reconvened its regular meeting at 11:50 a.m.
11.NEXT MEETING DATE-October 19,2018
12.ADJOURNMENT
There being no further business for the committee,the meeting adjourned at 11:51 a.m.
BY:
Cory Borgeson,Chair
Attest:Str)
tJanetposeAlaskaEnergy Authority,Secretary
BPMC Minutes 9/21/18 Page5 of6 SZ
BRADLEY LAKE PROJECT MANAGEMENT COMMITTEE (BPMC)
REGULAR MEETING
Friday,Sept 21,2018 10:00 A.M.
Alaska Energy Authority,Board Room
813 W.Northern Lights Boulevard,Anchorage,Alaska
To participate VIA TELECONFERENCE-1-888-585-9008 -Conference room code 467-050-126
AGENDA
1.CALL TO ORDER
2.ROLL CALL FOR COMMITTEE MEMBERS
3.PUBLIC ROLL CALL
4.PUBLIC COMMENTS
5.AGENDA APPROVAL
6.PRIOR MINUTES -August 17,2018
7.NEW BUSINESS
A.Bradley O&M Agreement K Gibson
B.Battle Creek Update AEA
C.Generator Report HEA
D.Executive Session
e Battle Creek Construction claims
e Federal Land Fees
REPORTS
A.O&D Update P Sarauer
B.Operators Report HEA
C.Budget Subcommittee Report AEA
COMMITTEE ASSIGNMENTS
10./MEMBERS COMMENTS
11.NEXT MEETING DATE -Oct.19,2018
12.ADJOURNMENT
BRADLEY LAKE PROJECT MANAGEMENT COMMITTEE MEETING
REGULAR MEETING
Alaska Energy Authority,Anchorage,Alaska
August 17,2018
1.CALL TO ORDER
Chair Janorschke called the regular meeting of the Bradley Lake Hydroelectric Project
Management Committee to order at 10:01 a.m.A quorum was established.
2.ROLL CALL FOR COMMITTEE MEMBERS
Bryan Carey (Alaska Energy Authority [AEA]);Mark Johnston (Anchorage Municipal Light &
Power [ML&P]);Cory Borgeson (Golden Valley Electric Association [GVEA]);Lee Thibert
(Chugach Electric Association [CEA]);Tony Izzo (Matanuska Electric Association [MEA]);John
Foutz (City of Seward);and Bradley Janorschke (Homer Electric Association [HEA)).
3.PUBLIC ROLL CALL
Tom Erickson,Jocelyn Gardner,Michele Hope,David Lockard,Janet Reiser,Kirk Warren,Teri
Webster,Brandi White (AEA);Matt Clarkson,Brian Hickey,Burke Wick (CEA);Stefan Saldanha
(Department of Law);Ron Rebenitsch (Energy Engineering);Leo Quiachon (phone-GVEA);Bob
Day,Emily Hutchinson (phone),Alan Owens (HEA);Kirk Gibson (McDowell Rackner Gibson,PC);Ed Jenkins,David Pease (phone),Matt Reisterer,Tony Zellers (MEA);Molly Morrison,Jeff
Warner (ML&P);Bernie Smith (Public),and Ladonna Lindley (AccurType Depositions).4.PUBLIC COMMENTS
None.
5.AGENDA APPROVALMOTION:Mr.Johnston made a motion to approve the agenda.Motion seconded by Mr.Thibert...
Mr.Carey requested to add an executive session regarding Battle Creek legal and financial
discussions after Member Comments in the agenda.Chair Borgeson noted the executive
session could be placed as Item 10B on the agenda.
The amended agenda,including Item 10B.Executive Session,was unanimously
approved.
6.PRIOR MINUTES-July 20,2018
MOTION:Mr.Foutz made a motion to approve the Minutes of July 20,2018.Mr.
Johnston seconded the motion.
The motion passed unanimously.
7.NEW BUSINESS
DRAFT BPMC Minutes 8/17/18 Page 1 of 3
A,Battle Creek Construction Update
Mr.Carey informed the contractor is progressing quickly.The Lower Access Road is
substantially completed.Road pioneering has reached the beginning of Wall #2.The July payestimateandcontractormaterialquantitiesremainoutstanding.The contractors are
experiencing challenges providing accurate survey data and the corresponding dollar request.The perception is more general excavation has occurred than was anticipated and less rock
excavation has occurred than was anticipated.The additional rock excavation was expected tobeusedforpipebeddingandthefinalsurfaceoftheroad.At this point,the quantities being
produced are on the low side for project costs.
Mr.Carey noted a proposal is being reviewed regarding utilization of sheet pile for the cutoff
wall at East Fork instead of using a membrane.AEA has requested the contractor providedetailedinformationbytheendofAugustregardingpossibleimpactstothescheduleorcost of
the project due to alignment changes.Currently,the contractor is close to the original budgetandclosetothespringschedule.Mr.Carey showed and described pictures of the Lower
Access Road and pioneering of the Upper Access Road.
Mr.Rebenitsch commented the contractoris building a quality road,despite the occasionalchallenges.
C.Bradley O&M Agreement Update |
Mr.Gibson informed Chair Borgeson tasked him with moving forward the O&M Agreement.Mr.Gibson followed two parallel tracks.One path is the O&M terms and conditions and the second
path is the financial compensation to the operator.Both paths are progressing well.Mr.Gibson
anticipates the O&M Agreement will be ready for review and approval by the BPMC at the
September meeting.Mr.Gibson requested any specific direction regarding compensation bedirectedtotheFinanceCommittee.
Mr.Carey expressed AEA looks forward to the successful conclusion and approval of theOperatorAgreementattheSeptember21"BBPMCmeeting.8."REPORTS |
A.O&D Report.
Mr.Warner explained the Bradley O&D Report does not include items that will be reviewed in
the Operator Report.CEA has scheduled a 60-day outage beginning February 2019,to
conduct work on the 115 kV line between Hope and Summit.HEA is scheduling an outage in
2019,to conduct work on the 115 kV line between Soldotna and Quartz.Mr.Warner stated the
O&D and Railbelt utilities will do their best to ensure the least amount of impact during the
outages.
Mr.Warner informed the BPMC assigned the O&D to provide a dam safety surveillance
monitoring presentation.Mr.Carey gave a summary dam safety reporting description at the
August 6"O&D meeting.Mr.Warner requested Mr.Carey develop a presentation to give at a
future BPMC meeting.Mr.Warner stated the O&D made a recommendation the operator
inspect the fish water screens every five years.The next inspection is schedule in the 2021
timeframe.
DRAFT BPMC Minutes 8/17/18 Page 2 of 3
Mr.Warner conveyed Mr.Day requested approval of the O&D to spend approximately $32,000
to inspect Unit 2's IRIS readings.The O&D approved the expenditure.CEA agreed to lend
their corona camera to the Bradley Project,resulting in an estimated savings of $6,000.
Discussions regarding an inspection of Unit 1 are likely to occur at the next meeting.
B.Operators Report
Mr.Day noted the annual outages went well.Unit 1 was out 10 days and Unit 2 was out a
week.Mr.Day expressed appreciation to Orion for their ongoing allowance to utilize barge
space.He noted Bradley has returned cooperation by storing Orion's bags of grout inside the
substation.Mr.Day discussed the winding health on Unit 2 has been monitored for years and
continues to trend at higher readings.An inspection by a generator consultant will be
conducted to assess the cause of the readings.Mr.Day explained the cost of replacement after
a failure is approximately three times the cost of rewinding the stator.Mr.Day noted the power
tunnel slide gate testing resulted in a few issues described in the report.
9.COMMITTEE ASIGNMENTS
None.
10.MEMBERS COMMENTS
A.Member Comments .
Mr.Carey announced he will be absent for the September meeting.
Mr.Thibert expressed appreciation to Mr.Gibson for his work on the O&M Agreement.
Chair Borgeson announced a five-minute break,to be followed by Executive Session to discussBattleCreeklegalandfinancialmatters.Mr.Gibson advised attendees in the Executive
Session must be designated by a member.There was no objection.
B.-Executive Session:10:37 am.Battle Creek Legal and Financial Matters11.-NEXT MEETING DATE -September 21,2018
12.ADJOURNMENT '
There being no further business for the committee,the meeting adjourned at 11:04 a.m.
BY:
Cory Borgeson,Chair
Attest:
Janet Reiser
Alaska Energy Authority,Secretary
DRAFT BPMC Minutes 8/17/18 Page 3 of 3
RESOLUTION
OF
BRADLEY LAKE PROJECT MANAGEMENT COMMITTEE
RESOLUTION NO.2018 -02
Authorizing the Second Amendment
to the
Second Amendedand Restated O&M Agreement
Introduction:The Bradley Lake Project Management Committee ("BPMC')is in the process of
developing a new O&M Agreement governing the terms and conditions under which the Bradley
Lake Hydroelectric Project ("Project”)will be operated.The currently effective O&M Agreement is
set to terminate on January 1,2019.Additional time is needed by the BPMC to finalize the terms
and conditions under which the Operator shall perform its duties at the Project.
Purpose of Resolution No.2018-02:Resolution No.2018-02,authorizes the Alaska Energy
Authority ("Authority”)to enter a Second Amendment with the Operator,Homer Electric
Association,Inc.(HEA),to extend the provisions of the current O&M Agreement governing the
current term and notice of termination of the O&M Agreement for a period of two (2)additional
months.
RESOLUTION NO.2018-02
WHEREAS,the Bradley Lake Project Power Sales Agreement (the "Power Sales Agreement”)
provides that the BPMC shall arrange for the operation and maintenance of the Project and
Project Related Facilities;
WHEREAS,the BPMC is authorized under its Bylaws adopted pursuant to the terms of the Power
Sales Agreement to approve agreements for the operation and maintenance of Project and
Project related facilities;
WHEREAS,to provide for the operation and maintenance of the Project and Project Related
Facilities,the BPMC entered the Master Maintenance and Operating Agreement with the
Authority under which the Authority shall enter contracts necessary to perform services for,or
operation maintenance of,the Project and Project Facilities;
WHEREAS,the Authority and HEA entered the Second Amendment and Restated Operation and
Maintenance for Bradley Lake Hydroelectric Project effective July 1,2008 (the "O&M
Agreement'),to inter alia,provide that HEA would continue as Operator and operate and maintain
the Project in accordance with the terms and conditions of the O&M Agreement;
WHEREAS,the BPMC authorized the Authority and HEA to enter the First Amendment to The
Second Amended and Restated Operation &Maintenance Agreement for Bradley Lake
Hydroelectric Project ("First Amendment”)on June 15,2016;
WHEREAS,the First Amendment extended the provisions of the O&M Agreement governing the
current term and notice of termination of the O&M Agreement for a period of six (6)months to
January 1,2019.
Page 1 of 2-BPMC Resolution 2018-02:Authorizing Second Amendment to the Second Amended and
Restated O&M Agreement
WHEREAS,the BPMC has decided that additional time is required to handle issues by and
between BPMC Participating Utilities and has authorized the Authority to enter a Second
Amendment to The Second Amended and Restated Operation &Maintenance Agreement for
Bradley Lake Hydroelectric Project ("Second Amendment')with HEA on September 21,2018
(Second Amendment attached hereto);
WHEREAS,the Second Amendment extends the provisions of the O&M Agreement governing
the current term and previously presented notice of termination of the O&M Agreement for a
period of two (2)months until March 1,2019.
NOW,THEREFORE,IT IS HEREBY RESOLVED BY THE BPMC,that additional time is
needed by the BPMC to finalize the terms and conditions under which the Operator shall perform
its duties at the Project;and,
BE IT FURTHER RESOLVED BY THE BPMC,that a period of two (2)months should be
enough time to finalize the terms and conditions under which the Operator shall perform its duties
at the Project;and,
BE IT FURTHER RESOLVED BY THE BPMC,that the Authority is authorized by the
BPMC to enter a Second Amendment with the Operator,Homer Electric Association,Inc.(HEA),
to extend the provisions of the current O&M Agreement governing the current term and notice of
termination of the O&M Agreement for a period of two (2)additional months;and,
BE IT FURTHER RESOLVED BY THE BPMC,that the above Recitals be incorporated
and made part of to this Resolution No.2018-02.
Dated at Anchorage Alaska,this 21st day of September 2018.
Chair
Attest:
Secretary
Page 2 of 2-BPMC Resolution 2018-02:Authorizing Second Amendment to the Second Amended and
Restated O&M Agreement
SECOND AMENDMENT
TO THE
SECOND AMENDED AND RESTATED
OPERATION &MAINTENANCE AGREEMENT
FOR
BRADLEY LAKE HYDROELECTRIC PROJECT
This SECOND AMENDMENT TO THE SECOND AMENDED AND RESTATED OPERATION &
MAINTENANCE AGREEMENT FOR BRADLEY LAKE HYDROELECTRIC PROJECT ("Second
Amendment”)dated effective as of September 21,2018,is entered into by and between the
Alaska Energy Authority ("Authority”)and Homer Electric Association,Inc.("HEA”).
WITNESSETH
WHEREAS,the Authority is a public corporation of the State of Alaska duly created,organized,
and existing pursuant to AS 44.83,and authorized by law to sell electric power generated by the
Bradley Lake Project ("Project”);
WHEREAS,the Authority is authorized under AS 44.83.396 to enter agreements for the operation
and maintenance of power projects owned by the Authority with a qualified utility;
WHEREAS,the Bradley Lake Project Power Sales Agreement (the "Power Sales Agreement”)
provides that the Bradley Lake Project Management Committee ("BPMC'”)shall arrange for the
operation and maintenance of the Project and Project Related Facilities;
WHEREAS,the BPMC is authorized under its Bylaws adopted pursuant to the terms of the Power
Sales Agreement to approve agreements for the operation and maintenance of Project and
Project related facilities;
WHEREAS,to provide for the operation and maintenance of the Project and Project Related
Facilities,the BPMC entered the Master Maintenance and Operating Agreement with the
Authority under which the Authority shall enter contracts necessary to perform services for,or
operation maintenance of,the Project and Project Facilities;
WHEREAS,the Authority and HEA entered the Second Amendment and Restated Operation and
Maintenance for Bradley Lake Hydroelectric Project effective July 1,2008 (the "O&M
Agreement”),to inter alia,provide that HEA would continue as Operator and operate and maintain
the Project in accordance with the terms and conditions of the O&M Agreement;
WHEREAS,the Authority,before executing a contract or contract amendment for operation or
maintenance of the Project or Project related facilities,must submit the contract or amendment to
the BPMC for its review and approval under the Master Maintenance and Operation Agreement;
WHEREAS,the BPMC authorized the Authority and HEA to enter the FIRST AMENDMENT TO
THE SECOND AMENDED AND RESTATED OPERATION &MAINTENANCE AGREEMENT
FOR BRADLEY LAKE HYDROELECTRIC PROJECT ("First Amendment”)on June 15,2016;
WHEREAS,the First Amendment extended the provisions of the O&M Agreement governing the
current term and notice of termination of the O&M Agreement for a period of six (6)months to
January 1,2019.
SECOND AMENDMENT TO O&M AGREEMENT Page 1 of 2
WHEREAS,the BPMC has decided that additional time is required to handle issues by and
between BPMC Participating Utilities and authorized the Authority and HEA to enter this Second
Amendment on September 21,2018;
WHEREAS,the Second Amendment extends the provisions of the O&M Agreement governing
the current term and previously presented notice of termination of the O&M Agreement for a
period of two (2)months until March 1,2019.
WHEREAS,the BPMC has reviewed and approved this Second Amendment.
NOW,THEREFORE,THE PARTIES AGREE AS FOLLOWS:
1.Section 2(b)of the O&M Agreement shall be amended to read as follows:
Except as expressly provided in this section,the term of this Agreement shall be five (5)
years from the Effective Date and shall be automatically renewed for successive five-year
terms until terminated as provided herein and subject to the termination rights set forth in
Section 2(c)and Section 7(d).Notice of termination by either party shall be given two
years in advance of the end of any term;provided,however,that the current,(or second)
term of this Agreement shall be extended to March 1,2019,and the date for which
termination notice shall be given shall be correspondingly extended to February 28,2017.
2.Except as amended in this Second Amendment,the terms and conditions of the O&M
Agreement remain in full force and effect.
IN WITNESS WHEREOF,the Parties have caused this Second Amendment to be executed the
day and year first above written.
HOMER ELECTRIC ASSOCIATION,INC.
By
Bradley P.Janorschke
General Manager
ALASKA ENERGY AUTHORITY
By
Janet Reiser
Executive Director
SECOND AMENDMENT TO O&M AGREEMENT Page 2 of 2
AB
BPMC Meeting
West Fork Upper Battle Creek Update
September 21,2018
Events:
e Lower Access Road (LAR)is substantially complete.
e July Pay Application reviewed and LAR cost at estimated.
e Road pioneered out to Upper Access Road (UAR)to Sta 475 above Wall #2.
e By Pass road constructed above Wall 2 with time and materials.Will
accelerate schedule.Cost being quantified (S200K -S400K).
e AEA and Contractor discussing a road alignment change at Wall 2.Net cost
$1.2m.Will help schedule,increase short and long term safety,and
decrease long term operational cost/risk.
e Perception is that more general excavation and less rock excavation has
occurred than bid estimates for first half UAR.General excavation is lower
cost but pipe bedding will require additional rock.
e Reviewing August (first half UAR)quantity surveys &Pay Application.
e Contractor will not complete all road to diversion this year.
e 2019 will be very busy with road completion,pipe installation,outfall work,
and diversion dam work.
Schedule:
Upper Access Road pioneered to base of Wall 3.
Pioneering at and past Wall 3.Will be occurring in the next month.
If they maintain schedule they will pioneer to diversion site this year.Walls
sections will not be completed this year.However,difficult sections and weather
unknowns may cause adjustments.
Contractor on budget.Schedule appears to be slightly behind initial schedule for
substantial completion Fall 2019.Contract document have substantial
completion July 2020.
Photo 1.By pass road going over Wall 2 area.
Photo 2.Outfall area image from drone
of Upper Access Road
SOCIATION'RELECTRICAS
e..ehh eeeoneLyane:ey tk
tee
rae
AURAL
NTSee
stratsAYak
Fart!
cana
orshee
-.
+»
-
a
.
"
.
tem
seme
=
om
a
ores
a
*wag¥>we we OForm
'
o
ie oe
i
3
'
4
hae
Fee,
Lc
aoe,
a ae
vi
i
-ee "wate d
°an
ea,
-_-herd game,or
*
Tn
aanY
veo
ar
s
ans
saa
wn\
Rae
.
aes-”ay
.
_
"
aad
nis
creatneat
mreosi
-
Ea
2ot
2
«
.
ao
.
ey
ON,
'
,
:
oe
>
*
.
t
.
ha
,
ve
é,
:
.
bb
eg
.
°
.
we
+
Ly
>
;
''
¢
,
*
vo
'
:
,
:
'
4
'
1
=
"
s
.
;
6
.
.
oS
.
"a.
-
'oer+=°'.hoe eee).tha tane --see Yow fhe eee!.IY pans SePagayeaes
es7Spee”7 weeT4eyageronsets aame.iy uf BYpeers,oe eB]ft:Pees,af bsSabSerefe condon
gp
Unit Statistics:
Bradley Lake Operator Report
BPMC
September 21,2018
as of 09/18/2018
Generation Unit 1 (MWhrs)Unit 2 (MWhrs)Total (MWhrs)
August 2018 17,635 12,169 29,804
Hydraulics Avg.Lake Level (ft.)Usage {ac ft.)Fish water (CFS)
ft.)
August 2018 1156.6 28,958 122.7 AVG
Lake Level -1164.5'as of September 18,2018 (Imminent spill is at 1175)
Capital Projects:
1)Battle Creek work has slowed -Work continues but the contractor does not
appear to have the same number of staff on site.
2)Barge Shipment -Yenney and associates barge shipment of materials and
equipment was received on September 13.Materials are staged and work is
commencing on the building.
3)Fish Water Control Automation The fish water flow computer has been repaired.
We have tried to operate in automatic but the system was unstable at certain
flows which resulted in a variation.Right now,automatic seems to over release.
It appears that our table for flow per pipe at a given depth of lake is not accurate.
We are making test runs and providing Emerson with the data for analysis.
4)Public Dock -The floating dock is closed during construction of Battie Creek.
5)FERC -personnel visited the site,toured Battle Creek and conducted an annual
inspection of the project.The comments at the time were very positive
concerning the state of the plant and the cleanliness.
6)Brush Clearing -Gage Tree Service provided personnel to clear the brush from the
spillway wall and alongside the groin of the Dam.When FERC visited they
seemed to be satisfied with the work.
7)Invasive weeds -Staff from the Soil conservation District will return on September
28"for an additional round of weed control.
Bradley Lake Operator Report Page 1
8)Unit 2 Generator concerns -We took Unit 2 out of Service Sept 17 to conduct
electrical tests on the machine.At the time of this writing those tests were
incomplete.|will try to make a verbal report on the 21°.
Operations,Maintenance,and Inspections:
1)Operations-During the month of August operations were fairly normal with
little excitement to report.
2)Unit availability-Unit 1 99.89%,Unit 2 100%.Unit one was shut down by the
dispatcher due to system disturbances for .8 hours.This demonstrates one of
the issues with some KPI's.The unit right now is either shut down,running
and Unit 2 out for 0 Hours for annual maintenance.
3)Gate Testing -The broken switch has been repaired and is working.The
Diversion tunnel gates have been tested.
4)Equipment Storage Building -the contractor and materials are on site and
construction is underway.
5)Flight Coordination -Flights have slowed somewhat with the slower pace of
work at Battle Creek.
Generator exposed for testing
Bradley Lake Operator Report Page 2
Initial testing
Bradley Lake Operator Report Page 3
ALASKA ENERGY AUTHORITY
BRADLEY LAKE HYDROELECTRIC PROJECT
FY 2018 4th QUARTER REPORT
REVENUES,EXPENSES &CHANGES IN SURPLUS
REVENUES
UTILITY CONTRIBUTIONS
OTHER MISCELLANEOUS*
INTEREST INCOME
EXPENSES
OPERATIONS
RENEWAL/REPLACE (R&C REPAYMENTS)
R&C INTEREST APPLIED AS REPMT
NON R&C CAPITAL PURCHASES-See A1
TRANSFER TO OPERATING RESERVE
DEBT SERVICE (net of Capital Reserve Reduction)
TRANSFER TO ARBITRAGE
CURRENT YEAR SURPLUS(DEFICIT)
PRIOR YEAR SURPLUS (DEFICIT)
BEGINNING SURPLUS (DEFICIT)
COMMITTED CY EXP &DEBT SVC
ENDING SURPLUS (DEFICIT)
BALANCE SHEET
ASSETS
REVENUE FUND
OPERATING FUND
DUE FROM R&C
DUE FROM AEA
OTHER RECEIVABLE
PREPAID
LIABILITIES &SURPLUS
CURRENT LIABILITIES
UNEARNED REVENUE
DUE TO R&C
COMMITTED CY EXP &DEBT SVC
PAYABLE TO UTILITIES O&M
PAYABLE TO UTILITIES R&C
OTHER INFORMATION
OPERATING RESERVE
MONTHLY CONTRIBUTIONS
*HEA sale of vehicles and loader-AEA to return funds to utilities with year end refund
FY2017 FY2018 FY2018
ACTUALS AMENDED ACTUALS
BUDGET
17,172,295 19,819,362 19,819,362
.-17,251
1,991,555 1,845,000 2,064,454
19,163,850 21,664,362 21,901,067
4,011,783 4,593,387 3,985,722
2,115,124 2,793,307 2,793,306
361,781 -226,781
89 1,307,000 954,060
(85,531)(112,145)(112,145)
12,426,200 12,778,100 12,778,100
334,404 304,713 270,777
19,163,850 21,664,362 20,896,601
-1,004,466
-(1,004,466)
1,338,657 -1,771,032
2,431,121 -855,664
1,147,663 -440,987
15,000
--51,2694,917,441 :3,133,952
1,657,802 -1,289,276
888,567 -399,223
1,223,409 -1,004,466
1,147,663 -440,9874,917,441 :3,133,952
1,030,822 918,677 918,677
1,628,614 3,303,227 3,303,227
1 of 10
ALASKA ENERGY AUTHORITY
BRADLEY LAKE HYDROELECTRIC PROJECT
Other Project Costs-Battle Creek
FY 2018 4th Quarter Report
Revenues,Expenses &Changes in Surplus
Revenues
Utility Contributions
Capital Reserve Contributions
Other Available Funds
Interest Income
Expenses
Battle Creek Administrative costs
Capital Purchases
Transfers To(From)Operating Reserve
Debt Service
IRS Subsidy
Cost of Issuance 9th Series
Capital Reserve Contribution
Transfer to Arbitrage
Current Year Surplus(Deficit)
Committed to CY Expense &Debt Service
Ending Surplus (Deficit)
Balance Sheet
Assets
Revenue Fund
Operating Fund
Due from Capital Reserve Fund
Other Receivable
Prepaid
Liabilities &Surplus
Current Liabilities
Committed to CY Expense &Debt Service
Payable to Utilities O&M
Other Information
Operating Reserve
Monthly Contribution March
Monthly Contribution April thru June
FY2018 FY2018
Amended Actuals
Budget
03/05/18
633,356 633,353
2,796,378 2,796,378
499,985 499,985
-14,758
3,929,719 3,944,474
43,800 137,456
16,500 16,500
8,760 8,760
903,064 895,824
-(571,876)
21,217 25,730
2,936,378 2,796,378
3,929,719 3,308,772
-635,702
-(635,702)
-733,871
-2,610
-6,000
-742,481
-106,780
-635,702
-742,481
8,760 8,760
117,164 117,164
172,064 172,064
2 of 10
ALASKA ENERGY AUTHORITY
BRADLEY LAKE HYDROELECTRIC PROJECT
Schedule A-1
FY17 FY17 FY18 FY18CAPITALPURCHASESNOTFUNDEDBYR&C FUND BUDGET |ACTUALS |BUDGET |ACTUALS
Replace Fish Water Valve Actuators 250,000 89 225,000 361,430
Equipment storage shed (unheated bus barn)--100,000 67,539
1 ton Flatbed with Plow --65,000 57,016
Battle Creek Bridge Repair Refurbishment (2)--182,000 -
Mobil Crane 40 to 50 tons (used)--100,000 88,875
Replace Michigan Loader --350,000 263,306
Replace 1988 Suburban Ambulance --65,000 §9,430
1/2 ton Pick up truck --35,000 34,693
Upgrade Residence kitchens/Crews Qtrs Kitchen --165,000 1,850
Replace High Bay Lighting in Power Plant --20,000 19,920
Total Non R&C Capital Purchases 250,000 89 1,307,000 954,060
3 of 10
ALASKA ENERGY AUTHORITY
BRADLEY LAKE OPERATIONS &MAINTENANCE
SCHEDULE B
BUDGET TO ACTUAL EXPENSES
FOR THE PERIOD 07/01/2017 THROUGH 06/30/2018
FY 18 FY 17
BUDGET %
FY18 Approved 07/01/2017 -(Over)Under FY17 Approved
Budget 06/30/2018 HEA Actual CEA Actual AEA Actual Total Actual |Budget to Date Budget FY17 Actual
[Summary by expense type
Labor &Benefits 1,889,814 1,889,814 1,467,072 121,165 *1,578,236 311,578 2,005,079 1,533,371
Travel 76,950 76,950 14,413 1,701 *16,114 60,836 132,950 27,009
Training 49,300 49,300 14,046 --14,046 35,254 49,300 35,736
Contractual 841,062 841,062 375,351 :284,422 659,773 181,289 1,217,418 850,184
Supplies &Materials 183,345 183,345 150,121 2,678 :152,799 30,546 229,358 113,150
Other Costs 387,818 387,818 35,696 38,345 202,329 276,370 111,448 381,744 297,447
Equi Furniture and Machinery 7,000 7,000 24,767 798 :25,562 (18,562)11,500 10,137
Maintenance Projects *-2,581 800 -3,381 (3,381)}=-
Administrative Costs 1,158,098 1,188,098 43,790 :1,215,650 1,259,441 (101,343}}1,126,761 1,144,749
4,593,387 4,593,387 2,127,837 158,484 1,702,401 3,985,722 607,665 5,154,110 4,011,783
FERC 535 -Operation Supervision &Engineering
Operations Sup/Eng
Bradley Lake Operating
Labor &Benefits 265,587 265,587 262,431 °:262,431 3,156 299,649 266,820
Travel 10,450 10,450 2,271 -.2,271 8,179 10,450 9,452
Training 9,300 9,300 3,452 :-3,452 5,848 9,300 11,171
Contractual 1,000 1,000 121 °.121 879 1,400 300
Supplies &Materials 4,000 4,000 3,210 -.3,210 790 4,100 5,781
Bradley Lake Operating Total 290,337 290,337 271,485 <-271,485 18,852 324,899 293,523
FERC 535 -Operation Supervision &Engineering Total 290,337 290,337 271,485 --271,485 18,852 324,899 293,523
FERC 537 -Hydraulic Expenses
Hydraulic Expenses
Bradley Lake Operating
Labor &Benefits 94,453 94,453 69,032 .:69,032 25,421 92,745 65,670
Contractual 2,000 2,000 ----2,000 4,000 5,647
Supplies &Materials 2,000 2,000 976 ::976 1,024 2,900 886
Bradley Lake Operating Totat 98,453 98,453 70,008 --70,008 28,445 99,645 72,202
FERC 537 -Hydraulic Expenses Total 98,453 98,453 70,008 ::70,008 28,445 99,645 72,202
FERC 538 -Electric Expenses
Electric Expenses
Bradley Lake Operating
Labor &Benefits 232,294 232,294 202,969 ::202,969 29,325 242,940 193,058
Travel 7,000 7,000 6,877 --6,877 123 7,000 8,638
Training 25,000 25,000 231 .:231 24,769 25,000 23,737
Contractual 2,000 2,000 1,400 =:1,400 600 2,000 1,400
Supplies &Materials 9,732 9,732 §,513 --$,513 4,219 8,500 4,672
Bradley Lake Operating Total 276,026 276,026 216,990 ::216,990 59,036 285,440 231,505
FERC 538 -Electric Expenses Total 276,026 276,026 216,990 :.216,990 $9,036 285,440 231,505
FERC 539-Misc.Hydraulic Power ion E.
Misc Hydro Power Exp
Bradley Lake Operating
Labor &Benefits 179,530 179,530 172,689 ::172,689 6,841 178,991 137,740
Training 15,000 15,000 10,363 =°10,363 4,637 15,000 829
Contractual 287,525 287,525 212,841 ::212,841 74,684 297,048 214,899
Supplies &Materials 17,900 17,900 18,271 <°18,271 {371}17,900 19,695
Bradley Lake Operating Total 499,955 499,955 414,164 -:414,164 85,791 508,939 373,163
BRADLEY CIRCUITS/RADIO TO BERNICE LK
Other Costs 35,695 35,695 35,696 ..35,696 (1)35,695 35,696
BRADLEY CIRCUITS/RADIO TO BERNICE LK Total 35,695 35,695 35,696 :-35,696 {1)35,695 35,696
BRADLEY CIRCUITS BERNICE LK TO ANCH
Other Costs 29,773 29,773 2 29,728 -29,728 4s 29,773 29,540
BRADLEY CIRCUITS BERNICE LK TO ANCH Total 29,773 29,773 :29,728 -29,728 45 29,773 29,540
FERC 539 -Misc.Hydrautic Power Generation Expenses Total 565,423 565,423 449,860 29,728 -479,587 85,836 574,407 438,398
FERC $40 -Rents
FERC Land Use Fee
Bradley Lake Operating
Other Costs 318,000 318,000 :.202,079 202,079 115,921 312,176 230,614
Bradley Lake Operating Total 318,000 318,000 ::202,079 202,079 115,921 312,176 230,614
FERC 540 -Rents Total 318,000 318,000 :-202,079 202,079 115,921 312,176 230,614
FERC $41 -Maintenance Supervision &Engineering
Maint Supervision/Eng
Bradley Lake Operating
Labor &Benefits 272,586 272,586 263,101 :-263,101 9,485 224,283 229,602
Bradley Lake Operating Total 272,586 272,586 263,101 °°263,101 9,485 224,283 229,602
FERC 541 -Maintenance Supervision &Engineering Totat 272,586 272,586 263,101 --263,101 9,485 224,283 229,602
4o0f 10
ALASKA ENERGY AUTHORITY
BRADLEY LAKE OPERATIONS &MAINTENANCE
SCHEDULE 8
BUDGET TO ACTUAL EXPENSES
FOR THE PERIOD 07/01/2017 THROUGH 06/30/2018
FY 18 FY 17
BUDGET %
FY18 Approved 07/01/2017 -{Over)Under FY17 Approved
Budget 06/30/2018 HEA Actual CEA Actual AEA Actual Total Actual |Budget to Date Budget FY17 Actual
FERC 542 -Maintenance of Structures
Maintenance of Structures
Bradley Lake Operating
Labor &Benefits 94,453 94,453 70,197 -:70,197 24,256 92,746 65,629
Contractual 10,000 10,000 :::<10,000 10,000 -
Supplies &Materials $3,713 53,713 $7,919 --57,919 {4,206},53,713 42,233
Equipment,Furniture and Machinery 7,000 7,000 8,513 --8,513 {1,513)]11,500 8,318
Maintenance Projects -.2,581 >-2,581 {2,581)]::
Bradley Lake Operating Total 165,166 165,166 139,209 -:139,209 25,957 167,959 116,180
FERC S42 -Maintenance of Structures Total 165,166 165,166 139,209 .-139,209 25,957 167,959 116,180
FERC 543 -Maintenance of Reservoirs,Dams &Waterways
Maint Res,Dams,WWays
Bradley Lake Operating
Labor &Benefits 50,610 50,610 9,314 -:9,314 41,296 $0,409 50,035
Contractual 6,500 6,500 --:-6,500 5,200 63,704
Bradley Lake Operating Total 57,110 $7,110 9,314 ::9,314 47,796 55,609 113,739
BRADLEY NUKA REPAIR
Contractual 15,000 15,000 **-*15,000 15,000 980
BRADLEY NUKA REPAIR Total 15,000 15,000 id --:15,000 15,000 980
BRADLEY POWER TUNNEL MAINT (Oam)
Contractual 15,000 15,000 :---15,000 15,000 9,431
BRADLEY POWER TUNNEL MAINT (Dam)Total 15,000 15,000 .-:15,000 15,000 9,431
FERC 543 -Maintenance of Reservoirs,Dams &Waterways Tot 87,110 87,110 9,314 --9,314 77,796 85,609 124,151
FERC 544 -Maintenance of Electric Plant
Maintenance of Elec Plant
Bradley Lake Operating
Labor &Benefits 379,102 379,102 291,662 -:291,662 87,440 370,983 266,161
Travel 4,500 4,500 >:°:4,500 4,500 740
Contractual 70,000 70,000 59,793 ::59,793 10,207 79,000 36,844
Supplies &Materials 20,000 20,000 12,743 --12,743 7,257 27,248 13,081
Bradley Lake Operating Total 473,602 473,602 364,198 -:364,198 109,404 481,728 316,825
FERC 544 -Maintenance of Electric Plant Totat 473,602 473,602 364,198 .:364,198 109,404 481,728 316,825
FERC 545 -Maintenance of Misc.Hydraulic Plant
Maint of Misc Hydr Plant
Bradley Lake Operating
Labor &Benefits 94,453 94,453 86,833 :-86,833 7,620 92,746 66,129
Contractual 3,900 3,900 2,009 a -2,009 1,891 3,900 §,274
Supplies &Materials 35,000 35,000 49,502 :-49,502 {14,502}43,000 20,631
Bradley Lake Operating Total 133,353 133,353 138,344 -:138,344 (4,991)139,646 92,033
BRADLEY FISH WATER DSGN/MIODLE FORK SHACK IMPR
Contractual -::----20,000 -
Supplies &Materials --1,345 --1,345 (1,345)-:
BRADLEY FISH WATER DSGN/MIDDLE FORK SHACK IMPR Ta :.1,345 :°1,345 (1,345)20,000 :
FERC 545 -e of Misc.Hydraulic Plant Total 133,353 133,353 139,689 °:139,689 (6,336)159,646 92,033
FERC 556 -System Control &Load Dispatching
System Cntl &Load Disp
Bradley Lake Operating
Labor &Benefits 20,618 20,618 34,363 id -34,363 (13,745)49,502 27,294
Contractual 53,000 53,000 35,618 --35,618 17,382 60,500 66,135
Supplies &Materials 6,000 6,000 642 -°642 5,358 6,000 2,229
Equipment,Furniture and Machinery --16,254 --16,254 (16,254)-:
Bradley Lake Operating Total 79,618 79,618 86,878 :-86,878 {7,260)116,002 95,657
Snow Measurement
Bradley Lake Operating
Contractual 10,000 10,000 *-10,000 10,000 .10,000 10,000
Bradley Lake Operating Total 10,000 10,000 -:10,000 10,000 -10,000 10,000
Seismic Service
Bradley Lake Operating
Contractual 62,000 62,000 :-61,285 61,285 715 60,370 61,358
Bradley Lake Operating Total 62,000 62,000 -.61,285 61,285 715 60,370 61,358
Streamguaging Serv
Bradiey Lake Operating
Contractual 213,137 213,137 *:213,137 213,137 :310,000 187,164
Bradley Lake Operating Total 213,137 213,137 °:213,137 213,137 :310,000 157,164
Permits
Bradley Lake Operating
Other Costs 350 350 :-250 250 100 100 450
Bradley Lake Operating Total 350 350 --250 250 100 100 450
FERC 556 -System Control &Load Dispatching Total 365,105 365,105 86,878 .284,672 371,550 (6,445)496,472 324,629
Sof 10
ALASKA ENERGY AUTHORITY
BRADLEY LAKE OPERATIONS &MAINTENANCE
SCHEDULE B
BUDGET TO ACTUAL EXPENSES
FOR THE PERIOD 07/01/2017 THROUGH 06/30/2018
Fy 18 FY 17
BUDGET %
FY18 Approved 07/01/2017 -(Over)Under FY17 Approved
Budget 06/30/2018 HEA Actual CEA Actual AFA Actual Total Actual Budget to Date Budget FY17 Actual
FERC 562 -Station Expenses
Station Expenses
Bradley Lake Operating
Labor &Benefits 123,726 123,726 1,573 121,165 -112,738 10,988 130,414 151,868
Travel 6,000 6,000 .1,701 .1,701 4,299 6,000 .
Contractual 4,000 4,000 7,440 :-7,440 (3,440)4,000 3,447
Supplies &Materials 16,000 16,000 -2,678 -2,678 13,322 16,000 3,848
Other Costs 4,000 4,000 -8,618 >8,618 (4,618)4,000 1,148
Equipment,Furniture and Machinery ::-795 -795 {795):-
Maintenance Projects -::800 -B00 (800)::
Bradley Lake Operating Total 153,726 153,726 9,014 125,756 -134,770 18,956 160,414 160,311
FERC 562 -Station Expenses Total 153,726 153,726 9,014 125,756 bd 134,770 18,956 160,414 160,311
FERC 571 -Maintenance of Overhead Lines
Maint of OH Lines
Bradley Lake Operating
Labor &Benefits 82,402 82,402 2,907 :>2,907 79,495 179,671 7,014
Travel 49,000 49,000 5,265 ::5,265 43,735 95,000 8,179
Contractual 86,000 86,000 56,046 :-56,046 29,954 50,000 :
Supplies &Materials 19,000 19,000 -:-:19,000 50,000 95
Equipment,Furniture and Machinery -:::bd *:-584
Bradley Lake Operating Total 236,402 236,402 64,218 :-64,218 172,184 374,671 15,872
BRADLEY JUNCTION SWITCH REMOVAL
Travel :::.:::5,000 :
Contractual +:-----70,000 73,076
BRADLEY JUNCTION SWITCH REMOVAL Total -:-:--:75,000 73,076
BRADLEY MARKER BALL REPLACEMENT
Labor &Benefits ::-----:6,352
Travel ::--::-$,000 :
Contractual ::83 :>83 (83)200,000 140,526
Equipment,Furniture and Machinery -::--.-.1,235
BRADLEY MARKER BALL REPLACEMENT Total :-83 :-83 (83)205,000 148,113
FERC $71 -Maintenance of Overhead Lines Total 236,402 236,402 64,301 °°64,301 172,102 654,671 237,061
FERC 920 &930 -Administrative Expense
AEA Bradley Fixed Admin Fees
Bradley Lake Operating
Administrative Costs 200,000 200,000 a -200,000 200,000 -200,000 200,600
Bradley Lake Operating Total 200,000 200,000 +:200,000 200,000 :200,000 200,000
Operating Committee Exp-Audit
Bradley Lake Operating
Administrative Costs 16,800 16,800 :2 16,800 16,800 :16,494 16,500
Bradley Lake Operating Total 16,800 16,800 :-16,800 16,800 -16,494 16,500
Operating Committee Exp-Legal
Bradley Lake Operating
Administrative Costs 25,000 25,000 -+115,610 115,610 (90,620)25,000 57,444
Bradley Lake Operating Total 25,000 25,000 :-115,610 115,610 {90,610)25,000 57,444
Operat Committee Exp-Arbitrage
Bradley Lake Operating
Administrative Costs 3,380 3,380 -:2,535 2,535 845 3,630 3,630
Bradley Lake Operating Total 3,380 3,380 -:2,535 2,535 845 3,630 3,630
Trust &Account Fees
Bradley Lake Operating
Administrative Costs 11,918 12,918 ::11,918 11,918 :12,000 11,918
Bradley Lake Operating Total 11,918 11,918 :-11,918 11,918 -12,000 11,918
Misc Admin
Bradley Lake Operating
Administrative Costs 10,000 10,000 ::10,350 10,350 {350}=10,000
Bradley Lake Operating Total 10,000 10,000 .:10,350 10,350 {350).10,000
FERC 920 &930 -Administrative Expense Total 267,098 267,098 :*357,213 357,213 (90,115)!257,124 299,492
FERC 924 &925 -Insurance Premiums
insurance Premiums
Bradley Lake Operating
Administrative Costs $81,000 581,000 43,790 <580,915 624,705 (43,705)564,637 554,670
Bradiey Lake Operating Total 581,000 581,000 43,790 :$80,915 624,705 (43,705)564,637 $54,670
FERC 924 &925 -Insurance Premiums Total 581,000 581,000 43,790 .580,915 624,705 (43,705)|564,637 554,670
6 of 10
ALASKA ENERGY AUTHORITY
BRADLEY LAKE OPERATIONS &MAINTENANCE
SCHEDULE B
BUDGET TO ACTUAL EXPENSES
FOR THE PERIOD 07/01/2017 THROUGH 06/30/2018
FY 18 FY 17
BUDGET %
FY18 Approved 07/01/2017 -(Over)Under FY17 Approved
Budget 06/30/2018 HEA Actual CEA Actual AEA Actual Total Actual |Budget to Date Budget FY17 Actual
FERC 928 -latory C jon
Exp
FERC Admin Fees
Bradley Lake Operating
Administrative Costs 185,000 185,000 -:176,523 176,523 8,477 180,000 122,210
Bradley Lake Operating Total 185,000 185,000 --176,523 176,523 8,477 180,000 122,210
FERC Related Prof Services
BRADLEY FERC PART 12 INSPECTION
Administrative Costs --::-:a 25,000 24,113
BRADLEY FERC PART 12 INSPECTION Total ---::=:25,000 24,113
BRADLEY CONTRACTUAL ENGINEER-FERC LICENSE ISSUES
Administrative Costs 125,000 125,000 .:100,999 100,999 24,001 100,000 144,264
BRADLEY CONTRACTUAL ENGINEER-FERC LICENSE ISSUES T.125,000 125,000 :>100,999 100,999 24,001 100,000 144,264
FERC 928 -R vc E:Total 310,000 310,000 ::277,522 277,522 32,478 305,000 290,586
Total Bradley Lake Budget 4,593,387 4,593,387 2,127,837 155,484 1,702,401 3,985,722 607,665 5,154,110 4,011,783
7 of 10
BRADLEY LAKE
R&C FUND DISBURSEMENTS AND REPAYMENTS
SCHEDULE D
Actual Actual Actual Actual Budget
FY17 TO REPAY @ 6/30/18 TO REPAY FY18
Description Expense 6/30/2017 Expense 6/30/2018
|R&C FUND PROJECTS
Governor 0.00 4,052,070.14 0.00 4,052,070.14 0.00
Replace RFLS 0.00 251,092.69 0.00 251,092.69 0.00
Replace Runners 0.00 1,946,732.79 0.00 1,946,732.79 0.00
Replace cable from dam to power house 0.00 2,321,922.94 0.00 2,321,922.94 0.00
Replace power system stabilizer 0.00 619,205.10 0.00 619,205.10 0.00
Replace two RTUs 0.00 86,905.27 0.00 86,905.27 0.00
Culvert Repairs 0.00 675,966.79 0.00 675,966.79 0.00
Tower Repair for Jack Frost Heaves 0.00 887,596.62 0.00 887,596.62 0.00
Replace Piant and SCADA Controls 0.00 1,344,683.05 0.00 1,344,683.05 0.00
Vibration Monitoring System 0.00 490.00 0.00 490.00 0.00
Fire Alarm System Replacement 0.00 0.00 0.00 0.00 350,000.00
Battle Creek Diversion 25,982.26 1,170,000.00 0.00 1,170,000.00 0.00
Bradley Replace Electro-Mechanical Relays 0.00 1,277,197.06 0.00 1,277,197.06 0.00
Fishwater Screen Debris Removal 0.00 312,236.43 0.00 312,236.43 0.00
Turbine Nozzel Repair 12,203.01 1,428,861.07 0.00 1,428,861.07 0.00
Spillway Raise 0.00 0.00 0.00 0.00 350,000.00
SVC replacement Daves Creek |Soldotna 5.606,007.81 7,176,585.15 1,341,405.96 8,517,991.11 1,360,400.00
5,644,193.08 | 23,551,545.10 1,341,405.96 |_24,892,951.06 2,060,400.00
Current Year R&C Repayment (3,262,788.00)(2,793,306.00)
Adjust to balance to $5million 0.00 0.00
Interest in Fund Applied to Repayment (361,780.54)(226,781.00)
Net Transfer from Revenue Fund (3,624,568.54)(3,020,087.00)
Cumulative Prior Years R&C Repayments (15,409,249.92)(17,886,155.09)
Due Back to Utilities 1,147 663.37 440,986.54
Adjust Due to R&C Actual 0.00 0.00
(14,261,586.55)(17,445,168.55)
[NET DUE TO R&C FUND §.665,390.01 4,427,695.51
|R&C FUND CASH FLOW PROJECTION
Beginning Investment Balance 5,623,509.49 3,219,624.39
Disbursements-current year -Accrual (2,906,842.05)(1,341,405.96)
Disbursements-prior year accrued (2,065,650.48)(2,737,351.03)
Utilities'R&C Repayment (1,055,961.11)(1,147 ,663.37)
Net other cash inflow(outflow)0.00 0.00
Current year interest earnings 361,780.54 226,781.00
Participants Contributions to R&C Fund 3,262,788.00 __2,793,306.00|
Ending Investment Balance 3,219,624.39 1,013,291.03
Accrued Due to Utilities (1,147,663.37)(440,986.54)
Accrued R&C vendor Payable at Year End (2,737.351.03)0.00
PROJECTED NET DUE +ENDING INVESTMENT BALANCE §,000,000.00 5,000,000.00
REPAYMENT AMOUNT
$3,330,802.80 x 25%yr 1 |32%yr 2 |25%yr 3 |18%yr4 2nd yr 1,065,856.90 [3rd yr 832,700.70 832,700.70
$5,644,193.08 x 25%all 4 years ist yr 1,411,048.27 [2nd yr 1,411,048.27 1,445,505.93
$1,341,405.96 x 25%all 4 years sdttt yr 335,351.49 515,100.00
ee 2476905.17 |2,579,100.46 2,793,306.63
8 of 10
ALASKA ENERGY AUTHORITY
BRADLEY LAKE HYDROELECTRIC PROJECT
Battle Creek Capital Purchases
Schedule E
Expenses for the period 07/01/17 through 06/30/18
.FY17 FY18 FY18BattleCreekCapitalPurchasesACTUALS|BUDGET |ACTUALSSEeee
Used 2007 Chevrolet Silverado 8,800 8,800
Used 2006 Chevrolet Silverado 7,700 7,700
Total Revenue Fund Capital Purchases -16,500 16,500
9 of 10
ALASKA ENERGY AUTHORITY
BRADLEY LAKE HYDROELECTRIC PROJECT
Battle Creek Administrative Costs
Schedule F
Expenses for the period 07/01/17 through 06/30/18
FY 18
FY18 BUDGET %
Approved 07/01/2017 -(Over)Under
Budget 6/30/2018 HEA Actual AEA Actual Total Actual |Budget to Date
Summary by expense type
Administrative Costs 43,000 43,800 94,977 42,480 137,456 (93,656)
43,000 43,800 94,977 42,480 137,456 (93,656)
FERC 920 &930 -Administrative Expense
Battle Creek Admin Fees
Administrative Costs 22,000 22,000 3,525 22,000 25,525 (3,525)
Battle Creek Admin Fees Total 22,000 22,000 3,525 22,000 25,525 (3,525)
Operating Committee Exp-Owners Representative
Administrative Costs --89,196 -89,196 (89,196)
Operating Committee Exp-Owners Representative Total --89,196 :89,196 (89,196)
Operating Committee Exp-Legal
Administrative Costs 15,000 15,000 -17,082 17,082 (2,082)
Operating Committee Exp-Legal Total 15,000 15,000 -17,082 17,082 (2,082)
Operat Committee Exp-Arbitrage
Administrative Costs 2,000 2,000 -2,180 2,180 (180)
Operat Committee Exp-Arbitrage Total 2,000 2,000 -2,180 2,180 (180)
Trust &Account Fees
Administrative Costs 4,300 4,300 -1,197 1,197 3,103
Trust &Account Fees Total 4,300 4,300 -1,197 1,197 3,103
Operat Committee Exp-Other
Administrative Costs 500 500 2,255 21 2,276 (1,776)
Operat Committee Exp-Other Total 500 500 2,255 21 2,276 (1,776)
FERC 920 &930 -Administrative Expense Total 43,800 43,800 94,977 42,480 137,456 (93,656)
Total 43,800 43,800 94,977 42,480 137,456 (93,656)
10 of 10
ALASKA ENERGY AUTHORITY
BATTLE CREEK PROJECT
FOR THE PERIOD 10/31/16 THROUGH 06/30/18
REVENUES,EXPENSES &CHANGES IN SURPLUS
REVENUES
UTILITY CONTRIBUTIONS
INTEREST INCOME
EXPENSES
CAPITAL PURCHASES
CURRENT YEAR SURPLUS(DEFICIT)*
COMMITTED CY EXP &DEBT SVC
ENDING SURPLUS (DEFICIT)
BALANCE SHEET
ASSETS
BATTLE CREEK ACCOUNT
RECEIVABLE
LIABILITIES &SURPLUS
CURRENT LIABILITIES
COMMITTED CY EXP &DEBT SVC
PAYABLE TO BATTLE CREEK PARTICIPATING UTILITIES*
TOTAL TOTAL
BUDGET ACTUALS
1,200,000 1,131,372
:2,488
1,200,000 1,133,860
1,200,000 1,133,860
1,200,000 1,133,860
-44,778
23,850
:68,628
-68,628
:68,628
1of2
ALASKA ENERGY AUTHORITY
BATTLE CREEK PROJECT
Schedule A-1
TOTAL TOTALCAPITALPURCHASESBUDGETACTUALS
Battle Creek Diversion 1,200,000 1,133,860
Total Capital Purchases paid for by HEA,CEA,MEA,Seward _1,200,000 1,133,860
2 of 2
Bradley Lake Project Management Committee -Alaska Online Public Notices Page |of 1
STATUS:Active
Bradley Lake Project Management Committee
ALASKA ENERGY AUTHORITY (AEA)
Bradley Lake Project Management Committee
Notice is hereby given that the Bradley Lake Project Management Committee will hold a regular meeting on
Friday,September 21,2018 at 10:00 a.m.For additional information contact Teri Webster at 907-771-3074.
This meeting will be conducted by electronic media pursuant to AS 44.62.310 at the following location:
Alaska Energy Authority Board Conference Room,813 West Northern Lights Boulevard,Anchorage,Alaska;
A teleconference line has been set up for those unable to attend in person.Dial 1-888-585-9008,Enter Code
467-050-126#.
The public is invited to attend.The State of Alaska (AEA)complies with Title Il of the Americans with Disabilities
Act of 1990.Disabled persons requiring special modifications to participate should contact AEA staff at 907-
771-3074 to make arrangements.
Attachments,History,Details
Attachments Details
None
.Commerce,Community andDepartment:Economic Development
Revision History Category:Public Notices
Created 9/14/2018 10:19:33 AM by tawebster Sub-Category:Location(s):Statewide
Project/Regulation #:
Publish Date:9/14/2018
Archive Date:9/22/2018
Events/Deadlines:
https://aws.state.ak.us/OnlinePublicNotices/Notices/View.aspx?id=191409 9/14/2018
FYx11.
12.
BRADLEY LAKE PROJECT MANAGEMENT COMMITTEE (BPMC)
REGULAR MEETING
<aw Friday,Sept 21,2018 10:00 A.M.
Alaska Energy Authority,Board Room
813 W.Northern Lights Boulevard,Anchorage,Alaska
To participate VIA TELECONFERENCE-1-888-585-9008 -Conference room code 467-050-126
AGENDA
CALL TO ORDER
ROLL CALL FOR COMMITTEE MEMBERS
PUBLIC ROLL CALL
PUBLIC COMMENTS
AGENDA APPROVAL
PRIOR MINUTES -August 17,2018
NEW BUSINESS
A.Bradley O&M Agreement K Gibson
B.Battle Creek Update AEA
C.Generator Report HEA
D.Executive Session
e Battle Creek Construction claims
e Federal Land Fees
REPORTS
A.O&D Update P Sarauer
B.Operators Report HEA
C.Budget Subcommittee Report AEA
COMMITTEE ASSIGNMENTS
MEMBERS COMMENTS
NEXT MEETING DATE -Oct.19,2018
ADJOURNMENT
Wot
BRADLEY LAKE PROJECT MANAGEMENT COMMITTEE oo
First Second,First Second First Second First SecondBPMC9/21/18 ROT TT oo I Ge |AT eZ [Apt+-q
Roll Call Agenda Minutes f ¢v
Roll call from top to bottom ending with Chair eQhishieg contract
Yes No Yes No Yes N No Yes No Yes No
ath.
Matanuska Electric Association a yn"uv
Chugach Electric Association a 8 -Vv ”
City of Seward vw \O i uw
v
Golden Valley Electric Association WA 9)-
Municipal Light &Power uv ”
Homer Electric Association Y "1
Alaska Energy Authority ”Mocdaine J
First ,Second First Second First Second First Second First Second
obsRollcallfromtoptobottomendingwithChairap
Yes No Yes No Yes No Yes No Yes No
Matanuska Electric Association
Chugach Electric Association
City of Seward
Golden Valley Electric Association -_
Municipal Light &Power
Homer Electric Association PD Ska
Alaska Energy Authority
Next Meeting:9/21 Dh ey te So ew ad
"ATTENDANCE - BPMC MEETING,Sept.21._COMMITTEE MEMBERS._ALTERNATE_,Cory Borgeson,(Chair _-|GVEA om 'LeoQuiachon-a|hee Thibert |CEA Burke Wick
|Bradamorsenre =HEA |Bob Day -
;
7 AEA "Janet Reiser
-fiTony Izzo,Vice Chair Oo MEA -(Tony Zellers -_:DO
"Mark Johnston MLP -Jefffarner/SaoJohnFoutz SO sew
Public Members COUNSEL oF
CEA Hickey (CEA)oo Kirk Gibson,McDowell Rackner&GibsonPCDoceyNPecet
|:|/Mark Johnson (((CEA)Oo oh -|Stefan Saldanha,Dept of Law
|||Sherri Higher (CEA)a 7:
:_Paul Risse (CEA):AEA Brenda Applegate
|oT Matt Clarkson (CEA)Oe a Katie Conway OO /
Josh Resnick (CEA)_|Amy Adler
HEA :ye Ric Baldwin (!(HEA)--.Y Jocelyn Gardner Oo :
nee pe
ee eee
7 a Alan Owens (HEA)7 WA Brandi White
P\x Emily Hutchinson(HEA)|__|Carmen Noble:
|7|Larry Jorgensen (HEA)_|Teri Webster ;a
Steve Canon (HEA)-'|Tom Erickson
MLP Anna Henderson (MLP)CO David Lockard
;
Moly orion WL)Warn a
:GVEA Ron Woolf (GVEA)|Jessica Houston _
vw Pete Sarauer (GVEA)__-
(MEA |dim Brooks (MEA)Deore &Saf:"Preeuhype|/David Pease (MEA);PeMattReisterer(MEA) Bdvenkins MEA)ce
;Public 4 Bernie Smith |ee
|CrystalEnkvist (APA)|
_|Mel Hutchinson(APA)od ee /
|TW Patch an 7
;
_Eric Myers (American TransmissionCo)_7 --7 7
:w-"Ron Rebenitsch (Energy Engineering)'-
okReeGornez ™M LP |_.
Cory-not egree+>Current-cumtrottisSsue wLee-emduficahan 195ves 46Tegal Ue witerns
'S +2045(oD "cost Sook 1M
Agreceh oy BHCeadperformance.TequirementsCOWrackternASvsSS yrsTollirn,Stoo years
MLB-Supprtte tabk.
Lee -COMMit}by hawrg it Aone CHNFAed-beforethethee nuhorzedebCan}agree +0 GO day s-not high power
x Finance Commitee ASS ignment
Budget Cost Joint mt w|BPHC
Generotoc-]LSH Luks i”°outgoodforoftyc.Provide whin ndct yerFeboutayeSIMSFalkd
IND ZS,se
Committee Ass igh ment
Budget for rend-need b adjust?Loss of refund vs.Add on,
Cory-hor aqyreéc MD Curise +,lea al So ew eeLee-oo EM Ah fica lesues1 beg0%CostsSook 31M
Agreceh wy BHCWeoyperformance.eguirencentsCOnkracktern4.5 vs SS yrsTolling,Seno yearn
MUP -Support to Jable.Lee-coun Py hawrg ct done CetlFAgA-before tat hee ayjhorvedBeboCan}agree t0 40 day s-pot tik power
x Finance Commetoe ASsignment
Budge}cost Jeet ota wl BPHCarea:400d for off yr,Powe lofin next yearFebovtayeSIM.S Falkd
im ZS,IiSo
Comite Ass (Sh Ment
Budget fr felind-need 3 adjust?Loss of refund vs.Add ON,
Bradley Lake Project Management Committee
Friday,Sept.21,2018
**PLEASE WRITE LEGIBLY**
NAME ORGANIZATION
Peter Savauer GVER
HLgery Toaensen HEACon.phen ksck FEL
BERME Sanz Fught &
K\RK Gis MEG
"Solp Ver tes,
David {Ase alanset a Phe dieMAltfervsMoEePpala(opner TEAfoxyLEMexes"EN
NU23.39 4 SHORT el Lo Extn,”(Lhe _ACA-